A pump room side wall chamfer construction template

By designing a side wall chamfer construction formwork for the pump room including side wall body and chamfer plate, the problems of inefficiency and poor adaptability of traditional chamfer construction methods are solved, and rapid adjustment of chamfer specifications and stability of concrete forming are achieved.

CN222731075UActive Publication Date: 2025-04-08CHINESE PEOPLES ARMED POLICE FORCE JIANGXI HYDRO POWER NO 2 GENERAL GRP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421516399.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-06-29
Publication Date
2025-04-08
Estimated Expiration
2034-06-29

AI Technical Summary

Technical Problem

The traditional chamfer construction method is inefficient and difficult to guarantee quality. The existing formwork design is complex, inconvenient to operate, and poor adaptability, so it cannot be adjusted to chamfer requirements of different specifications and angles in time.

Method used

A chamfer construction formwork for side walls of the pump room is designed, including side wall body and chamfer plate. The rounded corner plate is fixedly equipped with positioning blocks and sliders on one side away from the side wall body. The support plate and studs are used in conjunction with each other. The square grooves and protective covers are adjusted through springs and steel balls. The slots and plug plates are connected by bolts. The card blocks and steel balls are used for positioning. The sliders and convex grooves are quickly separated from the formwork.

Benefits of technology

This formwork can quickly adjust the specifications of chamfers, improve adaptability, ensure the integrity of concrete molding after chamfer construction, reduce space occupation, and facilitate handling.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222731075U_ABST
    Figure CN222731075U_ABST
Patent Text Reader

Abstract

The present application discloses a pump room side wall chamfer construction template, which belongs to the field of building construction. It comprises a side wall body and a chamfer plate, wherein the side wall of the side wall body is provided with a chamfer plate, and the chamfer plate is fixedly equipped with two positioning blocks on a side away from the side wall body, and the inner walls of the two positioning blocks are slidably connected with sliders, and the outer sides of the two sliders are fixedly connected with the two ends of the support plate; the chamfer can be formed by pouring concrete into the inner side of the chamfer plate, and the bolts are removed, and then the plug-in plate is removed from the inner wall of the slot, and then the tension ball can be pulled to drive the steel ball to move out of the inner wall position of the square groove through the pull rod, and then the chamfer plate can be taken out from the inner side of the chamfer plate, and then concrete can be poured into the middle position of the side wall body and the chamfer plate to form a chamfer, and then the specifications of the chamfer can be adjusted at will by setting the chamfer plate and the chamfer plate, thereby improving the adaptability.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of building construction, and in particular to a pump room side wall chamfer construction template. Background Art

[0002] In building construction, in order to improve the aesthetics and structural stability of the building, it is often necessary to chamfer the edges of the wall.

[0003] Traditional chamfering construction methods often rely on manual operations, which are inefficient and difficult to ensure quality. There are some templates specifically used for chamfering construction on the market, but most of them are complex in design, inconvenient to operate, and have poor adaptability to chamfering requirements of different specifications and angles, and cannot be adjusted in time for construction. For this reason, this application proposes a pump room side wall chamfering construction template to solve the above problems. Utility Model Content

[0004] In view of the deficiencies in the prior art, the utility model provides a pump room side wall chamfer construction template, which overcomes the deficiencies in the prior art and aims to solve the problems in the background technology.

[0005] In order to achieve the above-mentioned objectives, the present application adopts the following technical scheme: a pump room side wall chamfer construction template, comprising a side wall body and a chamfer plate, the side wall of the side wall body is provided with a chamfer plate, the chamfer plate is fixedly equipped with two positioning blocks on the side away from the side wall body, and the inner walls of the two positioning blocks are slidably connected with sliders, the outer sides of the two sliders are fixedly connected with two ends of the support plate, the inner wall of the support plate is threaded with studs, the outer side of the chamfer plate is provided with a square groove, the side of the chamfer plate close to the stud is fixedly equipped with a protective cover, the inner wall of the protective cover is fixedly connected with one end of a spring, the other end of the spring is fixedly connected with a steel ball, the outer edge of the steel ball is fixedly connected with a pull rod, the outer side of the chamfer plate is fixedly connected with a positioning plate, the side of the positioning plate close to the chamfer plate is fixedly equipped with a clamping block, the inner wall of the chamfer plate is provided with a slot, and the inner wall of the chamfer plate is plugged with a plug-in plate.

