Hanging basket for constructional engineering
By designing a hanging basket for construction projects with side plates, bottom plates and front baffles, the closure of the basket is achieved by using the engaging structure and spring lock rods, the problem of leakage of existing hanging basket materials is solved and the lifting efficiency and practicality are improved.
Patent Information
- Application Number
- CN202421566591.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-04
- Publication Date
- 2025-04-22
- Estimated Expiration
- 2034-07-04
AI Technical Summary
The existing hanging baskets for construction projects are mostly hollow structures and lack enclosure, which leads to easy material leakage during material lifting, affecting the normal progress of subsequent lifting.
A hanging basket for construction engineering including basket, side plate, bottom plate and front baffle is designed. By setting up a engaging structure and spring lock rod, the basket is quickly closed and disassembled to ensure the safe lifting of materials.
Through the arrangement of side plates, bottom plates and front baffles, the basket is closed, material leakage is avoided, material lifting efficiency and practicality are improved, and the structure is easy to disassemble.
Smart Images

Figure CN222781258U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of hanging baskets for construction projects, in particular to a hanging basket for construction projects. Background Art
[0002] The hanging basket is a construction tool for high-altitude construction work, used for curtain wall installation and exterior wall cleaning. The cantilever mechanism is erected on the building or structure, and the lifting mechanism is used to drive the suspension platform. The construction facility runs up and down along the facade of the building or structure through the steel wire rope. It is also a working platform set up for operators;
[0003] For example, a hanging basket for construction projects disclosed in the utility model with authorization announcement number CN221119152U has a protective door and a connecting piece. The protective door is connected to one side of the lower frame through the connecting piece. The protective door can be rotated to a certain angle with the connecting piece as the center. When preparing before work, the protective door can be opened and the staff can directly enter the hanging basket. The materials required for the work are also directly placed in the hanging basket, which is convenient for transporting materials and for staff to enter and exit the hanging basket. Currently, most of the hanging baskets for construction projects are not only used for construction operations, but may also be used for lifting materials. However, most existing hanging baskets are hollow structures and are not closed. Therefore, material leakage may occur during the lifting of materials, affecting the subsequent normal lifting of materials. Utility Model Content
[0004] In order to overcome the deficiencies of the prior art, the utility model provides a hanging basket for construction projects, which can solve the problems of the existing hanging baskets through the setting of protective doors and connecting parts. The protective door is connected to one side of the lower frame through the connecting parts, and the protective door can be rotated to a certain angle with the connecting parts as the center. When preparing before work, the protective door can be opened, and the staff can directly enter the hanging basket. The materials required for the work are also directly placed in the hanging basket, which is convenient for transporting materials and for the staff to enter and exit the hanging basket. At present, most of the hanging baskets for construction projects are not only used for construction operations, but may also be used for lifting materials. However, most of the existing hanging baskets are hollow structures and are not closed. Therefore, in the process of lifting materials, material leakage may occur, affecting the subsequent technical problem of normal lifting of materials.
[0005] In order to solve the above technical problems, the utility model provides the following technical solutions: a hanging basket for construction projects, comprising a basket body, a side panel is distributed on one side of the basket body, a bottom plate is arranged on the inner side of the bottom of the basket body, a front baffle is distributed on the top side of the basket body, and a baffle rod is fixedly installed on the top of the front baffle, an insertion rod is installed on the bottom side of the baffle rod, a reset spring is fixedly connected to the front end of the bottom of the front baffle, and a locking rod is fixedly connected to the other end of the reset spring, an adapter groove is provided at one end of the top of the basket body, and a slot is distributed on one side of the adapter groove, and a snap-fit structure is provided at the front end of the bottom of the basket body.
[0006] As a preferred technical solution of the utility model, the locking structure includes a locking hole, a locking slot and a positioning hole. The locking hole is opened at the bottom front end of the basket body, and the locking slot is distributed below the locking hole. The side wall of the basket body is opened with a positioning hole.
[0007] As a preferred technical solution of the utility model, a clamping strip is fixedly installed on the side wall of the side panel, and a positioning rod is distributed on one side of the clamping strip, a front baffle strip is fixedly installed on one end of the bottom plate, and a clamping block is arranged at the bottom of one end of the bottom plate.
[0008] As a preferred technical solution of the present utility model, the locking rod is slidably connected to the front baffle through the return spring, and the locking rod is symmetrically distributed along the vertical center line of the front baffle.
[0009] As a preferred technical solution of the utility model, the slots are symmetrically distributed along the vertical center line of the basket body, and the inner diameter of the slots is matched with the outer diameter of the insertion rod.
[0010] As a preferred technical solution of the utility model, the clamping strips are distributed equidistantly along the side walls of the side panels, and the clamping strips are distributed symmetrically along the vertical center line of the basket body.
