A moisture control water absorption structure for PC glass

By designing a moisture-controlled water absorption structure for PC glass, including a water-control equipment installation platform and multi-stage water-control equipment, the problem of poor water control effect of existing PC glass production equipment is solved, and more efficient moisture management and maintenance convenience is achieved.

CN222747620UActive Publication Date: 2025-04-11JIANGSU ANKO OPTICAL MATERIALS CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202420377335.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-29
Publication Date
2025-04-11
Estimated Expiration
2034-02-28

AI Technical Summary

Technical Problem

The water control mechanism structure of the existing PC glass production equipment is unreasonable, resulting in poor water control effect and affecting processing efficiency.

Method used

A moisture-controlled water absorption structure for PC glass is designed, including a water-control equipment installation platform, primary and secondary water-control equipment. The first-level water control equipment consists of an upper wiper and a lower wiper, and the second-level water control equipment includes a glass wiper roller, combined with a drain guide plate and a water recovery tank to achieve effective moisture management.

Benefits of technology

This structure not only ensures that the moisture on the surface of PC glass meets the standards, but also selects water control equipment according to different situations, which facilitates maintenance and repairs and reduces usage costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222747620U_ABST
    Figure CN222747620U_ABST
Patent Text Reader

Abstract

The utility model provides a moisture control water absorption structure for PC glass, comprising: a water control equipment installation platform, a water control operation platform is arranged on the water control equipment installation platform, a first-level water control equipment is arranged on the water control operation platform, a second-level water control equipment is arranged on the water control operation platform downstream of the first-level water control equipment, the first-level water control equipment comprises an upper wiper plate and a lower wiper plate, both ends of the lower wiper plate are fixedly mounted on the water control operation platform, sliding guide holes are arranged on both ends of the upper wiper plate, a sliding guide rod is arranged in the sliding guide hole, and the lower end of the sliding guide rod is mounted on the water control operation platform through a guide rod fixing seat. The utility model can not only ensure that the moisture content on the surface of the PC glass meets the standard, but also can select water control equipment according to different situations, which is convenient for maintenance and repair, and reduces the use cost.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of PC glass production equipment, in particular to a moisture control water absorption structure for PC glass. Background Art

[0002] Transparent PC sheet is a plastic sheet made of polycarbonate (PC). It has the characteristics of high transparency, good impact resistance, and strong UV resistance, so it is widely used in electronics, construction, automobiles and other fields. Transparent PC sheet can be made into products of various shapes and sizes by cutting and drilling, such as billboards, lampshades, car logos, etc.

[0003] A Chinese patent discloses a method for producing bulletproof glass (application number: 201810393145.0). The method adopts a glass processing equipment packaging mechanism, a processing box, a machine body, a wiping mechanism, a water spraying mechanism, a water control mechanism, a driving mechanism, a conveying mechanism, a material receiving box and a control mechanism. The inner half of the machine body is symmetrically connected to a fixed guide column, and the fixed shaft is connected to the inner part of the machine body. The cross-section of the two fixed guide columns, the fixed shaft and the conveyor belt is a "U"-shaped structure. However, the structure of the water control mechanism is unreasonable, and the water control effect is poor, which affects the processing efficiency. Utility Model Content

[0004] The technical problem solved by the utility model is to provide a moisture control water absorption structure for PC glass to solve the problems raised in the above background technology.

[0005] The technical problem solved by the utility model is achieved by the following technical scheme: a moisture control water absorption structure for PC glass, comprising: a water control equipment installation platform, a water control operation platform is arranged on the water control equipment installation platform, a primary water control equipment is arranged on the water control operation platform, a secondary water control equipment is arranged on the water control operation platform downstream of the primary water control equipment, the primary water control equipment comprises an upper wiper plate and a lower wiper plate, the upper wiper plate and the lower wiper plate are arranged in parallel in the same plane, both ends of the lower wiper plate are fixedly mounted on the water control operation platform, sliding guide holes are arranged at both ends of the upper wiper plate, a sliding guide rod is arranged in the sliding guide hole, the lower end of the sliding guide rod is mounted on the water control operation platform through a guide rod fixing seat, the secondary water control equipment comprises a glass wiping roller, and both ends of the glass wiping roller are mounted on a wiping roller mounting frame through a wiping roller mounting shaft.

[0006] Furthermore, the upper end of the wiping roller mounting frame is mounted on the output end of the regulating driving cylinder, and the cylinder body of the regulating driving cylinder is mounted on the water control equipment mounting platform.

[0007] Furthermore, a water control monitoring camera is provided on the upper side of the water control equipment installation platform, and the water control monitoring camera is installed on the water control equipment installation platform through a camera mounting frame.

