Underground pipe gallery supporting structure below railway line

By designing an underground pipeline support structure including fixed piles, inclined support plates, fixed pins and oblique braces below the railway line, the problem of creating a safe working environment for underground pipeline construction when the frame bridge is in position is solved, and the support of the soil on the side of the underground pipeline and the construction environment are ensured.

CN222796439UActive Publication Date: 2025-04-25安徽铁建工程有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421605010.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-07-08
Publication Date
2025-04-25
Estimated Expiration
2034-07-08

AI Technical Summary

Technical Problem

With the frame bridge in place, how to create a safe working environment for the construction of underground pipe corridors is a technical issue worth studying.

Method used

It adopts an underground pipeline support structure under the railway line, including fixed piles, inclined support plates, fixed pins and oblique braces. Through the cooperation of steel pipes and fixed piles, the soil on the side of the underground pipe corridor is supported, the pressure is reduced, and the soil and rocks that may fall from the top are blocked through oblique support.

Benefits of technology

This structure can provide a safe working environment for the construction of underground pipeline corridors, reduce the pressure on the sides of underground pipeline corridors, protect the underground pipeline corridors, and enable the underground pipeline corridors to be designed and constructed together with the frame bridge. The overall construction period is short and the impact on the operation of existing railway lines is relatively small.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222796439U_ABST
    Figure CN222796439U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of underground pipe gallery construction, and discloses an underground pipe gallery supporting structure below a railway line, which comprises a fixed pile, an inclined supporting plate is rotatably mounted on the fixed pile, in addition, a fixing pin for fixing the inclined supporting plate is further arranged on the fixed pile, an inclined strut is detachably mounted on the inclined supporting plate, and the inclined strut is fixedly connected with the inclined supporting plate. In addition, a steel pipe is arranged on one side of each fixing pile, through cooperation of the steel pipes and the fixing piles, soil on the side face of the underground pipe gallery can be supported, pressure borne by the side face of the underground pipe gallery is reduced, and the underground pipe gallery is protected. In addition, during construction, the inclined struts can also play a blocking role to block earth and stones which possibly fall down along the slope at the top, and a safe working environment is provided for construction of the underground pipe gallery.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of underground pipe gallery construction, in particular to an underground pipe gallery supporting structure under a railway line. Background Art

[0002] In order to improve the traffic conditions in the city, it is necessary to build an underpass under the busy operating railway and change the original level crossing between the railway and the highway into an overpass. During the jacking construction of the existing railway line under the frame bridge, in order to reduce the subsequent repeated construction, the underground pipeline corridor (mainly the branch line integrated pipeline corridor or cable pipeline corridor) can be designed and constructed simultaneously with the frame bridge. The underground pipeline corridor can integrate various engineering pipelines such as electricity, communications, and gas, and is an important infrastructure and "lifeline" to ensure the operation of the city.

[0003] When the frame bridge is being jacked into place, how to create a safe working environment for the construction of the underground pipeline gallery is a technical issue worthy of study. Utility Model Content

[0004] In order to solve the technical problem of facilitating the construction of an underground pipe gallery, the utility model provides an underground pipe gallery support structure under a railway line.

[0005] The utility model is implemented by the following technical solution: an underground pipe gallery support structure under a railway line, comprising fixed piles, on which are arranged:

[0006] An inclined support plate, the inclined support plate is rotatably mounted on the fixed pile;

[0007] A fixing pin, the fixing pin being detachably connected to the fixing pile, and the fixing pin being used to fix the oblique support plate;

[0008] An oblique brace is installed on the oblique support plate.

[0009] As a further improvement of the above solution, the fixing pile is provided with an installation opening, a limiting block is fixedly connected to the top of the installation opening, a fixing shaft is fixedly arranged in the installation opening, and a retaining spring is sleeved on the outer side of the fixing shaft.

[0010] As a further improvement of the above scheme, a rotating block is fixedly connected to one side of the inclined support plate, the rotating block is sleeved on the fixed shaft and rotatably connected to the fixed shaft, a stop block is fixedly connected on the rotating block and located on one side of the retaining spring, and a through hole is opened on the rotating block.

[0011] As a further improvement of the above solution, a first fixing hole and a second fixing hole are formed on the side wall of the installation opening, and the fixing pin can pass through the first fixing hole and the second fixing hole.

[0012] As a further improvement of the above solution, one side of the fixing pile is fixedly connected to the mounting base plate by screws, and the diagonal brace is fixedly connected to the mounting base plate by screws.

[0013] As a further improvement of the above solution, a frame bridge is further provided on one side of the fixed pile, an I-beam is fixedly connected to the outer side wall of the frame bridge, and the other end of the diagonal brace is fixedly connected to the I-beam.

[0014] As a further improvement of the above solution, a steel pipe is further provided on the other side of the fixed pile relative to the frame bridge.