[0011] Compared with the prior art, the utility model can achieve the following beneficial effects:
[0012] 1. The side panels, bottom panel and front baffle provided can facilitate the subsequent closing of the entire basket body, thereby facilitating the subsequent lifting of building materials, having higher practicality and being easy to disassemble. The side panels can be snap-connected to both sides of the basket body when in use, and the bottom panel can be inserted into the bottom of the basket body to close the bottom of the basket body, and then the front baffle can be inserted into the inner side of the basket body to close the entire basket body;
[0013] 2. Combined with the set baffle rod, plug rod and locking rod, the front baffle and the basket body can be quickly connected, which is convenient and quick, and easy to disassemble later, so that the materials hoisted inside the basket body can be unloaded, and the practicality is higher. When the front baffle is snap-connected to the inner side of the basket body, the plug rod will be snap-connected with the basket body, and at the same time, the spring drives the locking rod to move, so that one end of it is input into the inner side of the lock hole to realize the positioning of the front baffle, which is convenient for the subsequent closure of the basket body. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 This is a schematic diagram of the structure of a hanging basket for construction engineering of the utility model;
[0015] Figure 2 This is a schematic diagram of the structure of the hanging basket for construction engineering of the utility model from a top view;
[0016] Figure 3 This is a side view structural diagram of the side plate of the hanging basket for construction engineering of the utility model;
[0017] Figure 4 This is a schematic diagram of the bottom plate of a hanging basket for construction engineering of the utility model when viewed from above;
[0018] Among them: 1. basket body; 2. side panel; 3. bottom plate; 4. front baffle; 5. baffle rod; 6. plug rod; 7. return spring; 8. lock rod; 9. adapter slot; 10. slot; 11. lock hole; 12. card slot; 13. positioning hole; 14. card strip; 15. positioning rod; 16. front baffle strip; 17. card block. DETAILED DESCRIPTION
[0019] In order to make the technical means, creative features, objectives and effects of the present invention easy to understand, the present invention is further described below in conjunction with specific embodiments, but the following embodiments are only preferred embodiments of the present invention, not all. Based on the embodiments in the implementation mode, other embodiments obtained by those skilled in the art without creative work are all within the protection scope of the present invention.
[0020] Example
[0021] Please refer to Figure 1 As shown, the utility model provides a hanging basket for construction engineering, including a basket body 1, a side plate 2 is distributed on one side of the basket body 1, a bottom plate 3 is arranged on the inner side of the bottom of the basket body 1, a front baffle plate 4 is distributed on one side of the top of the basket body 1, and a baffle rod 5 is fixedly installed on the top of the front baffle plate 4, and an insertion rod 6 is installed on one side of the bottom of the baffle rod 5, a reset spring 7 is fixedly connected to the front end of the bottom of the front baffle plate 4, and a locking rod 8 is fixedly connected to the other end of the reset spring 7, an adapter groove 9 is opened at one end of the top of the basket body 1, and a slot 10 is distributed on one side of the adapter groove 9, and a clamping structure is opened at the front end of the bottom of the basket body 1;
[0022] When in use, the hooks arranged on both sides of the top of the basket body 1 can facilitate subsequent lifting, and when in use, the side panels 2, the bottom panel 3 and the front baffle 4 can be installed and disassembled according to actual use requirements, which is more practical;
[0023] As a further implementation of this embodiment, Figure 1 , Figure 2 , Figure 3 and Figure 4 As shown, a side plate 2 is distributed on one side of the basket body 1, a bottom plate 3 is arranged on the inner side of the bottom of the basket body 1, a front baffle plate 4 is distributed on one side of the top of the basket body 1, and a baffle rod 5 is fixedly installed on the top of the front baffle plate 4, and an insertion rod 6 is installed on one side of the bottom of the baffle rod 5, a reset spring 7 is fixedly connected to the front end of the bottom of the front baffle plate 4, and a locking rod 8 is fixedly connected to the other end of the reset spring 7, and the locking rod 8 is slidably connected to the front baffle plate 4 through the reset spring 7, and the locking rod 8 is symmetrically distributed along the vertical center line of the front baffle plate 4, an adapter groove 9 is opened at one end of the top of the basket body 1, and a slot 10 is distributed on one side of the adapter groove 9, and the slot 10 is symmetrically distributed along the vertical center line of the basket body 1, and The inner diameter of the slot 10 is matched with the outer diameter of the insertion rod 6. The lock hole 11 is opened at the bottom front end of the basket body 1, and a card slot 12 is distributed below the lock hole 11. A positioning hole 13 is opened on the side wall of the basket body 1. The lock hole 11, the card slot 12 and the positioning hole 13 form a clamping structure, and the clamping structure is arranged at the bottom front end of the basket body 1. A clamping strip 14 is fixedly installed on the side wall of the side plate 2, and a positioning rod 15 is distributed on one side of the clamping strip 14. The clamping strip 14 is equidistantly distributed along the side wall of the side plate 2, and the clamping strip 14 is symmetrically distributed along the vertical center line of the basket body 1. A front stopper 16 is fixedly installed at one end of the bottom plate 3, and a clamping block 17 is arranged at the bottom of one end of the bottom plate 3.
