Organic waste gas combustion furnace
By designing a heating water tank and a spiral diversion pipe in an organic exhaust gas combustion furnace, the water in the water tank is heated by using the heat after combustion, the problem of heat failure in the prior art is solved, and the recovery and energy conservation of heat are achieved.
Patent Information
- Application Number
- CN202420971142.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-08
- Publication Date
- 2025-04-22
- Estimated Expiration
- 2034-05-08
AI Technical Summary
The existing organic exhaust gas combustion furnace fails to effectively utilize internal heat during the combustion process, resulting in heat waste and energy waste.
An organic exhaust gas combustion furnace is designed with a built-in heating water tank and a spiral flow guide tube. The heat generated after combustion is used to heat the water in the water tank through the flow shield and the spiral flow guide tube to achieve heat recovery and utilization.
By effectively utilizing the heat inside the combustion furnace, heating the water, saving resources, avoiding the loss of heat, and achieving efficient utilization of energy.
Smart Images

Figure CN222783528U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of combustion furnaces, in particular to an organic waste gas combustion furnace. Background Art
[0002] Some organic waste gas will be generated in the production process of magnetic materials. In order to avoid the harm of organic waste gas to human body, it is necessary to burn these organic waste gas. The combustion of organic waste gas refers to the thermal oxidation decomposition and combustion of waste gas under direct high temperature conditions. However, this treatment method requires a lot of heat and energy consumption. Generally, the waste gas treated in this way has a high calorific value, and the concentration of organic matter in the waste gas is high. Under high temperature conditions, it can maintain high temperature incineration by using its own low calorific value.
[0003] According to Chinese patent CN210861139U, an organic waste gas combustion furnace has the following features: organic waste gas enters the combustion furnace from the bottom of the combustion furnace, and a hair dryer blows air into the combustion furnace, so that the organic waste gas moves in a spiral shape in the vertical furnace body, thereby extending the combustion time of the organic waste gas in the vertical furnace body and improving the waste gas treatment rate; a high-temperature mesh structure is arranged near the top of the inner cavity of the vertical furnace body, and the high-temperature mesh structure can heat the unreacted organic waste gas to cause secondary combustion, thereby further improving the organic waste gas treatment rate; the high-temperature mesh structure is a multi-layer high-temperature mesh layer stacking structure, which increases the contact area between the organic waste gas and the high-temperature mesh structure; a gap is arranged between two adjacent high-temperature mesh layers, and this design ensures the permeability of the high-temperature mesh structure, so that the post-combustion gas can pass through the high-temperature mesh structure smoothly.
[0004] When the above-mentioned combustion furnace burns the organic waste gas, a heating water tank is not set inside the combustion furnace, resulting in the heat generated by the organic waste gas during combustion being wasted, and the heat in the organic waste gas cannot be recycled, resulting in a waste of energy and further leading to heat loss. Therefore, an organic waste gas combustion furnace is proposed to solve the above problems. Utility Model Content
[0005] In view of the shortcomings of the prior art, the utility model provides an organic waste gas combustion furnace, which has the advantages that when the organic waste gas is burned, the heat inside the combustion furnace can be used to heat water, thereby achieving the purpose of saving resources. It solves the problem that when the existing organic waste gas combustion furnace is burning, the internal heat is not utilized, resulting in a waste of resources.
[0006] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: an organic waste gas combustion furnace, comprising a combustion furnace, an air intake pipe is fixedly connected to the interior of the combustion furnace, a flamethrower is fixedly connected to the right inner wall of the combustion furnace, a spiral plate is installed inside the combustion furnace, two heat insulation plates are fixedly connected to the interior of the combustion furnace, a heating water tank is fixedly connected to the top of the bottom heat insulation plate, a spiral guide pipe is fixedly connected to the top of the bottom heat insulation plate, a fixed plate is fixedly connected to the inner wall of the combustion furnace, a filter element is detachably connected to the interior of the fixed plate, a mounting plate is detachably connected to the interior of the combustion furnace, a catalyst carrier is fixedly connected to the left side of the mounting plate, and a removal assembly is arranged on the right side of the combustion furnace.
[0007] Furthermore, the removal assembly includes an electric push rod, which is fixedly connected to the outer surface of the combustion furnace. The movable end of the electric push rod is fixedly connected to a support plate. The right side of the mounting plate is fixedly connected to a connecting sleeve, and the connecting sleeve is detachably connected to the support plate by bolts.
[0008] Furthermore, a placement groove is provided on the right inner wall of the combustion furnace, and the mounting plate is located on the inner wall of the combustion furnace through the placement groove. A second sealing gasket is fixedly connected to a side of the mounting plate close to the combustion furnace.
[0009] Furthermore, the spiral plate is welded to the inner bottom wall of the combustion furnace, the bottom of the heat insulation plate is fixedly connected with a deflector, the front of the heating water tank is fixedly connected with a suction pipe, and the top of the heating water tank is fixedly connected with a water injection pipe.
