Connecting structure and prefabricated underground diaphragm wall
By using the connection method of the lock joint and the pin port in the connection structure of the prefabricated underground continuous wall, the problem of slow connection speed and misalignment during the lifting process is solved, and fast connection and high shear resistance are achieved.
Patent Information
- Application Number
- CN202421388525.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-17
- Publication Date
- 2025-04-15
- Estimated Expiration
- 2034-06-17
AI Technical Summary
During the lifting process of prefabricated underground continuous walls, the connection speed between adjacent prefabricated underground continuous walls is slow, which can easily lead to misalignment.
A connection structure is adopted, including a first sleeve and a second sleeve, both having a locking joint and a pin opening through which fast connection and alignment are achieved.
The connection speed and alignment performance of adjacent prefabricated underground continuous walls is improved, the misalignment phenomenon is reduced, and the shear resistance is enhanced.
Smart Images

Figure CN222758863U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of prefabricated underground continuous walls, in particular to a connection structure and a prefabricated underground continuous wall. Background Art
[0002] Prefabricated underground continuous wall is a kind of underground continuous wall prefabricated in the factory in advance. Compared with cast-in-place underground continuous wall, prefabricated underground continuous wall has the advantage of short construction time.
[0003] However, during hoisting, adjacent prefabricated underground continuous walls are generally connected by steel sections, which can still easily lead to slow connection speed and thus long construction time. At the same time, misalignment can easily occur between adjacent prefabricated underground continuous walls. Utility Model Content
[0004] In view of the above technical problems, the utility model provides a connection structure and a prefabricated underground continuous wall, which not only makes the connection speed of adjacent prefabricated underground continuous walls fast, but also makes it difficult for adjacent prefabricated underground continuous walls to be misaligned.
[0005] In order to solve the above problems, the technical solution provided by the utility model is:
[0006] A connection structure, comprising:
[0007] A first sleeve, wherein both sides of the first sleeve have a plurality of locking joints;
[0008] A second sleeve matched with the first sleeve, wherein both sides of the second sleeve have a plurality of pin holes;
[0009] Wherein, the locking connector and the latch opening cooperate with each other.
[0010] Optionally, the first sleeve is sleeved inside the second sleeve, or the first sleeve is sleeved outside the second sleeve.
[0011] Optionally, a filler is also included, and the filler is filled in the first sleeve or the second sleeve.
[0012] Optional,
[0013] The locking joint comprises a joint body, a first groove portion and a first protrusion portion which are arranged in sequence;
[0014] The latch port comprises a latch body, a second groove portion and a second protrusion portion which are arranged in sequence;
[0015] The first groove portion matches with the second protrusion portion, and the second groove portion matches with the first protrusion portion.
[0016] Optionally, the plurality of locking joints on both sides of the first sleeve are axially symmetrically arranged with respect to the first sleeve, and the plurality of latch openings on both sides of the second sleeve are axially symmetrically arranged with respect to the second sleeve.
[0017] A prefabricated underground continuous wall includes a connection structure and a first wall and a second wall that cooperate with each other, wherein the first sleeve and a plurality of locking joints are connected to the first wall, and the second sleeve and a plurality of latch openings are connected to the second wall.
[0018] Optionally, also include:
[0019] A plurality of first stress-bearing steel bars connected to the first wall, wherein the plurality of first stress-bearing steel bars and the plurality of locking joints are correspondingly connected;
[0020] A plurality of second stress-bearing steel bars are connected to the second wall, and the plurality of second stress-bearing steel bars and the plurality of the latch openings are connected correspondingly.
[0021] Optionally, also include:
[0022] A first anti-shear portion provided at one end of the first wall;
[0023] a second anti-shear portion provided at one end of the second wall;
[0024] Wherein, one of the first anti-shear portion and the second anti-shear portion is a convex portion, and the other is a concave portion, and the convex portion and the concave portion cooperate with each other.
[0025] The technical solution provided by the utility model has the following beneficial effects compared with the prior art: when the connection structure is connected, the first sleeve and the second sleeve are first matched, so that a plurality of locking joints and a plurality of pin openings are aligned. When the connection structure is used for prefabricated underground continuous walls, it is convenient to make the alignment performance of adjacent prefabricated underground continuous walls good and not prone to misalignment. At the same time, the shear resistance of adjacent prefabricated underground continuous walls is good. Then, under the self-weight of the first sleeve and the plurality of locking joints, the plurality of locking joints and the plurality of pin openings are matched. When the connection structure is used for prefabricated underground continuous walls, it is convenient to make the connection speed of adjacent prefabricated underground continuous walls fast. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 A front view of a prefabricated underground continuous wall proposed in an embodiment of the utility model;
[0027] Figure 2 A top view of a prefabricated underground continuous wall proposed in an embodiment of the utility model;
[0028] Figure 3A left view of a prefabricated underground continuous wall proposed in an embodiment of the utility model;
[0029] Figure 4 for Figure 3 Partial diagram of A in the middle;
[0030] In the figure: 1. first sleeve; 2. second sleeve; 3. locking joint; 31. joint body; 32. first groove; 33. first protrusion; 4. latch opening; 41. latch body; 42. second groove; 43. second protrusion; 5. filling material; 6. first wall; 7. second wall; 81. first stress-bearing steel bar; 82. second stress-bearing steel bar; 91. first shear-resistant part; 92. second shear-resistant part. DETAILED DESCRIPTION
[0031] In order to further understand the content of the utility model, the utility model is described in detail in conjunction with the accompanying drawings and embodiments.
