Mounting structure and air conditioner
By designing an installation structure including sliding channels, the problem of difficulty in installing ceiling-type air conditioning indoor units is solved, and the separate suspension of air conditioning indoor units is realized and the installation process is simplified.
Patent Information
- Application Number
- CN202420658278.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-01
- Publication Date
- 2025-04-18
- Estimated Expiration
- 2034-04-01
AI Technical Summary
The installation of ceiling-mounted air conditioning indoor unit is difficult and requires multiple people to cooperate, which leads to a complicated and time-consuming installation process.
An installation structure is provided, including a first bracket and a second bracket, the first bracket is configured with a sliding passage, and the slider of the second bracket can slide into the sliding passage, through which the air conditioning indoor unit can be suspended separately from the ceiling, reducing the number and efforts of the installation workers.
The separate suspension and installation of air-conditioning indoor units is realized, reducing the number of installation workers, simplifying the installation process, and reducing installation difficulty and time.
Smart Images

Figure CN222773411U_ABST
Abstract
Description
Technical Field
[0001] The embodiments of the present application belong to the technical field of air conditioner installation, and specifically relate to a mounting structure and an air conditioner. Background Art
[0002] The ceiling-mounted air conditioner indoor unit is usually installed on the ceiling. During installation, the top end of the expansion screw is fixed to the ceiling, and the bottom end of the expansion screw is hung into the hanging foot of the air conditioner indoor unit to suspend the air conditioner indoor unit on the ceiling. Then, the pipeline connected to the air conditioner outdoor unit is connected to the side of the air conditioner indoor unit, thereby realizing the connection between the air conditioner indoor unit and the air conditioner outdoor unit.
[0003] However, when it is necessary to place one side of the air-conditioning indoor unit for connecting the pipeline close to the side wall, due to the large size and weight of the air-conditioning indoor unit, at least two installation workers are required to lift the air-conditioning indoor unit, and at least one other installation worker is required to connect the pipeline to the air-conditioning indoor unit, and then hoist the air-conditioning indoor unit on the expansion screw. The entire installation process requires the cooperation of multiple people to complete, and the installation is difficult.
[0004] Accordingly, the art needs a new installation structure to solve the above problems. Utility Model Content
[0005] The main purpose of the embodiments of the present application is to provide a mounting structure and an air conditioner to solve the problem of difficulty in installing a ceiling-mounted air conditioner indoor unit in the related art.
[0006] To achieve the above-mentioned purpose, an embodiment of the present application provides an installation structure, including a bracket assembly, the bracket assembly including: a first bracket, which is configured with a sliding channel extending along a first direction, the front end of the sliding channel along the first direction passes through the first bracket, and the first bracket is configured to be connected to the ceiling; a second bracket, which includes a frame body and a sliding member, the frame body is configured to be connected to the outer side of the air-conditioning indoor unit along the second direction, the sliding member is arranged on the outer side of the frame body, and is slidably arranged in the sliding channel.
[0007] In a preferred technical solution of the above-mentioned mounting structure, the mounting structure includes at least two bracket assemblies, and the at least two bracket assemblies are configured to be connected to two sides of the air-conditioning indoor unit along the second direction.
[0008] In the preferred technical solution of the above-mentioned mounting structure, the first bracket is constructed with a first bayonet, the first bayonet is located below the sliding channel and is connected to the sliding channel, the first bayonet is spaced apart from the rear end of the sliding channel along the first direction, and the sliding member can be clamped in the first bayonet.
[0009] In a preferred technical solution of the above-mentioned installation structure, the sliding member includes a sliding rod, and the axis of the sliding rod is parallel to the second direction.
[0010] In the preferred technical solution of the above-mentioned installation structure, the sliding member also includes a locking member, which is arranged at the end of the sliding rod facing away from the frame body, and the locking member is located on the outside of the first bracket, and at least a partial projection of the locking member on the first bracket is located outside the sliding channel.