[0015] Compared with the prior art, the beneficial effects of the present invention are:

[0016] The utility model can support the soil on the side of the underground corridor through the cooperation of steel pipes and fixed piles, reduce the pressure on the side of the underground corridor, and protect the underground corridor. In addition, during construction, the diagonal support can block the soil and rocks that may fall along the slope from the top, providing a safe working environment for the construction of the underground corridor. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a schematic diagram of the overall structure of the utility model;

[0018] Figure 2 This is an exploded view of the fixed pile and inclined support plate structure of the utility model;

[0019] Figure 3 This is a cross-sectional view of the fixed pile structure of the utility model.

[0020] Figure 4 It is a schematic diagram of the overall structure of the utility model in use state;

[0021] Explanation of main symbols: 1. Frame bridge; 2. I-beam; 3. Steel pipe; 4. Fixed pile; 5. Installation port; 6. Limit block; 7. Fixed shaft; 8. Retaining spring; 9. Rotating block; 10. Stop block; 11. Oblique support plate; 12. Fixing pin; 13. First fixing hole; 14. Second fixing hole; 15. Mounting seat plate; 16. Oblique support. DETAILED DESCRIPTION

[0022] The present invention is further described below in conjunction with the accompanying drawings and specific implementation methods. It should be noted that, under the premise of no conflict, the various embodiments or technical features described below can be arbitrarily combined to form a new embodiment.

[0023] Please combine Figure 1, an underground pipe gallery support structure under a railway line in this embodiment includes a fixed pile 4. First, a mounting opening 5 is opened above the fixed pile 4, and a fixed shaft 7 is fixedly installed in the mounting opening 5. In addition, a rotating block 9 is sleeved on the outer side of the fixed shaft 7, and the rotating block 9 is rotatably connected to the fixed shaft 7 through a bearing ring. In addition, a retaining spring 8 is sleeved on the outer side of the fixed shaft 7, and a stopper 10 is fixedly connected to the two side walls of the rotating block 9. That is, the lower end of the retaining spring 8 abuts against the bottom of the mounting opening 5, and the two ends abut against two stoppers 10 respectively.

[0024] An inclined support plate 11 is fixedly connected to one side of the rotating block 9. Under the action of the clamping spring 8, the rotating block 9 and the inclined support plate 11 are pushed to rotate around the fixed shaft 7, so that the inclined support plate 11 is in an inclined state (expanded state). In addition, a limit block 6 is fixedly arranged on the inner top of the installation opening 5. When the inclined support plate 11 is in an inclined state, the limit block 6 contacts the upper surface of the inclined support plate 11 and presses against the inclined support plate 11.

[0025] The oblique support plate 11 is tilted by the action of the clamping spring 8. In order to further fix the oblique support plate 11, a through hole is provided on the rotating block 9, and a first fixing hole 13 and a second fixing hole 14 are provided on the fixing pile 4 and on the side wall at the position of the installation opening 5. In addition, a fixing pin 12 is provided, one end of which is threaded and connected to a fastening nut.

[0026] When the inclined support plate 11 is in an inclined state, the fixing pin 12 is used to simultaneously penetrate the first fixing hole 13 and the through hole on the rotating block 9, and then fixed by a tightening nut. At this time, the rotating block 9 and the fixed shaft 7 cannot continue to rotate relative to each other, so the inclined support plate 11 cannot continue to rotate and is fixed in an inclined state.

[0027] In addition, Figure 3 As shown, when the inclined support plate 11 and the rotating block 9 rotate around the fixed shaft 7, the inclined support plate 11 is stored in a vertical state on the side of the fixed pile 4. At this time, the through hole on the rotating block 9 corresponds to the position of the second fixing hole 14, and the inclined support plate 11 can be fixed by the fixing pin 12, so that the inclined support plate 11 remains in a vertical state. When the inclined support plate 11 is in a vertical state, it is convenient for transportation and storage.

[0028] When the inclined support plate 11 remains in an inclined state, the inclined brace 16 can be installed on the inclined support plate 11. In order to fix the inclined brace 16, a mounting seat plate 15 is provided as a connecting member. First, the mounting seat plate 15 is fixed to the side of the fixed pile 4 by screws. One side of the mounting seat plate 15 is in an "L" shape, which is convenient for installing the inclined brace 16. Bolts are passed through the inclined brace 16, the mounting seat plate 15 and the inclined support plate 11 from top to bottom in sequence. Therefore, the fixed pile 4, the inclined support plate 11 and the inclined brace 16 are fixed by the connecting effect of the mounting seat plate 15.

[0029] In addition, the present embodiment further comprises a frame bridge 1, an underground pipe gallery and a steel pipe 3. The frame bridge 1 is located below the railway line, and the underground pipe gallery is located on one side of the frame bridge 1. The steel pipe 3 is arranged on the side of the fixed pile 4 away from the underground pipe gallery. In addition, an I-beam 2 is fixedly connected to the outer wall of the frame bridge 1.

