Assembled energy dissipation facilities for hydraulic model tests
By designing a prefabricated energy dissipation facility with a multi-module combination, the problem of inconvenient adjustment of the energy dissipation facility in hydraulic model tests is solved, and the size adjustment is convenient and fast, reducing operational difficulty and improving test efficiency.
Patent Information
- Application Number
- CN202421439136.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-21
- Publication Date
- 2025-04-11
- Estimated Expiration
- 2034-06-21
AI Technical Summary
In hydraulic model test, the size adjustment of energy consumption facilities is inconvenient, resulting in high operational difficulty and low test efficiency.
Design a prefabricated energy dissipation facility to realize the size adjustment of the energy dissipation facility through a combination of multiple modules (such as slope top module, transition module, bottom plate tail module, etc.) and connecting components (such as the first connection module, the second connection module, the tenon head, the truncated groove, etc.).
Without overall disassembly, the size adjustment of the energy dissipation facility can be achieved by adjusting the number of connection modules, reducing operational difficulty and improving test efficiency.
Smart Images

Figure CN222744908U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of hydraulic engineering tests, in particular to an assembled energy dissipation facility used for hydraulic engineering model tests. Background Art
[0002] In water conservancy projects, energy dissipation facilities can quickly turn the downstream rapids into slow flows, shorten the length of the apron, eliminate the excess energy of the water flow, reduce downstream river scouring, and protect the riverbed and bank slopes. The design and construction of energy dissipation facilities are crucial to the safety and efficiency of water conservancy projects, especially in water conservancy facilities such as hydropower stations and reservoirs. Therefore, it is necessary to study and optimize the energy dissipation facilities downstream of hydraulic structures through hydraulic model tests, so as to determine the optimal size of the energy dissipation facilities.
[0003] During the hydraulic model test, the size of the energy dissipation facility needs to be adjusted multiple times to compare and determine the optimal size of the energy dissipation facility. Currently, the adjustment of the size of the energy dissipation facility requires replacing the entire section of the energy dissipation facility, but the energy dissipation facility is fixedly connected to the adjacent model structure, and the entire section of the energy dissipation facility is inconvenient to load and unload, resulting in inconvenience in adjusting the size of the energy dissipation facility. Utility Model Content
[0004] 1. Technical issues to be resolved
[0005] In view of the deficiencies of the prior art, the utility model provides an assembled energy dissipation facility for hydraulic model tests, which solves the problem of inconvenient size adjustment of the energy dissipation facility in hydraulic model tests.
[0006] (II) Technical solution
[0007] In order to achieve the above objectives, the present invention is implemented through the following technical solutions:
[0008] An assembled energy dissipation facility for hydraulic model test, the assembled energy dissipation facility comprising: a slope top module, a transition module, a bottom plate tail module, a top connection module, a stilling pool head module, a stilling pool tail module, a tail sill top module, a plurality of first connection modules and a second connection module;
[0009] The end of the slope top module is tilted downward; the head end of the transition module is tilted upward, and the end extends horizontally; the head end of the bottom plate tail module extends horizontally, and the end extends upward; the head end of the energy dissipation pool head module extends upward, and the end extends horizontally; the head end of the energy dissipation pool tail module extends horizontally, and the end extends upward;
[0010] The head end of the slope top module is fixedly connected to the upstream model, and the end is connected to the head end of the transition module through a plurality of first connection modules;
[0011] The end of the transition module is connected to the head end of the base plate tail module through a plurality of first connection modules;
[0012] The end of the bottom plate tail module is connected to the head end of the top connection module through a plurality of second connection modules;
[0013] The end of the top connection module is connected to the head end of the head module of the stilling basin through a plurality of second connection modules;
[0014] The end of the head module of the stilling pool is connected to the head end of the tail module of the stilling pool through a plurality of first connection modules;
[0015] The end of the stilling basin tail module is connected to the tail sill top module through a plurality of second connection modules.
[0016] Preferably, adjacent modules are connected to each other via a first connection component and a second connection component;
[0017] The first connection assembly includes: a tenon;
[0018] The side wall of the tenon is provided with a first insertion hole;
[0019] The second connection assembly includes: a mortise and tenon;
[0020] The mortise groove is provided with a second plug hole corresponding to the first plug hole;
[0021] When the adjacent modules are in a connected state, the tenon is in mortise and tenon connection with the mortise and tenon groove, and the plug is inserted into the first plug hole and the second plug hole.
