Fabricated green building damping wall mounting structure
By introducing auxiliary components and support adjustment components into the wall installation structure, the complex problem of horizontal verticality adjustment during wall installation is solved, and higher installation accuracy and efficiency are achieved.
Patent Information
- Application Number
- CN202421662256.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-15
- Publication Date
- 2025-04-25
- Estimated Expiration
- 2034-07-15
AI Technical Summary
In the prior art, when the horizontal verticality does not meet the requirements during the installation of the wall, the adjustment process is complicated and difficult, and some connectors need to be removed or other remedial measures are taken, resulting in an increase in construction costs and time.
It adopts a prefabricated green building shock-absorbing wall installation structure, including mounting seats, walls, auxiliary components and support and adjustment components. There is a sink groove and planting rib on the top of the mounting seat, and a plug-in hole at the bottom of the wall. The auxiliary components are used to assist in the positioning and installation of the wall, and the support and adjustment components are used to adjust the horizontal verticality of the wall.
Through the guidance of auxiliary components, ensure that the wall is accurately aligned with the planting ribs on the mounting base, reducing installation errors and improving installation accuracy and efficiency. The support adjustment assembly facilitates the horizontal perpendicularity of the wall, improving installation stability and efficiency.
Smart Images

Figure CN222797107U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of wall installation, in particular to an assembled green building shock-absorbing wall installation structure. Background Art
[0002] The assembled green building shock-absorbing wall is a building wall assembled with prefabricated components. It combines the characteristics of green building and shock-absorbing technology. The installation structure used is the key factor to ensure the realization of the wall function. It needs to comprehensively consider structural stability, seismic performance, thermal insulation, construction efficiency and sustainability. Through careful design and precise construction, it can ensure that the wall meets the green building standards while providing a safe, comfortable and durable living or working environment.
[0003] At present, when the horizontal and vertical degrees of traditional installation structures do not meet the requirements during wall installation, the adjustment process is often complicated and difficult, and some connectors need to be removed or other remedial measures need to be taken, resulting in increased construction costs and time. Utility Model Content
[0004] The purpose of the utility model is to solve the shortcomings of the prior art that when the horizontal verticality of the wall does not meet the requirements during the installation process, the adjustment process is often complicated and difficult, and some connecting parts need to be removed or other remedial measures need to be taken, resulting in increased construction costs and time. An assembled green building shock-absorbing wall installation structure is proposed.
[0005] In order to achieve the above purpose, the utility model adopts the following technical solutions:
[0006] The assembled green building shock-absorbing wall installation structure includes:
[0007] A mounting seat, wherein a sink groove is provided on the top of the mounting seat, and a plurality of evenly distributed embedded steel bars are fixedly arranged inside the sink groove;
[0008] A wall, wherein the bottom of the wall is provided with plug holes that are compatible with the embedded reinforcement and are the same in number, and one side of the wall is provided with two rows of multiple grouting holes;
[0009] Auxiliary components, which are placed on the mounting base and used to assist in wall positioning and installation;
[0010] The support adjustment component is arranged between the mounting seat and the wall and is used to support the wall and adjust the horizontal and vertical degree of the wall.
[0011] In a possible design, the auxiliary component includes a main auxiliary frame and a secondary auxiliary frame respectively placed on the periphery of the mounting base groove, the top inner sides of the main auxiliary frame and the secondary auxiliary frame are provided with beveled edges to facilitate the passage of the wall, both sides of the main auxiliary frame are fixed with T-shaped blocks, both sides of the secondary auxiliary frame are opened with T-shaped slots, and the T-shaped blocks are adapted to the T-shaped slots and can be detached from the plug-in.
[0012] In a possible design, the support adjustment assembly includes two No. 1 fixing seats symmetrically fixed on both sides of the top of the mounting seat, and two No. 2 fixing seats symmetrically fixed at the corresponding positions of the No. 1 fixing seats on one side of the wall, and a No. 1 threaded sleeve is rotatably provided on the inner sides of the two No. 1 fixing seats, and a No. 2 threaded sleeve is rotatably provided on the inner sides of the two No. 2 fixing seats, and a threaded rod is threadedly connected to the end of the No. 1 threaded sleeve close to the No. 2 threaded sleeve, and the same connecting column is fixedly provided at the end of the two threaded rods close to each other, and locking nuts are threadedly connected to the outside of the two threaded rods, and an adjusting nut is fixedly provided on the middle section of the connecting column.
[0013] In a possible design, the plurality of plug-in holes are connected to each other, and the two rows of the plurality of grouting holes are connected to the plurality of plug-in holes.
