Industrial electromagnetic flowmeter instrument
By designing fixed components and limiting column screw mechanisms, the electromagnetic flowmeter instrument and the flowmeter main body are easily disassembled and assembled, solving the problem of inconvenient maintenance in the existing technology, improving work efficiency and ensuring the stability of the connection.
Patent Information
- Application Number
- CN202421351423.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-14
- Publication Date
- 2025-04-18
- Estimated Expiration
- 2034-06-14
AI Technical Summary
The instruments and flow meter bodies of existing electromagnetic flow meters are difficult to be easily disassembled and assembled, resulting in inconvenient maintenance and repair operations and affecting work efficiency.
An industrial electromagnetic flowmeter instrument was designed. By setting up fixed components, including mobile arc plates, fixed arc plates, connecting arc plates and clamp plates, the limit columns and screw mechanisms are used to make the instrument and flowmeter body conveniently disassemble and assemble.
It realizes rapid disassembly and assembly of the flowmeter body and the instrument, saves maintenance time, improves work efficiency, and ensures a stable connection between the instrument and the flowmeter body.
Smart Images

Figure CN222774057U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of electromagnetic flowmeters, in particular to an industrial electromagnetic flowmeter. Background Art
[0002] Electromagnetic flowmeter is a new type of flow measurement instrument that developed rapidly in the 1950s and 1960s with the development of electronic technology. Electromagnetic flowmeter is an instrument that uses the principle of electromagnetic induction to measure the flow rate of conductive fluid based on the electromotive force induced when the conductive fluid passes through an external magnetic field. The structure of the electromagnetic flowmeter is mainly composed of magnetic circuit system, measuring conduit, electrode, shell, lining and converter. Electromagnetic flowmeter is widely used in sewage, fluorine chemical industry, production water, tap water industry, medicine, steel and many other aspects. It is much better than other types of flowmeters in terms of reliability and stability.
[0003] At present, the instrument and flowmeter body of the electromagnetic flowmeter are divided into two types: inseparable design and detachable design. The inseparable design is not conducive to the maintenance operation of the electromagnetic flowmeter, while the detachable design currently uses multiple bolts to combine the two together. This method is more troublesome to install and disassemble, which is not conducive to improving work efficiency.
[0004] Therefore, there is a need for an industrial electromagnetic flowmeter, in which the meter and the flowmeter body can be easily disassembled and assembled, so as to facilitate the maintenance and repair of the electromagnetic flowmeter and improve work efficiency. Utility Model Content
[0005] In order to solve the above problems, the utility model proposes an industrial electromagnetic flow meter, which has the characteristics of convenient disassembly and assembly and simple and quick operation.
[0006] In order to achieve the above purpose, the utility model proposes the following specific solutions:
[0007] An industrial electromagnetic flow meter comprises a flow meter body, a first connecting pipe is fixedly provided on the outer wall of the flow meter body, a first docking ring is fixedly provided on the top end of the first connecting pipe, an instrument is movably connected to the top surface of the first docking ring, the instrument is located above the first docking ring, a second connecting pipe is fixedly provided on the outer wall of the instrument, a second docking ring is fixedly provided on the lower end of the second connecting pipe, the second docking ring is movably connected to the top surface of the first docking ring, a fixing assembly is movably connected to the top surface of the second docking ring, the fixing assembly comprises a movable arc plate and a fixed arc plate, the movable arc plate is movably connected to the top surface of the second docking ring, a connecting arc plate is fixedly provided on one side wall of the movable arc plate, a connecting cylinder is fixedly provided on one side wall of the connecting arc plate, a fixed arc plate is movably inserted into the inner side of the connecting cylinder, the fixed arc plate is located below the connecting arc plate, a clamping plate is fixedly provided on one side wall of the fixed arc plate, and the clamping plate is clamped on the edge of the bottom surface of the first docking ring.
[0008] As an optimal technical solution for an industrial electromagnetic flowmeter of the utility model, a spring tube is fixedly provided on the top surface of the movable arc plate, a spring is fixedly provided on the inner wall of one side of the spring tube, and one end of the spring is fixed on the outer wall of the second connecting pipe.
[0009] As a preferred technical solution of an industrial electromagnetic flowmeter of the utility model, a fixing rod is fixedly provided on the outer wall of the lower end of the second connecting pipe, and the fixing rod is located below the spring.