[0006] As a preferred embodiment, one end of the stud close to the rounded plate abuts against the outer side of the rounded plate, and one end of the stud away from the rounded plate is fixedly equipped with a handle, and a circular hole is formed on the inner wall of the handle.

[0007] By adopting the above technical solution, the rounded corner plate can be supported and positioned to ensure that the rounded corner plate will not shake easily when subjected to concrete tension, thereby ensuring the integrity of the concrete molding after the chamfering construction.

[0008] As a preferred embodiment, one end of the pull rod away from the steel ball is fixedly connected to a tension ball, the pull rod is inserted through the middle position of the spring, and the pull rod is slidably connected to the inner wall position of the protective cover.

[0009] By adopting the above technical solution, pulling the tension ball can drive the steel ball to move through the pull rod to achieve position adjustment, and after the user's hand releases the tension ball, the steel ball can be reset to the initial position with the help of the spring force.

[0010] As a preferred embodiment, the side of the plug-in plate close to the chamfered plate is plugged into the inner wall of the slot, the outer side of the chamfered plate is fixedly equipped with a connecting plate, and the inner wall of the connecting plate and the plug-in plate away from the slot is threadedly connected with bolts, and both sides of the chamfered plate are in contact with both sides of the side wall body.

[0011] By adopting the above technical solution, the connecting plate and the plug-in plate can be firmly connected by bolts, and the plug-in plate can be stably positioned on the inner wall of the slot, thereby ensuring the stability of the chamfered plate and ensuring that the chamfered plate will not shake easily when squeezed by concrete.

[0012] As a preferred implementation, the clamping block is inserted into the inner wall of the square groove, a clamping hole is provided on the inner wall of the clamping block, and the semicircle of the steel ball is arranged on the inner wall of the clamping hole.

[0013] By adopting the above technical solution, when the card block is inserted into the inner wall of the square groove, the steel ball can be used to position the card block, thereby ensuring that the card block will not easily fall off the inner wall of the square groove.

[0014] As a preferred embodiment, the inner walls of the two positioning blocks are provided with convex grooves adapted to the shape of the slider, and the two positioning blocks are arranged in the middle of the rounded plate.

[0015] By adopting the above technical solution, the slider can be quickly clamped to the inner wall of the convex groove, and the rounded corner plate can be supported by the studs to ensure the stability of the rounded corner plate. After the construction is completed, it can be quickly separated to reduce space occupancy and facilitate transportation.

[0016] Beneficial effects of this application:

[0017] 1. A pump room side wall chamfer construction template can form a chamfer by pouring concrete into the inner side of the chamfer plate, and then remove the bolts and then remove the plug-in plate from the inner wall of the slot, and then pull the tension ball to drive the steel ball to move out of the inner wall position of the square groove through the pull rod, and then the chamfer plate can be taken out from the inner side of the chamfer plate, and then concrete can be poured into the middle position of the side wall body and the chamfer plate to form a chamfer, and then the chamfer specifications can be adjusted at will by setting the chamfer plate and the chamfer plate, thereby improving adaptability.

[0018] 2. This pump room side wall chamfer construction template is designed to clamp the slider to the inner wall of the convex groove, cooperate with the studs to form a support for the chamfered plate, and then insert the support component into the circular hole on the inner wall of the handle, with the other end supported by the ground to ensure stability. After the construction is completed, the handle can be turned to quickly separate it, reducing space occupancy and facilitating transportation. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 This is a schematic diagram of the overall structure of this application;

[0020] Figure 2 This is a schematic diagram of the expanded structure of this application;

[0021] Figure 3 It is a schematic diagram of the cross-sectional structure of this application;

[0022] Figure 4 For this application Figure 3 Enlarged structural diagram at A in the middle.

[0023] Numbers in the figure: 1. Side wall body; 2. Chamfered plate; 3. Positioning block; 4. Slider; 5. Support plate; 6. Stud; 7. Handle; 8. Square groove; 9. Protective cover; 10. Spring; 11. Steel ball; 12. Pull rod; 13. Tension ball; 14. Chamfered plate; 15. Positioning plate; 16. Block; 17. Slot; 18. Plug-in plate; 19. Bolt. DETAILED DESCRIPTION

[0024] The technical solutions in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, rather than all of the embodiments.