[0014] In a possible design, the interiors of the two rows of multiple grouting holes can be free from plugs.
[0015] In a possible design, a positioning steel plate can be detachably placed in the recess of the mounting seat, and the positioning steel plate is provided with the same number of through holes as the embedded reinforcement.
[0016] In a possible design, a plurality of node bars are implanted on both sides of the wall, and a plurality of connecting bars are implanted on the top of the wall.
[0017] In this application, when starting to use it, first ensure that the installation position of the mounting base is clean and flat, and prepare all the required installation tools and materials, then pass the positioning steel plate through the holes on it through multiple evenly distributed embedded steel bars, and place it in the sink groove, then use tools to correct the multiple embedded steel bars to ensure the verticality of the embedded steel bars, and after the correction is completed, take the positioning steel plate out of the sink groove, then place the auxiliary auxiliary frame, and place the auxiliary auxiliary frame on the periphery of the sink groove of the mounting base to ensure that the auxiliary auxiliary frame is stable and accurately positioned, and then install the main auxiliary frame, and connect the T-shaped plug of the main auxiliary frame to the T-shaped slot on the auxiliary auxiliary frame by plugging, so as to form a connection. After the wall is lifted, the main auxiliary frame and the auxiliary auxiliary frame are higher than the rebars. When the wall is lowered, the bottom of the wall first enters the auxiliary assembly through the bevels of the main auxiliary frame and the auxiliary auxiliary frame to locate the lowered position of the wall, so that the plug holes at the bottom of the wall can be aligned with the rebars on the mounting seat. Then the wall is lowered again, so that the rebars are fully inserted into the plug holes at the bottom of the wall, and the bottom of the wall is placed in the sink. Then the support adjustment assembly is installed, and the two No. 1 fixing seats of the two support adjustment assemblies are respectively installed on both sides of the top of the mounting seat, and then the two No. 2 fixing seats are respectively installed at the corresponding positions of the wall to support the wall. When the horizontal and vertical degree of the wall needs to be corrected, first use the tool to rotate the adjusting nut. The adjusting nut drives the two threaded rods to rotate while rotating. The two threaded rods rotate out or in the No. 1 threaded sleeve and the No. 2 threaded sleeve respectively, so that the No. 1 threaded sleeve and the No. 2 threaded sleeve move in the direction of moving away from or approaching each other, pushing the wall to tilt forward or backward, thereby adjusting the horizontal and vertical degree of the wall, so that it can not only adjust the horizontal and vertical degree of the wall, but also provide additional support for the wall. Then use the level to measure the level of the wall. When the horizontal and vertical degree of the wall is adjusted, turn the two locking nuts respectively. The two locking nuts The threaded rod moves in the direction away from each other until it abuts against one side of the No. 1 threaded sleeve and the No. 2 threaded sleeve to complete the locking of the extended length of the threaded rod, and then insert the grouting pipe into a grouting hole at the edge of the bottom, and then grout into the gap between the plug hole and the embedded reinforcement through the grouting hole, and observe the grouting hole, and then use plugs to plug the grouting holes in sequence from near to far until all the grouting holes are fully blocked to complete the installation connection between the wall and the mounting seat, implant multiple node bars on both sides of the wall for binding and connection with other walls, and implant multiple connecting bars on the top of the wall for binding and connection with the composite plate.
[0018] The utility model has the following beneficial effects:
[0019] In the utility model, by setting the auxiliary components, when the wall starts to descend, its bottom first enters the interior of the auxiliary components through the bevels of the main auxiliary frame and the auxiliary auxiliary frame. In this process, the bevels play a guiding role, ensuring that the wall can descend in a predetermined direction, thereby accurately aligning the embedded steel bars on the mounting seat, so that the staff can place the wall in the correct position without complicated operations or adjustments, reducing errors in the installation process, improving installation accuracy, and improving work efficiency;
[0020] The utility model provides a support and adjustment component, and by rotating the adjustment nut, the two threaded rods can be conveniently controlled to move in and out of the first threaded sleeve and the second threaded sleeve, so as to adjust the inclination angle of the wall and ensure that the horizontal and vertical degrees of the wall meet the design requirements, thereby providing an effective support and adjustment mechanism for the wall during installation, which not only improves the installation accuracy and stability of the wall, but also improves the work efficiency and reduces the labor intensity.
