A PEC beam-column post-cast node construction tool
By adopting adjustable formwork components and fixed components in the PEC beam and column node construction tooling, combined with the design of prefabricated laminated plates and casting ports, the adaptability and low casting efficiency of beam and column casting are solved, and efficient and cost-saving casting effect is achieved.
Patent Information
- Application Number
- CN202421461820.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-25
- Publication Date
- 2025-04-11
- Estimated Expiration
- 2034-06-25
AI Technical Summary
The prior art is difficult to adapt to beams and columns of different sizes when pouring PEC beams and columns, and the casting efficiency is low.
The casting tooling with adjustable size, including formwork components and fixing components, is adopted to achieve the fixing and adjustment of the formwork components through the combination of screws and clamps, and combines the design of prefabricated laminated plates and casting ports to improve casting efficiency.
Available for beam and column casting of different sizes, improve pouring efficiency and save costs through removable fixed components.
Smart Images

Figure CN222745294U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building construction, in particular to a PEC beam-column post-casting node construction tool. Background Art
[0002] PEC beams and columns, that is, steel-concrete composite columns and steel-concrete composite beams in the partially encapsulated steel-concrete composite structure system, are a new type of building structure system that combines the advantages of steel structure and concrete structure. Prefabricated buildings are mostly implemented in a design-production-construction manner. As an important part of the field of prefabricated buildings, construction puts forward new requirements for it. How to ensure the quality, safety, progress, environmental protection and other goals of the construction method, which puts forward high requirements on the design of the installation tooling for construction. There are two types of traditional PEC post-cast nodes. One is to open grouting holes on the PEC beams and grout the PEC beam-column post-cast nodes through the holes. The second is to manually apply mortar. Both methods will weaken the strength of the beams. Secondly, it is difficult to ensure the construction quality by manual application.
[0003] To solve the above problems, a Chinese patent with application number 202120756441.X discloses an assembled PEC beam-column node structure and tooling. The above-disclosed beam-column node structure and tooling include a column structure, a beam structure and a beam-column connecting structure for connecting the column structure and the beam structure, the beam-column connecting structure including a plug-in accommodating unit fixedly connected to the side of the column structure and a plug-in unit fixedly connected to the beam structure; the plug-in accommodating unit includes a first support plate fixedly arranged on the column structure and a surrounding plate fixedly arranged on the upper end of the first support plate, the first support plate, the surrounding plate and the side of the column structure form a plug-in accommodating groove with an upper end opening for accommodating the plug-in unit; the plug-in unit includes a plug-in plate, a plug-in plate connecting plate and a second support plate arranged at the upper ends of the plug-in plate and the plug-in plate connecting plate, wherein the outer contour of the plug-in plate is adapted to the plug-in accommodating groove. A Chinese patent with application number 202211525617.6 discloses a PEC beam-column node casting device. The above-mentioned point casting device comprises two symmetrical casting mold monomers, wherein the casting mold monomer comprises a rectangular side panel and a rectangular bottom panel, one side of the rectangular side panel is vertically connected to the lower side of the rectangular side panel, the rectangular side panel is provided with an opening, and the opening is connected to a polygonal tube arranged in a vertical direction, and a movable part is provided in the polygonal tube, and the movable part is transitionally connected to the inner wall of the polygonal tube, and a driving part is connected to the lower part of the movable part, and the driving part is used to drive the movable part to move in the vertical direction in the polygonal tube. When in use, the sides of the rectangular bottom panels of the two casting mold monomers facing away from the rectangular side panels fit together, so that a rectangular space open at the front, back and top is formed between the two casting mold monomers.
