A test fixture for a large deepwater jacket leveler
By designing a test tooling that simulates the pile legs of the catheter, the problem of difficulty in testing reliability of the existing equalizer is solved, effectively testing the equalizer function and ensuring its normal use when the catheter is installed.
Patent Information
- Application Number
- CN202421494772.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-27
- Publication Date
- 2025-04-04
- Estimated Expiration
- 2034-06-27
AI Technical Summary
Existing equalizers are difficult to test their reliability when actually used, resulting in the inability to ensure the normal function of the equalizer when the catheter is installed.
A test tooling for a large deep water conduit frame equalizer is designed, including bottom tooling, variable diameter steel piles and steel piles, which simulate the conduit frame pile legs, clamp and fix it with the leveling ring to test the hydraulic jaw clamping ability, pull-up cylinder capacity and overall strength of the leveling device.
This test tooling can effectively test the functional reliability of the equalizer, ensure that the equalizer can be used normally when the catheter is installed, and is suitable for a variety of working conditions, saving steel.
Smart Images

Figure CN222719158U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of offshore jacket installation, and in particular relates to a testing tool for a large deepwater jacket leveler. Background Art
[0002] At present, as the infrastructure for offshore oil and gas development, the design, construction and installation of offshore platforms are crucial links in offshore oil and gas development. The level of their construction and installation, to a certain extent, marks the level of offshore oil and gas development. In the installation of deepwater jackets, the horizontality is a key installation indicator, and the jacket leveler is the last barrier used to adjust the horizontality when the jacket is seated and the horizontality does not meet the requirements. It is one of the key machines for jacket installation. Due to the large size and high quality of large deepwater jackets, it is difficult to test the reliability of existing levelers in actual use.
[0003] Therefore, it is urgent to design a test fixture for a large deepwater jacket leveler to solve the above-mentioned problem of difficulty in testing the reliability of the leveler function and ensure that the jacket leveler function can be used normally during the jacket installation. Utility Model Content
[0004] In order to solve the technical problem mentioned in the background technology that it is difficult to test the functional reliability of the leveler, a test fixture for a large deepwater jacket leveler is provided to solve the above problem.
[0005] In order to achieve the above-mentioned purpose, the specific technical scheme of the test fixture of the large deepwater jacket leveler of the utility model is as follows:
[0006] A test fixture for a large deepwater jacket leveler comprises a bottom fixture, a leveling ring is fixedly connected to the bottom fixture for the leveler to abut and clamp, a variable diameter steel pile is connected to the bottom fixture, and a steel pile is connected to the variable diameter steel pile, so that the bottom fixture, the variable diameter steel pile and the steel pile together form a simulated jacket leg.
[0007] Furthermore, the bottom tooling includes a bottom plate, to which a vertical cylinder is fixedly connected, the center of the bottom plate and the center of the vertical cylinder are on the same vertical line, and the bottom tooling is connected to the variable diameter steel pile through the vertical cylinder.
[0008] Furthermore, the center of the bottom plate and the center of the leveling ring are on the same vertical line, and the diameter of the leveling ring is larger than the diameter of the vertical cylinder, so that an accommodating space for the leveler is formed between the leveling ring and the vertical cylinder.
[0009] Furthermore, a bottom cylinder is fixedly connected to the bottom plate, the diameter of the bottom cylinder is the same as the diameter of the leveling ring, and one end of the bottom cylinder away from the bottom plate is fixedly connected to the leveling ring, so that the bottom tooling is fixedly connected to the leveling ring.
[0010] Furthermore, an inner rib plate is fixedly connected to the bottom plate, one end of the inner rib plate is fixedly connected to the outer side wall of the vertical tube, one end of the inner rib plate away from the vertical tube is fixedly connected to the inner side wall of the bottom tube, and an outer rib plate is fixedly connected to the bottom plate, one end of the outer rib plate is fixedly connected to the outer side wall of the bottom tube.
[0011] Furthermore, a first ring plate is fixedly connected to one end of the inner rib plate away from the bottom plate to support the leveler, an inner wall of the first ring plate is fixedly connected to the vertical tube, a gap is provided between the outer wall of the first ring plate and the inner wall of the bottom tube, and a drainage hole is provided in the circular bottom area where the bottom plate and the bottom tube are fixedly connected.
[0012] Furthermore, the variable diameter steel pile includes a first cylinder and a second cylinder, the center of the first cylinder and the center of the second cylinder are on the same vertical line, the first cylinder and the second cylinder are fixedly connected by a second ring plate, and the variable diameter steel pile is detachably connected to the vertical cylinder through the first cylinder.
