Pipeline butt joint device

By designing a pipeline docking device including a carrier frame, a clamping frame, an extrusion angle and a rotating unit, the problem of low pipeline docking installation efficiency in water conservancy projects is solved, and efficient and convenient pipeline docking and deviation correction installation is achieved.

CN222768269UActive Publication Date: 2025-04-18SHANXI FIRST CONSTR GROUP

Patent Information

Application Number
CN202421643746.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-07-11
Publication Date
2025-04-18
Estimated Expiration
2034-07-11

AI Technical Summary

Technical Problem

The prior art has troubles in the docking and installation of water conservancy pipelines in water conservancy engineering construction, especially the difficulty in docking and removing long pipes, which affects construction efficiency.

Method used

A pipe docking device is designed, including a carrier frame, a clamping frame, an extrusion angle and a rotating unit. The mounting flange is positioned, rotated and fixed by these components to achieve efficient docking of the pipe.

Benefits of technology

By simplifying the pipeline docking process, the device reduces the consumption of manpower and material resources, improves the pipeline installation efficiency in water conservancy engineering construction, and facilitates corrected installation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222768269U_ABST
    Figure CN222768269U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of pipeline butt-joint devices, and discloses a pipeline butt-joint device which comprises two water conservancy pipelines to be installed in a butt-joint mode, and further comprises a U-shaped bearing frame, and the side faces of the opposite ends of the two water conservancy pipelines are both fixedly connected with installation flanges. A butt joint cavity communicating with the outside is formed in the bearing frame, the inner diameter of the butt joint cavity is larger than the outer diameter of the mounting flanges, clamping frames matched with the two mounting flanges are slidably connected to the opposite side walls in the butt joint cavity, and extrusion oblique angles are arranged on the opposite side walls in the clamping frames; the opposite side faces of the bearing frame penetrate through and are in threaded connection with a first adjusting rod with one end rotationally connected with the side face of the clamping frame, and a rotating unit used for rotating the water conservancy pipeline is arranged on the bearing frame. According to the hydraulic engineering pipeline installation device, the two installation flanges are extruded through the extrusion oblique angles, then the two installation flanges are positioned and in butt joint, installation personnel can conveniently conduct deviation correction installation on a hydraulic engineering pipeline, and meanwhile the installation efficiency of the hydraulic engineering pipeline during hydraulic engineering construction is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of pipeline butt joint devices, in particular to a pipeline butt joint device. Background Art

[0002] Water conservancy projects are projects built to control and allocate surface water and groundwater in nature to achieve the purpose of eliminating harm and promoting benefits. Water is an indispensable and precious resource for human production and life, but its natural state does not fully meet human needs. Only by building water conservancy projects can we control water flows, prevent floods and waterlogging disasters, and regulate and distribute water to meet the needs of people's lives and production for water resources. Water conservancy projects need to build dams, dikes, spillways, sluices, water inlets, channels, ferries, rafts, fishways and other different types of hydraulic structures to achieve their goals. The most commonly used in water conservancy projects are water pipelines. Due to the limited production length of water pipelines, they need to be docked and installed during the construction of water conservancy projects.

[0003] In order to facilitate the docking and installation of water conservancy projects, the prior art has made many improvements to the pipe docking device for water conservancy projects, such as the patent publication number CN220074455U, which discloses a water conservancy pipeline auxiliary docking device, including a mounting plate and a support seat, the interior of the mounting plate is provided with a placement groove, the inner top wall of the placement groove is provided with a storage groove, the inner side wall of the storage groove is provided with a first slide groove, the inner bottom wall of the first slide groove is fixedly connected with a fixing rod, the outer wall of the fixing rod is slidably connected with a connecting block, one side of the connecting block is fixedly connected with a connecting plate, the bottom of the connecting plate is fixedly connected with an extrusion plate, the top of the connecting plate is fixedly connected with a connecting column, the outside of the connecting column is provided with a second slide groove, and the inner top wall of the storage groove is provided with an empty groove. The utility model can facilitate the extrusion and fixing of pipes of different diameters to be docked to prevent deviation, facilitate people to fix the pipes to be docked for easy splicing, save a lot of manpower and material resources, and improve the use stability of the docking device.

[0004] The above patent has obvious beneficial effects, but still has the following shortcomings in actual operation:

[0005] In the above-mentioned comparative document, the water conservancy pipe is passed through the placement grooves on the two mounting plates, and the water conservancy pipe is squeezed by the extrusion plate, so as to align the ends of the two water conservancy pipes. However, in reality, if the docking device in the above-mentioned comparative document is used to dock the water conservancy pipes on site, the water conservancy pipe to be installed needs to be passed through the mounting plates. After the water conservancy pipe is installed, the device needs to be taken out along the water conservancy pipe. If the water conservancy pipe is long, it is more troublesome to take out the docking device. Therefore, there is an urgent need to improve the pipe docking device in this field to solve the defects of the prior art. Summary of the Invention

[0006] Aiming at the deficiencies of the prior art, the utility model provides a pipeline docking device, which facilitates installers to correct the installation of water conservancy pipelines and improves the installation efficiency of water conservancy pipelines during the construction of water conservancy projects at the same time.