[0008] Furthermore, the water control monitoring camera is installed on the camera mounting frame through a camera mounting seat, and the camera mounting frame is installed on the water control equipment mounting platform through fixing bolts.

[0009] Furthermore, a scratch-resistant rubber strip is provided on one side of the upper wiper plate and the lower wiper plate close to the PC glass, and a rubber strip mounting groove is provided on the upper wiper plate and the lower wiper plate, and the scratch-resistant rubber strip is fixed in the rubber strip mounting groove.

[0010] Furthermore, the water control equipment installation platform includes a left support plate and a right support plate, a drainage guide plate is provided between the left support plate and the right support plate, and the drainage guide plate is inclined.

[0011] Furthermore, a water recovery trough is provided at the lower end of the drainage guide plate, both ends of the water recovery trough are installed on the left support plate and the right support plate, and one end of the water recovery trough is connected to the water recovery tank through a water recovery pipe.

[0012] Furthermore, the drainage guide plate is mounted on the left support plate and the right support plate by means of fixing bolts, and support plate fixing pads are provided at the lower ends of the left support plate and the right support plate.

[0013] Furthermore, the upper end of the secondary water control device is mounted on the device support rod by means of fixing bolts, and both ends of the device support rod are mounted on the water control device mounting platform by means of fixing bolts.

[0014] Furthermore, a water absorption plate is provided on the water control operation platform at the lower end of the secondary water control device, and a water absorption plate installation groove is provided on the water control operation platform, and the water absorption plate is clamped in the water absorption plate installation groove.

[0015] Furthermore, the glass wiping roller comprises a wiping roller body, a water absorbing layer is arranged on the outer side of the wiping roller body, a supporting shaft is arranged inside the wiping roller body, and supporting bearings are arranged on both sides of the wiping roller body.

[0016] Compared with the prior art, the utility model has the beneficial effects of: the utility model can not only ensure that the moisture on the surface of the PC glass meets the standard, but also can select water control equipment according to different situations, facilitate maintenance and repair, and reduce the cost of use. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a structural schematic diagram of the utility model.

[0018] Figure 2 It is a schematic diagram of the structure of the water control equipment installation platform of the utility model.

[0019] Figure 3 This is a schematic diagram of the installation of the water control equipment of the utility model.

[0020] Figure 4 This is a schematic diagram of the structure of the glass wiping roller of the utility model. DETAILED DESCRIPTION

[0021] In order to make the technical means for realizing the utility model, creative features, objectives and effects easy to understand, the utility model is further explained below in conjunction with specific diagrams. In the description of the utility model, it should be noted that, unless otherwise clearly stipulated and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense. For example, it can be a fixed connection or a detachable connection, or an integral connection can be a mechanical connection or an electrical connection; it can be directly connected or indirectly connected through an intermediate medium, and it can be the internal connection of two components. Example 1

[0022] like Figures 1 to 4 As shown, a moisture control water absorption structure for PC glass includes: a water control device installation platform 1, a water control operation platform 2 is provided on the water control device installation platform 1, a primary water control device 4 is provided on the water control operation platform 2, a secondary water control device 5 is provided on the water control operation platform 2 downstream of the primary water control device 4, the primary water control device 4 includes an upper wiper plate 41 and a lower wiper plate 44, the upper wiper plate 41 and the lower wiper plate 44 are arranged in parallel in the same plane, and both ends of the lower wiper plate 44 are fixedly mounted on the water control operation platform 2 The upper wiper plate 41 has sliding guide holes at both ends, and a sliding guide rod 42 is arranged in the sliding guide hole. The lower end of the sliding guide rod 42 is mounted on the water control operation platform 2 through a guide rod fixing seat 43. The secondary water control device 5 includes a glass wiping roller 54, and both ends of the glass wiping roller 54 are mounted on the wiping roller mounting frame 52 through a wiping roller mounting shaft 53; the upper end of the wiping roller mounting frame 52 is mounted on the output end of the adjusting driving cylinder 51, and the cylinder body of the adjusting driving cylinder 51 is mounted on the water control device mounting platform 1. The glass wiping roller 54 includes a wiping roller body 541, and a water absorbing layer 542 is arranged on the outer side of the wiping roller body 541, and a support shaft 543 is arranged in the wiping roller body 541, and support bearings 544 are arranged on both sides of the wiping roller body 541. Example 2