[0022] Preferably, adjacent modules are sealed at the joints between the modules by means of a first sealing assembly and a second sealing assembly;
[0023] The first sealing assembly includes: a connecting groove;
[0024] The groove wall of the connecting groove is provided with a limit groove, the groove bottom is provided with a sealing groove, and a sealing strip is provided in the sealing groove;
[0025] The second sealing assembly includes: a connecting block;
[0026] The connecting block corresponds to the connecting groove, and the connecting block is provided with a limiting block corresponding to the limiting groove;
[0027] When adjacent modules are connected, the connection blocks are spliced with the connection grooves to squeeze the sealing strips;
[0028] The limiting block is accommodated in the limiting groove.
[0029] Preferably, the assembled energy dissipation facility further comprises: a bottom filler;
[0030] The bottom filler is filled under the module to provide support for the module;
[0031] Preferably, the bottom filler comprises: a plurality of supporting foam boards and a cushioning foam board;
[0032] The supporting foam plate corresponds to each module one by one, and the top shape of the supporting foam plate matches the bottom shape of the corresponding module;
[0033] The raised foam board is placed under the supporting foam board.
[0034] Preferably, the slope top module, transition module, bottom plate tail module, top connection module, energy dissipation pool head module, energy dissipation pool tail module, tail sill top module, first connection module and second connection module are all made of plexiglass.
[0035] (III) Beneficial effects
[0036] The utility model provides an assembled energy dissipation facility for hydraulic model tests. Compared with the prior art, it has the following beneficial effects:
[0037] In the utility model, the assembled energy dissipation facility is constructed by connecting a plurality of modules, including a slope top module, a transition module, a bottom plate tail module, a top connection module, an energy dissipation pool head module, an energy dissipation pool tail module, a tail sill top module, a first connection module and a second connection module. When the size of the assembled energy dissipation facility needs to be adjusted, there is no need to disassemble the entire facility from the upstream model. The size of the assembled energy dissipation facility can be adjusted by adjusting the number of the first connection modules and the second connection modules at various locations, so that the size adjustment of the assembled energy dissipation facility is convenient and quick, which reduces the operational difficulty of the hydraulic model test and improves the test efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0038] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0039] Figure 1 It is an assembly front view of each module of the assembled energy dissipation facility in the embodiment of the utility model;
[0040] Figure 2 It is an axonometric diagram of the assembled energy dissipation facility in the embodiment of the utility model;
[0041] Figure 3 An exploded view of the assembled energy dissipation facility in the embodiment of the utility model;
[0042] Figure 4 It is an exploded view of another angle of the assembled energy dissipation facility in the embodiment of the utility model;
[0043] Figure 5 for Figure 3 The enlarged view of point A in the middle;
[0044] Figure 6 This is a top axonometric view of the first connection module in the embodiment of the utility model;
[0045] Figure 7 This is a bottom-up axonometric view of the first connection module in the embodiment of the utility model;
[0046] The reference numerals in the figure are set as: slope top module 1, transition module 2, bottom plate tail module 3, top connection module 4, energy dissipation pool head module 5, energy dissipation pool tail module 6, tail sill top module 7, first connection module 8, second connection module 9, first connection component 10, tenon 11, first socket 12, second connection component 20, mortise 21, second socket 22, plug 30, first sealing component 40, connecting groove 41, limiting groove 42, sealing groove 43, sealing strip 44, second sealing component 50, connecting block 51, limiting block 52, supporting foam board 60, and raising foam board 61. DETAILED DESCRIPTION
[0047] In order to make the purpose, technical solution and advantages of the embodiments of the utility model clearer, the technical solution in the embodiments of the utility model is described clearly and completely. Obviously, the described embodiments are part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0048] The embodiment of the present application solves the problem of inconvenient size adjustment of energy dissipation facilities in hydraulic model tests by providing an assembled energy dissipation facility for hydraulic model tests.
[0049] The technical solution in the embodiment of the present application is to solve the above technical problems, and the overall idea is as follows:
[0050] In the embodiment of the utility model, the prefabricated energy dissipation facility is constructed by connecting a plurality of modules, including a slope top module, a transition module, a bottom plate tail module, a top connection module, an energy dissipation pool head module, an energy dissipation pool tail module, a tail sill top module, a first connection module, and a second connection module. When the size of the prefabricated energy dissipation facility needs to be adjusted, there is no need to disassemble it as a whole from the upstream model. The size of the prefabricated energy dissipation facility can be adjusted by adjusting the number of the first connection modules and the second connection modules at various locations, so that the size adjustment of the prefabricated energy dissipation facility is convenient and quick, which reduces the operational difficulty of the hydraulic model test and improves the test efficiency.
[0051] In order to better understand the above technical solution, the above technical solution will be described in detail below in conjunction with the accompanying drawings and specific implementation methods.
