Large-diameter pipe roofing connecting structure for composite stratum construction

By using the pipe curtain connection structure reinforced by connecting plate plug-in and anchor rods in the construction of composite formations, the problem of insufficient connection strength of steel pipe columns is solved, significantly improving the overall structural stability and safety of the pipe curtain, and reducing construction difficulty and cost.

CN222796508UActive Publication Date: 2025-04-25CHINA RAILWAY TUNNEL GROUP CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421528874.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-06-28
Publication Date
2025-04-25
Estimated Expiration
2034-06-28

AI Technical Summary

Technical Problem

Under composite formation conditions, the connection strength between steel pipe columns during pipe curtain construction is insufficient, which affects the stability and safety of the overall structure.

Method used

A large-diameter pipe curtain connection structure constructed in composite formations is adopted. This structure connects multiple steel pipe columns into an integral structure through a connecting plate plugged into the installation hole of the steel pipe column, and further enhances the connection strength through the anchor rod and the drive assembly.

Benefits of technology

It significantly improves the connection strength of the pipe curtain, can resist various forces and torques brought by complex geological conditions in the composite formation, ensures the stability and safety of the pipe curtain structure, and reduces construction difficulty and cost.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222796508U_ABST
    Figure CN222796508U_ABST
Patent Text Reader

Abstract

The utility model discloses a large-diameter pipe roofing connecting structure for composite stratum construction, which comprises a connecting plate, the connecting structure is used for being matched with a pipe roofing, the pipe roofing comprises a plurality of steel pipe columns arranged in a preset construction direction, and mounting holes are formed in the two ends of each steel pipe column in the width direction of the pipe roofing; and the connecting plate is inserted into the plurality of steel pipe columns through the mounting holes in the plurality of steel pipe columns. The connecting structure has the effects that the connecting strength between every two adjacent steel pipe columns is enhanced, and the overall structural stability of the pipe roofing is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of pipe curtain construction, and in particular to a large-diameter pipe curtain connection structure for composite stratum construction. Background Art

[0002] In civil engineering construction, especially when developing underground space under composite stratum conditions, pipe curtain construction technology has been widely used as an important underground excavation technology. Pipe curtain construction method, also known as pipe jacking method, is a new underground excavation technology that realizes stable excavation of underground space by using a pipe curtain structure formed by connecting a large number of steel pipes. However, under composite stratum conditions, due to the complex and changeable geological conditions, pipe curtain construction faces many challenges.

[0003] Composite strata usually refer to strata structures formed by the interlacing and superposition of multiple rock and soil layers of different properties. Under such stratum conditions, the connection strength between steel pipe columns in pipe curtain construction becomes a key factor affecting the overall stability of the pipe curtain. At present, the connection methods between steel pipe columns in pipe curtain construction mainly include welding and bolt connection, but in actual construction, due to factors such as construction conditions and improper operation process, the connection strength between steel pipe columns is insufficient, which seriously affects the strength of the overall connection structure of the pipe curtain. Summary of the invention

[0004] In order to strengthen the connection strength between two adjacent steel pipe columns and improve the overall structural stability of the pipe curtain, the present application provides a large-diameter pipe curtain connection structure for composite stratum construction.

[0005] The large-diameter pipe-roof connection structure for composite stratum construction provided in this application adopts the following technical solution:

[0006] A large-diameter pipe curtain connection structure for composite stratum construction includes a connecting plate. The connecting structure is used in conjunction with the pipe curtain. The pipe curtain includes a plurality of steel pipe columns arranged along a predetermined construction direction. Each of the steel pipe columns is provided with mounting holes at both ends along the width direction of the pipe curtain. The connecting plate is plugged into the plurality of steel pipe columns through the mounting holes on the plurality of steel pipe columns.