[0023] like Figures 1 to 4As shown, a moisture control water absorption structure for PC glass includes: a water control equipment installation platform 1, a water control operation platform 2 is provided on the water control equipment installation platform 1, a first-level water control equipment 4 is provided on the water control operation platform 2, a second-level water control equipment 5 is provided on the water control operation platform 2 downstream of the first-level water control equipment 4, the first-level water control equipment 4 includes an upper wiper plate 41 and a lower wiper plate 44, the upper wiper plate 41 and the lower wiper plate 44 are parallelly arranged in the same plane, both ends of the lower wiper plate 44 are fixedly installed on the water control operation platform 2, both ends of the upper wiper plate 41 are provided with sliding guide holes, a sliding guide rod 42 is provided in the sliding guide hole, the lower end of the sliding guide rod 42 is installed on the water control operation platform 2 through a guide rod fixing seat 43, a water control monitoring camera 71 is provided on the upper side of the water control equipment installation platform 1, and the water control monitoring camera 71 is installed on the water control equipment installation platform 1 through a camera mounting frame 72. The water control monitoring camera 71 is installed on the camera mounting frame 72 through a camera mounting seat, and the camera mounting frame 72 is installed on the water control equipment installation platform 1 through fixing bolts. Example 3

[0024] like Figures 1 to 4 As shown, a moisture control water absorption structure for PC glass comprises: a water control equipment installation platform 1, a water control operation platform 2 is arranged on the water control equipment installation platform 1, a primary water control equipment 4 is arranged on the water control operation platform 2, a secondary water control equipment 5 is arranged on the water control operation platform 2 downstream of the primary water control equipment 4, the primary water control equipment 4 comprises an upper wiper plate 41 and a lower wiper plate 44, the upper wiper plate 41 and the lower wiper plate 44 are arranged in parallel in the same plane, both ends of the lower wiper plate 44 are fixedly mounted on the water control operation platform 2, sliding guide holes are arranged at both ends of the upper wiper plate 41, a sliding guide rod 42 is arranged in the sliding guide hole, the lower end of the sliding guide rod 42 is mounted on the water control operation platform 2 through a guide rod fixing seat 43, a scratch-resistant rubber strip is arranged on the side of the upper wiper plate 41 and the lower wiper plate 44 close to the PC glass, a rubber strip mounting groove is arranged on the upper wiper plate 41 and the lower wiper plate 44, and the scratch-resistant rubber strip is fixed in the rubber strip mounting groove. Example 4

[0025] like Figures 1 to 4As shown, a moisture control water absorption structure for PC glass comprises: a water control equipment installation platform 1, a water control operation platform 2 is provided on the water control equipment installation platform 1, a primary water control equipment 4 is provided on the water control operation platform 2, a secondary water control equipment 5 is provided on the water control operation platform 2 downstream of the primary water control equipment 4, the primary water control equipment 4 comprises an upper wiper plate 41 and a lower wiper plate 44, the upper wiper plate 41 and the lower wiper plate 44 are arranged in parallel in the same plane, both ends of the lower wiper plate 44 are fixedly mounted on the water control operation platform 2, sliding guide holes are provided at both ends of the upper wiper plate 41, a sliding guide rod 42 is provided in the sliding guide hole, the lower end of the sliding guide rod 42 is mounted on the water control operation platform 2 through a guide rod fixing seat 43, the water control equipment installation platform 1 comprises a left support plate 12 and a right support plate 11, a drainage guide plate 14 is provided between the left support plate 12 and the right support plate 11, and the drainage guide plate 14 is arranged inclined. The lower end of the drain guide plate 14 is provided with a water recovery trough, and both ends of the water recovery trough are installed on the left support plate 12 and the right support plate 11, and one end of the water recovery trough is connected to the water recovery tank through a water recovery pipe. The drain guide plate 14 is installed on the left support plate 12 and the right support plate 11 by fixing bolts, and the lower ends of the left support plate 12 and the right support plate 11 are provided with a support plate fixing pad 13. The upper end of the secondary water control device 5 is installed on the device support rod 6 by fixing bolts, and both ends of the device support rod 6 are installed on the water control device installation platform 1 by fixing bolts. A water absorption plate 3 is provided on the water control operation platform 2 at the lower end of the secondary water control device 5, and a water absorption plate installation groove is provided on the water control operation platform 2, and the water absorption plate 3 is clamped in the water absorption plate installation groove.

[0026] A water control operating platform 2 is provided on a water control equipment installation platform 1 of the utility model, a primary water control equipment 4 is provided on the water control operating platform 2, a secondary water control equipment 5 is provided on the water control operating platform 2 downstream of the primary water control equipment 4, the primary water control equipment 4 comprises an upper wiper plate 41 and a lower wiper plate 44, the upper wiper plate 41 and the lower wiper plate 44 are arranged in parallel in the same plane, both ends of the lower wiper plate 44 are fixedly mounted on the water control operating platform 2, sliding guide holes are provided at both ends of the upper wiper plate 41, a sliding guide rod 42 is provided in the sliding guide hole, the lower end of the sliding guide rod 42 is mounted on the water control operating platform 2 through a guide rod fixing seat 43, which can not only ensure that the moisture content on the surface of the PC glass meets the standard, but also the water control equipment can be selected according to different situations, which is convenient for maintenance and repair and reduces the use cost.