[0007] To achieve the above object, the utility model provides the following technical solutions: A pipeline docking device includes two water conservancy pipelines to be docked and installed. Installation flanges are fixedly connected to the side surfaces of the opposite ends of the two water conservancy pipelines. The device further includes a C-shaped carrier. A docking cavity communicating with the outside and having an inner diameter larger than the outer diameter of the installation flange is formed in the carrier. Clamping frames adapted to the two installation flanges are slidably connected to the opposite side walls in the docking cavity. Extrusion chamfers are provided on the opposite side walls in the clamping frame. A first adjusting rod, one end of which is rotatably connected to the side surface of the clamping frame, penetrates and is threadedly connected to the opposite side surfaces of the carrier. A rotating unit for rotating the water conservancy pipeline is provided on the carrier.

[0008] Preferably, the rotating unit includes two symmetric sliding seats capable of sliding on the carrier. A second adjusting rod penetrates and is threadedly connected to the sliding seat. A connecting plate is provided at the lower end of the second adjusting rod. A plugging column adapted to the mounting holes on the installation flange is rotatably connected to the side surface of the connecting plate.

[0009] Preferably, a force-increasing rod is provided at one end of the first adjusting rod away from the clamping frame.

[0010] Preferably, two symmetric mounting ears are fixedly connected to one end of the first adjusting rod away from the clamping frame. A connecting shaft is fixedly connected between the two mounting ears. A让位槽 adapted to the connecting shaft is formed through the side surface of the force-increasing rod. A placing groove adapted to the force-increasing rod is formed at the upper end of the first adjusting rod.

[0011] Preferably, a communicating groove communicating with the outside is formed at one end of the carrier. Limiting grooves are formed on the opposite side walls in the communicating groove. The sliding seat is adapted to the communicating groove and the limiting grooves.

[0012] Preferably, a clamping plate is fixedly connected to one end of the second adjusting rod close to the connecting plate. A clamping groove communicating with the outside and adapted to the clamping plate is formed on the side surface of the connecting plate.

[0013] Preferably, two symmetric lifting lugs are fixedly installed on the upper side surface of the carrier.

[0014] Aiming at the deficiencies of the prior art, the utility model provides a pipeline docking device, which overcomes the deficiencies of the prior art. The beneficial effects of the utility model are as follows:

[0015] 1. In the utility model, a bearing frame is provided. When the mounting flanges between the ends of two water conservancy pipes need to be docked and installed, the bearing frame is clamped on the sides of the two mounting flanges, and the clamping frame is driven close to the mounting flanges by rotating the first adjusting rod. The two mounting flanges are squeezed by squeezing the bevel angle, and then the two mounting flanges are positioned and docked, which is convenient for the installers to correct the deviation of the water conservancy pipes and improve the efficiency of the installation of the water conservancy pipes during the construction of water conservancy projects.

[0016] 2. In the utility model, a rotating unit is provided, and the plug-in column on the connecting plate is plugged into the mounting hole on the mounting flange, and the position of the connecting plate is adjusted by the second adjusting rod. The connecting plate drives the mounting flange to rotate, and the mounting holes on the mounting flange can be aligned, which further facilitates the installation personnel to correct the connection and installation between the water conservancy pipes.

[0017] 3. In the utility model, a force rod is provided, which facilitates the installer to rotate the first adjusting rod. When the force rod is not needed, the force rod can be placed in the placement groove, which facilitates the installer to operate the first adjusting rod.

[0018] Other features and advantages of the utility model will be described in the following description, and partly become apparent from the description, or understood by implementing the utility model. The purpose and other advantages of the utility model can be realized and obtained by the structures indicated in the description, claims and drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. They are used together with the embodiments of the present invention to explain the present invention and do not constitute a limitation to the present invention.

[0020] Figure 1 This is a schematic diagram of the structure of the utility model when connecting water conservancy pipelines;

[0021] Figure 2 It is a structural schematic diagram of a partial cross-section of the carrier frame in the utility model;

[0022] Figure 3 It is a structural schematic diagram of the force rod extraction and placement slot in the utility model;

[0023] Figure 4 It is a structural schematic diagram of a part of the carrier frame in the utility model;

[0024] Figure 5 It is a structural schematic diagram of the sliding seat in the utility model.