[0013] Furthermore, a first guide rib is fixedly connected to the inner side wall of the first cylinder of the variable diameter steel pile, and the first guide rib is circumferentially arranged along the inner side wall of the first cylinder. A plurality of first guide ribs form a vertical cylinder accommodating cavity matching the vertical cylinder, so that the variable diameter steel pile can be detachably connected to the bottom tooling.
[0014] Furthermore, a second guide rib is fixedly connected to the inner wall of the steel pile, and the second guide rib is circumferentially arranged along the inner wall of the steel pile. A plurality of second guide ribs form a second cylinder accommodating cavity matching the second cylinder, so that the steel pile and the variable diameter steel pile can be detachably connected.
[0015] Furthermore, the vertical tube, the variable diameter steel piles and the inner side walls of the steel piles are fixedly connected with lifting ears for hooking.
[0016] The test fixture of the large deepwater jacket leveler of the utility model has the following advantages:
[0017] 1. The utility model can simulate the pile legs of the conductor frame, effectively test the clamping capacity of the hydraulic claws of the upper and lower circles of the leveler, the lifting cylinder capacity and the overall strength, and check whether the leveling equipment as a whole can withstand the load required by the equipment.
[0018] 2. The utility model adopts a split design, which is convenient for land and sea transportation; when encountering different working conditions, steel piles of different sizes can be replaced and reused multiple times, which is suitable for a variety of working conditions and saves steel.
[0019] 3. The utility model can simulate the eccentric working condition of steel piles. After disassembly, it can be stored horizontally for a long time to avoid the risk of tipping over in windy weather. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 This is a schematic diagram of the test fixture structure of the large deepwater jacket leveler of the utility model;
[0021] Figure 2 This is a schematic diagram of the bottom tooling structure of the utility model;
[0022] Figure 3 This is a cross-sectional view of the bottom tooling structure of the utility model;
[0023] Figure 4 This is a schematic diagram of the variable diameter steel pile structure of the utility model;
[0024] Figure 5 This is a cross-sectional view of the variable diameter steel pile structure of the utility model;
[0025] Figure 6 This is a schematic diagram of the steel pile structure of the utility model;
[0026] Figure 7 This is a cross-sectional view of the steel pile structure of the utility model;
[0027] Figure 8 This is a schematic diagram of the installation of the leveler of the utility model under the functional test condition;
[0028] Fig. 9 It is a test schematic diagram of the leveler of the utility model under the functional test condition;
[0029] Fig.10 This is a schematic diagram of the installation of the leveler of the utility model under emergency test conditions;
[0030] Fig.11 It is a test schematic diagram of the leveler of the utility model under emergency test conditions;
[0031] Fig.12 This is a schematic diagram of the installation of the leveler of the utility model under load test conditions;
[0032] Fig.13 It is a test schematic diagram of the leveler of the utility model under load test conditions.
[0033] Explanation of marks in the figure: 1. Bottom tooling; 101. Bottom plate; 102. Vertical cylinder; 103. Bottom cylinder; 104. Inner rib plate; 105. Outer rib plate; 106. First ring plate; 2. Variable diameter steel pile; 201. First cylinder; 202. Second cylinder; 203. Second ring plate; 204. First guide rib plate; 205. Reinforcement rib plate; 3. Steel pile; 301. Second guide rib plate; 4. Leveling ring; 41. Bell mouth; 5. Lifting ear; 6. Leveler. DETAILED DESCRIPTION
[0034] In order to make the purpose, technical solution and advantages of the embodiment of the utility model clearer, the technical solution in the embodiment of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiment of the utility model. Obviously, the described embodiment is a part of the embodiment of the utility model, not all the embodiments. Based on the embodiment of the utility model, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the utility model.
[0035] Those skilled in the art will appreciate that, although some embodiments herein include certain features included in other embodiments but not other features, the combination of features of different embodiments is meant to be within the scope of the present invention and form different embodiments. For example, in the claims, any one of the claimed embodiments may be used in any combination.
[0036] Please refer to the attached Figure 1 To Attachment Fig.13 The test fixture of the large deepwater jacket leveler 6 of the utility model is described.
[0037] Due to the large size and high mass of a large deepwater jacket, it is difficult to test the reliability of the existing leveler 6 in actual use.