[0010] As a preferred technical solution of an industrial electromagnetic flowmeter of the utility model, a connecting groove is provided on the other side wall of the movable arc plate, and the fixing rod is movably inserted into the inner side of the connecting groove.
[0011] As an optimal technical solution for an industrial electromagnetic flowmeter of the utility model, a support plate is fixedly provided on the other side wall of the fixed arc plate, a threaded barrel is fixedly provided on the middle part of the top surface of the support plate, the threaded barrel is movably inserted into the inner side of the connecting barrel, and a screw is threadedly connected to the inner side of the threaded barrel.
[0012] As an optimal technical solution for an industrial electromagnetic flowmeter of the utility model, a limiting hole is provided on the top edge of the first docking ring, and a limiting column is fixedly provided on the bottom edge of the second docking ring, and the limiting column is movably inserted into the inner side of the limiting hole.
[0013] As a preferred technical solution of an industrial electromagnetic flowmeter of the utility model, the first connecting pipe is connected to the inner side of the first docking ring, and the second connecting pipe is connected to the inner side of the second docking ring.
[0014] As a preferred technical solution of an industrial electromagnetic flowmeter of the utility model, the size of the limit hole is matched with the size of the limit column, and the size of the connection groove is matched with the size of the fixing rod.
[0015] Compared with the existing technology, the utility model has the following beneficial effects:
[0016] The utility model connects and fixes the first docking ring on the flow meter body and the second docking ring on the instrument through the setting of a fixing component, and the limiting column is inserted into the inner side of the limiting hole, which can prevent the first docking ring or the second docking ring from rotating. The clamping plate on the fixed arc plate is clamped on the edge of the bottom surface of the first docking ring, and the first docking ring and the second docking ring are firmly fixed by tightening the screw. When disassembling, it is only necessary to loosen the screws on both sides and then pull the screws in the direction away from the second connecting pipe to move the movable arc plate in the direction away from the second connecting pipe, so that the instrument can be moved upward to be removed. The flow meter body and the instrument of this scheme are very convenient to disassemble and assemble, which is beneficial to saving the maintenance time of the electromagnetic flow meter and improving work efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] In order to better describe the technical solution of the utility model in detail, the present invention is further explained below in conjunction with the accompanying drawings and embodiments.
[0018] Figure 1 It is a three-dimensional diagram of the overall structure provided by the utility model;
[0019] Figure 2 It is a three-dimensional cross-sectional view of the utility model;
[0020] Figure 3 A three-dimensional diagram of the fixing assembly of the utility model;
[0021] Figure 4 For this utility model Figure 2 A magnified schematic diagram of center A.
[0022] In the figure: 1. flow meter body; 11. first connecting pipe; 12. first docking ring; 121. limiting hole; 2. instrument; 21. second connecting pipe; 211. fixing rod; 22. second docking ring; 221. limiting column; 3. fixing assembly; 31. movable arc plate; 311. connecting groove; 312. spring tube; 313. spring; 314. connecting arc plate; 315. connecting tube; 32. fixed arc plate; 321. clamping plate; 322. support plate; 323. threaded tube; 324. screw. DETAILED DESCRIPTION
[0023] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model. Example
[0024] See also Figure 1-4As shown, the utility model provides the following technical solutions: an industrial electromagnetic flowmeter, comprising a flowmeter body 1 (the flowmeter body 1 is a prior art, and the specific operation mode and principle can refer to the electromagnetic flowmeter in the prior art, so it is not described in detail here), a first connecting pipe 11 is fixedly provided on the outer wall of the flowmeter body 1, which is used for connecting and fixing a first docking ring 12, a first docking ring 12 is fixedly provided on the top of the first connecting pipe 11, which is used for connecting an instrument 2, the first connecting pipe 11 is connected to the inner side of the first docking ring 12, and an instrument 2 is movably connected to the top surface of the first docking ring 12 (the instrument 2 is a prior art, and the specific operation mode and principle can refer to the electromagnetic flowmeter in the prior art, so it is not described in detail here), and the instrument 2 is located above the first docking ring 12. This solution uses the flowmeter body 1 to detect the flow rate and uses the instrument 2 to display the data, and the two can be separated for easy maintenance.
