Perpendicularity detection device for formed hole of underwater cast-in-place pile

By designing an underwater cast pile hole-forming verticality detection device including a detection cage, a bracket, a dial and an infrared emitter, the problem of intuition in the prior art is solved, and the detection results in the prior art are not intuitive and inconvenient for rapid on-site inspection is achieved, and the verticality and skew direction observations are achieved, and the efficiency of hole-forming verticality control is improved.

CN222773924UActive Publication Date: 2025-04-18LANZHOU MUNICIPAL CONSTR GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421720010.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-07-19
Publication Date
2025-04-18
Estimated Expiration
2034-07-19

AI Technical Summary

Technical Problem

In the prior art, in the perpendicularity detection of underwater cast piles, the detection results are not intuitive and require data analysis, which is inconvenient for rapid on-site inspection.

Method used

A perpendicularity detection device for underwater cast piles is designed, including detection cage, bracket, dial, vertical scale ring, rope measuring, infrared transmitter and other components. Through the measuring rope measuring, infrared rays are projected onto the dial, and verticality and skew direction are visually displayed.

Benefits of technology

The device is easy to operate, and can quickly and intuitively observe the deflection direction and inclination angle of the hole, which is convenient to adjust the perpendicularity of the hole in time, and improve the efficiency of the perpendicularity of the drilling pile.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222773924U_ABST
    Figure CN222773924U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of cast-in-place pile pore-forming perpendicularity detection, in particular to an underwater cast-in-place pile pore-forming perpendicularity detection device which comprises a detection cage. The support is located above the detection cage, the dial is connected with the upper side of the support, the perpendicularity scale rings are arranged on the dial and distributed at intervals, the measuring rope is connected to the lower side of the dial, the infrared emitter is arranged on the measuring rope and located below the support, and one end of the measuring rope penetrates through the support and is connected with the middle of the upper side of the detection cage. The infrared emitter acts on the dial; the device is convenient to operate, the deflection direction and the inclination angle of the formed hole can be rapidly and visually observed, the perpendicularity of the formed hole can be conveniently and timely adjusted, and the perpendicularity of the formed hole of the cast-in-situ bored pile can be conveniently controlled.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of verticality detection of bored pile holes, in particular to an underwater bored pile hole verticality detection device. Background Art

[0002] A bored pile is a pile made by directly drilling a hole at the designed pile position. Its cross-section is circular. After the hole is formed, a steel cage is placed in the hole and concrete is poured. Due to the advantages of no vibration, no soil squeezing, low noise, and suitability for use in areas with dense urban buildings, bored piles are widely used in construction. According to different hole-forming processes, bored piles can be divided into bored piles with dry holes, bored piles with mud wall protection, and bored piles with manual holes, etc. They are used in urban buildings. According to their different hole-forming methods, bored piles can be divided into bored piles, sunken pipe bored piles, manually dug bored piles, explosive expansion bored piles, etc. Bored and poured piles refer to piles made by drilling a pile hole with a drilling machine and pouring concrete in the hole (or first hanging a steel cage in the hole). Depending on whether the drill bit of the drilling machine is constructed in the aquifer of the soil, it is divided into three methods: mud wall drilling, dry drilling and casing wall drilling. At present, most of the verticality detection methods and tools used for underwater bored piles after drilling are ultrasonic detection or caliper detection.

[0003] At present, the process control of underwater bored pile drilling is usually based on the verticality of the drill rod or impact drill wire rope as a reference, or ultrasonic hole quality detector is used for detection. The detection results are not intuitive and require data analysis, which is not convenient for rapid detection of verticality on site. Utility Model Content

[0004] The utility model aims to provide a device for detecting the verticality of a borehole of an underwater bored pile, which is used to solve the problem that the detection result of the verticality of a borehole of an underwater bored pile is not intuitive, data analysis is required, and it is not convenient to quickly detect the verticality on site.