[0038] Therefore, the utility model provides a test tool for a large deepwater jacket leveler 6, such as Figure 1 As shown, it includes a bottom tooling 1, to which a leveling ring 4 is fixedly connected, so that a leveler 6 can be abutted and clamped, a variable-diameter steel pile 2 is connected to the bottom tooling 1, and a steel pile 3 is connected to the variable-diameter steel pile 2, so that the bottom tooling 1, the variable-diameter steel pile 2 and the steel pile 3 together form a simulated conductor frame pile leg, and the leveler 6 is abutted and clamped against the leveling ring 4, so as to test the reliability of the leveler 6 under different working conditions.
[0039] like Figure 2 and Figure 3 As shown, the bottom tooling 1 includes a bottom plate 101, to which a vertical cylinder 102 is fixedly connected. The center of the bottom plate 101 and the center of the vertical cylinder 102 are on the same vertical line to ensure uniform force on the bottom tooling 1. The bottom tooling 1 is connected to the variable diameter steel pile 2 through the vertical cylinder 102.
[0040] The center of the bottom plate 101 and the center of the leveling ring 4 are on the same vertical line to ensure uniform force on the bottom tooling 1. The diameter of the leveling ring 4 is larger than the diameter of the vertical cylinder 102 so that an accommodating space for the leveler 6 is formed between the leveling ring 4 and the vertical cylinder 102.
[0041] A bottom cylinder 103 is fixedly connected to the bottom plate 101, and the diameter of the bottom cylinder 103 is the same as the diameter of the leveling ring 4. The end of the bottom cylinder 103 away from the bottom plate 101 is fixedly connected to the leveling ring 4, so that the bottom tooling 1 is fixedly connected to the leveling ring 4. Specifically, the bottom tooling 1 is fixedly connected to the leveling ring 4 through the bottom cylinder 103 to prevent water from accumulating at the bottom of the bottom tooling 1 and corroding the leveling ring 4.
[0042] Preferably, in order to improve the structural strength of the bottom tooling 1, an inner rib plate 104 is fixedly connected to the bottom plate 101, one end of the inner rib plate 104 is fixedly connected to the outer wall of the vertical tube 102, one end of the inner rib plate 104 away from the vertical tube 102 is fixedly connected to the inner wall of the bottom tube 103, and an outer rib plate 105 is fixedly connected to the bottom plate 101, one end of the outer rib plate 105 is fixedly connected to the outer wall of the bottom tube 103.
[0043] Preferably, the end of the inner rib plate 104 away from the bottom plate 101 is fixedly connected with a first ring plate 106 to support the leveler 6. Specifically, the first ring plate 106, the vertical cylinder 102 and the leveling ring 4 together form a space with a top opening for placing the leveler 6, and the first ring plate 106 supports the leveler 6 and assists the lower ring body clamp of the leveler 6 in leveling;
[0044] In order to facilitate drainage of the bottom tooling 1, the inner wall of the first ring plate 106 is fixedly connected to the vertical tube 102, a gap is arranged between the outer wall of the first ring plate 106 and the inner wall of the bottom tube 103, and a drainage hole is opened in the circular bottom area where the bottom plate 101 and the bottom tube 103 are fixedly connected. Specifically, the accumulated water enters from the top of the bottom tooling 1, a part of the accumulated water entering the vertical tube 102 flows out through the drainage hole inside the vertical tube 102, and a part of the accumulated water entering between the vertical tube 102 and the leveling ring 4 flows out from the drainage hole between the vertical tube 102 and the bottom tube 103 through the gap, thereby achieving the effect of drainage.
[0045] Preferably, the drainage holes between the vertical tube 102 and the bottom tube 103 are staggered with the inner rib plate 104 to avoid the drainage holes and the inner rib plate 104 overlapping and thus affecting the drainage effect and structural strength of the bottom tooling 1.
[0046] Preferably, a bell mouth 41 is fixedly connected to the leveling ring 4 to facilitate the installation of the leveler 6 and to guide the installation of the leveler 6 .
[0047] like Figure 4 and Figure 5As shown, the variable diameter steel pile 2 includes a first cylinder 201 and a second cylinder 202. The center of the first cylinder 201 and the center of the second cylinder 202 are on the same vertical line to ensure uniform force on the variable diameter steel pile 2. The first cylinder 201 and the second cylinder 202 are fixedly connected by a second ring plate 203. The variable diameter steel pile 2 is detachably connected to the vertical cylinder 102 through the first cylinder 201, so that the variable diameter steel pile 2 is detachably connected to the bottom tooling 1, which is convenient for installation and disassembly of the device.
[0048] The inner wall of the first cylinder 201 of the variable diameter steel pile 2 is fixedly connected with a first guide rib 204, and the first guide rib 204 is arranged circumferentially along the inner wall of the first cylinder 201. A plurality of first guide ribs 204 surround a vertical cylinder 102 accommodating cavity that matches the vertical cylinder 102, so that the variable diameter steel pile 2 is detachably connected to the bottom tooling 1.