[0025] Reference Figure 1 , Figure 2 , Figure 3 and Figure 4 As shown, specifically, the top surface of the second docking ring 22 is movably connected with a fixing assembly 3 for fixing the first docking ring 12 and the second docking ring 22. The fixing assembly 3 includes a movable arc plate 31 and a fixed arc plate 32. The movable arc plate 31 is movably connected to the top surface of the second docking ring 22, and is used to drive the connecting arc plate 314 to move. A connecting arc plate 314 is fixedly provided on one side wall of the movable arc plate 31, and is used to drive the fixed arc plate 32 to move. A spring cylinder 312 is fixedly provided on the top surface of the movable arc plate 31, and is used to connect and store a spring 313. A spring 313 is fixedly provided on the inner wall of one side of the spring cylinder 312, and provides elasticity for the movable arc plate 31. The movable arc plate 31 is provided with a fixing rod 211 on the outer wall of the second connecting tube 21, which is used to prevent the movable arc plate 31 from rotating. The fixing rod 211 is located below the spring 313. A connecting groove 311 is provided on the other side wall of the movable arc plate 31, which is used to cooperate with the fixing rod 211 to prevent the movable arc plate 31 from rotating. The size of the connecting groove 311 is matched with the size of the fixing rod 211. The fixing rod 211 is movably inserted into the inner side of the connecting groove 311. The movable arc plate 31 of this scheme can move laterally, driving the card plate 321 to move, which facilitates the disassembly and assembly of the instrument 2 and improves efficiency.
[0026] Reference Figure 1 , Figure 2 , Figure 3 and Figure 4As shown, specifically, a connecting cylinder 315 is fixedly provided on one side wall of the connecting arc plate 314 for movement of the threaded cylinder 323, a fixed arc plate 32 is movably inserted inside the connecting cylinder 315 for fixing the first docking ring 12 and the second docking ring 22, the fixed arc plate 32 is located below the connecting arc plate 314, a clamping plate 321 is fixedly provided on one side wall of the fixed arc plate 32 for engaging with the first docking ring 12, the clamping plate 321 is engaged with the bottom edge of the first docking ring 12, and a supporting plate 322 is fixedly provided on the other side wall of the fixed arc plate 32 for The threaded barrel 323 is connected to the fixed arc plate 32. A threaded barrel 323 is fixedly provided in the middle of the top surface of the support plate 322 to drive the fixed arc plate 32 to move in the vertical direction. The threaded barrel 323 is movably inserted into the inner side of the connecting barrel 315. A screw rod 324 is threadedly connected to the inner side of the threaded barrel 323. The threaded barrel 323 is moved in the vertical direction by turning the screw rod 324. The present solution utilizes the clamping plate 321 to clamp the first docking ring 12 to ensure that the meter 2 is firmly connected to the flow meter body 1 and is convenient for disassembly and assembly, which is beneficial to improving the maintenance and use efficiency.
[0027] Reference Figure 1 , Figure 2 and Figure 4 As shown, specifically, a second connecting pipe 21 is fixedly provided on the outer wall of the instrument 2 for connecting and fixing the second docking ring 22, a second docking ring 22 is fixedly provided on the lower end of the second connecting pipe 21 for connecting to the flowmeter body 1, the second connecting pipe 21 is communicated with the inner side of the second docking ring 22, the second docking ring 22 is movably connected to the top surface of the first docking ring 12, a limiting hole 121 is provided on the edge of the top surface of the first docking ring 12 for connecting the limiting column 221, a limiting column 221 is fixedly provided on the edge of the bottom surface of the second docking ring 22 for preventing the second docking ring 22 or the first docking ring 12 from rotating, the size of the limiting hole 121 is matched with the size of the limiting column 221, the limiting column 221 is movably inserted into the inner side of the limiting hole 121, and this scheme ensures that the second docking ring 22 will not rotate after docking with the first docking ring 12, thereby ensuring the stability of the electromagnetic flowmeter during use.