[0052] Example:
[0053] like Figure 1 to Figure 7 As shown, the utility model provides an assembled energy dissipation facility for hydraulic model test, the assembled energy dissipation facility comprises: a slope top module 1, a transition module 2, a bottom plate tail module 3, a top connection module 4, a stilling pool head module 5, a stilling pool tail module 6, a tail sill top module 7, a plurality of first connection modules 8 and a second connection module 9;
[0054] The end of the slope top module 1 is tilted downward; the head end of the transition module 2 is tilted upward, and the end extends horizontally; the head end of the bottom plate tail module 3 extends horizontally, and the end extends upward; the head end of the stilling pool head module 5 extends upward, and the end extends horizontally; the head end of the stilling pool tail module 6 extends horizontally, and the end extends upward;
[0055] The head end of the slope top module 1 is fixedly connected to the upstream model, and the end is connected to the head end of the transition module 2 through a plurality of first connection modules 8;
[0056] The end of the transition module 2 is connected to the head end of the bottom plate tail module 3 through a plurality of first connection modules 8;
[0057] The end of the bottom plate tail module 3 is connected to the head end of the top connection module 4 through a plurality of second connection modules 9;
[0058] The end of the top connection module 4 is connected to the head end of the energy dissipation pool head module 5 through a plurality of second connection modules 9;
[0059] The end of the stilling pool head module 5 is connected to the head end of the stilling pool tail module 6 through a plurality of first connection modules 8;
[0060] The end of the stilling basin tail module 6 is connected to the tail sill top module 7 through a plurality of second connection modules 9 .
[0061] When the size of the assembled energy dissipation facility needs to be adjusted, it is not necessary to disassemble it as a whole from the upstream model. The effect of adjusting the size of the assembled energy dissipation facility can be achieved by adjusting the number of the first connection modules 8 and the second connection modules 9 at various locations.
[0062] like Figure 3 to Figure 7 As shown, adjacent modules are connected to each other via a first connection component 10 and a second connection component 20;
[0063] The first connecting assembly 10 includes: a tenon 11;
[0064] The side wall of the tenon 11 is provided with a first insertion hole 12;
[0065] The second connecting assembly 20 includes: a mortise and tenon 21;
[0066] The mortise groove 21 is provided with a second insertion hole 22 corresponding to the first insertion hole 12;
[0067] When the adjacent modules are in the connected state, the tenon 11 is in mortise and tenon connection with the mortise groove 21 , and the plug 30 is inserted into the first plug hole 12 and the second plug hole 22 .
[0068] The connection method of the first connection component 10 and the second connection component 20 makes the assembly and disassembly of each module convenient and the connection is stable and reliable.
[0069] like Figure 5 to Figure 7 As shown, the adjacent modules are sealed by the first sealing assembly 40 and the second sealing assembly 50 to prevent water seepage in the assembled energy dissipation facility;
[0070] The first sealing assembly 40 includes: a connecting groove 41;
[0071] The groove wall of the connecting groove 41 is provided with a limit groove 42, the groove bottom is provided with a sealing groove 43, and a sealing strip 44 is provided in the sealing groove 43;
[0072] The second sealing assembly 50 includes: a connecting block 51;
[0073] The connecting block 51 corresponds to the connecting groove 41 , and the connecting block 51 is provided with a limiting block 52 corresponding to the limiting groove 42 ;
[0074] When adjacent modules are connected, the connection block 51 is spliced with the connection groove 41 to squeeze the sealing strip 44 to achieve sealing of the splicing seam of adjacent modules;
[0075] The limiting block 52 is accommodated in the limiting groove 42 to limit the relative position of the connecting block 51 and the connecting groove 41 , thereby preventing the connecting block 51 from being lifted up by the sealing strip 44 .
[0076] like Figures 1 to 7 As shown, the first connecting assembly 10, the second connecting assembly 20, the first sealing assembly 40 and the second sealing assembly 50 are all arranged at corresponding positions of each module.
[0077] like Figure 2 As shown, the assembled energy dissipation facility further includes: bottom filler;
[0078] The bottom filler is filled under the module to provide support for the module;
[0079] The bottom filler includes: a plurality of supporting foam plates 60 and a cushioning foam plate 61;
[0080] The supporting foam plate 60 corresponds to each module one by one, and the top shape of the supporting foam plate 60 matches the bottom shape of the corresponding module;
[0081] The raised foam plate 61 is placed under the supporting foam plate 60;
[0082] When the size of the assembled energy dissipation facility is adjusted, the raised foam boards 61 of different specifications and sizes are correspondingly increased, decreased or replaced to achieve stable support for the module.
[0083] The slope top module 1, transition module 2, bottom plate tail module 3, top connection module 4, energy dissipation pool head module 5, energy dissipation pool tail module 6, tail sill top module 7, first connection module 8 and second connection module 9 are all made of organic glass with a roughness meeting the resistance similarity requirements.