[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: an underwater bored pile hole verticality detection device, comprising a detection cage, a bracket located above the detection cage, a dial connected to the upper side of the bracket, a plurality of verticality scale rings arranged on the dial and spaced apart, a measuring rope connected to the lower side of the dial, an infrared transmitter arranged on the measuring rope and located below the bracket, one end of the measuring rope passes through the bracket and is connected to the upper middle part of the detection cage, and the infrared transmitter acts on the dial.

[0006] Furthermore, the bracket includes a support ring, a center ring located in the middle of the support ring and having the same center as the support ring, two positioning adjustment rods connected to the support ring and the center ring and arranged crosswise, and a support rod connected to the intersection of the two positioning adjustment rods, one end of the support rod is connected to the middle of the lower side of the dial, and the center ring is sleeved on the outside of the measuring rope.

[0007] Furthermore, a level is provided on the outer wall of the support rod.

[0008] Furthermore, the detection cage includes a plurality of vertically spaced circular rings, a plurality of reinforcing rods arranged on the inner walls of the circular rings and cross-arranged, and a plurality of vertical stabilizing rods connected to the plurality of circular rings and arranged in a ring-like manner. One end of the measuring rope is connected to the intersection of the plurality of reinforcing rods.

[0009] Compared with the prior art, the beneficial effects of the utility model are as follows:

[0010] The utility model has the following beneficial effects:

[0011] When in use, put the detection cage into the pile hole, and set up the bracket on the top of the pile hole, align the center position of the bracket with the center position of the pile hole, at this time, the measuring rope coincides with the center of the pile hole, the infrared ray emitted by the infrared transmitter is the center line of the pile hole, and the position where the infrared ray is projected onto the dial through the center of the bracket is the deviation direction of the hole, and the value shown is the verticality of the pile hole. The device is easy to operate, and can quickly and intuitively observe the deflection direction and inclination angle of the hole, so as to facilitate timely adjustment of the verticality of the hole, which is beneficial to the verticality control of bored pile holes. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] Figure 1 The utility model is a schematic diagram of the structure of a device for detecting the verticality of a borehole of an underwater bored pile.

[0013] In the figure: 1. detection cage; 2. bracket; 3. dial; 4. verticality scale ring; 5. infrared transmitter; 6. support ring; 7. positioning adjustment rod; 8. support rod; 9. level; 10. ring; 11. reinforcement rod; 12. vertical stabilizing rod; 13. measuring rope; 14. center ring. DETAILED DESCRIPTION

[0014] See also Figure 1A device for detecting the verticality of a bored pile hole under water comprises a detection cage 1, a bracket 2 located above the detection cage 1, a dial 3 connected to the upper side of the bracket 2, a plurality of verticality scale rings 4 arranged on the dial 3 and arranged at intervals, a measuring rope 13 connected to the lower side of the dial 3, an infrared transmitter 5 arranged on the measuring rope 13 and located below the bracket 2, one end of the measuring rope 13 passes through the bracket 2 and is connected to the middle part of the upper side of the detection cage 1, and the infrared transmitter 5 acts on the dial 3; the dial 3 is marked with verticality scales according to the ratio of the distance from the center position of the dial 3 to the length of the support rod 8. Degree ring 4 is convenient for verticality observation; when in use, the detection cage 1 is placed in the pile hole, and the bracket 2 is set up on the top of the pile hole, and the center position of the bracket 2 is consistent with the center position of the pile hole. At this time, the measuring rope 13 coincides with the center of the pile hole, and the infrared ray emitted by the infrared transmitter 5 is the center line of the pile hole. The position of the infrared ray projected to the dial 3 through the center of the bracket 2 is the deviation direction of the hole, and the value shown is the verticality of the pile hole. The device is easy to operate, and can quickly and intuitively observe the deflection direction and inclination angle of the hole, which is convenient for timely adjustment of the verticality of the hole, which is beneficial to the verticality control of the bored pile hole.