[0028] The working principle and use process of this utility model:
[0029] When in use, the meter 2 is moved above the flow meter body 1, so that the limiting column 221 on the second docking ring 22 is vertically aligned with the limiting hole 121 on the first docking ring 12, and then the second docking ring 22 is moved downward and pressed on the first docking ring 12. During the downward movement of the second docking ring 22, the inclined surface of the clamping plate 321 first contacts the outer wall of the first docking ring 12, and the clamping plate 321 moves to one side, driving the movable arc plate 31 to move to one side, and the spring 313 stretches. When the limiting column 221 is fully inserted into the inner side of the limiting hole 121, The clamping plate 321 moves to the bottom of the first docking ring 12, and the spring 313 contracts, driving the movable arc plate 31 to move toward the side of the second connecting tube 21. Then, the screw 324 is tightened to drive the threaded tube 323 to move upward. The clamping plate 321 moves upward and engages with the edge of the bottom surface of the first docking ring 12. The installation of the instrument 2 is completed. When it needs to be disassembled, just loosen the screw 324, and then pull the screws 324 on both sides to move away from the second connecting tube 21, thereby driving the movable arc plate 31 to move, and the spring 313 stretches, and the instrument 2 can be moved up and removed.
[0030] Finally, it should be noted that the above description is only a preferred embodiment of the utility model and is not intended to limit the utility model. Although the utility model is described in detail with reference to the above embodiments, those skilled in the art can still modify the technical solutions recorded in the above embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.
Claims
1. An industrial electromagnetic flowmeter, comprising a flowmeter body (1), characterized in that: A first connecting pipe (11) is fixedly provided on the outer wall of the flow meter body (1), a first docking ring (12) is fixedly provided on the top of the first connecting pipe (11), a meter (2) is movably connected to the top surface of the first docking ring (12), the meter (2) is located above the first docking ring (12), a second connecting pipe (21) is fixedly provided on the outer wall of the meter (2), a second docking ring (22) is fixedly provided on the lower end of the second connecting pipe (21), the second docking ring (22) is movably connected to the top surface of the first docking ring (12), a fixing assembly (3) is movably connected to the top surface of the second docking ring (22), the fixing assembly (3) is movably connected to the top surface of the first docking ring (12), and the fixing assembly (3) is movably connected to the top surface of the second docking ring (22). The component (3) comprises a movable arc plate (31) and a fixed arc plate (32); the movable arc plate (31) is movably connected to the top surface of the second docking ring (22); a connecting arc plate (314) is fixedly provided on one side wall of the movable arc plate (31); a connecting tube (315) is fixedly provided on one side wall of the connecting arc plate (314); a fixed arc plate (32) is movably inserted inside the connecting tube (315); the fixed arc plate (32) is located below the connecting arc plate (314); a clamping plate (321) is fixedly provided on one side wall of the fixed arc plate (32); and the clamping plate (321) is clamped on the bottom edge of the first docking ring (12).
2. An industrial electromagnetic flowmeter according to claim 1, characterized in that: A spring tube (312) is fixedly provided on the top surface of the movable arc plate (31), a spring (313) is fixedly provided on the inner wall of one side of the spring tube (312), and one end of the spring (313) is fixed on the outer wall of the second connecting pipe (21).
3. An industrial electromagnetic flowmeter according to claim 2, characterized in that: A fixing rod (211) is fixedly provided on the outer wall of the lower end of the second connecting pipe (21), and the fixing rod (211) is located below the spring (313).
4. An industrial electromagnetic flowmeter according to claim 3, characterized in that: The other side wall of the movable arc plate (31) is provided with a connecting groove (311), and the fixing rod (211) is movably inserted into the inner side of the connecting groove (311).
5. An industrial electromagnetic flowmeter according to claim 4, characterized in that: A support plate (322) is fixedly provided on the other side wall of the fixed arc plate (32), a threaded barrel (323) is fixedly provided on the middle part of the top surface of the support plate (322), the threaded barrel (323) is movably plugged into the inner side of the connecting barrel (315), and a screw rod (324) is threadedly connected to the inner side of the threaded barrel (323).
6. An industrial electromagnetic flowmeter according to claim 5, characterized in that: A limiting hole (121) is provided on the top edge of the first docking ring (12), and a limiting column (221) is fixedly provided on the bottom edge of the second docking ring (22), wherein the limiting column (221) is movably inserted into the inner side of the limiting hole (121).
7. An industrial electromagnetic flowmeter according to claim 6, characterized in that: The first connecting pipe (11) is connected to the inner side of the first docking ring (12), and the second connecting pipe (21) is connected to the inner side of the second docking ring (22).
8. An industrial electromagnetic flowmeter according to claim 7, characterized in that: The size of the limiting hole (121) is matched with the size of the limiting column (221), and the size of the connecting groove (311) is matched with the size of the fixing rod (211).