[0011] In the preferred technical solution of the above-mentioned installation structure, the sliding channel includes a front end slide, which is located at the front end of the sliding channel along the first direction, and the length of the front end slide along the third direction gradually increases from the rear end to the front end of the first bracket.
[0012] In a preferred technical solution of the above-mentioned mounting structure, the second bracket further includes a stopper, which is disposed at the front end of the bracket along the first direction, and the stopper abuts against the front end of the first bracket.
[0013] In a preferred technical solution of the above-mentioned mounting structure, a first connecting hole is configured at the top of the first bracket; the bracket assembly also includes a connecting member, the connecting member includes a connecting rod and a first fixing member, the axis of the connecting member is parallel to the third direction, the top of the connecting member is configured to be connected to the ceiling, the first fixing member is connected to the connecting rod, the connecting member is inserted into the first connecting hole, and the top of the first fixing member abuts against the first bracket.
[0014] In the preferred technical solution of the above-mentioned mounting structure, a second connecting hole is constructed on the top of the frame, the second connecting hole corresponds to the first connecting hole, and the rear end of the second connecting hole along the first direction passes through the frame; the connecting member also includes a second fixing member, the second fixing member is connected to the connecting rod, and is spaced below the first fixing member, the connecting rod located between the first fixing member and the second fixing member is passed through the second connecting hole, and the top of the second fixing member abuts against the frame.
[0015] An embodiment of the present application further provides an air conditioner, comprising an air conditioner indoor unit and the mounting structure in the above embodiment, wherein the air conditioner indoor unit comprises a shell, and a frame included in the mounting structure is connected to the shell.
[0016] It can be understood by those skilled in the art that the mounting structure and the air conditioner of the embodiment of the present application, the mounting structure includes a bracket assembly, the bracket assembly includes a first bracket and a second bracket, the first bracket is configured with a sliding channel extending along a first direction, the front end of the sliding channel along the first direction passes through the first bracket, and the first bracket is configured to be connected to the ceiling; the second bracket includes a frame and a sliding member, the frame is configured to be connected to the outer side of the air conditioner indoor unit along the second direction, the sliding member is arranged on the outer side of the frame and slides in the sliding channel. Through the above-mentioned arrangement, when the air-conditioning indoor unit is installed through the installation structure, the first bracket and the second bracket are separated, the first bracket is first connected to the ceiling, and then the second bracket is connected to both sides of the air-conditioning indoor unit along the second direction. After completion, two installation workers lift the air-conditioning indoor unit, so that the sliding member slides into the sliding channel from the front end of the sliding channel, and maintains a certain interval with the rear end of the sliding channel, so as to reserve space for installing pipelines between the rear side and the side wall of the air-conditioning indoor unit. Then the lifting workers no longer need to lift the air-conditioning indoor unit. After connecting the pipeline to the air-conditioning indoor unit, the air-conditioning indoor unit is pushed to the rear end until the rear side of the air-conditioning indoor unit fits with the side wall, thus completing the installation of the air-conditioning indoor unit. The whole process is simple and only requires at most two installation workers to complete, which is more time-saving and labor-saving. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] The preferred implementation of the installation structure of the embodiment of the present application is described below with reference to the accompanying drawings. The accompanying drawings are:
[0018] Figure 1 The mounting structure of the embodiment of the present application is connected to the indoor unit of the air conditioner. Figure 1 ;
[0019] Figure 2 The mounting structure of the embodiment of the present application is connected to the indoor unit of the air conditioner. Figure 2 ;
[0020] Figure 3 This is a schematic diagram of the installation structure of the embodiment of the present application. Figure 1 ;
[0021] Figure 4 The explosion of the installation structure of the embodiment of the present application Figure 1 ;
[0022] Figure 5 The explosion of the installation structure of the embodiment of the present application Figure 2 .
