Construction hanging formwork structure

By using symmetrically arranged plastic support plates and semicircular sleeves, combined with the design of extended bolts and slotted embeds, the problems of cumbersome operation and inability to reuse in traditional mold lifting tools are solved, achieving more efficient installation and sealing effects.

CN222797045UActive Publication Date: 2025-04-25SHANGHAI HUACHENG ENG CONSTR MANAGEMENT CO
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421669570.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-07-15
Publication Date
2025-04-25
Estimated Expiration
2034-07-15

AI Technical Summary

Technical Problem

Traditional hanging mold tools have complicated operation steps during construction, and it is difficult to cut iron wire and disassemble wooden boards after pouring, resulting in the inability to reuse the tools.

Method used

Two sets of plastic support plates and semicircular sleeves are used to fix the lengthened bolts and ear nuts to ensure that the semicircular sleeve and plastic support plate are effectively supported, reduce installation steps, and enhance sealing through the fitting of grooves and inserts.

Benefits of technology

The installation steps of the hanging mold bracket are simplified, the installation efficiency is improved, and the seal between the plastic support plate and the concrete wall is enhanced through adjustable threaded sleeves and top bolts, realizing the reuse of tools.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222797045U_ABST
    Figure CN222797045U_ABST
Patent Text Reader

Abstract

The utility model relates to a construction hanging formwork structure which comprises two sets of symmetrically-arranged plastic supporting plates and semicircular sleeves, the semicircular sleeves are fixedly arranged at the lower ends of the plastic supporting plates, the plastic supporting plates are provided with notches matched with the semicircular sleeves, the side edge of one plastic supporting plate is provided with an embedding groove, and the side edge of the other plastic supporting plate is provided with an embedding block matched with the embedding groove. The two semicircular sleeves form a circular sleeve, a fixing assembly is arranged between the two semicircular sleeves and comprises bases, the bases are fixedly arranged on the two sides, close to one ends, of the two semicircular sleeves, horizontal grooves are formed in the ends, away from the semicircular sleeves, of the bases, and a lengthened bolt is hinged to the interior of one horizontal groove of every two adjacent bases; and the other end of the lengthened bolt is in threaded connection with a lug nut.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of hanging formwork in the construction industry, and in particular relates to a construction hanging formwork structure. Background Art

[0002] During the construction process, when processing the drainage pipe area, a hanging mold tool will be used to support the drainage pipe area. After the subsequent drainage pipe installation is completed, the drainage pipe area needs to be poured for the second time. During the construction process, a hanging mold bracket is needed to support the opening area. The current traditional hanging mold tools are composed of wooden boards, wooden strips and iron wires. During construction, the lower side of the wooden board is supported by wooden strips. Holes corresponding to the drainage pipes are opened on the wooden board. Then, the wooden strips are pulled from the upper side with iron wires, and finally the opening area is poured for the second time. However, the operation steps of this type of hanging mold tool are cumbersome, and the iron wire needs to be cut after pouring. The removal of the lower wooden board is also difficult, and the wooden board will be damaged during removal, making it impossible to reuse the hanging mold tool. Utility Model Content

[0003] The purpose of the utility model is to provide a construction hanging formwork structure for solving the problems existing in the background technology.

[0004] In order to achieve the above technical purpose, the technical solution adopted by the utility model is as follows:

[0005] A construction hanging formwork structure, comprising two groups of symmetrically arranged plastic support plates and semicircular sleeves, wherein the semicircular sleeves are fixedly arranged at the lower ends of the plastic support plates, the plastic support plates are provided with notches matching the semicircular sleeves, one of the plastic support plates is provided with an embedding groove on its side, and the other plastic support plate is provided with an embedding block matching the embedding groove on its side, the two semicircular sleeves form a circular sleeve, and a fixing component is arranged between the two semicircular sleeves;

[0006] The fixing assembly comprises a base, and the base is fixedly provided on both sides of the two semicircular sleeves close to one end, and a horizontal groove is provided on the end of the base away from the semicircular sleeve. An extension bolt is hingedly provided in the horizontal groove of one of the two adjacent bases, and the other end of the extension bolt is threadedly connected with an ear nut;

[0007] The device can fix two semicircular sleeves on the drain pipe by lengthening bolts and lug nuts, so that the semicircular sleeves and the plastic support plate are effectively supported, reducing the installation steps of the hanging formwork bracket and improving the installation efficiency;

[0008] A top support assembly is provided between the plastic support plate and the semicircular sleeve on the same side, and the top support assembly includes a top support frame. A top support frame is fixedly provided at one end of the two semicircular sleeves away from each other, and a plurality of top support bolts are fixedly provided at the upper end of the top support frame. The top support bolts are threadedly rotatably connected to a threaded sleeve.

[0009] Preferably, a corner brace is provided between the plastic support plate and the semicircular sleeve on the same side.