[0021] The utility model can provide an effective support and adjustment mechanism for the wall during installation by setting the support and adjustment components, which not only improves the installation accuracy and stability of the wall, but also improves the work efficiency and reduces the labor intensity. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 This is a schematic diagram of the overall structure of the assembled green building shock-absorbing wall installation structure proposed by the utility model;
[0023] Figure 2 This is a schematic diagram of the overall split structure of the assembled green building shock-absorbing wall installation structure proposed by the utility model;
[0024] Figure 3 This is a schematic diagram of the wall cross-sectional structure of the assembled green building shock-absorbing wall installation structure proposed by the utility model;
[0025] Figure 4 This is a schematic diagram of the auxiliary components disassembly and partial enlargement of the structure of the assembled green building shock-absorbing wall installation structure proposed by the utility model;
[0026] Figure 5 This is a schematic diagram of the support and adjustment components and a partially enlarged structure of the assembled green building shock-absorbing wall installation structure proposed by the utility model.
[0027] In the figure: 1. mounting base; 101. sink groove; 2. embedded reinforcement; 3. wall; 301. plug hole; 302. grouting hole; 4. node reinforcement; 5. connecting reinforcement; 6. plug; 7. positioning steel plate; 701. penetration hole; 8. main auxiliary frame; 9. auxiliary auxiliary frame; 10. bevel; 11. T-slot; 12. T-block; 13. No. 1 fixing base; 14. No. 2 fixing base; 15. No. 1 threaded sleeve; 16. No. 2 threaded sleeve; 17. threaded rod; 18. connecting column; 19. adjusting nut; 20. locking nut. DETAILED DESCRIPTION
[0028] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.
[0029] Embodiment 1
[0030] Reference Figure 1-5 , wall mounting structure, including:
[0031] The mounting base 1 is used as the mounting base of the wall 3 , and a sink 101 is designed on the top thereof to facilitate the stable placement of the wall 3 . A plurality of evenly distributed embedded steel bars 2 are fixedly arranged inside the sink 101 , and the embedded steel bars 2 are used to connect with the wall 3 .
[0032] The bottom of the wall 3 is designed with a plug hole 301 compatible with the anchor bolt 2 to ensure a stable connection between the wall 3 and the mounting base 1. One side of the wall 3 is designed with two rows of multiple grouting holes 302 for grouting to enhance the connection strength between the wall 3 and the anchor bolt 2.
[0033] The auxiliary components include a main auxiliary frame 8 and a sub-auxiliary frame 9. The heights of the main auxiliary frame 8 and the sub-auxiliary frame 9 are higher than the rebar 2. The main auxiliary frame 8 and the sub-auxiliary frame 9 are placed on the periphery of the sink groove 101 of the mounting seat 1 to assist in the positioning and installation of the wall 3. T-shaped blocks 12 are fixedly provided on both sides of the main auxiliary frame 8, and T-shaped slots 11 are provided on both sides of the sub-auxiliary frame 9. The T-shaped blocks 12 and the T-shaped slots 11 are connected to each other to achieve rapid construction and disassembly of the two. When the wall 3 starts to descend, its bottom first enters the interior of the auxiliary component through the beveled edges 10 of the main auxiliary frame 8 and the sub-auxiliary frame 9. In this process, the beveled edges 10 play a guiding role, ensuring that the wall 3 can descend in a predetermined direction, thereby accurately aligning with the rebar 2 on the mounting seat 1, so that the staff can place the wall 3 in the correct position without complicated operations or adjustments, thereby reducing errors during the installation process, improving installation accuracy, and improving work efficiency.
[0034] The support and adjustment component includes a No. 1 fixing seat 13, a No. 2 fixing seat 14, a No. 1 threaded sleeve 15, a No. 2 threaded sleeve 16, a threaded rod 17, a connecting column 18, an adjusting nut 19 and a locking nut 20. The component is arranged between the mounting seat 1 and the wall 3, and is used to support the wall and adjust the horizontal and vertical degree of the wall. When the horizontal and vertical degree of the wall 3 needs to be adjusted, the adjusting nut 19 is rotated to conveniently control the in and out movement of the two threaded rods 17 in the No. 1 threaded sleeve 15 and the No. 2 threaded sleeve 16, adjust the inclination angle of the wall 3, and ensure that the horizontal and vertical degree of the wall 3 meets the design requirements, thereby providing an effective support and adjustment mechanism for the wall 3 during its installation, which not only improves the installation accuracy and stability of the wall 3, but also improves work efficiency and reduces labor intensity. The outer parts of the two threaded rods 17 are also threadedly connected with locking nuts 20 for locking the adjusted position.
[0035] The present application can be used in the technical field of installation of shock-absorbing walls of assembled green buildings, and can also be used in other fields applicable to the present application.