[0015] The bracket 2 includes a support ring 6, a center ring 14 located in the middle of the support ring 6 and having the same center as the support ring 6, two positioning adjustment rods 7 connected to the support ring 6 and the center ring 14 and arranged crosswise, and a support rod 8 connected to the intersection of the two positioning adjustment rods 7, one end of the support rod 8 is connected to the middle of the lower side of the dial 3, and the center ring 14 is sleeved on the outside of the measuring rope 13; a level 9 is provided on the outer wall of the support rod 8; the position of the center ring 14 is made consistent with the center position of the pile hole by positioning the adjustment rod 7 in the hole of the bracket 2, and the bracket 2 and the dial 3 are made level by observing the level 9.

[0016] The detection cage 1 includes a plurality of circular rings 10 arranged at intervals vertically, a plurality of reinforcing rods 11 arranged on the inner wall of the circular rings 10 and arranged crosswise, a plurality of vertical stabilizing rods 12 connected to the plurality of circular rings 10 and arranged at intervals in a ring shape, and one end of a measuring rope 13 is connected to the connection intersection of the plurality of reinforcing rods 11; the detection cage 1 is a cylinder composed of three circular rings 10, a plurality of reinforcing rods 11 and a plurality of vertical stabilizing rods 12, the diameter of which is consistent with the diameter of the hole.

[0017] Working principle: When in use, put the detection cage 1 into the pile hole, and set up the bracket 2 on the top of the pile hole. Use the positioning adjustment rod 7 in the hole of the bracket 2 to make the position of the center ring 14 consistent with the center position of the pile hole, and make the bracket 2 and the dial 3 horizontal by observing the level 9. At this time, the measuring rope 13 coincides with the center of the pile hole, and the infrared ray emitted by the infrared transmitter 5 is the center line of the pile hole. The position of the infrared ray projected to the dial 3 through the center of the bracket 2 is the deviation direction of the hole. The value shown is the verticality of the pile hole. The device is easy to operate, and can quickly and intuitively observe the deflection direction and inclination angle of the hole, so as to facilitate timely adjustment of the verticality of the hole, which is beneficial to the verticality control of bored pile holes.

[0018] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. An underwater bored pile verticality detection device, comprising a detection cage (1), characterized in that: A support (2) located above the detection cage (1), a dial (3) connected to the upper side of the support (2), a plurality of verticality scale rings (4) arranged on the dial (3) and arranged at intervals, a measuring rope (13) connected to the lower side of the dial (3), and an infrared transmitter (5) arranged on the measuring rope (13) and located below the support (2), wherein one end of the measuring rope (13) passes through the support (2) and is connected to the middle part of the upper side of the detection cage (1), and the infrared transmitter (5) acts on the dial (3).

2. An underwater bored pile hole verticality detection device as claimed in claim 1, characterized in that: The bracket (2) comprises a support ring (6), a center ring (14) located in the middle of the support ring (6) and having the same center as the support ring (6), two positioning adjustment rods (7) connected to the support ring (6) and the center ring (14) and arranged crosswise, and a support rod (8) connected to the intersection of the two positioning adjustment rods (7), one end of the support rod (8) being connected to the middle of the lower side of the scale plate (3), and the center ring (14) being sleeved on the outside of the measuring rope (13).

3. An underwater bored pile hole verticality detection device as claimed in claim 2, characterized in that: The outer wall of the support rod (8) is provided with a level (9).

4. The underwater bored pile hole verticality detection device according to claim 1, characterized in that: The detection cage (1) comprises a plurality of circular rings (10) arranged at intervals in a vertical direction, a plurality of reinforcing rods (11) arranged on the inner walls of the circular rings (10) and arranged crosswise, and a plurality of vertical stabilizing rods (12) connected to the plurality of circular rings (10) and arranged at intervals in a ring shape, wherein one end of the measuring rope (13) is connected to a connection intersection of the plurality of reinforcing rods (11).