[0004] In the above-mentioned prior art disclosed, when casting the PEC beam-column node, two symmetrical casting mold monomers are arranged on the beam and column, a casting space is enclosed between the two casting mold monomers, an opening is arranged on the casting mold monomer, and concrete is poured into the casting space through the opening. In the above-mentioned scheme, the size of the casting mold monomer is fixed and only beams of the same size can be cast. For beams of different sizes, corresponding casting molds need to be remade. In addition, during casting, due to the small opening on the casting mold monomer, the casting efficiency is low. Utility Model Content
[0005] The utility model aims to overcome the defects in the above-mentioned prior art and provides a PEC beam-column post-casting node construction tooling which can adjust the size, is suitable for casting beam-column nodes of different sizes and has high casting efficiency.
[0006] In order to achieve the above-mentioned purpose of the utility model, the utility model adopts the following technical scheme: a PEC beam-column post-cast node construction tool, including a column and a structural beam arranged on the column, concrete is poured on the structural beam, a prefabricated composite plate is arranged on the concrete, a casting tool for facilitating casting is provided at the junction of the structural beam and the column, the composite plate is erected on the casting tool to form an integral structure, the casting tool includes a formwork assembly arranged on the structural beam in a covering manner and a detachable fixing assembly for fastening the formwork assembly; the fixing assembly includes a clamping member for clamping the formwork assembly and a screw for adjusting the clamping width of the clamping member and tightening the clamping member; a casting port which is relatively arranged and used for casting is formed on the formwork assembly, and a precast hole corresponding to the casting port is provided on the composite plate.
[0007] As a preferred solution of the utility model, the template assembly includes two plates that are arranged opposite to each other. The two plates are located on opposite sides of the structural beam, and the two plates are abutted against the structural beam. The two plates and the structural beam form a casting space.
[0008] As a preferred solution of the utility model, the two pouring ports are formed on the top of the corresponding plate, and the pouring ports are located at the side ends of the plate.
[0009] As a preferred solution of the utility model, the pouring port is inclined toward the outside of the structural beam.
[0010] As a preferred solution of the utility model, the bottom end of the pouring port is flush with the inner side of the plate, and the size of the pouring port gradually increases from bottom to top.
[0011] As a preferred solution of the utility model, a support plate for supporting the pouring port is provided on the side wall of the pouring port, and a fixing block for fixing the support plate is provided on the plate.
[0012] As a preferred solution of the utility model, the clamping member is a U-shaped structure, and the clamping member is clamped on the structural beam to fasten the plate.
[0013] As a preferred solution of the utility model, the clamping member is located on the outside of the two plates, and the clamping member abuts against the plates.
[0014] As a preferred solution of the utility model, a connecting hole is formed on the clamping member, and the screw rod passes through the connecting hole to be connected to the clamping member.
[0015] As a preferred solution of the utility model, nuts for tightening the clamping piece are provided at both ends of the screw rod, and the nuts are located outside the clamping piece.
[0016] Compared with the prior art, the beneficial effects of the utility model are:
[0017] 1. A casting tool is installed at the junction of the structural beam and the column. The casting tool includes a template component and a fixing component. The template component is covered on the template component of the structural beam, and the template component is clamped by the clamping member of the fixing component. The clamping member is tightened under the action of the screw, thereby fixing the template component. At the same time, the clamping width of the clamping member can be adjusted under the action of the screw, ensuring that the template component can be applied to beams and columns of different sizes, thereby improving the practicality of the casting tool. In addition, the prefabricated composite plate and the casting tool form an integral structure, and precast holes corresponding to the casting ports are preset on the composite plate. Concrete is poured through the precast holes and the casting ports, thereby improving the pouring efficiency;
[0018] 2. Furthermore, the screw rod is connected to the clamping member through the connecting hole, and nuts are connected to both ends of the screw rod. The clamping width of the clamping member can be adjusted by adjusting the nuts, and the clamping member and the formwork assembly can be tightly fixed by the nuts. In addition, the fixing assembly is a detachable structure. After the concrete is poured and solidified, the fixing assembly can be disassembled and reused. At the same time, the formwork assembly can also be reused, saving construction costs;
[0019] 3. Furthermore, the pouring port is an open structure inclined toward the outside of the structural beam, and the size of the pouring port gradually increases from bottom to top. During pouring, the pouring speed can be increased, thereby improving the pouring efficiency. At the same time, after maintenance, the tooling is removed and excess concrete at the pouring port is chiseled out. Compared with traditional chiseling, the amount of concrete chiseled out is smaller, thereby improving the convenience of construction. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 It is a schematic diagram of the structure of the present invention;
[0021] Figure 2 is a side view of the present invention;
[0022] Figure 3 is a top view of the present invention;
[0023] Figure 4 It is a structural schematic diagram of the pouring tooling of the present invention;
[0024] Figure 5 It is a side view of the pouring tooling;
[0025] Figure 6 It is an exploded view of the template component;
[0026] Figure 7 This is an exploded view of a fixed component.
