Prefabricated pipe pile splicing device
By designing a prefabricated pipe pile connecting device, using a butt collar, elastic cushion layer and telescopic support rod, the misalignment problem caused by manual push and support during the traditional welding process is solved, and the rapid alignment and high-quality welding of pipe piles are achieved.
Patent Information
- Application Number
- CN202421586444.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-05
- Publication Date
- 2025-04-18
- Estimated Expiration
- 2034-07-05
AI Technical Summary
During the traditional welding process of prefabricated pipe piles, manual pushing and supporting makes it difficult to control the welding quality, and it is prone to docking misalignment, which affects the accuracy of the butt of the pipe pile head and the stability of the construction quality.
A prefabricated pipe pile connecting device is designed, including a butt collar, an elastic cushion layer and a removable telescopic support rod, which enables rapid alignment and stable connection of pipe piles through pulling bolts and connecting wings.
Effectively ensure the rapid alignment of the upper and lower prefabricated pipe piles, avoid misalignment, improve welding quality, ensure the hammer, tensile and bending strength of the pipe piles, and simplify the construction process.
Smart Images

Figure CN222771472U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of prefabricated pipe pile construction, in particular to a prefabricated pipe pile connecting device. Background Art
[0002] At present, when constructing prefabricated pipe piles, due to the large depth required by the construction design, a single prefabricated pipe pile is difficult to meet the existing construction design requirements, so most of them use the method of connecting piles to connect the two ends of the prefabricated pipe piles to meet the design and construction requirements. The installation of prefabricated pipe piles is carried out by static pressure or hammering, and pipe pile butt welding is required during the construction process.
[0003] The traditional welding method is to weld short steel bars on the end plate and manually push and support the pipe piles for welding. The welding quality is difficult to control, and it is easy to cause misalignment between the upper and lower pipe piles. In addition, manual pushing and supporting for pipe pile welding is very time-consuming and labor-intensive, and cannot effectively ensure the accuracy of the pipe pile head welding and the stability of the construction quality.
[0004] Therefore, a prefabricated pipe pile connecting device is proposed to solve the above technical problems. Utility Model Content
[0005] The technical problem solved by the utility model is that the traditional welding process of prefabricated pipe piles is usually manual pushing and supporting, the welding quality is difficult to control, and the docking misalignment is prone to occur, which leads to the accuracy of the docking of the pipe pile heads and the stability of the construction quality being affected.
[0006] In order to solve the above technical problems, the technical solutions adopted by the present utility model are as follows:
[0007] A prefabricated pipe pile connection device, comprising a butt collar, the butt collar comprising a left half-ring and a right half-ring sleeved on the head of the prefabricated pipe pile, the connection surfaces of the left half-ring and the right half-ring being provided with a connection wing plate extending radially outwardly along the prefabricated pipe pile, the connection wing plate being provided with a tension bolt hole, and the tension bolt hole being provided with a tension bolt; and also comprising an elastic cushion layer arranged on the butt collar;
[0008] It also includes a plurality of telescopic support rods detachably arranged at the bottom of the docking collar, the telescopic support rods including a sleeve rod and an insertion rod, the insertion rod is locked by a fixing bolt penetrating the sleeve rod wall; the top of the telescopic support rod is also provided with an L-shaped pad, the pad is arranged at the bottom of the docking collar by a transverse mounting bolt;
[0009] A plurality of horizontal through grooves are also provided in the middle of the butt-jointing collar, and the height of the horizontal through grooves is the same as the connecting height of the upper and lower prefabricated pipe piles.
[0010] Particularly, a horizontal support plate is also provided at the bottom of the telescopic support rod.
[0011] Particularly, at least two tension bolts are arranged on the connecting wing plate, and adjacent tension bolts are arranged in opposite directions.
[0012] Particularly, the top of the docking ring is further provided with two semi-funnel-shaped docking rings which are respectively arranged on the left half ring and the right half ring.