[0032] The present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It is understood that the specific embodiments described herein are only used to explain the relevant utility model, rather than to limit the utility model. It should also be noted that, for the convenience of description, only the parts related to the utility model are shown in the accompanying drawings. The words "first", "second", etc. described in the present utility model are set for the convenience of describing the technical solution of the present utility model, and have no specific limiting effect. They are all general references and do not constitute a limiting effect on the technical solution of the present utility model. It should be noted that, in the absence of conflict, the embodiments and features in the embodiments in the present application can be combined with each other. In the description of the present utility model, it should be noted that the orientation or position relationship indicated by the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inside", "outside", etc. is based on the orientation or position relationship shown in the accompanying drawings, which is only for the convenience of describing the present utility model and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present utility model. In addition, the terms "first", "second", and "third" are only used for descriptive purposes and cannot be understood as indicating or implying relative importance. Unless otherwise clearly specified and limited, the terms "installed", "connected" and "connected" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, or it can be a connection between the insides of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present utility model can be understood according to specific circumstances. Multiple technical solutions in the same embodiment, and multiple technical solutions in different embodiments, can be arranged and combined to form new technical solutions that do not have contradictions or conflicts, all of which are within the scope of protection required by the present utility model.
[0033] Example 1
[0034] Combined with Figure 1-4 , this embodiment provides a connection structure, including:
[0035] A first sleeve 1, both sides of the first sleeve 1 are provided with a plurality of locking joints 3;
[0036] A second sleeve 2 matched with the first sleeve 1, with a plurality of pin holes 4 on both sides of the second sleeve 2;
[0037] Among them, the locking connector 3 and the latch opening 4 cooperate with each other.
[0038] Specifically, when the connection structure is connected, the first sleeve 1 and the second sleeve 2 are first matched, so that the multiple locking joints 3 and the multiple pin holes 4 are aligned. When the connection structure is used for prefabricated underground continuous walls, it is convenient to make the alignment performance of adjacent prefabricated underground continuous walls good and not prone to misalignment. At the same time, the shear resistance of adjacent prefabricated underground continuous walls is good. Then, under the action of the self-weight of the first sleeve 1 and the multiple locking joints 3, the multiple locking joints 3 and the multiple pin holes 4 are matched. When the connection structure is used for prefabricated underground continuous walls, it is convenient to make the connection speed of adjacent prefabricated underground continuous walls fast; wherein, the material of the first sleeve 1 and the second sleeve 2 can both be steel.
[0039] Further, such as Figure 2 The first sleeve 1 is sleeved inside the second sleeve 2 , or the first sleeve 1 is sleeved outside the second sleeve 2 .
[0040] Specifically, when the first sleeve 1 is sleeved inside the second sleeve 2, the caliber of the first sleeve 1 is relatively small; when the first sleeve 1 is sleeved outside the second sleeve 2, the caliber of the second sleeve 2 is relatively small.
[0041] Further, such as Figure 2 , and also includes a filler 5, which is filled in the first sleeve 1 or the second sleeve 2.
[0042] Specifically, the filler 5 is used to fill in a sleeve with a relatively small diameter. When the first sleeve 1 is sleeved in the second sleeve 2, the filler 5 is filled in the first sleeve 1. When the first sleeve 1 is sleeved outside the second sleeve 2, the filler 5 is filled in the second sleeve 2. The filler 5 can be a high-strength, non-shrinkage cement-based grouting material, etc. It should be noted that after the first sleeve 1 and the second sleeve 2 are fully matched, the filler 5 is poured into the first sleeve 1 or the second sleeve 2 to increase the strength of the first sleeve 1 or the second sleeve 2.
[0043] Further, such as Figure 4 ,
[0044] The locking joint 3 comprises a joint body 31, a first groove portion 32 and a first protrusion portion 33 which are arranged in sequence;
[0045] The latch port 4 includes a latch body 41, a second groove portion 42 and a second protrusion portion 43 which are arranged in sequence;
[0046] The first groove portion 32 cooperates with the second protrusion portion 43 , and the second groove portion 42 cooperates with the first protrusion portion 33 .
[0047] Specifically, since the first groove portion 32 and the second protrusion portion 43 cooperate with each other, and the second groove portion 42 and the first protrusion portion 33 cooperate with each other, the locking connector 3 and the latch port 4 can be snapped into place, which not only makes the connection speed of the locking connector 3 and the latch port 4 fast, but also prevents the locking connector 3 and the latch port 4 from separating.