[0027] Figure numerals: column 1, structural beam 2, concrete 201, composite plate 202, precast hole 2021, formwork assembly 3, plate 301, pouring port 3011, support plate 302, fixing block 303, fixing assembly 4, clamp 401, connecting hole 4011, screw 402, gasket 4021, nut 4022. DETAILED DESCRIPTION
[0028] The embodiments of the utility model are described in detail below with reference to the accompanying drawings.
[0029] like Figure 1-Figure 6 As shown, a PEC beam-column post-cast node construction tool comprises a column body 1 and a structural beam 2 arranged on the column body 1, concrete 201 is cast on the structural beam 2, a prefabricated composite plate 202 is arranged on the concrete 201, a casting tool for easy casting is arranged at the junction of the structural beam 2 and the column body 1, the composite plate 202 is erected on the casting tool to form an integral structure, the casting tool comprises a formwork assembly 3 which is wrapped around the structural beam 2 and a detachable fixing assembly 4 for fastening the formwork assembly 3; the fixing assembly 4 comprises a clamping member 401 for clamping the formwork assembly 3 and a screw 402 for adjusting the clamping width of the clamping member 401 and tightening the clamping member 401; a casting port 3011 which is relatively arranged and used for casting is formed on the formwork assembly 3, and a precast hole 2021 corresponding to the casting port 3011 is provided on the composite plate 202.
[0030] Furthermore, the column 1 is vertically arranged, and the column 1 is a rectangular structure. The structural beam 2 is horizontally connected to the column 1. The structural beams 2 are connected to the four sides of the column 1. The two adjacent structural beams 2 are perpendicular to each other. Concrete 201 is poured on the structural beam 2, and a composite plate 202 is arranged above the concrete 201. When the joint between the structural beam 2 and the column 1, i.e. the node, is to be poured, holes for pouring are opened on the composite plate 202, and the concrete is poured to the node through the holes.
[0031] The formwork assembly 3 is wrapped around the structural beam 2, and the formwork assembly 3 is located at the junction of the structural beam 2 and the column 1. The top of the formwork assembly 3 abuts against the lower surface of the composite plate 202. The fixing assembly 4 is arranged on the formwork assembly 3, and the formwork assembly 3 is fastened to the structural beam 2 through the fixing assembly 4. With the cooperation of the formwork assembly 3 and the fixing assembly 4, when the PEC beam-column node is post-cast, there is no need to open a grouting hole on the upper part of the PEC beam, thereby reducing the structural impact on the PEC beam. While ensuring that the structure is not affected, the construction efficiency of the PEC beam-column post-cast node is improved.
[0032] In addition, since the fixing assembly 4 is a detachable structure and at least two groups of fixing assemblies 4 are arranged on the formwork assembly 3, the fixing assembly 4 can be removed and reused multiple times after the pouring is completed and the concrete is solidified, thereby saving resources and costs; at the same time, when the formwork assembly 3 is tightened, the clamping width of the clamping member 401 can be adjusted through the cooperation of the screw 402 and the clamping member 401, thereby meeting the pouring requirements of structural beams 2 of different sizes, improving the use range of the fixing assembly 4, and thereby improving the practicability of the pouring tooling.