[0013] Furthermore, a rigid cushion layer is fixed to the inner wall of the docking ring.
[0014] Compared with the prior art, the utility model has the following advantages and beneficial effects: the utility model has a simple structure and is quick to install. At the same time, it can effectively ensure that the upper and lower prefabricated pipe piles are quickly aligned, and it is convenient to carry out welding construction, avoiding the misalignment of the weld caused by the misalignment of the pipe piles, which affects the hammer resistance, tension resistance and bending resistance of the prefabricated pipe piles; at the same time, the telescopic support rod at the bottom can effectively support the left half ring and the right half ring that have not been fixed and locked, so as to facilitate the adjustment of the height of the docking ring and the alignment of the weld height. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 It is a structural schematic diagram of the utility model.
[0016] The meanings of the numbers in the figure are: left half ring—1, right half ring—2, connecting wing plate—3, tension bolt—4, elastic cushion—5, telescopic support rod—6, sleeve rod—61, insert rod—62, fixing bolt—63, pad—7, mounting bolt—71, horizontal through groove—8, horizontal support plate—9, docking ring—10. DETAILED DESCRIPTION
[0017] The following will clearly and completely describe the technical solutions in the embodiments of the utility model in conjunction with the accompanying drawings in the embodiments of the utility model, so as to have a further understanding of the concept of the utility model, the technical problems solved, the technical features constituting the technical solutions and the technical effects brought about.
[0018] like Figure 1 As shown, a prefabricated pipe pile connection device comprises a butt collar, wherein the butt collar comprises a left half-ring 1 and a right half-ring 2 which are sleeved on the head of the prefabricated pipe pile, a connection wing plate 3 which extends radially outwardly along the prefabricated pipe pile is provided on the connection surface of the left half-ring 1 and the right half-ring 2, a tension bolt hole is provided on the connection wing plate 3, and a tension bolt 4 is provided in the tension bolt hole; and an elastic cushion layer 5 is also provided on the butt collar;
[0019] It also includes a plurality of telescopic support rods 6 detachably arranged at the bottom of the docking collar, the telescopic support rods 6 including a sleeve rod 61 and an insertion rod 62, the insertion rod 62 is locked by a fixing bolt 63 penetrating the rod wall of the sleeve rod 61; an L-shaped pad 7 is also arranged on the top of the telescopic support rod 6, and the pad 7 is arranged at the bottom of the docking collar by a transverse mounting bolt 71;
[0020] A plurality of horizontal through grooves 8 are also provided in the middle of the butt-jointing collar, and the height of the horizontal through grooves 8 is the same as the connecting height of the upper and lower prefabricated pipe piles.
[0021] In the present invention, the main working principle is as follows: first, the telescopic support rod 6 is installed at the bottom of the docking collar through the pad 7 and the mounting bolts 71, and then the left half ring 1 and the right half ring 2 of the present invention device are sleeved on the pile head of the bottom prefabricated pipe pile, and pre-connected through the tension bolts 4. Then, by adjusting the height of the bottom telescopic support rod 6, the telescopic support rod 6 can support the pre-connected docking collar, and just expose the welding seam of the upper and lower pipe piles from the horizontal through groove 8. Then, the prefabricated pipe pile to be connected is lifted, and the pre-docking collar at the bottom of the pipe pile is aligned from the top of the docking collar and then slowly lowered. Finally, the left half ring 1 and the right half ring 2 are locked by the tension bolts 4 to ensure that the sleeve is firmly tied and the elastic cushion layer 5 is used to prevent the pipe pile from being damaged by excessive force. The docking collar can ensure that the upper and lower prefabricated pipe piles are quickly aligned to avoid the misalignment of the prefabricated pipe piles.
[0022] As a preferred embodiment, a horizontal support plate 9 is further provided at the bottom of the telescopic support rod 6 .