[0010] Preferably, support bars are fixedly provided at the lower ends of the two plastic support plates, and the support bars match the positions of the plurality of threaded sleeves.

[0011] Preferably, the outer side of the threaded sleeve is provided with anti-slip textures.

[0012] Preferably, an oblique brace is fixedly provided between the top support frame and the semicircular sleeve.

[0013] Preferably, the horizontal groove is engaged and matched with the lengthened bolt, the middle portion of the lengthened bolt is not provided with threads, and the lengthened bolt is provided with threads on the side away from the hinge.

[0014] The device can adjust the height difference of the two plastic support plates through the extension bolts in the two horizontal grooves, so that the two plastic support plates tend to be in the same horizontal plane, and the sealing between the two plastic support plates can be enhanced by the engagement of the embedding groove and the embedding block; the hinged extension bolts can avoid the storage of parts and components, facilitate the reuse of the device, and avoid the loss of parts and components; the height of the threaded sleeve can be adjusted by rotating the threaded sleeve, thereby squeezing the plastic support plate, and relying on the overall length increase of the threaded sleeve and the top support bolt, the plastic support plate and the top support frame can have an upward and downward pushing tendency respectively, thereby relying on the toughness of the plastic support plate made of plastic material to allow the threaded sleeve to push the plastic support plate upward to fit closely to the concrete wall, thereby enhancing the sealing between the plastic support plate and the concrete wall. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] The present invention can be further described by the non-limiting embodiments given in the accompanying drawings.

[0016] Figure 1 This is a schematic diagram of the installation structure of a construction hanging formwork structure of the utility model Figure 1 ;

[0017] Figure 2 This is a schematic diagram of the installation structure of a construction hanging formwork structure of the utility model Figure 2 ;

[0018] Figure 3 for Figure 2 The enlarged schematic diagram of point A in the middle;

[0019] Figure 4 for Figure 2 The enlarged schematic diagram of point B in the middle;

[0020] Figure 5 This is a structural schematic diagram of a construction hanging formwork structure of the utility model;

[0021] Figure 6 for Figure 5 The enlarged schematic diagram of the center C;

[0022] The main component symbols are described as follows:

[0023] Plastic support plate 1, semicircular sleeve 11, notch 12, embedded groove 13, embedded block 14, base 15, horizontal groove 151, lengthened bolt 152, ear nut 153, angle support 16, support bar 17, top support frame 21, top support bolt 22, threaded sleeve 23, diagonal support 24. DETAILED DESCRIPTION

[0024] In order to enable those skilled in the art to better understand the present invention, the technical solution of the present invention is further described below in conjunction with the accompanying drawings and embodiments.

[0025] like Figure 1-3 As shown, a construction hanging formwork structure of the utility model comprises two groups of symmetrically arranged plastic support plates 1 and semicircular sleeves 11. Before installation, the plastic support plates 1 must be coated with a concrete release agent on their upper sides to facilitate subsequent disassembly of the plastic support plates 1. The semicircular sleeves 11 are fixedly arranged at the lower ends of the plastic support plates 1. An angle brace 16 is arranged between the plastic support plates 1 and the semicircular sleeves 11 on the same side. The angle brace 16 can enhance the strength between the plastic support plates 1 and the semicircular sleeves 11. The lower ends of the two plastic support plates 1 are fixedly provided with support bars 17, which can improve the support of the plastic support plates 1 The plastic support plate 1 is provided with a notch 12 matching with the semicircular sleeve 11. The prefabricated notch 12 and the semicircular sleeve 11 can match with the caliber of the drainage pipe to be constructed, so that the two semicircular sleeves 11 can be sleeved on the installed drainage pipe. A side of one plastic support plate 1 is provided with an embedding groove 13, and a side of the other plastic support plate 1 is provided with an embedding block 14 matching with the embedding groove 13. The embedding of the embedding groove 13 and the embedding block 14 can enhance the sealing between the two plastic support plates 1. The two semicircular sleeves 11 form a circular sleeve, and a fixing component is provided between the two semicircular sleeves 11;

[0026] like Figure 4-6 As shown, the fixing assembly includes a base 15, and the bases 15 are fixedly provided on both sides of the two semicircular sleeves 11 near one end. A horizontal groove 151 is opened at the end of the base 15 away from the semicircular sleeve 11. An extension bolt 152 is hingedly provided in one of the horizontal grooves 151 of the two adjacent bases 15. The extension bolt 152 can be rotatably assembled inside the two adjacent horizontal grooves 151. When the extension bolt 152 is assembled inside the two horizontal grooves 151, the two plastic support plates 1 can be in the same horizontal state. The other end of the extension bolt 152 is threadedly connected with an ear nut 153. By rotating the ear nut 153, the semicircular sleeves 11 on both sides can be fixed, so that the plastic support plate 1 is fixedly assembled on the drain pipe. The horizontal groove 151 is matched with the extension bolt 152. No thread is set in the middle of the extension bolt 152, and a thread is set on the side of the extension bolt 152 away from the hinge.

