A detachable auxiliary tool for installing steel tube bundle shear wall

By providing a detachable auxiliary tool for the installation of steel pipe bundle shear walls, the combination of connecting seats and bolts is used to solve the problems of poor connection firmness, lifting safety hazards and welding cutting damage during the installation of steel pipe bundle shear walls, high-quality connection and safe lifting are achieved, and reusable support, reducing costs.

CN222716520UActive Publication Date: 2025-04-04CCCC FOURTH HIGHWAY ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421319681.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-06-11
Publication Date
2025-04-04
Estimated Expiration
2034-06-11

AI Technical Summary

Technical Problem

During the installation process, the steel pipe bundle shear wall has poor connection firmness, lifting safety hazards, misalignment problems and irreversible damage caused by welding and cutting, which affects structural quality and fire safety.

Method used

It provides a detachable auxiliary tool for installing steel pipe bundle shear walls, including connecting seats, fastening bolts and connecting bolts. By setting connecting seats on both sides of the wall of the steel pipe bundle shear walls, and stable lifting and straightening fixing are achieved through tightening bolts and connecting bolts, avoiding fire operations and protecting the wall structure.

Benefits of technology

The connection strength of the steel pipe bundle shear wall is improved, safe lifting and straightening butt, avoid high-temperature operations of welding and gas welding cutting, protect the wall structure, and support the reuse of the connecting structure, reducing costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222716520U_ABST
    Figure CN222716520U_ABST
Patent Text Reader

Abstract

The utility model provides a detachable auxiliary tool for installing a steel tube bundle shear wall. The ear plate of the connecting seat is vertically connected to the outer side of the base plate and one end extends outward. The base plate is provided with a plurality of fastening holes, and each fastening hole is staggered in the horizontal and vertical directions. One end of the ear plate extending outward is provided with a connecting hole, and the other end is provided with a lifting hole. Two connecting seats are oppositely arranged on both sides of the wall of the steel tube bundle shear wall, and the fastening bolts pass through the fastening holes of the wall and the two base plates and are connected with nuts. The ear plates of adjacent steel tube bundle shear walls are arranged tightly and the connecting holes are aligned, and the connecting bolts pass through the connecting holes and are connected with nuts. During the lifting process, the connecting seat is connected to the lifting machinery to realize the stable lifting of the wall. After docking, the connecting seat realizes the straightening and fixing of the two sides of the wall respectively, improves the quality of the wall connection, and only the fastening bolts and the connecting bolts need to be removed, and no hot work is required. The disassembled connecting seat can be reused, which effectively saves costs.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of steel tube bundle shear walls and provides a detachable auxiliary tool for installing a steel tube bundle shear wall. Background Art

[0002] When the steel tube bundle shear wall is manufactured by the processing plant, the welded ear plates are installed on site at the component hoisting position. Since the ear plates are only connected to the wall surface by welding and are not connected to the internal structure of the wall, the ear plate structure connection is poor in firmness, which poses a safety hazard during the hoisting process. In addition, it is difficult to play a role in straightening the wall when the steel tube bundles are connected, and misalignment problems are prone to occur, affecting the quality of the wall connection.

[0003] During the processing and after the installation of the steel tube bundle shear wall, the components need to be welded and cut, which will cause irreversible damage to the steel tube bundle components with a wall thickness of only 4mm, affecting the quality of the structure. After the installation is completed, the ear plate is removed by gas welding and cutting. There are also large sparks when the ear plate is cut. The gap between the fire connection device and the welding surface is large, and the welding sparks cannot be effectively connected, affecting fire safety. Utility Model Content

[0004] Based on this, the utility model provides a detachable auxiliary tool for installing a steel tube bundle shear wall to improve the connection strength with the steel tube bundle shear wall, realize safe lifting and straightening docking, and avoid high-temperature operations such as welding and gas welding cutting during the installation and disassembly of the connection structure, thereby protecting the wall structure and realizing the reuse of the connection structure.

[0005] In order to achieve the above-mentioned purpose, the utility model provides a detachable auxiliary tool for installing a steel tube bundle shear wall, including a connecting seat, a fastening bolt and a connecting bolt. The connecting seat includes a bottom plate and an ear plate, the ear plate is vertically connected to the outside of the bottom plate and one end extends outward, a plurality of fastening holes are arranged on the bottom plate, each of the fastening holes is staggered in the horizontal and longitudinal directions, and a connecting hole is arranged at one end of the ear plate extending outward, and a hoisting hole is arranged at the other end; two connecting seats are oppositely placed on both sides of the wall of the steel tube bundle shear wall, and the fastening bolts pass through the fastening holes of the wall and the two bottom plates and are connected to nuts; the ear plates of adjacent steel tube bundle shear walls are arranged tightly and the connecting holes are aligned, and the connecting bolts pass through the connecting holes and are connected to the nuts.