[0007] By adopting the above technical solution, first, the connecting plate connects multiple steel pipe columns into an integral pipe curtain structure, which significantly improves the connection strength of the pipe curtain. This connection method can resist various forces and moments brought by complex geological conditions in composite formations, ensuring the stability and safety of the pipe curtain structure; second, the connection structure adopts a plug-in method to connect steel pipe columns, which is simple and convenient to construct, reducing the construction difficulty and cost. At the same time, the design of the connecting plate is also convenient for on-site installation and adjustment, improving construction efficiency; third, the connection structure is suitable for the connection of steel pipe columns of different diameters and lengths, and has strong adaptability. In the construction of composite formations, appropriate steel pipe columns and connecting plate specifications can be selected according to actual conditions to meet different construction needs.

[0008] Preferably, a pair of connecting blocks are respectively provided at both ends of the segment of the connecting plate located in each of the steel pipe columns in the height direction of the pipe curtain, and the two connecting blocks of the same pair are slidably installed with anchor rods, and a driving assembly for driving the two anchor rods of the same pair to slide in a direction away from the connecting plate is installed on the connecting plate; an anchor hole is provided on the side wall of the steel pipe column, and one end of the anchor rod away from the connecting block is passed through the anchor hole and is inserted into the steel pipe column, and one end of the anchor rod passing through the steel pipe column is buried in the earth.

[0009] By adopting the above technical solution, first, the connection plate is tightly connected to the steel pipe column and the surrounding earthwork through the anchor rod, forming a more stable overall structure; this helps to resist the various forces and moments brought by the complex geological conditions in the composite strata, and improve the stability and safety of the pipe curtain structure; second, the anchor rod can slide on the connection block to adapt to the steel pipe columns and earthwork at different spacings. This design makes the connection structure more adaptable and can adapt to different geological conditions and construction requirements; third, due to the close connection between the connection structure and the steel pipe column and earthwork, the problems of loose connection and looseness that may occur in the traditional connection method are avoided. At the same time, the inspection of the connection quality is also more convenient and accurate, which helps to improve the construction quality.

[0010] Preferably, the driving assembly includes a driving block and a first bidirectional threaded rod, the driving block is provided on each of the anchor rods, and different threaded sections of the first bidirectional threaded rod are respectively threadedly connected to the driving blocks on the two connecting blocks of the same pair.

[0011] By adopting the above technical solution, first, by using the first bidirectional threaded rod, the two anchor rods of the same pair can be easily adjusted at the same time, thereby improving the adjustment efficiency; this helps to quickly complete the adjustment of the anchor rods at the construction site, saving time and labor costs; second, since the first bidirectional threaded rod can accurately control the sliding distance of the anchor rod, the stability of the connection structure during the adjustment process can be ensured; this helps to avoid loosening or damage of the connection structure due to improper adjustment, thereby improving the overall stability of the pipe curtain structure.

[0012] Preferably, outer side walls at both ends of the steel pipe column along the width direction of the tube curtain are respectively provided with C-shaped pieces and T-shaped pieces, and the T-shaped piece on one steel pipe column is inserted into the adjacent steel pipe column through the C-shaped piece on the adjacent steel pipe column.

[0013] By adopting the above technical solution, firstly, a more solid connection structure is formed between adjacent steel pipe columns through the plug-in connection of C-shaped parts and T-shaped parts. This connection method can effectively resist various forces and moments brought by complex geological conditions in composite strata, and improve the overall stability and safety of the pipe curtain structure; secondly, the plug-in connection method of C-shaped parts and T-shaped parts has strong adaptability. Whether it is the connection requirements of steel pipe columns of different diameters or different angles, they can be met by adjusting the position and angle of C-shaped parts and T-shaped parts, so that the connection structure can adapt to different geological conditions and construction requirements.

[0014] Preferably, the T-shaped member includes a pair of first angle steels arranged up and down in a vertical direction, and one end of each of the first angle steels is connected to one of the steel pipe columns, and the other end extends toward a direction away from the other angle steel of the same pair; the C-shaped member includes a pair of second angle steels arranged up and down in a vertical direction, and one end of each of the second angle steels is connected to one of the steel pipe columns, and the other end extends toward a direction close to the other second angle steel of the same pair, and a connecting groove for inserting the two first angle steels is formed between the two second angle steels.