[0023] In this embodiment, the purpose of setting the horizontal support plate 9 at the bottom of the telescopic support rod 6 is to ensure that the connecting wing plates 3 on both sides are evenly stressed, effectively ensure that the connecting wing plates 3 on both sides are tightly fitted, and ensure the docking effect of the prefabricated pipe piles.
[0024] As a preferred embodiment, at least two tension bolts 4 are provided on the connecting wing plate 3, and adjacent tension bolts 4 are arranged in opposite directions.
[0025] In this embodiment, the telescopic support rod 6 and the docking ring can be installed on an uneven ground through the horizontal support plate 9, which effectively simplifies the use environment requirements and increases the versatility of the device of the utility model.
[0026] As a preferred embodiment, two semi-funnel-shaped docking rings 10 are respectively arranged on the left half ring 1 and the right half ring 2 at the top of the docking ring.
[0027] In this embodiment, the docking ring 10 is used to help the prefabricated pipe piles to be connected to be quickly placed in place, speed up the pipe pile docking speed, and improve the construction efficiency.
[0028] As a further embodiment, a rigid cushion layer is fixed to the inner wall of the docking ring 10 .
[0029] In this embodiment, the role of the rigid cushion layer is to facilitate the sliding of the piped pile during the falling process, so that the piped pile can be quickly placed and slide into the lowered docking ring as quickly as possible.
[0030] The words “connection” and “fixation” appearing in the description of the present invention may refer to fixed connection, processing and forming, welding, or mechanical connection. The specific meanings of the above terms in the present invention shall be understood according to the specific circumstances.
[0031] In the description of the present invention, the terms "center", "upper", "lower", "horizontal", "inner", "outer", etc., which indicate the orientation or position relationship, are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying a specific orientation that the device or element referred to must have, and therefore cannot be understood as a limitation on the present invention.
[0032] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the utility model, rather than to limit it. Although the utility model has been described in detail with reference to the aforementioned embodiments, ordinary technicians in the field should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not make the essence of the corresponding technical solutions deviate from the scope of the technical solutions of the embodiments of the utility model.
Claims
1. A prefabricated pipe pile connection device, characterized in that: The invention comprises a butt joint collar, the butt joint collar comprises a left half-ring (1) and a right half-ring (2) sleeved on the head of a prefabricated pipe pile, the connection surfaces of the left half-ring (1) and the right half-ring (2) are provided with a connection wing plate (3) extending radially outwardly along the prefabricated pipe pile, the connection wing plate (3) is provided with a tension bolt hole, and a tension bolt (4) is provided in the tension bolt hole; and the butt joint collar also comprises an elastic cushion layer (5) arranged on the butt joint collar; It also includes a plurality of telescopic support rods (6) detachably arranged at the bottom of the docking collar, the telescopic support rods (6) including a sleeve rod (61) and an insertion rod (62), the insertion rod (62) being locked by a fixing bolt (63) penetrating the rod wall of the sleeve rod (61); an L-shaped pad (7) is also arranged at the top of the telescopic support rod (6), the pad (7) being arranged at the bottom of the docking collar by a transverse mounting bolt (71); A plurality of horizontal through grooves (8) are also provided in the middle of the butt-jointing collar, and the height of the horizontal through grooves (8) is the same as the connecting height of the upper and lower prefabricated pipe piles.
2. A prefabricated pipe pile connection device as claimed in claim 1, characterized in that: A horizontal support plate (9) is also provided at the bottom of the telescopic support rod (6).
3. A prefabricated pipe pile connection device as claimed in claim 1, characterized in that: At least two tension bolts (4) are provided on the connecting wing plate (3), and adjacent tension bolts (4) are arranged in opposite directions.
4. A prefabricated pipe pile connection device as claimed in claim 1, characterized in that: The top of the butt joint ring is also provided with two semi-funnel-shaped butt joint rings (10) which are respectively arranged on the left half ring (1) and the right half ring (2).
5. A prefabricated pipe pile connection device as claimed in claim 4, characterized in that: A rigid cushion layer is fixed to the inner wall of the docking ring (10).