[0023] In the attached figure:
[0024] 100. Bracket assembly;
[0025] 110. The first bracket;
[0026] 111. Sliding channel; 112. Front slideway;
[0027] 113. First bayonet; 114. Second bayonet;
[0028] 115. First connecting hole; 116. Third bayonet;
[0029] 117. a first plate body; 118. a first folded edge;
[0030] 120, second bracket;
[0031] 121, frame;
[0032] 1211, second connection hole; 1212, assembly hole;
[0033] 1213. second plate body; 1214. second folded edge;
[0034] 122. Sliding parts;
[0035] 1221. Sliding rod; 1222. Positioning member;
[0036] 123. Stopper;
[0037] 130. Connectors;
[0038] 131. Connecting rod; 132. First fixing member;
[0039] 133. second fixing member;
[0040] 200. Air conditioner indoor unit;
[0041] 210. Shell. DETAILED DESCRIPTION
[0042] First, those skilled in the art should understand that these implementations are only used to explain the technical principles of the embodiments of the present application, and are not intended to limit the protection scope of the embodiments of the present application. Those skilled in the art can make adjustments to them as needed to adapt to specific application scenarios.
[0043] Secondly, it should be noted that in the description of the embodiments of the present application, terms such as "inside" and "outside" indicating directions or positional relationships are based on the directions or positional relationships shown in the accompanying drawings. This is only for the convenience of description and does not indicate or imply that the device or component must have a specific orientation, be constructed and operated in a specific orientation. Therefore, it cannot be understood as a limitation on the embodiments of the present application.
[0044] In addition, it should be noted that in the description of the embodiments of the present application, unless otherwise clearly specified and limited, the terms "connected" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For those skilled in the art, the specific meanings of the above terms in the embodiments of the present application can be understood according to the specific circumstances.
[0045] In order to make the purpose, technical solution and advantages of the embodiments of the present application clearer, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0046] As described in the background technology, the ceiling-mounted air-conditioning indoor unit in the related technology has the problem of great difficulty in installation. The inventor has found through research that the reason for this problem is that in the related technology, the ceiling-mounted air-conditioning indoor unit is connected to the ceiling by expansion screws. When it is necessary to put one side of the air-conditioning indoor unit for connecting the pipeline close to the side wall, due to the large size and weight of the air-conditioning indoor unit, at least two installation workers are required to lift the air-conditioning indoor unit, and at least one installation worker is required to connect the pipeline to the air-conditioning indoor unit, and then hoist the air-conditioning indoor unit on the expansion screw. The entire installation process requires the cooperation of multiple people to complete, resulting in the problem of great difficulty in installing the air-conditioning indoor unit.
[0047] In view of the above technical problems, an embodiment of the present application provides an installation structure and an air conditioner, wherein the first bracket is configured with a sliding channel, and the sliding member of the second bracket can be slid into the sliding channel from the front end of the sliding channel. When the air conditioner indoor unit is installed through the installation structure, the first bracket and the second bracket are separated, the first bracket is first connected to the ceiling, and then the second bracket is connected to both sides of the air conditioner indoor unit along the second direction. After completion, two installation workers lift the air conditioner indoor unit so that the sliding member slides into the sliding channel from the front end of the sliding channel and maintains a certain interval with the rear end of the sliding channel (at this time, the sliding member does not need to slide into the rear end of the sliding channel to reserve space for installing pipelines between the rear side and the side wall of the air conditioner indoor unit. After the sliding member slides into the sliding channel, the air conditioner indoor unit has been suspended on the ceiling through the installation structure, and there is no need to lift the air conditioner indoor unit). The lifting worker releases the air conditioner indoor unit, connects the pipeline to the air conditioner indoor unit, and then pushes the air conditioner indoor unit to the rear end until the rear side of the air conditioner indoor unit fits with the side wall, thus completing the installation of the air conditioner indoor unit. The whole process is simple and can be completed by only two installation workers at most, which is more time-saving and labor-saving.
[0048] The principles and features of the embodiments of the present application are described below in conjunction with the accompanying drawings. The examples given are only used to explain the embodiments of the present application and are not used to limit the scope of the embodiments of the present application.