[0015] By adopting the above technical solution, the production and installation of T-shaped pieces and C-shaped pieces are relatively simple, and the construction workers only need to weld or bolt them according to the designed size and angle. At the same time, due to the plug-in matching method between them, the connection process is more convenient and quick, which improves the construction efficiency.

[0016] Preferably, a pouring cavity is formed between the two first angle steels of one steel pipe column and the two second angle steels of an adjacent steel pipe column, and the pouring cavity is used for pouring concrete.

[0017] By adopting the above technical solution, a pouring cavity is formed between the T-shaped member and the C-shaped member and poured with concrete, which can further strengthen the connection strength between the two steel pipe columns. The presence of concrete can resist forces and moments from all directions, thereby improving the stability and safety of the entire pipe curtain structure.

[0018] Preferably, a second bidirectional threaded rod is provided between two adjacent steel pipe columns, and one end of the second bidirectional threaded rod is passed through a side plate of the first angle steel, and the other end is passed through a corresponding side plate of the second angle steel.

[0019] By adopting the above technical solution, the second two-way threaded rod is inserted into the side plates of the first angle steel and the second angle steel, providing an additional connection point between the two steel pipe columns. This increases the stability and shear resistance of the connection, and helps to resist the complex stress and deformation in the stratum; the use of the second two-way threaded rod for connection does not require a complicated welding or bolt connection process, and only requires pre-drilling holes in the first angle steel and the second angle steel, which is convenient for workers to carry out connection construction.

[0020] Preferably, the connecting plate is penetrated through each of the adjacent C-shaped members and the T-shaped members through each of the perfusion cavities.

[0021] By adopting the above technical solution, the connecting plate is inserted into the pouring cavity. After the concrete is poured into the pouring cavity, the connecting plate segment at that location is connected to the C-shaped piece and the T-shaped piece, thereby improving the stability of the connecting plate and reducing the slippage of the connecting plate along the width direction of the pipe curtain.

[0022] In summary, the present application includes at least one of the following beneficial technical effects:

[0023] 1. The connecting plate connects multiple steel pipe columns into an integral pipe curtain structure, significantly improving the connection strength of the pipe curtain. This connection method can resist various forces and moments brought by complex geological conditions in composite strata, ensuring the stability and safety of the pipe curtain structure; secondly, the connection structure uses plug-in connection to connect steel pipe columns, which is simple and convenient to construct, reducing the construction difficulty and cost;

[0024] 2. The connection structure uses plug-in to connect steel pipe columns, which is simple and convenient to construct, reducing the construction difficulty and cost. At the same time, the design of the connection plate is also convenient for on-site installation and adjustment, improving construction efficiency; third, the connection structure is suitable for connecting steel pipe columns of different diameters and lengths, and has strong adaptability. In the construction of composite formations, appropriate steel pipe columns and connection plate specifications can be selected according to actual conditions to meet different construction needs. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1 It is a partial structural front view of the tube curtain according to an embodiment of the present application.

[0026] Figure 2 It is a schematic diagram of the connection structure between two adjacent steel pipe columns in an embodiment of the present application.

[0027] Description of reference numerals:

[0028] 1. Connecting plate; 2. Steel pipe column; 21. Mounting hole; 11. Connecting block; 12. Anchor rod; 3. Driving assembly; 31. Driving block; 32. First bidirectional threaded rod; 4. T-shaped piece; 41. First angle steel; 5. C-shaped piece; 51. Second angle steel; 511. Connecting groove; 6. Second bidirectional threaded rod; 7. Infusion cavity. DETAILED DESCRIPTION

[0029] The following is combined with Figure 1-2 This application is described in further detail.