[0030] The implementation process and principle of an underground pipe gallery support structure under a railway line in the embodiment of the present application are as follows:

[0031] (I): The frame bridge 1 is located below the railway line and is pushed into place by the jacking method. In the railway subgrade soil on one side of the underground pipe gallery to be constructed, a horizontal spiral drilling method is used to drill holes, and then the steel pipes 3 are pressed into the holes, and each steel pipe 3 is arranged vertically.

[0032] (ii) In the middle and both sides of the railway roadbed, a small area of ​​soil is excavated along the steel pipe 3 close to the frame bridge 1, and then the fixed piles 4 are vertically pressed in, so that the middle and both sides of the horizontally arranged steel pipe 3 are supported by the vertically arranged fixed piles 4. The bottom end of the fixed pile 4 should be lower than the bottom surface of the bottom plate of the frame bridge 1, and the inclined support plate 11 needs to face the frame bridge 1 and be exposed from the soil.

[0033] (III): Install the diagonal support 16. First, pull out the fixing pin 12 from the second fixing hole 14. At this time, the diagonal support plate 11 and the rotating block 9 rotate around the fixed shaft 7 under the action of the clamping spring 8 until the diagonal support plate 11 rotates from the vertical position to an inclined state with one end tilted upward. The diagonal support plate 11 will stop rotating when it encounters the limit block 6. Insert the fixing pin 12 into the first fixing hole 13 to prevent the rotating block 9 and the diagonal support plate 11 from rotating further.

[0034] At this time, the mounting base plate 15 is fixedly connected to the fixing pile 4 by screws, and then the diagonal brace 16, the mounting base plate 15 and the diagonal support plate 11 are fixed together by bolts. At the same time, the other end of the diagonal brace 16 can be directly fixed to the I-beam 2 on the side of the frame bridge 1 by screws or welding. The installation is completed.

[0035] (IV): Excavate the soil between the frame bridge 1 and the fixed piles 4. Install the underground pipe gallery. After the construction of the underground pipe gallery is completed, it can be backfilled gradually, and the diagonal braces 16 can be gradually removed during the backfilling process, while the steel pipes 3 and fixed piles 4 are retained.

[0036] Through the above method, the steel pipe 3 and the fixed pile 4 can play a role in supporting the soil, and cooperate with the diagonal brace 16 to provide a safe working environment for the construction of the underground pipe gallery. In addition, the underground pipe gallery and the frame bridge 1 are designed and constructed together, the overall construction period is short, and the impact on the operation of the existing railway line is relatively small.

[0037] The above-mentioned implementation modes are only preferred implementation modes of the present invention, and cannot be used to limit the protection scope of the present invention. Any non-substantial changes and substitutions made by technicians in this field on the basis of the present invention shall fall within the scope of protection required by the present invention.

Claims

1. An underground pipe gallery support structure under a railway line, comprising fixed piles, characterized in that: The fixing pile is provided with: An inclined support plate, the inclined support plate is rotatably mounted on the fixed pile; A fixing pin, the fixing pin being detachably connected to the fixing pile, and the fixing pin being used to fix the oblique support plate; An oblique brace is installed on the oblique support plate.

2. The underground pipe gallery support structure under the railway line according to claim 1, characterized in that: The fixing pile is provided with an installation opening, the top of the installation opening is fixedly connected to a limiting block, a fixing shaft is fixedly arranged in the installation opening, and a retaining spring is sleeved on the outer side of the fixing shaft.

3. The underground pipe gallery support structure under the railway line according to claim 2, characterized in that: A rotating block is fixedly connected to one side of the inclined support plate, the rotating block is sleeved on the fixed shaft and rotatably connected to the fixed shaft, a stopper is fixedly connected to the rotating block and located on one side of the retaining spring, and a through hole is opened on the rotating block.

4. The underground pipe gallery support structure under the railway line according to claim 2, characterized in that: A first fixing hole and a second fixing hole are formed on the side wall of the installation opening, and the fixing pin can pass through the first fixing hole and the second fixing hole.

5. The underground pipe gallery support structure under the railway line according to claim 1, characterized in that: One side of the fixing pile is fixedly connected with a mounting base plate by means of screws, and at the same time, the diagonal brace is fixedly connected with the mounting base plate by means of screws.

6. The underground pipe gallery support structure under the railway line according to claim 1, characterized in that: A frame bridge is also provided on one side of the fixed pile, an I-beam is fixedly connected to the outer side wall of the frame bridge, and the other end of the diagonal brace is fixedly connected to the I-beam.

7. The underground pipe gallery support structure under the railway line according to claim 1, characterized in that: A steel pipe is also arranged on the side of the fixed pile away from the frame bridge.