[0049] The air conditioner provided in the embodiment of the present application includes an air conditioner indoor unit, an air conditioner outdoor unit and a mounting structure. The air conditioner indoor unit is used to be set on the indoor ceiling, and the air conditioner outdoor unit is used to be set outdoors. The air conditioner indoor unit and the air conditioner outdoor unit are connected by pipelines.
[0050] The pipelines may include refrigerant pipelines, connecting cables, and drain pipes. The refrigerant pipeline is used to connect the refrigerant in the indoor unit of the air conditioner to the outdoor unit of the air conditioner. The connecting cable is used to connect the electrical parts of the indoor unit of the air conditioner to the outdoor unit of the air conditioner to ensure the normal operation of the electrical components in the indoor unit of the air conditioner and the outdoor unit of the air conditioner. The drain pipe is used to guide the condensed water generated on the surface of the indoor heat exchanger when the air conditioner is cooling to the outside for discharge.
[0051] The rear side of the air-conditioning indoor unit in this embodiment is used for connecting pipelines, wherein the rear side of the air-conditioning indoor unit refers to the side facing the side wall.
[0052] refer to Figure 1 and Figure 2 The air-conditioning indoor unit 200 in the embodiment of the present application can be suspended on the ceiling through the mounting structure, and after the installation is completed, one side of the air-conditioning indoor unit 200 for connecting the pipeline is in contact with the side wall.
[0053] The principles and features of the installation structure in the embodiments of the present application are described below.
[0054] refer to Figure 1-Figure 4 The installation structure provided in the embodiment of the present application includes a bracket assembly 100, and the bracket assembly 100 includes a first bracket 110 and a second bracket 120. The first bracket 110 is used to be connected to the ceiling, and the second bracket 120 is used to be connected to the shell 210 of the air-conditioning indoor unit 200. The first bracket 110 and the second bracket 120 are connected in cooperation, so that the air-conditioning indoor unit 200 is suspended on the ceiling.
[0055] The first bracket 110 is configured with a sliding channel 111 extending along the first direction X. The front end of the sliding channel 111 along the first direction X passes through the first bracket 110. The first bracket 110 is configured to be connected to the ceiling, and the rear end of the first bracket 110 is used to face the side wall.
[0056] The second bracket 120 includes a frame 121 and a sliding member 122. The frame 121 is constructed to be connected to the outer side of the air-conditioning indoor unit 200 along the second direction Y. The sliding member 122 is arranged on the outer side of the frame 121 (the side of the frame 121 away from the air-conditioning indoor unit 200) and is slidably arranged in the sliding channel 111.
[0057] The first direction X may be perpendicular to the side wall, and the second direction Y may be parallel to the ceiling and perpendicular to the first direction X.
[0058] When the air conditioner indoor unit 200 is connected to the ceiling through the mounting structure, the first bracket 110 and the second bracket 120 are separated, and the first bracket 110 is first connected to the ceiling, and the rear end of the first bracket 110 faces the side wall. The mounting position of the first bracket 110 on the ceiling is reasonably set so that after the air conditioner indoor unit 200 is installed, the rear side of the air conditioner indoor unit 200 can be basically attached to the side wall, so that the air conditioner indoor unit 200 is more beautiful after installation. Then connect the second bracket 120 to both sides of the air-conditioning indoor unit 200 along the second direction Y. After completion, two installation workers lift the whole formed by the air-conditioning indoor unit 200 and the second bracket 120, so that the sliding member 122 slides from the front end of the sliding channel 111 into the sliding channel 111, and maintains a certain distance from the rear end of the sliding channel 111 (at this time, the sliding member 122 does not need to slide into the rear end of the sliding channel 111, so as to reserve space for installing pipelines between the rear side of the air-conditioning indoor unit 200 and the side wall. After the sliding member 122 slides into the sliding channel 111, the air-conditioning indoor unit 200 has been suspended on the ceiling through the installation structure, and the installation workers do not need to lift the air-conditioning indoor unit 200 at this time). The lifting worker releases the air-conditioning indoor unit 200, connects the pipeline to the air-conditioning indoor unit 200, and then pushes the air-conditioning indoor unit 200 to the rear end until the rear side of the air-conditioning indoor unit 200 fits with the side wall, and the installation of the air-conditioning indoor unit 200 is completed.