[0049] Preferably, the first guide rib 204 is provided with a chamfer to compensate for the tolerance between the first guide rib 204 and the vertical cylinder 102 , so as to facilitate the first cylinder 201 to be detachably sleeved on the vertical cylinder 102 .
[0050] Preferably, a reinforcing rib plate 205 is circumferentially fixedly connected to the connection between the first cylinder 201 and the second ring plate 203 to improve the structural strength of the connection, thereby ensuring the overall structural rigidity of the variable diameter steel pile 2.
[0051] like Figure 6 and Figure 7 As shown, the inner wall of the steel pile 3 is fixedly connected with a second guide rib 301, and the second guide rib 301 is circumferentially arranged along the inner wall of the steel pile 3. A plurality of second guide ribs 301 surround a second cylinder 202 accommodating cavity that matches the second cylinder 202, so that the steel pile 3 and the variable diameter steel pile 2 can be detachably connected, which is convenient for installation and disassembly of the device.
[0052] Preferably, the second guide rib 301 is provided with a chamfer to compensate for the tolerance between the second guide rib 301 and the second cylinder 202 , so as to facilitate the detachable sleeve connection of the steel pile 3 on the second cylinder 202 .
[0053] It should be noted that the width of the second guide rib 301 of steel piles 3 of different sizes can be determined according to the inner diameter of the steel pile 3 and the outer diameter of the second cylinder 202 of the variable-diameter steel pile 2, to ensure that it plays a positioning role during the installation process and can also meet the requirement of no bumps.
[0054] The inner walls of the vertical tube 102, the variable diameter steel piles 2 and the steel piles 3 are fixedly connected with lifting ears 5 for hooking, so as to facilitate the assembly and disassembly of the device.
[0055] Optionally, the lifting lug 5 of the vertical cylinder 102 is set near the upper edge of the vertical cylinder 102, the lifting lug 5 of the variable diameter steel pile 2 is set near the upper edge of the second cylinder 202, and the lifting lug 5 of the steel pile 3 is set near the upper edge of the steel pile 3, so that the bottom tooling 1 can achieve the bottom tooling 1 lifting condition, the variable diameter steel pile 2 can achieve the variable diameter steel pile 2 lifting condition, and the steel pile 3 can achieve the steel pile 3 lifting condition, so that the device can meet the requirements of simulating various skirt working conditions.
[0056] Preferably, the lifting lugs 5 of the vertical tube 102, the lifting lugs 5 of the variable-diameter steel piles 2, and the lifting lugs 5 of the steel piles 3 are all provided with four in the circumference to facilitate smooth lifting by the crane.
[0057] like Figure 8 and Fig. 9 As shown, under the functional test condition of the leveler 6, the bottom tooling 1 is placed on the ground, the claws of the lower ring body of the leveler 6 abut against and clamp the leveling ring 4, and the function of the hydraulic press and electronic control system of the leveler 6 is tested, specifically whether the clamping devices of the upper and lower ring bodies can work normally and whether the oil cylinder of the leveler 6 can move normally.
[0058] like Fig.10 and Fig.11 As shown, under the emergency test condition of the leveler 6, the bottom tooling 1 is placed on the ground, the variable diameter steel pile 2 is placed on the upper part of the bottom tooling 1, and the steel pile 3 is placed on the upper part of the variable diameter steel pile 2. The leveler 6 is inserted into the device, and the emergency unlocking system of the leveler 6 is started to simulate the situation where the hydraulic system of the upper and lower ring body claws of the leveler 6 is damaged, and whether the leveler 6 can be removed from the leveling ring 4 and the steel pile 3.
[0059] like Fig.12 and Fig.13 As shown, under the load test condition of the leveler 6, the bottom tooling 1 is placed on the ground, the variable diameter steel pile 2 is placed on the upper part of the bottom tooling 1, and the steel pile 3 is placed on the upper part of the variable diameter steel pile 2, which can simulate the working positions of the steel pile 3, the skirt pile conductor frame, and the leveler 6. The leveler 6 is inserted into the test tooling, the lower ring body claws of the leveler 6 abut against and clamp the leveling ring 4, and the upper ring body claws of the leveler 6 clamp the steel pile 3. The tension is provided by the leveling cylinder of the leveler 6 to test whether the main structure of the leveler 6 can withstand the load required by the working condition and whether the leveling cylinder of the leveler 6 can provide the load required by the working condition.