[0027] A top support assembly is provided between the plastic support plate 1 and the semicircular sleeve 11 on the same side, and the top support assembly includes a top support frame 21. The top support frame 21 is fixedly provided at one end of the two semicircular sleeves 11 away from each other, and an oblique support 24 is fixedly provided between the top support frame 21 and the semicircular sleeve 11. A plurality of top support bolts 22 are fixedly provided at the upper end of the top support frame 21. The top support bolts 22 are threadedly connected with threaded sleeves 23. The outer side of the threaded sleeve 23 is provided with anti-slip patterns, and the support bar 17 matches the position of the plurality of threaded sleeves 23.

[0028] Working principle: when pouring concrete around the drain pipe, first buckle the two semicircular sleeves 11 on the drain pipe, and at the same time, make the embedding groove 13 between the two plastic support plates 1 engage with the embedding block 14, and then rotate the lengthening bolts 152 in the bases 15 on both sides respectively, so that the lengthening bolts 152 enter the two adjacent horizontal grooves 151. At this time, the horizontality of the two plastic support plates 1 can be adjusted by the lengthening bolts 152, so that the two plastic support plates 1 approach the same horizontal plane, and then push the two semicircular sleeves 11 and the plastic support plate 1 upward to make the upper end of the plastic support plate 1 close to the concrete wall, and then rotate the ear nuts 153 on one side of the two lengthening bolts 152 respectively, so that the ear nuts 153 are close to the side of the base 15, so that the lengthening bolts 152 are fixed inside the two adjacent horizontal grooves 151, and at the same time, the two semicircular sleeves 11 can be brought close to each other, so that the semicircular sleeves 11 and the plastic support plate 1 are fixed on the drain pipe;

[0029] After the plastic support plate 1 and the semicircular sleeve 11 are fixedly installed, several threaded sleeves 23 are rotated respectively so that the threaded sleeves 23 can move upward until they are pressed against the plastic support plate 1, so that the threaded sleeves 23 and the top support bolts 22 have an upward and downward expansion tendency for the plastic support plate 1 and the top support frame 21 respectively. Therefore, relying on the toughness of the plastic support plate 1 made of plastic material, the threaded sleeves 23 push the plastic support plate 1 upward to fit closely to the concrete wall, thereby enhancing the sealing between the plastic support plate 1 and the concrete wall and preventing concrete leakage during concrete pouring.

[0030] The above embodiments are merely illustrative of the principles and effects of the present invention, and are not intended to limit the present invention. Anyone familiar with the technology may modify or change the above embodiments without violating the spirit and scope of the present invention. Therefore, all equivalent modifications or changes made by those with ordinary knowledge in the relevant technical field without departing from the spirit and technical ideas disclosed in the present invention shall still be covered by the claims of the present invention.

Claims

1. A construction hanging formwork structure, comprising two sets of symmetrically arranged plastic support plates and semicircular sleeves, characterized in that: The semicircular sleeve is fixedly arranged at the lower end of the plastic support plate, the plastic support plate is provided with a notch matching the semicircular sleeve, one side of the plastic support plate is provided with an embedding groove, and the other side of the plastic support plate is provided with an embedding block matching the embedding groove, the two semicircular sleeves form a circular sleeve, and a fixing component is provided between the two semicircular sleeves; The fixing assembly comprises a base, and the base is fixedly provided on both sides of the two semicircular sleeves close to one end, and a horizontal groove is provided on the end of the base away from the semicircular sleeve. An extension bolt is hingedly provided in the horizontal groove of one of the two adjacent bases, and the other end of the extension bolt is threadedly connected with an ear nut; A top support assembly is provided between the plastic support plate and the semicircular sleeve on the same side, and the top support assembly includes a top support frame. A top support frame is fixedly provided at one end of the two semicircular sleeves away from each other, and a plurality of top support bolts are fixedly provided at the upper end of the top support frame. The top support bolts are threadedly rotatably connected to a threaded sleeve.

2. A construction hanging formwork structure according to claim 1, characterized in that: An angle brace is provided between the plastic support plate and the semicircular sleeve on the same side.

3. A construction hanging formwork structure according to claim 1, characterized in that: The lower ends of the two plastic support plates are fixed with support strips, and the support strips match the positions of the plurality of threaded sleeves.

4. A construction hanging formwork structure according to claim 1, characterized in that: The outer side of the threaded sleeve is provided with anti-skid patterns.

5. A construction hanging formwork structure according to claim 1, characterized in that: An oblique support is fixedly provided between the top support frame and the semicircular sleeve.

6. A construction hanging formwork structure according to claim 1, characterized in that: The horizontal groove is engaged and matched with the lengthened bolt, the middle part of the lengthened bolt is not provided with a thread, and the lengthened bolt is provided with a thread on a side away from the hinge.