[0010] Furthermore, a conical cover is fixedly connected to the top of the fixing plate, one end of the spiral guide tube away from the bottom insulation plate is fixedly connected to the mounting plate, a sealing plate is fixedly connected to the right side of the filter element, screws are passed through the interior of the sealing plate, and the sealing plate is detachably connected to the right side outer surface of the combustion furnace by screws, and a first sealing gasket is fixedly connected to the side of the sealing plate close to the combustion furnace.
[0011] Furthermore, a drain pipe is fixedly connected to the bottom of the combustion furnace.
[0012] Compared with the prior art, the technical solution of this application has the following beneficial effects:
[0013] 1. The organic waste gas combustion furnace, when the organic waste gas enters the interior of the combustion furnace through the air intake pipe during combustion, the flamethrower is ignited. Due to the existence of the spiral plate, the organic waste gas will burn in a spiral manner and stay longer during combustion. The catalyst carrier will catalyze the organic waste gas during the combustion process. The heat generated after combustion enters the interior of the spiral guide pipe through the guide cover to heat the water in the heating water tank, ensuring that the heat can stay for a longer period of time when discharged. Due to the direct contact between the heating water tank and the bottom insulation board, the flame of the organic waste gas can reach the bottom of the bottom insulation board when burning, directly heating the heating water tank; the heat of the spiral guide pipe will enter the interior of the fixed plate when it is discharged, the filter element can filter harmful substances in the gas, and the screws of the filter element can be removed and replaced after a period of use, thereby increasing the service life of the device.
[0014] 2. For the organic waste gas combustion furnace, when the catalyst carrier is being replaced, the electric push rod can be started to drive the support plate to move to the right, and then the mounting plate connected to the sleeve is separated from the inside of the combustion furnace, and the catalyst carrier is moved out for replacement. Compared with the existing manual replacement method, this structure is safer when used and can avoid finger burns as much as possible. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 This is the main cross-sectional view of the structure of the utility model;
[0016] Figure 2 This is a three-dimensional diagram of the heating water tank of the utility model structure;
[0017] Figure 3 It is a partial top view of the combustion furnace of the utility model structure.
[0018] In the figure: 1. combustion furnace; 2. air intake pipe; 3. flamethrower; 4. spiral plate; 5. heat insulation plate; 6. air guide cover; 7. heating water tank; 8. spiral air guide pipe; 9. fixing plate; 10. filter element; 11. sealing plate; 12. screws; 13. mounting plate; 14. catalyst carrier; 15. connecting sleeve; 16. electric push rod; 17. support plate; 18. drain pipe. DETAILED DESCRIPTION
[0019] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0020] See also Figure 1-3An organic waste gas combustion furnace in this embodiment includes a combustion furnace 1, an air intake pipe 2 is fixedly connected to the inside of the combustion furnace 1, a flamethrower 3 is fixedly connected to the right inner wall of the combustion furnace 1, a spiral plate 4 is installed inside the combustion furnace 1, and the spiral plate 4 is welded to the inner bottom wall of the combustion furnace 1.
[0021] Two insulation boards 5 are fixedly connected inside the combustion furnace 1, a guide cover 6 is fixedly connected to the bottom of the bottom insulation board 5, a heating water tank 7 is fixedly connected to the top of the bottom insulation board 5, a suction pipe is fixedly connected to the front of the heating water tank 7, and a water injection pipe is fixedly connected to the top of the heating water tank 7.
[0022] A spiral guide tube 8 is fixedly connected to the top of the bottom heat insulation plate 5, a fixing plate 9 is fixedly connected to the inner wall of the combustion furnace 1, a conical cover is fixedly connected to the top of the fixing plate 9, a filter element 10 is detachably connected to the inside of the fixing plate 9, one end of the spiral guide tube 8 away from the bottom heat insulation plate 5 is fixedly connected to the fixing plate 9, a sealing plate 11 is fixedly connected to the right side of the filter element 10, a first sealing gasket is fixedly connected to the side of the sealing plate 11 close to the combustion furnace 1, screws 12 are passed through the inside of the sealing plate 11, and the sealing plate 11 is detachably connected to the right outer surface of the combustion furnace 1 by the screws 12.
[0023] A mounting plate 13 is detachably connected to the interior of the combustion furnace 1, a catalyst carrier 14 is fixedly connected to the left side of the mounting plate 13, a placement groove is opened on the right inner wall of the combustion furnace 1, the mounting plate 13 is located on the inner wall of the combustion furnace 1 through the placement groove, and a second sealing gasket is fixedly connected to the side of the mounting plate 13 close to the combustion furnace 1.
[0024] A removal assembly is provided on the right side of the combustion furnace 1, and the removal assembly includes an electric push rod 16, which is fixedly connected to the outer surface of the combustion furnace 1, and the movable end of the electric push rod 16 is fixedly connected to a support plate 17, and the right side of the mounting plate 13 is fixedly connected to a connecting sleeve 15, and the connecting sleeve 15 is detachably connected to the support plate 17 by bolts.