[0030] The present application embodiment discloses a large diameter pipe curtain connection structure for composite stratum construction. Figure 1 and Figure 2 The large-diameter pipe curtain connection structure for composite formation construction includes a connection plate 1. In the present embodiment, the connection plate 1 is a steel plate. The connection structure is used in conjunction with the pipe curtain. The pipe curtain includes a plurality of steel pipe columns 2 arranged along a predetermined construction direction. Both ends of each steel pipe column 2 along the width direction of the pipe curtain are provided with mounting holes 21. The connection plate 1 is slidably plugged into the plurality of steel pipe columns 2 along the length direction of the steel pipe columns 2 through the mounting holes 21 on the plurality of steel pipe columns 2. Connecting the plurality of steel pipe columns 2 through the connection plate 1 can effectively improve the connection strength between the plurality of steel pipe columns 2, thereby enhancing the overall structural strength of the pipe curtain.

[0031] A pair of connecting blocks 11 are respectively provided at both ends of the segment of the connecting plate 1 located in each steel pipe column 2 in the direction of the height of the pipe curtain, and the two connecting blocks 11 of the same pair are both slidably installed with anchor rods 12. A driving component 3 for driving the two anchor rods 12 of the same pair to slide away from the connecting plate 1 is installed on the connecting plate 1; anchor holes are opened on the side walls of the steel pipe column 2, and the ends of the anchor rods 12 away from the connecting blocks 11 are penetrated into the steel pipe column 2 through the anchor holes, and the ends of the anchor rods 12 that penetrate the steel pipe column 2 are buried in the earth; the earth is connected to the connecting plate 1 by the anchor rods 12, so as to reduce the slippage of the connecting plate 1 in each installation hole 21 along the width direction of the pipe curtain, thereby enhancing the connection strength between the connecting plate 1 and the steel pipe column 2.

[0032] Reference Figure 1 The driving assembly 3 includes a driving block 31 and a first bidirectional threaded rod 32. The driving block 31 is fixedly installed on each anchor rod 12. The different thread segments of the first bidirectional threaded rod 32 are respectively threadedly connected to the driving blocks 31 on the two connecting blocks 11 of the same pair. The anchor rod 12 can be driven to slide by twisting the first bidirectional threaded rod 32.

[0033] Reference Figure 1 and Figure 2 C-shaped pieces 5 and T-shaped pieces 4 are respectively provided on the outer side walls at both ends of the steel pipe column 2 along the width direction of the pipe curtain. The T-shaped piece 4 on one steel pipe column 2 is inserted into the adjacent steel pipe column 2 through the C-shaped piece 5 on the adjacent steel pipe column 2; the two adjacent steel pipe columns 2 are stably connected by the insertion of the C-shaped piece 5 and the T-shaped piece 4, further enhancing the connection strength between the steel pipe columns 2.

[0034] The T-shaped member 4 includes a pair of first angle steels 41 arranged vertically up and down, and one end of the two first angle steels 41 is connected to a steel pipe column 2, and the other end extends toward the direction away from the other angle steel of the same pair; the C-shaped member 5 includes a pair of second angle steels 51 arranged vertically up and down, and one end of the two second angle steels 51 is connected to a steel pipe column 2, and the other end extends toward the direction close to the other second angle steel 51 of the same pair, and a connecting groove 511 for inserting the two first angle steels 41 is formed between the two second angle steels 51 of the same pair.

[0035] A second bidirectional threaded rod 6 is provided between two adjacent steel pipe columns 2, one end of the second bidirectional threaded rod 6 is passed through a side plate of a first angle steel 41, and the other end is passed through a side plate of a second angle steel 51 corresponding to the first angle steel 41;

[0036] A pouring cavity 7 is formed between two first angle steels 41 of a steel pipe column 2 and two second angle steels 51 of an adjacent steel pipe column 2 , and the pouring cavity 7 is used for pouring concrete; the connecting plate 1 is penetrated through each adjacent C-shaped member 5 and T-shaped member 4 through each pouring cavity 7 .

[0037] The implementation principle of a large-diameter pipe curtain connection structure for composite stratum construction in an embodiment of the present application is as follows: after the steel pipe column 2 welded with the C-shaped member 5 and the T-shaped member 4 is pushed up to form the pipe curtain, the worker enters the large-diameter steel pipe column 2, installs the second bidirectional threaded rod 6 in two adjacent C-shaped members 5 and T-shaped members 4, and then opens a mounting hole 21 on the steel pipe column 2, and then inserts the steel pipe column 2 equipped with the connecting block 11 into each steel pipe column 2 through the mounting hole 21, and finally, after the first bidirectional threaded rod 32 is screwed, the anchor rod 12 is driven into the earthwork, and the connection of the pipe curtain can be completed.