[0059] The installation structure in this embodiment includes a bracket assembly 100, which includes a first bracket 110 and a second bracket 120. The first bracket 110 is configured with a sliding channel 111 extending along a first direction X, and the front end of the sliding channel 111 along the first direction X passes through the first bracket 110, and the first bracket 110 is configured to be connected to the ceiling; the second bracket 120 includes a frame 121 and a sliding member 122, and the frame 121 is configured to be connected to the outer side of the air-conditioning indoor unit 200 along the second direction Y, and the sliding member 122 is arranged on the outer side of the frame 121 and is slidably arranged in the sliding channel 111. Through the above-mentioned arrangement, when the installation structure is in use, the first bracket 110 is first connected to the ceiling, and then the second bracket 120 is connected to both sides of the air-conditioning indoor unit 200 along the second direction Y, and then the sliding member 122 of the second bracket 120 is slid from the front end of the sliding channel 111 into the position between the two ends of the sliding channel 111, and then the pipeline is connected to the rear side of the air-conditioning indoor unit 200. After completion, the air-conditioning indoor unit 200 is pushed to the rear end until the rear side of the air-conditioning indoor unit 200 is in contact with the side wall, and the installation of the air-conditioning indoor unit 200 is completed. The whole process is simple and only requires a maximum of two installation workers to complete it, which is more time-saving and labor-saving.
[0060] refer to Figure 1 In some embodiments, the mounting structure may include at least two bracket assemblies 100, and the at least two bracket assemblies 100 are used to connect to both sides of the air-conditioning indoor unit 200 along the second direction Y, so that during the installation of the air-conditioning indoor unit 200, both sides of the air-conditioning indoor unit 200 along the second direction Y are supported by the bracket assemblies 100, which can improve the stability of the air-conditioning indoor unit 200 during the installation process; in addition, the two sides of the air-conditioning indoor unit 200 along the second direction Y are connected to the ceiling through the mounting structure, thereby improving the connection strength between the air-conditioning indoor unit 200 and the ceiling.
[0061] refer to Figure 2 and Figure 3 In some embodiments, the frame 121 may be configured with an assembly hole 1212, and the assembly hole 1212 is configured to be connected to the indoor unit. When the air conditioner indoor unit 200 and the second bracket 120 are connected, the assembly hole 1212 is used to correspond to the process hole on the housing 210, and the fixing bolt is passed through the assembly hole 1212 and the process hole to connect the second bracket 120 to the outer side of the housing 210 along the second direction Y.
[0062] Furthermore, there may be a plurality of assembly holes 1212 to improve the connection strength between the second bracket 120 and the housing 210 .
[0063] In some embodiments, there can be multiple sliding channels 111, and the multiple sliding channels 111 are arranged at intervals along the third direction Z; accordingly, there can be multiple sliding rods 1221, and the multiple sliding rods 1221 and the multiple sliding channels 111 are arranged one by one, and each sliding rod 1221 is slid into the corresponding sliding channel 111 respectively. On the one hand, the supporting strength of the first bracket 110 to the second bracket 120 can be improved, and on the other hand, it can avoid the second bracket 120 and the first bracket 110 from easily rotating around the axis of the sliding rod 1221 when there is only one sliding rod 1221.
[0064] refer to Figure 2 and Figure 3 In some embodiments, the first bracket 110 can be constructed with a first bayonet 113, which is located below the sliding channel 111 and is connected to the sliding channel 111. The first bayonet 113 is spaced apart from the sliding channel 111 at the rear end along the first direction X, and the sliding member 122 can be clamped in the first bayonet 113.