[0033] The pouring ports 3011 opened on the formwork assembly 3 are located on opposite sides of the formwork assembly 3. When the formwork assembly 3 is fastened to the structural beam 2, the composite plate 202 is prefabricated in the factory, and corresponding holes are opened on the composite plate 202 at the same time. The positions of the holes correspond to the pouring ports 3011. Concrete enters the pouring ports 3011 through the holes and is then poured into the formwork assembly 3, thereby improving the pouring efficiency.
[0034] The formwork assembly 3 includes two relatively arranged plates 301, the two plates 301 are located on opposite sides of the structural beam 2, and the two plates 301 are abutted on the structural beam 2, and the two plates 301 and the structural beam 2 form a casting space. Furthermore, the plates 301 are made of wooden material, and the two plates 301 are tightly attached to the opposite sides of the structural beam 2. The bottom of the plates 301 is flush with the bottom of the structural beam 2, and the top of the plates 301 is abutted against the lower surface of the composite plate 202. The two plates 301 and the structural beam 2 and the composite plate 202 form a closed space, which is the casting space. Concrete is poured into the casting space through holes and casting ports 3011. The formed casting space can effectively ensure the tightness of the post-casting nodes to prevent leakage during casting.
[0035] The two pouring ports 3011 are both formed at the top of the corresponding plate 301, and the pouring ports 3011 are located at the side end of the plate 301. Furthermore, the top of the pouring port 3011 abuts against the lower surface of the composite plate 202. The pouring port 3011 is formed at the top edge of the plate 301, and the two pouring ports 3011 are relatively arranged. The pouring port 3011 is a funnel-shaped structure. By adopting a "funnel" device for the pouring port 3011 of the PEC beam-column post-cast node, the opening is larger than the opening on the traditional PEC beam, so the pouring efficiency is higher and the concrete is easier to compact. In addition, after maintenance, the tooling is removed and the excess concrete at the pouring port 3011 is chiseled out. Compared with traditional chiseling, the chiseled out concrete is smaller, which improves the convenience of construction.
[0036] Specifically, the pouring port 3011 is inclined toward the outside of the structural beam 2, that is, the inner side of the pouring port 3011 is an open structure connected to the pouring space, and the outer side of the pouring port 3011 is an inclined flat plate structure. The top of the pouring port 3011 is open, and concrete is poured into the pouring port 3011 from the top opening, and then flows into the pouring space.
[0037] To further explain, the bottom end of the pouring port 3011 is flush with the inner side of the plate 301, and the size of the pouring port 3011 gradually increases from bottom to top. The bottom of the pouring port 3011 is flush with the plate 301. During pouring, the flush setting can prevent concrete from accumulating at the bottom of the pouring port 3011. In addition, the size of the pouring port 3011 gradually increases from the bottom of the pouring port 3011 to the top of the pouring port 3011. During pouring, a large amount of concrete can enter the pouring port 3011, thereby improving the pouring efficiency. In addition, since the outer wall of the pouring port 3011 is inclined toward the outside of the structural beam 2, when the concrete enters the pouring port 3011, the inclined outer wall can make the concrete flow quickly, thereby avoiding the situation where the concrete flows too slowly and accumulates and blocks the pouring port 3011, thereby ensuring the smooth pouring.
[0038] In addition, it should be noted that a support plate 302 for supporting the pouring port 3011 is provided on the side wall of the pouring port 3011, a fixing block 303 for fixing the support plate 302 is provided on the plate 301, the fixing block 303 is fixedly arranged on the plate 301, the support plate 302 is vertically arranged on the upper side of the fixing block 303, and the top of the support plate 302 abuts against the inclined side wall of the pouring port 3011, and the support plate 302 is fixedly connected to the inclined side wall of the pouring port 3011. During pouring, as concrete continuously enters the The pouring port 3011 is in the pouring port 3011, thereby forming a great impact force on the pouring port 3011. As time goes by, the pouring port 3011 may be damaged and the concrete cannot enter the pouring space. Under the action of the fixing block 303 and the supporting plate 302, the pouring port 3011 is supported and fixed, ensuring that the inclined side wall of the pouring port 3011 can withstand the impact of the concrete and that the pouring port 3011 will not be damaged, thereby ensuring that the pouring is carried out smoothly and further improving the pouring efficiency.