[0025] In the figure: 1. Water conservancy pipeline; 2. Installation flange; 3. Bearing frame; 4. Docking cavity; 5. Clamping frame; 6. Extrusion bevel; 7. First adjusting rod; 8. Rotating unit; 9. Sliding seat; 10. Connecting plate; 11. Insertion column; 12. Second adjusting rod; 13. Force - adding rod; 14. Installation ear; 15. Connecting shaft; 16.让位槽 (Let - through groove); 17. Placing groove; 18. Connecting groove; 19. Limiting groove; 20. Clamping plate; 21. Clamping groove; 22. Lifting lug. Detailed implementation mode

[0026] Next, the technical solutions in the embodiments of the present utility model will be clearly and completely described in conjunction with the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only a part of the embodiments of the present utility model, rather than all the embodiments.

[0027] Embodiment 1

[0028] Please refer to Figure 1-Figure 5 , a pipeline docking device, including two water conservancy pipelines 1 to be docked and installed. Installation flanges 2 are fixedly connected to the side surfaces of the opposite ends of the two water conservancy pipelines 1. It further includes a U - shaped bearing frame 3. A docking cavity 4 that communicates with the outside and has an inner diameter larger than the outer diameter of the installation flange 2 is opened in the bearing frame 3. Clamping frames 5 that are adapted to the two installation flanges 2 are slidably connected to the opposite side walls in the docking cavity 4. Extrusion bevels 6 are provided on the opposite side walls in the clamping frame 5. The opposite side surfaces of the bearing frame 3 are penetrated and threadedly connected with a first adjusting rod 7 whose one end is rotatably connected to the side surface of the clamping frame 5. A rotating unit 8 for rotating the water conservancy pipeline 1 is provided on the bearing frame 3.

[0029] The specific implementation mode in this embodiment: When it is necessary to dock and install two water conservancy pipelines 1 during the construction of water conservancy projects, the water conservancy pipelines 1 are hoisted to the installation position by a lifting device, and the two ends are roughly abutted. When installing, the installer clamps the bearing frame 3 at the ends where the two water conservancy pipelines 1 need to be connected. By rotating the first adjusting rod 7, the first adjusting rod 7 drives the clamping frame 5 to move towards the installation flange 2. The clamping frame 5 is arc - shaped. The two installation flanges 2 are extruded through the extrusion bevels 6 until the side surfaces of the two installation flanges 2 are in contact with the two extrusion bevels 6, and through the extrusion of the extrusion bevels 6, the two installation flanges 2 approach and are close to each other. Subsequently, the two water conservancy pipelines 1 are rotated through the rotating unit 8 so that the positions of the installation holes on the two installation flanges 2 are aligned, and bolts are passed through the installation holes exposed outside to position the installation flanges 2. Then, the first adjusting rod 7 is rotated in the reverse direction, the rotating unit 8 is released, the bearing frame 3 is removed, and bolts are continued to be installed in other installation holes to complete the connection installation between the two water conservancy pipelines 1, which is convenient for the installer to perform deviation - correcting installation on the water conservancy pipelines 1.

[0030] Embodiment 2

[0031] See also Figure 1 , Figure 2 , Figure 4 and Figure 5 , this embodiment includes the above-mentioned embodiment, wherein the rotating unit 8 includes two symmetrical sliding seats 9 that can slide on the supporting frame 3, a second adjusting rod 12 passes through and is threadedly connected to the sliding seat 9, a connecting plate 10 is provided at the lower end of the second adjusting rod 12, and a plug-in column 11 that is adapted to the mounting hole on the mounting flange 2 is rotatably connected to the side of the connecting plate 10, a connecting groove 18 that is connected to the outside is opened at one end of the supporting frame 3, and limiting grooves 19 are opened on the opposite side walls of the connecting groove 18, the sliding seat 9 is adapted to the connecting groove 18 and the limiting groove 19, and a clamping plate 20 is fixedly connected to one end of the second adjusting rod 12 close to the connecting plate 10, and a clamping groove 21 that is connected to the outside and adapted to the clamping plate 20 is opened on the side of the connecting plate 10.

[0032] Specific implementation method in this embodiment: when it is necessary to align the mounting holes on the mounting flange 2, the plug-in column 11 is plugged into the mounting hole at the matching position on the mounting flange 2, the sliding seat 9 is inserted into the connecting groove 18 and the limiting groove 19, the clamping plate 20 is plugged into the clamping groove 21, and the clamping frame 5 is slightly loosened so that the mounting flange 2 can be rotated. According to the position of the mounting holes on the two mounting flanges 2 on site, the mounting flange 2 can be rotated by rotating the second adjusting rod 12. Since the mounting flange 2 is limited by the clamping frame 5, when the second adjusting rod 12 is rotated to drive the connecting plate 10 to move up or down, the mounting flange 2 will rotate. When the mounting flange 2 rotates, the second adjusting rod 12 The position of the second adjusting rod 12 needs to be changed accordingly. At this time, the sliding seat 9 can slide in the limit groove 19, and the plug-in column 11 and the connecting plate 10 are rotatably connected, which can respectively drive the two mounting flanges 2 to rotate, and observe the mounting holes on the mounting flanges 2 in real time. When the mounting holes on the two mounting flanges 2 are aligned, bolts are passed through the two mounting holes, and the first adjusting rod 7 is tightened to make the clamping frame 5 press the two mounting flanges 2. At the same time, the second adjusting rod 12 is loosened, the connecting plate 10 and the sliding seat 9 are removed, and the bolts are continued to be installed in the other mounting holes, so as to facilitate the installation personnel to correct the connection and installation between the water conservancy pipes 1.