[0025] Reference Figure 1-4A pump room side wall chamfer construction template comprises a side wall body 1 and a chamfer plate 14. The side wall of the side wall body 1 is provided with a chamfer plate 2. The chamfer plate 2 is fixedly equipped with two positioning blocks 3 on the side away from the side wall body 1, and the inner walls of the two positioning blocks 3 are slidably connected with sliders 4. The outer sides of the two sliders 4 are fixedly connected with two ends of a support plate 5. The inner wall of the support plate 5 is threadedly connected with a stud 6. A square groove 8 is provided on the outer side of the chamfer plate 2. A protective cover 9 is fixedly equipped on the side of the chamfer plate 2 close to the stud 6. One end of a spring 10 is fixedly connected to the inner wall of the protective cover 9. A steel ball 11 is fixedly connected to the other end of the spring 10. A pull rod 12 is fixedly connected to the outer edge of the steel ball 11. A positioning plate 15 is fixedly connected to the outer side of the chamfer plate 14. A block 16 is fixedly equipped on the side of the positioning plate 15 close to the chamfer plate 14. A slot 17 is provided on the inner wall of the chamfer plate 14. A plug-in plate 18 is plugged into the inner wall of the chamfer plate 2.

[0026] See also Figure 1 and Figure 2 One end of the stud 6 close to the chamfered plate 2 is in contact with the outer side of the chamfered plate 2, and the end of the stud 6 away from the chamfered plate 2 is fixedly equipped with a handle 7. A circular hole is provided on the inner wall of the handle 7, so that the chamfered plate 2 can be supported and positioned to ensure that the chamfered plate 2 will not shake easily when subjected to concrete tension, thereby ensuring the integrity of the concrete molding after the chamfering construction.

[0027] See also Figure 4 A tension ball 13 is fixedly connected to one end of the pull rod 12 away from the steel ball 11. The pull rod 12 is inserted into the middle position of the spring 10. The pull rod 12 is slidably connected to the inner wall position of the protective cover 9, so that the steel ball 11 can be moved by pulling the tension ball 13 through the pull rod 12 to achieve position adjustment. After the user's hand releases the tension ball 13, the steel ball 11 can be reset to the initial position with the help of the force of the spring 10.

[0028] See also Figure 1 and Figure 3 The side of the plug-in plate 18 close to the chamfered plate 14 is plugged into the inner wall position of the slot 17, and a connecting plate is fixedly assembled on the outer side of the chamfered plate 2, and the inner wall of the connecting plate and the plug-in plate 18 away from the slot 17 is threadedly connected with bolts 19. Both sides of the chamfered plate 14 are in contact with the two sides of the side wall body 1, so that the connecting plate and the plug-in plate 18 can be firmly connected through the bolts 19, and then the plug-in plate 18 can be stably positioned at the inner wall position of the slot 17, thereby ensuring the stability of the chamfered plate 14 and ensuring that the chamfered plate 14 will not shake easily when squeezed by concrete.

[0029] See also Figure 3 and Figure 4The card block 16 is inserted into the inner wall of the square groove 8, and a card hole is opened on the inner wall of the card block 16. The semicircle of the steel ball 11 is set at the inner wall of the card hole, so that when the card block 16 is inserted into the inner wall of the square groove 8, the steel ball 11 can be used to position the card block 16, ensuring that the card block 16 will not easily leave the inner wall of the square groove 8.

[0030] See also Figure 1 - Figure 3 The inner walls of the two positioning blocks 3 are provided with convex grooves that match the shape of the slider 4, and the two positioning blocks 3 are arranged in the middle position of the chamfered plate 2, so that the slider 4 can be quickly connected to the inner wall position of the convex groove, and the chamfered plate 2 is supported by the studs 6 to ensure the stability of the chamfered plate 2. After the construction is completed, it can be quickly separated to reduce space occupancy and facilitate transportation.