[0039] At least two groups of fixing components 4 are arranged on the formwork component 3, and at least two groups of fixing components 4 are arranged along the length direction of the plate 301, and the distance between two adjacent fixing components 4 is the same. By setting at least two groups of fixing components 4, the plate 301 can be divided into several parts with the same spacing along the length direction, thereby ensuring the force balance of the plate 301, and further ensuring that the plate 301 can be firmly fastened to the side of the structural beam 2.
[0040] The clamping member 401 is a U-shaped structure, and the clamping member 401 is clamped on the structural beam 2 to fasten the plate 301. Furthermore, the clamping member 401 is a U-shaped structure with an open top. The clamping member 401 clamps from the bottom of the structural beam 2 to the opposite sides of the plate 301. The inner walls of the clamping member 401 are respectively abutted against the side walls of the corresponding plate 301. Under the action of the clamping member 401, the two plates 301 are fixed, ensuring that the plate 301 will not shake during pouring, thereby avoiding leakage of slurry.
[0041] Further explanation, when the clamping member 401 is clamped on the plate 301, the clamping member 401 is located on the outside of the two plates 301, and the clamping member 401 abuts against the plates 301, that is, the inner walls on both sides of the U-shaped structure of the clamping member 401 abut against the corresponding plates 301, ensuring that the plates 301 and the structural beam 2 are tightly fitted without leaving any gaps, thereby avoiding the penetration of concrete during the pouring process.
[0042] A connecting hole 4011 is formed on the clamping member 401, and the screw 402 passes through the connecting hole 4011 to be connected to the clamping member 401. Furthermore, the connecting hole 4011 is formed on the side wall of the clamping member 401, and the screw 402 is arranged in the connecting hole 4011, and when the clamping member 401 is clamped on the plate 301, the screw 402 is located below the plate 301.
[0043] Nuts 4022 for tightening the clamping member 401 are provided at both ends of the screw rod 402, and the nut 4022 is located on the outside of the clamping member 401. Furthermore, the nut 4022 is threadedly connected to the screw rod 402, and the nut 4022 is arranged on the opposite sides of the clamping member 401. A gasket 4021 sleeved on the screw rod 402 is arranged between the nut 4022 and the clamping member 401. When the clamping member 401 is clamped on the plate 301, the nut 4022 is rotated to shrink the clamping member 401, thereby shrinking the two sides of the clamping member 401, and then clamping the plate 301; when the clamping width of the clamping member 401 does not match the size of the structural beam 2, the position of the nut 4022 on the screw rod 402 is adjusted to achieve the adjustment of the clamping width of the clamping member 401, thereby meeting the use requirements of structural beams 2 of different sizes.
[0044] A construction method of a PEC beam-column post-casting node construction tool comprises the following steps:
[0045] S1, opening precast holes 2021 according to the casting positions on the composite board 202 prefabricated in the factory, and making the formwork assembly 3;
[0046] S2, placing two plates 301 on opposite sides of the structural beam 2, and ensuring that the pouring port 3011 corresponds to the precast hole 2021;
[0047] S3, rotating the nut 4022 to adjust the length of the screw rod 402 in the clamping member 401, thereby adjusting the clamping width of the clamping member 401, clamping the adjusted clamping member 401 on the plate 301, and then tightening the nut 4022 so that the clamping member 401 fixes the plate (301);
[0048] S4, pouring concrete onto the post-cast nodes of the PEC beams and columns through the pre-cast holes 2021 and the pouring ports 3011;
[0049] S5. Maintain the poured nodes, remove the pouring tools, and chisel out excess concrete from the pouring opening 3011.