[0065] The distance between the first bayonet 113 and the rear end of the sliding channel 111 is reasonably set so that when the sliding member 122 is locked in the first bayonet 113, the distance between the rear side of the air-conditioning indoor unit 200 and the side wall can meet the space requirement for installing the pipeline on the rear side of the air-conditioning indoor unit 200.
[0066] The first bracket 110 is connected to the ceiling, and the rear end of the first bracket 110 faces the side wall. After the second bracket 120 is connected to both sides of the air conditioner indoor unit 200 along the second direction Y, the installer lifts the whole consisting of the air conditioner indoor unit 200 and the second bracket 120, and slides the sliding member 122 from the front end of the sliding channel 111 into the sliding channel 111, until the sliding member 122 is clamped in the first clamping port 113, the pipeline can be connected to the rear side of the air conditioner indoor unit 200.
[0067] After the sliding member 122 is locked in the first clamping hole 113, the two side edges of the first clamping hole 113 along the first direction X can limit the sliding member 122 to prevent the air conditioner indoor unit 200 from shaking along the first direction X when installing the pipeline.
[0068] In some embodiments, the first bracket 110 may also be configured with a second bayonet 114 , which is located below the sliding channel 111 and correspondingly communicated with the rear end of the sliding channel 111 , and the sliding member 122 may be clamped in the second bayonet 114 .
[0069] The installation position of the first bracket 110 on the ceiling is reasonably set so that when the sliding member 122 slides into the rear end of the sliding channel 111, the rear side of the air-conditioning indoor unit 200 can basically fit the side wall, so as to improve the overall aesthetics of the room after the air-conditioning indoor unit 200 is installed.
[0070] After the sliding member 122 is locked in the second clamping hole 114, the two side edges of the second clamping hole 114 along the first direction X can limit the sliding member 122 to prevent the air conditioner indoor unit 200 from shaking along the first direction X after installation, thereby improving the installation strength of the air conditioner indoor unit 200.
[0071] In some embodiments, the sliding member 122 may include a sliding rod 1221 , the axis of the sliding rod 1221 is parallel to the second direction Y, and the sliding rod 1221 is slidably disposed in the sliding channel 111 .
[0072] Furthermore, the sliding member 122 can also include a locking member 1222, which can be in the form of a locking block, a locking plate, etc. The locking member 1222 is arranged at the end of the sliding rod 1221 that is away from the frame 121, and the locking member 1222 is located on the outside of the first bracket 110. At least part of the projection of the locking member 1222 on the first bracket 110 is located outside the sliding channel 111, so that the locking member 1222 cannot pass through the sliding channel 111 along the second direction Y, so that the second bracket 120 is not easy to fall off from the first bracket 110, thereby improving the stability of the connection between the second bracket 120 and the first bracket 110.
[0073] In some embodiments, the sliding channel 111 may include a front end slide 112, which is located at the front end of the sliding channel 111 along the first direction X. The length of the front end slide 112 along the third direction Z gradually increases from the rear end to the front end of the first bracket 110, so that the front end opening of the sliding channel 111 is enlarged, which facilitates sliding the sliding member 122 into the sliding channel 111.
[0074] In some embodiments, the second bracket 120 may further include a stopper 123 , which may include a stopper plate. The stopper 123 is disposed at the front end of the bracket body 121 along the first direction X, and the stopper 123 abuts against the front end of the first bracket 110 .
[0075] When installing the air-conditioning indoor unit 200, after installing the pipeline to the rear side of the air-conditioning indoor unit 200, the whole consisting of the second bracket 120 and the air-conditioning indoor unit 200 is pushed toward the side wall until the sliding member 122 slides into the rear end of the sliding channel 111, and the stopper 123 abuts against the front end of the first bracket 110 to prevent the second bracket 120 from continuing to move toward the side wall and causing the sliding member 122 to bend, deform or be damaged.