[0024] When the basket body 1 is needed to realize the lifting and processing of building materials, the side panels 2 are first connected to the two sides of the basket body 1 by snapping. Since the inner wall of the side panel 2 is evenly distributed with multiple clips 14, and the size of the clips 14 is adapted to the size of the grille slots opened on the side walls of the basket body 1, the snap connection between the side panels 2 and the basket body 1 can be realized by combining the multiple clips 14, and the positioning rods 15 symmetrically distributed on both sides of the clips 14 will be respectively input into the inner sides of the positioning holes 13, so as to improve the stability of the snap connection between the side panels 2 and the basket body 1, and then the bottom panel 3 is input into the notch opened on the inner side of the bottom of the basket body 1, and the clip blocks 17 provided at the same time will snap into the connection. It is connected to the inner side of the card slot 12, thereby realizing the connection between the bottom plate 3 and the basket body 1, and realizing the sealing treatment of the bottom of the basket body 1, and finally the front baffle plate 4 is respectively engaged and connected to the inner sides of the adapter slots 9 opened on both sides of the top of the basket body 1. When the front baffle plate 4 moves to a certain position, the reverse force generated by the deformation of the reset spring 7 will push the locking rod 8, thereby realizing the movement of the locking rod 8, and inputting one end of the locking rod 8 into the inner side of the locking hole 11 to realize the preliminary connection between the front baffle plate 4 and the basket body 1, and at the same time, the insertion rod 6 will be input into the inner side of the slot 10, so as to further improve the stability of the connection between the two, and the whole structure is easy to disassemble and has higher practicality.
[0025] The above shows and describes the basic principle, main features and advantages of the utility model. Those skilled in the art should understand that the utility model is not limited by the above embodiments. The above embodiments and descriptions are only preferred examples of the utility model and are not used to limit the utility model. Without departing from the spirit and scope of the utility model, the utility model may have various changes and improvements, which fall within the scope of the utility model to be protected. The scope of protection of the utility model is defined by the attached claims and their equivalents.
Claims
1. A hanging basket for construction engineering, comprising a basket body (1), characterized in that: A side plate (2) is distributed on one side of the basket body (1), a bottom plate (3) is arranged on the inner side of the bottom of the basket body (1), a front baffle (4) is distributed on one side of the top of the basket body (1), a baffle rod (5) is fixedly installed on the top of the front baffle (4), an insertion rod (6) is installed on one side of the bottom of the baffle rod (5), a reset spring (7) is fixedly connected to the front end of the bottom of the front baffle (4), and a locking rod (8) is fixedly connected to the other end of the reset spring (7), an adapter groove (9) is provided at one end of the top of the basket body (1), and a slot (10) is distributed on one side of the adapter groove (9), and a snap-fit structure is provided at the front end of the bottom of the basket body (1).
2. A construction engineering hanging basket according to claim 1, characterized in that: The locking structure comprises a locking hole (11), a locking groove (12) and a positioning hole (13); the locking hole (11) is arranged at the front end of the bottom of the basket body (1), the locking groove (12) is arranged below the locking hole (11), and the side wall of the basket body (1) is provided with a positioning hole (13).
3. A hanging basket for construction engineering according to claim 1, characterized in that: A clamping strip (14) is fixedly mounted on the side wall of the side plate (2), and a positioning rod (15) is distributed on one side of the clamping strip (14); a front stop strip (16) is fixedly mounted on one end of the bottom plate (3), and a clamping block (17) is arranged at the bottom of one end of the bottom plate (3).
4. A construction engineering hanging basket according to claim 1, characterized in that: The locking rod (8) is slidably connected to the front baffle (4) via the return spring (7), and the locking rod (8) is symmetrically distributed along the vertical center line of the front baffle (4).
5. A construction engineering hanging basket according to claim 1, characterized in that: The slots (10) are symmetrically distributed along the vertical center line of the basket body (1), and the inner diameter of the slots (10) is matched with the outer diameter of the insertion rod (6).
6. A construction engineering hanging basket according to claim 3, characterized in that: The clamping strips (14) are distributed at equal distances along the side walls of the side panels (2), and the clamping strips (14) are distributed symmetrically along the vertical center line of the basket body (1).
Citation Information
Patent Citations
Hanging basket for constructional engineering
CN221119152U