[0084] In summary, compared with the prior art, the present invention has the following beneficial effects:
[0085] In the embodiment of the utility model, the prefabricated energy dissipation facility is constructed by connecting a plurality of modules, including a slope top module, a transition module, a bottom plate tail module, a top connection module, an energy dissipation pool head module, an energy dissipation pool tail module, a tail sill top module, a first connection module, and a second connection module. When the size of the prefabricated energy dissipation facility needs to be adjusted, there is no need to disassemble it as a whole from the upstream model. The size of the prefabricated energy dissipation facility can be adjusted by adjusting the number of the first connection modules and the second connection modules at various locations, so that the size adjustment of the prefabricated energy dissipation facility is convenient and quick, which reduces the operational difficulty of the hydraulic model test and improves the test efficiency.
[0086] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.
[0087] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. An assembled energy dissipation facility for hydraulic model testing, characterized in that: The assembled energy dissipation facility comprises: a slope top module (1), a transition module (2), a bottom plate tail module (3), a top connection module (4), a stilling pool head module (5), a stilling pool tail module (6), a tail sill top module (7), a plurality of first connection modules (8) and a second connection module (9); The end of the slope top module (1) is tilted downward; the head end of the transition module (2) is tilted upward, and the end extends horizontally; the head end of the bottom plate tail module (3) extends horizontally, and the end extends upward; the head end of the stilling pool head module (5) extends upward, and the end extends horizontally; the head end of the stilling pool tail module (6) extends horizontally, and the end extends upward; The head end of the slope top module (1) is fixedly connected to the upstream model, and the tail end is connected to the head end of the transition module (2) through a plurality of first connection modules (8); The end of the transition module (2) is connected to the head end of the base plate tail module (3) via a plurality of first connection modules (8); The end of the bottom plate tail module (3) is connected to the head end of the top connection module (4) via a plurality of second connection modules (9); The end of the top connection module (4) is connected to the head end of the energy dissipation basin head module (5) via a plurality of second connection modules (9); The end of the stilling pool head module (5) is connected to the head end of the stilling pool tail module (6) via a plurality of first connection modules (8); The end of the stilling basin tail module (6) is connected to the tail sill top module (7) via a plurality of second connection modules (9).
2. The assembled energy dissipation facility for hydraulic model test according to claim 1, characterized in that: Adjacent modules are connected to each other via a first connection component (10) and a second connection component (20); The first connecting component (10) comprises: a tenon (11); A first insertion hole (12) is formed on the side wall of the tenon (11); The second connection assembly (20) comprises: a mortise and tenon (21); The mortise groove (21) is provided with a second insertion hole (22) corresponding to the first insertion hole (12); When the adjacent modules are in a connected state, the tenon (11) and the mortise (21) are mortise-and-tenon connected, and the plug (30) is inserted into the first insertion hole (12) and the second insertion hole (22).
3. The assembled energy dissipation facility for hydraulic model test according to claim 1, characterized in that: Adjacent modules are sealed at the joints between the modules by using a first sealing assembly (40) and a second sealing assembly (50); The first sealing assembly (40) comprises: a connecting groove (41); A limiting groove (42) is provided on the groove wall of the connecting groove (41), a sealing groove (43) is provided on the groove bottom, and a sealing strip (44) is provided in the sealing groove (43); The second sealing assembly (50) comprises: a connecting block (51); The connecting block (51) corresponds to the connecting groove (41), and the connecting block (51) is provided with a limiting block (52) corresponding to the limiting groove (42); When adjacent modules are connected, the connection block (51) is spliced with the connection groove (41) to squeeze the sealing strip (44); The limiting block (52) is accommodated in the limiting groove (42).
4. The assembled energy dissipation facility for hydraulic model test according to claim 1, characterized in that: The assembled energy dissipation facility further includes: a bottom filler; The bottom filler is filled under the module to provide support for the module.
5. The assembled energy dissipation facility for hydraulic model test according to claim 4, characterized in that: The bottom filler comprises: a plurality of supporting foam plates (60) and a cushioning foam plate (61); The supporting foam plate (60) corresponds to each module one by one, and the top shape of the supporting foam plate (60) matches the bottom shape of the corresponding module; The raised foam plate (61) is cushioned below the supporting foam plate (60).
6. The assembled energy dissipation facility for hydraulic model test according to any one of claims 1 to 5, characterized in that: The slope top module (1), transition module (2), bottom plate tail module (3), top connection module (4), energy dissipation pool head module (5), energy dissipation pool tail module (6), tail sill top module (7), first connection module (8) and second connection module (9) are all made of organic glass.