[0060] The utility model can simulate the pipe frame pile leg, effectively test the clamping capacity of the hydraulic claws of the upper and lower circles of the leveler 6, the lifting cylinder capacity and the overall strength, and check whether the leveling device as a whole can bear the load required by the device.
[0061] The utility model adopts a split design, which is convenient for land and sea transportation; when encountering different working conditions, steel piles of different sizes can be replaced 3. It can be used multiple times and is suitable for various working conditions, saving steel.
[0062] The utility model can simulate the eccentric working condition of the steel pile, and after being disassembled, it can be stored horizontally for a long time to avoid the risk of tipping over in windy weather.
[0063] Obviously, the above embodiments of the present invention are merely examples for clearly illustrating the present invention, and are not intended to limit the implementation methods of the present invention. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all implementation methods here. Any modifications, equivalent substitutions, and improvements made within the spirit and principles of the present invention shall be included in the protection scope of the claims of the present invention.
Claims
1. A test fixture for a large deepwater jacket leveler, characterized in that: It includes a bottom tooling, a leveling ring is fixedly connected to the bottom tooling for the leveler to abut and clamp, a variable diameter steel pile is connected to the bottom tooling, and a steel pile is connected to the variable diameter steel pile, so that the bottom tooling, the variable diameter steel pile and the steel pile together form a simulated pipe frame pile leg.
2. The test fixture for the large deepwater jacket leveler according to claim 1, characterized in that: The bottom tooling comprises a bottom plate, on which a vertical tube is fixedly connected, the center of the bottom plate and the center of the vertical tube are on the same vertical line, and the bottom tooling is connected to the variable diameter steel pile through the vertical tube.
3. The test fixture for the large deepwater jacket leveler according to claim 2, characterized in that: The center of the bottom plate and the center of the leveling ring are on the same vertical line, and the diameter of the leveling ring is larger than the diameter of the vertical cylinder, so that an accommodating space for the leveler is formed between the leveling ring and the vertical cylinder.
4. The test fixture for the large deepwater jacket leveler according to claim 3, characterized in that: A bottom cylinder is fixedly connected to the bottom plate, the diameter of the bottom cylinder is the same as the diameter of the leveling ring, and one end of the bottom cylinder away from the bottom plate is fixedly connected to the leveling ring, so that the bottom tooling is fixedly connected to the leveling ring.
5. The test fixture for the large deepwater jacket leveler according to claim 4, characterized in that: An inner rib plate is fixedly connected to the bottom plate, one end of the inner rib plate is fixedly connected to the outer side wall of the vertical tube, and one end of the inner rib plate away from the vertical tube is fixedly connected to the inner side wall of the bottom tube. An outer rib plate is fixedly connected to the bottom plate, one end of the outer rib plate is fixedly connected to the outer side wall of the bottom tube.
6. The test fixture for the large deepwater jacket leveler according to claim 5, characterized in that: A first ring plate is fixedly connected to one end of the inner rib plate away from the bottom plate to support the leveler. The inner wall of the first ring plate is fixedly connected to the vertical tube. A gap is provided between the outer wall of the first ring plate and the inner wall of the bottom tube. A drainage hole is provided in the circular bottom area where the bottom plate and the bottom tube are fixedly connected.
7. The test fixture for the large deepwater jacket leveler according to claim 2, characterized in that: The variable diameter steel pile comprises a first cylinder and a second cylinder, the center of the first cylinder and the center of the second cylinder are on the same vertical line, the first cylinder and the second cylinder are fixedly connected by a second ring plate, and the variable diameter steel pile is detachably connected to the vertical cylinder through the first cylinder.
8. The test fixture for the large deepwater jacket leveler according to claim 7, characterized in that: The first guide ribs are fixedly connected to the inner side wall of the first cylinder of the variable diameter steel pile. The first guide ribs are circumferentially arranged along the inner side wall of the first cylinder. A plurality of first guide ribs form a vertical cylinder accommodating cavity matching the vertical cylinder, so that the variable diameter steel pile can be detachably connected to the bottom tooling.
9. The test fixture for the large deepwater jacket leveler according to claim 7, characterized in that: The inner wall of the steel pile is fixedly connected with a second guide rib plate, which is arranged circumferentially along the inner wall of the steel pile. A plurality of second guide rib plates form a second cylinder accommodating cavity matching the second cylinder, so that the steel pile and the variable diameter steel pile can be detachably connected.
10. The test fixture for the large deepwater jacket leveler according to claim 2, characterized in that: The vertical tube, the variable diameter steel pile and the inner wall of the steel pile are fixedly connected with lifting ears for the hook to hang.