[0038] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A large-diameter pipe-roof connection structure for composite stratum construction, comprising a connection plate (1), characterized in that: The connection structure is used in conjunction with a pipe curtain, the pipe curtain comprising a plurality of steel pipe columns (2) arranged in a predetermined construction direction, each of the steel pipe columns (2) being provided with mounting holes (21) at both ends along the width direction of the pipe curtain, and the connection plate (1) being plugged into the plurality of steel pipe columns (2) through the mounting holes (21) on the plurality of steel pipe columns (2).

2. A large diameter pipe-roof connection structure for composite stratum construction according to claim 1, characterized in that: A pair of connection blocks (11) are respectively provided at both ends of the segment of the connection plate (1) located in each of the steel pipe columns (2) in the height direction of the pipe curtain, and the two connection blocks (11) of the same pair are both slidably installed with anchor rods (12). The connection plate (1) is installed with a driving component (3) for driving the two anchor rods (12) of the same pair to slide in a direction away from the connection plate (1); an anchor hole is opened on the side wall of the steel pipe column (2), and one end of the anchor rod (12) away from the connection block (11) is penetrated into the steel pipe column (2) through the anchor hole, and one end of the anchor rod (12) that penetrates out of the steel pipe column (2) is buried in the earth.

3. A large diameter pipe-roof connection structure for composite stratum construction according to claim 2, characterized in that: The driving assembly (3) comprises a driving block (31) and a first bidirectional threaded rod (32), wherein each anchor rod (12) is provided with the driving block (31), and different thread segments of the first bidirectional threaded rod (32) are respectively threadedly connected to the driving blocks (31) on the two connecting blocks (11) of the same pair.

4. The large-diameter pipe-roof connection structure for composite stratum construction according to claim 1, characterized in that: The outer side walls of both ends of the steel pipe column (2) along the width direction of the tube curtain are respectively provided with C-shaped pieces (5) and T-shaped pieces (4); the T-shaped piece (4) on one steel pipe column (2) is inserted into the adjacent steel pipe column (2) through the C-shaped piece (5) on the adjacent steel pipe column (2).

5. A large diameter pipe-roof connection structure for composite stratum construction according to claim 4, characterized in that: The T-shaped member (4) comprises a pair of first angle steels (41) arranged vertically up and down, wherein one end of the two first angle steels (41) is connected to one of the steel pipe columns (2) and the other end extends in a direction away from the other angle steel of the same pair; the C-shaped member (5) comprises a pair of second angle steels (51) arranged vertically up and down, wherein one end of the two second angle steels (51) is connected to one of the steel pipe columns (2) and the other end extends in a direction close to the other second angle steel (51) of the same pair, and a connecting groove (511) for inserting the two first angle steels (41) is formed between the two second angle steels (51).

6. A large diameter pipe-roof connection structure for composite stratum construction according to claim 5, characterized in that: A pouring cavity (7) is formed between the two first angle steels (41) of one steel pipe column (2) and the two second angle steels (51) of an adjacent steel pipe column (2), and the pouring cavity (7) is used for pouring concrete.

7. A large diameter pipe-roof connection structure for composite stratum construction according to claim 6, characterized in that: A second bidirectional threaded rod (6) is arranged between two adjacent steel pipe columns (2), one end of the second bidirectional threaded rod (6) is passed through a side plate of the first angle steel (41), and the other end is passed through a side plate of the corresponding second angle steel (51).

8. The large-diameter pipe-roof connection structure for composite stratum construction according to claim 6, characterized in that: The connecting plate (1) is provided through each of the perfusion chambers (7) and is disposed on each of the adjacent C-shaped pieces (5) and the T-shaped pieces (4).