[0006] Furthermore, it also includes an ejection pad and an ejection bolt. The ejection pad is arranged on the side of the base plate away from the wall and is provided with a through hole consistent with the layout of the fastening holes. The ejection bolt is connected to the threaded hole of the ejection pad and is arranged with its front end facing the base plate.

[0007] Furthermore, the pad is provided with a column structure protruding outward, and a threaded hole adapted to the ejection bolt is provided in the column structure.

[0008] Furthermore, the ejection pad is adapted to the shape of a portion of the bottom plate on one side of the ear plate, the through holes are arranged in the same manner as the fastening holes on one side of the ear plate, and the ejection threaded hole is centrally arranged between adjacent through holes.

[0009] Furthermore, the fastening bolt is a single-head bolt, the ejection pad is arranged on a connecting seat close to one end of the bolt head, and the nut meshing and connected with the single-head bolt is arranged on the connecting seat on the other side.

[0010] Furthermore, the fastening bolts are stud bolts, and the ejection pad is at least arranged on a connecting seat on one side of the wall of the steel tube bundle shear wall.

[0011] Furthermore, the connecting seat is a single-piece casting, or the base plate and the ear plate are connected by welding.

[0012] Furthermore, a plurality of groups of connection seats are arranged at intervals between adjacent steel tube bundle shear walls, and the ear plates of each group of connection seats are fixed by connection bolts respectively.

[0013] Compared with the prior art, the detachable clamping plate tool for installing the steel tube bundle shear wall provided by the utility model has the following technical effects:

[0014] 1. A connection seat with a bottom plate and an ear plate is provided, and the two connection seats are placed opposite to each other on both sides of the wall of the steel tube bundle shear wall and fixedly connected by fastening bolts. The fastening holes are staggered in the horizontal and vertical directions to avoid horizontal and vertical stress concentration and damage to the wall;

[0015] 2. During the lifting process, the connection seat is connected to the lifting machinery to achieve stable lifting of the wall; after the lifting and docking, the connection seats on different sides are tightened by connecting bolts respectively to achieve the straightening and fixing of the wall, ensure the accurate connection of the steel pipe bundle, and improve the quality of the wall connection;

[0016] 3. When disassembling the connection seat, you only need to remove the fastening bolts and connecting bolts, and no hot work is required. This avoids fire hazards caused by large sparks when using gas welding to cut the ear plates, and also avoids the reduction of wall strength due to high temperature caused by hot work. In addition, the disassembled connection seat can be reused, effectively saving costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] The accompanying drawings, which constitute a part of the specification, describe embodiments of the present invention and are used together with the specification to explain the principles of the present invention. With reference to the accompanying drawings, the present invention can be more clearly understood according to the following detailed description, in which:

[0018] Figure 1 This is a three-dimensional structural diagram of the detachable auxiliary tool for installing the steel tube bundle shear wall provided; (after the steel tube bundle shear wall is connected)

[0019] Figure 2 It is a side view of the structural schematic diagram of the provided detachable auxiliary tool for installing the steel tube bundle shear wall; (after the steel tube bundle shear wall is connected)

[0020] Figure 3 This is a front view of the structural schematic diagram of the provided detachable auxiliary tool for installing the steel tube bundle shear wall; (before the steel tube bundle shear wall is connected)

[0021] Figure 4 It is a three-dimensional structural schematic diagram of a pad connection seat of the provided detachable auxiliary tool for installing a steel tube bundle shear wall;

[0022] Figure 5 It is a three-dimensional structural schematic diagram of the structural schematic diagram of the pad of the provided steel tube bundle shear wall installation detachable auxiliary tool;

[0023] Figure 6 It is a schematic diagram of the state in which each fastening bolt of the provided detachable auxiliary tool for installing the steel tube bundle shear wall is pulled out.

[0024] Description of the accompanying drawings:

[0025] 1a, 1b-connecting seat, 11-bottom plate, 12-ear plate, 13-fastening hole, 14-lifting hole, 15-connecting hole;

[0026] 2- Fasten the bolts;

[0027] 3-Connecting bolts;

[0028] 4- pad, 41- through hole, 42- threaded hole;

[0029] 5a, 5b-wall;

[0030] 6-Ejector bolt.

[0031] It should be understood that the size of each part shown in the accompanying drawings is not drawn according to the actual proportional relationship. In addition, the same or similar reference numerals represent the same or similar components. DETAILED DESCRIPTION

[0032] This patent is a utility model developed based on the current construction process requirements. During the processing of the steel tube bundle shear wall and after installation, the components need to be subjected to hot work such as welding and cutting, which will cause irreversible damage to the steel tube bundle components and affect the structural quality.