[0027] The above shows and describes the basic principle and main features of the utility model and the advantages of the utility model. Those skilled in the art should understand that the utility model is not limited by the above embodiments. The above embodiments and descriptions are only for explaining the principle of the utility model. Without departing from the spirit and scope of the utility model, the utility model may have various changes and improvements, which fall within the scope of the utility model to be protected. The scope of protection of the utility model is defined by the attached claims and their equivalents.

Claims

1. A moisture control water absorption structure for PC glass, comprising: A water control equipment installation platform (1), wherein a water control operation platform (2) is provided on the water control equipment installation platform (1), and a primary water control equipment (4) is provided on the water control operation platform (2), wherein the secondary water control equipment (5) is provided on the water control operation platform (2) downstream of the primary water control equipment (4), wherein the primary water control equipment (4) comprises an upper wiper plate (41) and a lower wiper plate (44), wherein the upper wiper plate (41) and the lower wiper plate (44) are arranged in parallel in the same plane, and the two ends of the lower wiper plate (44) are fixedly mounted on the water control operation platform (2), and the upper wiper plate ( The two ends of the water control device (5) are provided with sliding guide holes, and the sliding guide holes are provided with sliding guide rods (42). The lower ends of the sliding guide rods (42) are mounted on the water control operation platform (2) through guide rod fixing seats (43). The secondary water control device (5) comprises a glass wiping roller (54), and the two ends of the glass wiping roller (54) are mounted on a wiping roller mounting frame (52) through wiping roller mounting shafts (53); the upper end of the wiping roller mounting frame (52) is mounted on the output end of the regulating drive cylinder (51), and the cylinder body of the regulating drive cylinder (51) is mounted on the water control device mounting platform (1).

2. The moisture control water absorption structure for PC glass according to claim 1, characterized in that: A water control monitoring camera (71) is provided on the upper side of the water control equipment installation platform (1), and the water control monitoring camera (71) is installed on the water control equipment installation platform (1) via a camera mounting frame (72).

3. The moisture control water absorption structure for PC glass according to claim 2, characterized in that: The water control monitoring camera (71) is mounted on a camera mounting frame (72) via a camera mounting seat, and the camera mounting frame (72) is mounted on the water control equipment mounting platform (1) via fixing bolts.

4. The moisture control water absorption structure for PC glass according to claim 1, characterized in that: The upper wiper plate (41) and the lower wiper plate (44) are provided with a scratch-resistant rubber strip on one side close to the PC glass, and the upper wiper plate (41) and the lower wiper plate (44) are provided with a rubber strip mounting groove, and the scratch-resistant rubber strip is fixed in the rubber strip mounting groove.

5. The moisture control water absorption structure for PC glass according to claim 1, characterized in that: The water control equipment installation platform (1) comprises a left support plate (12) and a right support plate (11), a drainage guide plate (14) is provided between the left support plate (12) and the right support plate (11), and the drainage guide plate (14) is arranged at an angle.

6. The moisture control water absorption structure for PC glass according to claim 5, characterized in that: A water recovery trough is provided at the lower end of the drainage guide plate (14), and both ends of the water recovery trough are mounted on the left support plate (12) and the right support plate (11), and one end of the water recovery trough is connected to the water recovery tank via a water recovery pipe.

7. The moisture control water absorption structure for PC glass according to claim 5, characterized in that: The drainage guide plate (14) is mounted on the left support plate (12) and the right support plate (11) by means of fixing bolts, and support plate fixing pads (13) are provided at the lower ends of the left support plate (12) and the right support plate (11).

8. The moisture control water absorption structure for PC glass according to claim 1, characterized in that: The upper end of the secondary water control device (5) is mounted on the device support rod (6) via fixing bolts, and both ends of the device support rod (6) are mounted on the water control device installation platform (1) via fixing bolts.

9. The moisture control water absorption structure for PC glass according to claim 1, characterized in that: A water absorption plate (3) is provided on the water control operation platform (2) at the lower end of the secondary water control device (5), and a water absorption plate installation groove is provided on the water control operation platform (2), and the water absorption plate (3) is clamped in the water absorption plate installation groove.

10. The moisture control water absorption structure for PC glass according to claim 1, characterized in that: The glass wiping roller (54) comprises a wiping roller body (541), a water absorbing layer (542) is provided on the outside of the wiping roller body (541), a supporting shaft (543) is provided inside the wiping roller body (541), and supporting bearings (544) are provided on both sides of the wiping roller body (541).

Citation Information

Patent Citations

  • Bullet-proof glass production method

    CN108689620A