[0048] Further, such as Figure 2 The locking joints 3 on both sides of the first sleeve 1 are arranged axially symmetrically with respect to the first sleeve 1 , and the latch openings 4 on both sides of the second sleeve 2 are arranged axially symmetrically with respect to the second sleeve 2 .
[0049] Specifically, it is convenient to increase the symmetry of a plurality of locking joints 3 and at the same time, it is convenient to increase the symmetry of a plurality of latch openings 4 .
[0050] Example 2
[0051] Combined with Figure 1-4 The present embodiment provides a prefabricated underground continuous wall, including a connection structure of embodiment 1, and also including a first wall 6 and a second wall 7 that cooperate with each other, a first sleeve 1 and a plurality of locking joints 3 are connected to the first wall 6, and a second sleeve 2 and a plurality of pin holes 4 are connected to the second wall 7.
[0052] Specifically, the first wall 6 is used as an upper segmented wall; the second wall 7 is used as a lower segmented wall.
[0053] Further, such as Figure 1 , 3 and 4, also including:
[0054] A plurality of first stress-bearing steel bars 81 connected to the first wall 6, and the plurality of first stress-bearing steel bars 81 and the plurality of locking joints 3 are connected correspondingly;
[0055] A plurality of second stress-bearing steel bars 82 connected to the second wall 7, and a plurality of second stress-bearing steel bars 82 and a plurality of latch openings 4 are connected correspondingly.
[0056] Specifically, the first stress-bearing steel bar 81 is used to increase the connection firmness between the locking joint 3 and the first wall 6 ; the second stress-bearing steel bar 82 is used to increase the connection firmness between the latch opening 4 and the second wall 7 .
[0057] Further, such as Figure 3 , also includes:
[0058] A first anti-shear portion 91 provided at one end of the first wall 6;
[0059] A second anti-shear portion 92 provided at one end of the second wall 7;
[0060] Among them, one of the first anti-shear portion 91 and the second anti-shear portion 92 is a convex portion, and the other is a concave portion, and the convex portion and the concave portion cooperate with each other.
[0061] Specifically, the first anti-shear portion 91 and the second anti-shear portion 92 are used to increase the shear resistance of the first wall 6 and the second wall 7. When the first anti-shear portion 91 is a convex portion, the second anti-shear portion 92 is a concave portion; when the first anti-shear portion 91 is a concave portion, the second anti-shear portion 92 is a convex portion.
[0062] The above schematically describes the present invention and its implementation methods, which are not restrictive. The drawings show only one implementation method of the present invention, and the actual structure is not limited thereto. Therefore, if ordinary technicians in this field are inspired by it and design structural methods and embodiments similar to the technical solution without creativity without departing from the purpose of the present invention, they should all fall within the protection scope of the present invention.
Claims
1. A connection structure, characterized in that: include: A first sleeve, wherein both sides of the first sleeve have a plurality of locking joints; A second sleeve matched with the first sleeve, wherein both sides of the second sleeve have a plurality of pin holes; Wherein, the locking connector and the latch opening cooperate with each other.
2. A connection structure according to claim 1, characterized in that: The first sleeve is sleeved inside the second sleeve, or the first sleeve is sleeved outside the second sleeve.
3. A connection structure according to claim 2, characterized in that: It also includes a filling material, which is filled in the first sleeve or the second sleeve.
4. A connection structure according to any one of claims 1 to 3, characterized in that: The locking joint comprises a joint body, a first groove portion and a first protrusion portion which are arranged in sequence; The latch port comprises a latch body, a second groove portion and a second protrusion portion which are arranged in sequence; The first groove portion matches with the second protrusion portion, and the second groove portion matches with the first protrusion portion.
5. A connection structure according to any one of claims 1 to 3, characterized in that: The plurality of locking joints on both sides of the first sleeve are arranged axially symmetrically with respect to the first sleeve, and the plurality of latch openings on both sides of the second sleeve are arranged axially symmetrically with respect to the second sleeve.
6. A prefabricated underground continuous wall, characterized in that: It includes a connection structure as described in any one of claims 1 to 5, and also includes a first wall and a second wall that cooperate with each other, the first sleeve and the plurality of locking joints are connected to the first wall, and the second sleeve and the plurality of pin holes are connected to the second wall.
7. The prefabricated underground continuous wall according to claim 6, characterized in that: Also includes: A plurality of first stress-bearing steel bars connected to the first wall, wherein the plurality of first stress-bearing steel bars and the plurality of locking joints are correspondingly connected; A plurality of second stress-bearing steel bars are connected to the second wall, and the plurality of second stress-bearing steel bars and the plurality of the latch openings are connected correspondingly.
8. The prefabricated underground continuous wall according to claim 6, characterized in that: Also includes: A first anti-shear portion provided at one end of the first wall; a second anti-shear portion provided at one end of the second wall; Wherein, one of the first anti-shear portion and the second anti-shear portion is a convex portion, and the other is a concave portion, and the convex portion and the concave portion cooperate with each other.