[0033] Various exemplary embodiments of the present invention will now be described in detail with reference to the accompanying drawings. The description of the exemplary embodiments is merely illustrative and is in no way intended to limit the present invention and its application or use. The present invention can be implemented in many different forms and is not limited to the embodiments herein. In the present invention, when a particular device is described as being between a first device and a second device, there may or may not be an intermediate device between the particular device and the first device or the second device. Example

[0034] like Figures 1 to 6 As shown, a detachable auxiliary tool for installing a steel tube bundle shear wall comprises a connection seat 1a, 1b, a fastening bolt 2 and a connection bolt 3. The connection seat 1a, 1b comprises a bottom plate 11 and an ear plate 12, wherein the ear plate 12 is vertically connected to the outer side of the bottom plate 11 and one end thereof extends outward, and a plurality of fastening holes 13 are arranged on the bottom plate 11, and each of the fastening holes 13 is staggered in the transverse and longitudinal directions, and a connection hole 15 is arranged at one end of the ear plate 12 extending outward, and a hoisting hole 14 is arranged at the other end; the two connection seats 1a, 1b are oppositely disposed on both sides of the wall bodies 5a, 5b of the steel tube bundle shear wall, and the fastening bolt 2 passes through the fastening holes 13 of the wall bodies 5a, 5b and the two bottom plates 11 and is connected to a nut; the ear plates 12 of adjacent steel tube bundle shear walls are arranged closely and the connection holes 15 are aligned, and the connection bolt 3 passes through the connection hole 15 and is connected to the nut.

[0035] The bottom plates of the connecting seats 1a and 1b are placed close to the outer wall of the steel pipe bundle, and the bottom plates are fixed and clamped to the steel pipe bundle shear wall with fastening bolts 2. When lifting, the connecting seats are used for lifting interfaces. When the steel pipe bundle is connected and installed, the connecting seats are fastened with connecting bolts to play a fixing and straightening role, which not only ensures the quality of the components on site but also ensures the connection strength.

[0036] In addition, the bolt connection is changed to eliminate the hot work at the connection site, avoiding fire hazards. At the same time, this tool can be dismantled and reused after the steel pipe bundle is installed, saving costs.

[0037] This tool is connected by welding the installation back plate 1 and the connection plate 3. Before installing the steel pipe bundle, fasten the clamping plate to the upper and lower steel pipe bundle components with through bolts. During installation, the clamping plate can also be used as a lifting lug plate. When the upper and lower steel pipe bundles are butt-jointed, the upper and lower clamping plates are fastened and fixed with bolts. After the upper and lower steel pipe bundles are butt-welded, the installation clamping plate is removed and reused.

[0038] In a specific implementation, the connection bases 1a and 1b are single-piece castings, or the bottom plate 11 is welded to the ear plate 12. In one embodiment, the technical solution adopted is: the bottom plate and the ear plate of the connection base are both 10 mm thick steel plates, which are welded.

[0039] In order to improve the connection strength, a plurality of groups of connection seats 1a, 1b are arranged at intervals between adjacent steel tube bundle shear walls, and the ear plates 12 of each group of connection seats 1a, 1b are fixed by connection bolts 3 respectively. Example

[0040] like Figures 1 to 6 As shown, based on the first embodiment, the structure is optimized: an ejection pad 4 and an ejection bolt 6 are provided, wherein the ejection pad 4 is arranged on the side of the bottom plate 11 away from the walls 5a and 5b and is provided with through holes 41 that are consistent with the layout of the fastening holes 13.

[0041] The ejection bolt 6 is connected to the threaded hole 42 of the ejection pad 4 and arranged with its front end facing the bottom plate 11. Specifically, the pad 4 is provided with a columnar structure protruding outward, and the threaded hole 42 adapted to the ejection bolt 6 is provided in the columnar structure.

[0042] The ejection pad 4 is adapted in shape to a portion of the bottom plate 11 on one side of the ear plate 12 , the through holes 41 are arranged in the same manner as the fastening holes 13 on one side of the ear plate 12 , and the ejection threaded hole 42 is centrally arranged between adjacent through holes 41 .

[0043] Among them, the fastening bolt 2 is a single-head bolt, the ejection pad 4 is arranged on the connecting seat 1a, 1b close to one end of the bolt head, and the nut meshing and connected with the single-head bolt is arranged on the connecting seat 1a, 1b on the other side, which can realize the single-sided removal of multiple single-head bolts.