[0076] refer to Figure 4 and Figure 5In some embodiments, the first bracket 110 may include a first plate 117, the first plate 117 may extend in a vertical direction, and the sliding channel 111 may be constructed on the first plate 117. The top end of the first plate 117 may be bent toward the second bracket 120 to form a first folded edge 118, the first folded edge 118 may be perpendicular to the first plate 117, and the second bracket 120 may be disposed in a space surrounded by the first plate 117 and the first folded edge 118.
[0077] The second bracket 120 may include a second plate body 1213, the second plate body 1213 may be parallel to the first plate body 117, the sliding member 122 may be arranged on the side of the second plate body 1213 facing the first plate body 117, the top end of the second plate body 1213 may be bent toward the first plate body 117 to form a second folded edge 1214, the front end of the second plate body 1213 may be bent toward the first plate body 117 to form the above-mentioned stop member 123, and the second folded edge 1214 may be perpendicular to the second plate body 1213.
[0078] In some embodiments, a first connection hole 115 may be configured at the top of the first bracket 110 , and an axis of the first connection hole 115 may extend along the third direction Z.
[0079] In an implementation in which the first bracket 110 includes the first folded edge 118 , the first connection hole 115 may be configured on the first folded edge 118 .
[0080] The bracket assembly 100 may also include a connecting member 130, which includes a connecting rod 131 and a first fixing member 132. The axis of the connecting member 130 is parallel to the third direction Z, and the top of the connecting member 130 is constructed to be connected to the ceiling; the first fixing member 132 is connected to the connecting rod 131, and the outer side wall of the connecting rod 131 may have a thread. The first fixing member 132 may include a fastening nut, which is threadedly connected to the connecting rod 131.
[0081] In this embodiment, the first bracket 110 can be installed on the ceiling through the connecting member 130. During the specific installation, the top end of the connecting rod 131 can be fixed to the ceiling first, and then the first bracket 110 can be moved so that the connecting rod 131 is inserted into the first connecting hole 115, and then the first fixing member 132 is connected to the connecting rod 131, and the top of the first fixing member 132 is abutted against the first bracket 110.
[0082] Furthermore, a second connection hole 1211 may be constructed at the top of the frame 121, the axis of the second connection hole 1211 may extend along the third direction Z, the second connection hole 1211 corresponds to the first connection hole 115, and the rear end of the second connection hole 1211 along the first direction X passes through the frame 121.
[0083] In an implementation in which the second bracket 120 includes the second folded edge 1214 , the second connection hole 1211 may be configured at the second folded edge 1214 .
[0084] The connecting member 130 may also include a second fixing member 133, which is connected to the connecting rod 131 and is spaced below the first fixing member 132. The connecting rod 131 between the first fixing member 132 and the second fixing member 133 is passed through the second connecting hole 1211, and the top of the second fixing member 133 is in contact with the frame 121.
[0085] The outer side wall of the connecting rod 131 may have threads, the second fixing member 133 may include a fastening nut, and the second fixing member 133 and the connecting rod 131 may be threadedly connected.
[0086] After the first bracket 110 is fixed to the ceiling through the connecting member 130 and the second bracket 120 is connected to the air conditioner indoor unit 200, the whole consisting of the air conditioner indoor unit 200 and the second bracket 120 is lifted so that the sliding member 122 slides into the sliding channel 111. During this process, the connecting rod 131 slides into the second connecting hole 1211 along the rear end of the second connecting hole 1211. After the second bracket 120 and the first bracket 110 are in place, the bottom of the bracket assembly 100 (the first plate 117) is opened. The second fixing member 133 is rotated upward from the bottom end of the connecting rod 131 until the top of the second fixing member 133 abuts against the second folded edge 1214, and the second fixing member 133 is continued to be rotated upward until the sliding rod 1221 abuts against the first bracket 110, so as to further lift the whole composed of the air-conditioning indoor unit 200 and the second bracket 120 upward, so that the air-conditioning indoor unit 200 is closer to the ceiling and the indoor space occupied by the air-conditioning indoor unit 200 is reduced.