[0036] Embodiment 2
[0037] On the basis of the first embodiment, the second embodiment also includes: an assembled green building shock-absorbing wall installation structure, which is applied to the field of assembled green building shock-absorbing wall installation technology, multiple plug holes 301 are connected to each other, and two rows of multiple grouting holes 302 are also connected to the multiple plug holes 301, which is convenient for the circulation of grouting liquid. The insides of the two rows of multiple grouting holes 302 can be detached from the plug. There is a plug 6, which is used to seal the grouting holes 302 that are bubbling after grouting, so that the slurry continues to circulate and pour out of the unblocked grouting holes 302, so that the holes in the wall 3 can be completely poured to avoid the generation of gaps and bubbles.
[0038] A detachable positioning steel plate 7 is placed in the groove 101 of the mounting seat 1. The positioning steel plate 7 is provided with the same number of through holes 701 as the anchor bars 2. Before the wall 3 is installed, the positioning steel plate 7 can be placed in the groove 101 first, and multiple anchor bars 2 can be corrected by using tools to ensure the verticality of the anchor bars 2.
[0039] Both sides of the wall 3 are implanted with multiple node bars 4 that are tied and connected to other walls 3 for achieving connection between the walls 3. The top of the wall 3 is also implanted with multiple connecting bars 5 that are tied and connected to the composite plates for achieving connection between the wall 3 and the composite plates.
[0040] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes within the technical scope disclosed by the present invention according to the technical scheme and the utility model concept of the present invention, which should be covered by the protection scope of the present invention.
Claims
1. The assembled green building shock-absorbing wall installation structure is characterized by: include: A mounting seat (1), wherein a sink groove (101) is provided on the top of the mounting seat (1), and a plurality of evenly distributed embedded steel bars (2) are fixedly arranged inside the sink groove (101); A wall (3), wherein the bottom of the wall (3) is provided with plug holes (301) that are compatible with the embedded reinforcement (2) and are the same in number, and one side of the wall (3) is provided with two rows of multiple grouting holes (302); An auxiliary component, which is placed on the mounting base (1) and is used to assist in positioning and installing the wall (3); A support adjustment component is arranged between the mounting seat (1) and the wall (3) and is used to support the wall (3) and adjust the horizontality and verticality of the wall (3).
2. The assembled green building shock-absorbing wall installation structure according to claim 1 is characterized in that: The auxiliary assembly comprises a main auxiliary frame (8) and a secondary auxiliary frame (9) respectively placed on the periphery of a sink groove (101) of a mounting seat (1); the top inner sides of the main auxiliary frame (8) and the secondary auxiliary frame (9) are both provided with a bevel (10) for facilitating the passage of a wall (3); both sides of the main auxiliary frame (8) are fixedly provided with T-shaped plug blocks (12); both sides of the secondary auxiliary frame (9) are provided with T-shaped slots (11); the T-shaped plug blocks (12) are adapted to the T-shaped slots (11) and can be disconnected from the plug blocks.
3. The assembled green building shock-absorbing wall installation structure according to claim 1 is characterized in that: The support adjustment component comprises two No. 1 fixing seats (13) fixedly and symmetrically arranged on both sides of the top of the mounting seat (1); two No. 2 fixing seats (14) are symmetrically and fixedly arranged on one side of the wall (3) at the corresponding position of the No. 1 fixing seat (13); a No. 1 threaded sleeve (15) is rotatably arranged on the inner side of the two No. 1 fixing seats (13); a No. 2 threaded sleeve (16) is rotatably arranged on the inner side of the two No. 2 fixing seats (14); a threaded rod (17) is threadedly connected to one end of the No. 1 threaded sleeve (15) and the No. 2 threaded sleeve (16); a same connecting column (18) is fixedly arranged on one end of the two threaded rods (17) and a locking nut (20) is threadedly connected to the outside of the two threaded rods (17); and an adjusting nut (19) is fixedly arranged in the middle section of the connecting column (18).
4. The assembled green building shock-absorbing wall installation structure according to claim 1 is characterized in that: The plurality of plug holes (301) are connected to each other, and the two rows of the plurality of grouting holes (302) are connected to the plurality of plug holes (301).
5. The assembled green building shock-absorbing wall installation structure according to claim 4 is characterized in that: The insides of the two rows of multiple grouting holes (302) can be free from plugs (6).
6. The assembled green building shock-absorbing wall installation structure according to claim 2 is characterized in that: A positioning steel plate (7) is detachably placed in the sink groove (101) of the mounting seat (1), and the positioning steel plate (7) is provided with the same number of through holes (701) as the number of embedded reinforcement bars (2).
7. The assembled green building shock-absorbing wall installation structure according to claim 1 is characterized in that: A plurality of node bars (4) are implanted on both sides of the wall (3), and a plurality of connection bars (5) are implanted on the top of the wall (3).