[0033] Embodiment 3

[0034] See also Figure 1-Figure 4 This embodiment includes all the above embodiments, which further includes: a force rod 13 is provided at one end of the first adjusting rod 7 away from the clamping frame 5, two symmetrical mounting ears 14 are fixedly connected to the one end of the first adjusting rod 7 away from the clamping frame 5, a connecting shaft 15 is fixedly connected between the two mounting ears 14, a make way groove 16 adapted to the connecting shaft 15 is opened through the side of the force rod 13, a placement groove 17 adapted to the force rod 13 is opened at the upper end of the first adjusting rod 7, and two symmetrical lifting ears 22 are fixedly installed on the upper side of the carrier frame 3.

[0035] The specific implementation method in this embodiment is as follows: the force rod 13 is used to facilitate the installer to rotate the first adjustment rod 7. When the force rod 13 is not needed, the force rod 13 is rotated in the connecting shaft 15 through the clearance groove 16, and the force rod 13 is inserted into the placement groove 17 for placement, which is convenient for storing the force rod 13. The lifting ear 22 facilitates the lifting and transfer of the carrier frame 3.

[0036] The above description is only a preferred embodiment of the utility model and is not intended to limit the utility model. Although the utility model is described in detail with reference to the above embodiments, those skilled in the art can still modify the technical solutions recorded in the above embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.

Claims

1. A pipe docking device, comprising two water conservancy pipes (1) to be docked and installed, the sides of the two water conservancy pipes (1) facing each other are fixedly connected with mounting flanges (2), characterized in that: It further includes a carrier frame (3) in a C shape. A docking cavity (4) that communicates with the outside and has an inner diameter larger than the outer diameter of the mounting flange (2) is provided in the carrier frame (3). Clamping frames (5) adapted to the two mounting flanges (2) are slidably connected to the opposite side walls in the docking cavity (4). Extrusion chamfers (6) are provided on the opposite side walls in the clamping frame (5). A first adjusting rod (7) with one end rotatably connected to the side surface of the clamping frame (5) penetrates and is threadedly connected to the opposite side surfaces of the carrier frame (3). A rotating unit (8) for rotating the water pipeline (1) is provided on the carrier frame (3).

2. A pipe docking device according to claim 1, characterized in that: The rotating unit (8) includes two symmetric sliding seats (9) that can slide on the carrier frame (3). A second adjusting rod (12) penetrates and is threadedly connected to the sliding seat (9). A connecting plate (10) is provided at the lower end of the second adjusting rod (12). A plugging post (11) adapted to the mounting holes on the mounting flange (2) is rotatably connected to the side surface of the connecting plate (10).

3. A pipe docking device according to claim 1, characterized in that: A force - adding rod (13) is provided at the end of the first adjusting rod (7) away from the clamping frame (5).

4. A pipe docking device according to claim 3, characterized in that: Two symmetric mounting ears (14) are fixedly connected to the end of the first adjusting rod (7) away from the clamping frame (5). A connecting shaft (15) is fixedly connected between the two mounting ears (14). A让位槽 (16) adapted to the connecting shaft (15) is provided through - opened on the side surface of the force - adding rod (13). A placing groove (17) adapted to the force - adding rod (13) is opened at the upper end of the first adjusting rod (7).

5. A pipe docking device according to claim 2, characterized in that: A communicating groove (18) that communicates with the outside is opened at one end of the carrier frame (3). Limiting grooves (19) are opened on the opposite side walls in the communicating groove (18). The sliding seat (9) is adapted to the communicating groove (18) and the limiting grooves (19).

6. A pipe docking device according to claim 2, characterized in that: A clamping plate (20) is fixedly connected to the end of the second adjusting rod (12) close to the connecting plate (10). A clamping groove (21) that communicates with the outside and is adapted to the clamping plate (20) is opened on the side surface of the connecting plate (10).

7. The pipe docking device according to claim 1, characterized in that: Two symmetric lifting lugs (22) are fixedly installed on the upper side surface of the carrier frame (3).

Citation Information

Patent Citations

  • Auxiliary butting device for water conservancy pipelines

    CN220074455U

Cited By

  • A connection device for water conservancy pipelines

    CN224630689U