[0050] The above description of the disclosed embodiments enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention; therefore, the present invention will not be limited to the embodiments shown herein, but will conform to the widest scope consistent with the principles and novel features disclosed herein.
[0051] Although the following terms are used more frequently in this article: column 1, structural beam 2, concrete 201, composite plate 202, precast hole 2021, formwork assembly 3, plate 301, pouring port 3011, support plate 302, fixing block 303, fixing assembly 4, clamp 401, connecting hole 4011, screw 402, gasket 4021, nut 4022, etc., the possibility of using other terms is not excluded. These terms are used only to more conveniently describe and explain the essence of the utility model; interpreting them as any additional restrictions is contrary to the spirit of the utility model.
Claims
1. A PEC beam-column post-cast node construction tool, comprising a column (1) and a structural beam (2) arranged on the column (1), concrete (201) is poured on the structural beam (2), and a prefabricated composite plate (202) is arranged on the concrete (201), characterized in that: A casting tool for facilitating casting is provided at the junction of the structural beam (2) and the column (1); the composite plate (202) is mounted on the casting tool to form an integral structure; the casting tool comprises a template assembly (3) which is arranged on the structural beam (2) in a covering manner and a detachable fixing assembly (4) for fastening the template assembly (3); the fixing assembly (4) comprises a clamping member (401) for clamping the template assembly (3) and a screw (402) for adjusting the clamping width of the clamping member (401) and tightening the clamping member (401); a casting port (3011) which is arranged opposite to each other and is used for casting is formed on the template assembly (3); and a precast hole (2021) corresponding to the casting port (3011) is provided on the composite plate (202).
2. A PEC beam-column post-casting node construction tooling according to claim 1, characterized in that: The formwork assembly (3) comprises two plates (301) arranged opposite to each other. The two plates (301) are located on opposite sides of the structural beam (2), and the two plates (301) are abutted against the structural beam (2). The two plates (301) and the structural beam (2) form a casting space.
3. A PEC beam-column post-casting node construction tool according to claim 2, characterized in that: The two pouring ports (3011) are both formed at the top of the corresponding plate (301), and the pouring ports (3011) are located at the side ends of the plate (301).
4. A PEC beam-column post-casting node construction tool according to claim 1, characterized in that: The pouring port (3011) is arranged to be inclined toward the outside of the structural beam (2).
5. A PEC beam-column post-casting node construction tooling according to claim 2, characterized in that: The bottom end of the pouring port (3011) is flush with the inner side of the plate (301), and the size of the pouring port (3011) gradually increases from bottom to top.
6. A PEC beam-column post-casting node construction tool according to claim 2, characterized in that: A support plate (302) for supporting the pouring port (3011) is provided on the side wall of the pouring port (3011), and a fixing block (303) for fixing the support plate (302) is provided on the plate (301).
7. A PEC beam-column post-casting node construction tool according to claim 2, characterized in that: The clamping member (401) is a U-shaped structure, and the clamping member (401) is clamped on the structural beam (2) to fasten the plate (301).
8. A PEC beam-column post-casting node construction tooling according to claim 2, characterized in that: The clamping member (401) is located on the outer sides of the two plates (301), and the clamping member (401) abuts against the plates (301).
9. A PEC beam-column post-casting node construction tool according to claim 1, characterized in that: The clamping member (401) is formed with a connecting hole (4011), and the screw rod (402) passes through the connecting hole (4011) to be connected to the clamping member (401).
10. A PEC beam-column post-cast node construction tool according to claim 1, characterized in that: Nuts (4022) for tightening the clamping member (401) are provided at both ends of the screw rod (402), and the nuts (4022) are located outside the clamping member (401).
Citation Information
Patent Citations
PEC beam column joint pouring device
CN115788035A
Fabricated PEC beam column joint structure and tool
CN216130343U
Cited By
Pouring formwork assembly and pouring method of PEC beam column post-pouring joint
CN121827549A