[0087] refer to Figure 2-Figure 4 In some embodiments, the first bracket 110 can also be constructed with a third bayonet 116, which is located above the sliding channel 111 and is correspondingly connected to the rear end of the sliding channel 111. The sliding member 122 can be clamped in the third bayonet 116, and the third bayonet 116 can be a space for the sliding member 122 to avoid rising. After the sliding member 122 slides into the second bayonet 114, the second fixing member 133 continues to rotate upward until the sliding rod 1221 is clamped into the third bayonet 116 and abuts against the top edge of the third bayonet 116, so as to further lift the whole composed of the air-conditioning indoor unit 200 and the second bracket 120 upward, so that the air-conditioning indoor unit 200 is closer to the ceiling, and the indoor space occupied by the air-conditioning indoor unit 200 is reduced.
[0088] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present application, rather than to limit it. Although the present application has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present application.
Claims
1. A mounting structure, characterized in that: A bracket assembly is included, the bracket assembly comprising: A first bracket is configured with a sliding channel extending along a first direction, wherein a front end of the sliding channel along the first direction passes through the first bracket, and the first bracket is configured to be connected to a ceiling; The second bracket comprises a frame body and a sliding member, wherein the frame body is configured to be connected to the outer side of the air conditioner indoor unit along the second direction, and the sliding member is arranged on the outer side of the frame body and slidably arranged in the sliding channel.
2. The mounting structure according to claim 1, characterized in that: The mounting structure includes at least two bracket assemblies, and the at least two bracket assemblies are configured to be connected to two sides of the air conditioner indoor unit along the second direction.
3. The mounting structure according to claim 1, characterized in that: The first bracket is configured with a first bayonet, the first bayonet is located below the sliding channel and is communicated with the sliding channel, the first bayonet is spaced apart from the rear end of the sliding channel along the first direction, and the sliding member can be clamped in the first bayonet.
4. The mounting structure according to claim 1, characterized in that: The sliding member includes a sliding rod, and an axis of the sliding rod is parallel to the second direction.
5. The mounting structure according to claim 4, characterized in that: The sliding member further comprises a retaining member, which is arranged at one end of the sliding rod away from the frame body and is located outside the first bracket. At least a partial projection of the retaining member on the first bracket is located outside the sliding channel.
6. The mounting structure according to claim 4, characterized in that: The sliding channel comprises a front end slide, and the front end slide is located at the front end of the sliding channel along the first direction. The length of the front end slide along the third direction gradually increases from the rear end to the front end of the first bracket.
7. The mounting structure according to any one of claims 1 to 6, characterized in that: The second bracket further includes a stopper, which is disposed at the front end of the bracket body along the first direction, and the stopper abuts against the front end of the first bracket.
8. The mounting structure according to any one of claims 1 to 6, characterized in that: A first connecting hole is configured on the top of the first bracket; The bracket assembly also includes a connecting member, which includes a connecting rod and a first fixing member. The axis of the connecting member is parallel to the third direction. The top of the connecting member is constructed to be connected to the ceiling. The first fixing member is connected to the connecting rod. The connecting member is inserted into the first connecting hole, and the top of the first fixing member abuts against the first bracket.
9. The mounting structure according to claim 8, characterized in that: A second connection hole is configured on the top of the frame, the second connection hole corresponds to the first connection hole, and the rear end of the second connection hole along the first direction passes through the frame; The connecting member also includes a second fixing member, which is connected to the connecting rod and is spaced below the first fixing member. The connecting rod located between the first fixing member and the second fixing member is passed through the second connecting hole, and the top of the second fixing member is in contact with the frame.
10. An air conditioner, characterized in that: It comprises an air-conditioning indoor unit and a mounting structure as claimed in any one of claims 1 to 9, wherein the air-conditioning indoor unit comprises a shell, and a frame included in the mounting structure is connected to the shell.