[0044] Alternatively, the fastening bolts 2 are stud bolts, and the ejection pads 4 are at least arranged on the connecting seats 1a, 1b on one side of the wall bodies 5a, 5b of the steel tube bundle shear wall.

[0045] Based on the above embodiments, a detachable auxiliary tool for installing a steel tube bundle shear wall is provided to improve the connection strength with the steel tube bundle shear wall, realize safe lifting and straightening docking, and avoid high-temperature operations such as welding and gas welding cutting during the installation and disassembly of the connection structure, thereby protecting the wall structure. The tool is reusable and has strong practical value at the construction site.

[0046] So far, various embodiments of the present disclosure have been described in detail. In order to avoid obscuring the concept of the present disclosure, some details known in the art are not described.

[0047] Based on the above description, those skilled in the art can fully understand how to implement the technical solutions disclosed herein. Although some specific embodiments of the utility model have been described in detail by examples, those skilled in the art should understand that the above examples are only for illustration and not for limiting the scope of the utility model. Those skilled in the art should understand that the above embodiments may be modified or some technical features may be replaced by equivalents without departing from the scope and spirit of the utility model. The scope of the utility model is defined by the appended claims.

Claims

1. A detachable auxiliary tool for installing a steel tube bundle shear wall, characterized in that: It comprises a connecting seat (1a, 1b), a fastening bolt (2) and a connecting bolt (3); The connecting seat (1a, 1b) comprises a base plate (11) and an ear plate (12), wherein the ear plate (12) is vertically connected to the outer side of the base plate (11) and one end of the ear plate protrudes outwards, and a plurality of fastening holes (13) are arranged on the base plate (11), and each of the fastening holes (13) is staggered in the transverse and longitudinal directions, and a connection hole (15) is arranged at one end of the ear plate (12) protruding outwards, and a lifting hole (14) is arranged at the other end; The two connection seats (1a, 1b) are oppositely placed on both sides of the wall body (5a, 5b) of the steel tube bundle shear wall, and the fastening bolts (2) pass through the fastening holes (13) of the wall body (5a, 5b) and the two bottom plates (11) and are connected to the nuts; The ear plates (12) of adjacent steel tube bundle shear walls are arranged closely together and the connection holes (15) are aligned, and the connection bolts (3) pass through the connection holes (15) and are connected to the nuts.

2. The detachable auxiliary tool for installing a steel tube bundle shear wall according to claim 1, characterized in that: It also includes an ejection pad (4) and an ejection bolt (6); the ejection pad (4) is arranged on a side of the bottom plate (11) away from the wall (5a, 5b) and is provided with a through hole (41) having a layout consistent with the fastening hole (13); the ejection bolt (6) is connected to a threaded hole (42) of the ejection pad (4) and is arranged with its front end facing the bottom plate (11).

3. The detachable auxiliary tool for installing a steel tube bundle shear wall according to claim 2, characterized in that: The backing plate (4) is provided with a columnar structure protruding outwards, and a threaded hole (42) adapted to the ejection bolt (6) is provided in the columnar structure.

4. The detachable auxiliary tool for installing a steel tube bundle shear wall according to claim 3, characterized in that: The ejection pad (4) is adapted in shape to a portion of the bottom plate (11) on one side of the ear plate (12); the through hole (41) is arranged in the same manner as the fastening hole (13) on one side of the ear plate (12); and the ejection threaded hole (42) is centrally arranged between adjacent through holes (41).

5. The detachable auxiliary tool for installing a steel tube bundle shear wall according to claim 2, 3 or 4, characterized in that: The fastening bolt (2) is a single-head bolt, the ejection pad (4) is arranged on a connection seat (1a, 1b) close to one end of the bolt head, and a nut meshing with the single-head bolt is arranged on the connection seat (1a, 1b) on the other side.

6. The detachable auxiliary tool for installing a steel tube bundle shear wall according to claim 2, 3 or 4, characterized in that: The fastening bolts (2) are stud bolts, and the ejection pads (4) are at least arranged on the connection seats (1a, 1b) on one side of the wall body (5a, 5b) of the steel tube bundle shear wall.

7. The detachable auxiliary tool for installing a steel tube bundle shear wall according to claim 1, characterized in that: The connection seat (1a, 1b) is a single-piece casting, or the bottom plate (11) and the ear plate (12) are connected by welding.

8. The detachable auxiliary tool for installing a steel tube bundle shear wall according to claim 1, characterized in that: A plurality of groups of connection seats (1a, 1b) are arranged at intervals between adjacent steel tube bundle shear walls, and the ear plates (12) of each group of connection seats (1a, 1b) are fixed by connection bolts (3) respectively.