[0031] Working principle: When using the device, first install the chamfered plate 2 and the chamfered plate 14 to the outer side of the side wall body 1 until the outer sides of the chamfered plate 2 and the outer sides of the chamfered plate 14 fit with the two sides of the side wall body 1, then tighten the stud 6 to the inner wall of the support plate 5 until one end of the stud 6 close to the chamfered plate 2 abuts against the chamfered plate 2, then insert the support assembly into the circular hole on the inner wall of the handle 7, and the other end is supported on the ground to ensure stability. When the chamfer needs to be formed during construction, directly put the concrete The soil can be poured to the inner side of the chamfered plate 14. When a chamfer needs to be formed, the bolt 19 can be removed first, and then the plug-in plate 18 can be removed from the inner wall of the slot 17. Then, the tension ball 13 can be pulled to drive the steel ball 11 to move away from the inner wall position of the square groove 8 through the pull rod 12 to achieve position adjustment. Then, the chamfered plate 14 can be taken out from the inner side of the chamfered plate 2, and at the same time, concrete can be poured into the middle position between the side wall body 1 and the chamfered plate 2 to form a chamfer, thereby improving the convenience of construction.

[0032] The above is only a preferred specific implementation manner of the present application, but the protection scope of the present application is not limited thereto. Any technician familiar with the technical field can make equivalent substitutions or changes within the technical scope disclosed in the present application according to the technical solution and utility model concept of the present application, which should be covered by the protection scope of the present application.

Claims

1. A pump room side wall chamfering construction template, comprising a side wall body (1) and a chamfering plate (14), characterized in that: The side wall of the side wall body (1) is provided with a chamfered plate (2), and two positioning blocks (3) are fixedly mounted on the side of the chamfered plate (2) away from the side wall body (1), and the inner walls of the two positioning blocks (3) are slidably connected to sliders (4), and the outer sides of the two sliders (4) are fixedly connected to the two ends of a support plate (5), and the inner wall of the support plate (5) is threadedly connected to a stud (6), and the outer side of the chamfered plate (2) is provided with a square groove (8), and the side of the chamfered plate (2) close to the stud (6) is fixedly mounted with a protective cover (9), one end of a spring (10) is fixedly connected to the inner wall of the protective cover (9), the other end of the spring (10) is fixedly connected to a steel ball (11), the outer edge of the steel ball (11) is fixedly connected to a pull rod (12), the outer side of the chamfered plate (14) is fixedly connected to a positioning plate (15), a clamping block (16) is fixedly assembled on the side of the positioning plate (15) close to the chamfered plate (14), a slot (17) is provided on the inner wall of the chamfered plate (14), and a plug-in plate (18) is plugged into the inner wall of the chamfered plate (2).

2. A pump room side wall chamfering construction template according to claim 1, characterized in that: One end of the stud (6) close to the chamfered plate (2) abuts against the outer side of the chamfered plate (2), and one end of the stud (6) away from the chamfered plate (2) is fixedly mounted with a handle (7), and a circular hole is provided on the inner wall of the handle (7).

3. A pump room side wall chamfering construction template according to claim 1, characterized in that: One end of the pull rod (12) away from the steel ball (11) is fixedly connected to a tension ball (13), the pull rod (12) is inserted through the middle of the spring (10), and the pull rod (12) is slidably connected to the inner wall of the protective cover (9).

4. A pump room side wall chamfering construction template according to claim 1, characterized in that: The plug-in plate (18) is plugged into the inner wall of the slot (17) on one side close to the chamfered plate (14); a connecting plate is fixedly mounted on the outer side of the chamfered plate (2); and bolts (19) are threadedly connected to the inner wall of the connecting plate and the plug-in plate (18) on the side away from the slot (17); and both sides of the chamfered plate (14) are in contact with both sides of the side wall body (1).

5. A pump room side wall chamfering construction template according to claim 1, characterized in that: The clamping block (16) is inserted into the inner wall of the square groove (8), a clamping hole is provided on the inner wall of the clamping block (16), and the semicircle of the steel ball (11) is arranged on the inner wall of the clamping hole.

6. A pump room side wall chamfering construction template according to claim 1, characterized in that: The inner walls of the two positioning blocks (3) are each provided with a convex groove that matches the shape of the slider (4), and the two positioning blocks (3) are arranged at the middle position of the rounded corner plate (2).