[0025] In this embodiment, two insulation plates 5 are provided to form a heating cavity between the two insulation plates 5. When the heat is discharged by the guide cover 6 and the spiral guide tube 8, the heat can better heat the heating water tank 7, ensuring that the heat can be utilized to the maximum extent, thereby achieving the purpose of saving resources.
[0026] The working principle of the above embodiment is:
[0027] The organic waste gas combustion furnace, when the organic waste gas enters the combustion furnace 1 through the air intake pipe 2 during combustion, the flamethrower 3 is ignited, and due to the existence of the spiral plate 4, the organic waste gas will be burned in a spiral manner, and the retention time during combustion is longer. The catalyst carrier 14 will catalyze the organic waste gas during the combustion process, and the heat generated after combustion enters the spiral guide pipe 8 through the guide cover 6 to heat the water in the heating water tank 7, ensuring that the heat can stay for a longer period of time when discharged, and due to the direct contact between the heating water tank 7 and the bottom insulation board 5, the flame of the organic waste gas can directly reach the bottom of the bottom insulation board 5 when burning, directly The heating water tank 7 is heated; the heat of the spiral guide tube 8 will enter the interior of the fixed plate 9 when it is discharged, the filter element 10 can filter harmful substances in the gas, and the filter element 10 can be removed and replaced by the screw 12 after being used for a period of time, thereby increasing the service life of the device; when the catalyst carrier 14 is being replaced, the electric push rod 16 can be started to drive the support plate 17 to move to the right, and then the mounting plate 13 connected by the connecting sleeve 15 is separated from the interior of the combustion furnace 1, and the catalyst carrier 14 is moved out for replacement. Compared with the existing manual replacement method, this structure is safer when used, and finger burns are avoided as much as possible.
[0028] It should be noted that the standard parts used in the application can be purchased from the market, special-shaped parts can be customized according to the description in the specification and drawings, and the specific connection methods of each part adopt mature bolts, rivets, welding, etc. in the prior art, and conventional means. Machinery, parts and equipment all adopt conventional models in the prior art; plus the circuit connection adopts the conventional connection method in the prior art, which will not be described in detail here. The contents not described in detail in this specification belong to the prior art known to professional and technical personnel in this field.
[0029] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.
[0030] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. An organic waste gas combustion furnace, comprising a combustion furnace (1), characterized in that: An air intake pipe (2) is fixedly connected to the interior of the combustion furnace (1), a flamethrower (3) is fixedly connected to the right inner wall of the combustion furnace (1), a spiral plate (4) is installed inside the combustion furnace (1), two heat insulation plates (5) are fixedly connected to the interior of the combustion furnace (1), a heating water tank (7) is fixedly connected to the top of the bottom heat insulation plate (5), a spiral flow guide pipe (8) is fixedly connected to the top of the bottom heat insulation plate (5), a fixed plate (9) is fixedly connected to the inner wall of the combustion furnace (1), a filter element (10) is detachably connected to the interior of the fixed plate (9), a mounting plate (13) is detachably connected to the interior of the combustion furnace (1), a catalyst carrier (14) is fixedly connected to the left side of the mounting plate (13), and a removal component is arranged on the right side of the combustion furnace (1).
2. The organic waste gas combustion furnace according to claim 1, characterized in that: The removal assembly comprises an electric push rod (16), the electric push rod (16) is fixedly connected to the outer surface of the combustion furnace (1), the movable end of the electric push rod (16) is fixedly connected to a support plate (17), the right side of the mounting plate (13) is fixedly connected to a connecting sleeve (15), and the connecting sleeve (15) is detachably connected to the support plate (17) by bolts.
3. The organic waste gas combustion furnace according to claim 1, characterized in that: The right inner wall of the combustion furnace (1) is provided with a placement groove, the mounting plate (13) is located on the inner wall of the combustion furnace (1) through the placement groove, and a second sealing gasket is fixedly connected to the side of the mounting plate (13) close to the combustion furnace (1).
4. The organic waste gas combustion furnace according to claim 1, characterized in that: The spiral plate (4) is welded to the inner bottom wall of the combustion furnace (1); the bottom of the heat insulation plate (5) is fixedly connected to a flow guide cover (6); the front of the heating water tank (7) is fixedly connected to a suction pipe; and the top of the heating water tank (7) is fixedly connected to a water injection pipe.
5. The organic waste gas combustion furnace according to claim 1, characterized in that: A conical cover is fixedly connected to the top of the fixing plate (9); one end of the spiral guide tube (8) away from the bottom heat insulation plate (5) is fixedly connected to the fixing plate (9); a sealing plate (11) is fixedly connected to the right side of the filter element (10); screws (12) are inserted into the interior of the sealing plate (11); the sealing plate (11) is detachably connected to the right side outer surface of the combustion furnace (1) by means of the screws (12); and a first sealing gasket is fixedly connected to the side of the sealing plate (11) close to the combustion furnace (1).
6. The organic waste gas combustion furnace according to claim 1, characterized in that: A drainage pipe (18) is fixedly connected to the bottom of the combustion furnace (1).
Citation Information
Patent Citations
Organic waste gas combustion furnace
CN210861139U