Roof operating platform

By designing a roof operation platform, including components such as climbing frames, countertop support frames, guardrails and safety suspension points, the problems of unstable and high safety hazards of traditional scaffolding construction methods are solved, and higher construction safety and operation efficiency are achieved.

CN222810413UActive Publication Date: 2025-04-29HONGFA CONSTR CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421349258.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-06-13
Publication Date
2025-04-29
Estimated Expiration
2034-06-13

AI Technical Summary

Technical Problem

The construction methods of traditional scaffolding are instability and high safety hazards, and there are great risks for workers to build construction countertops and safety facilities at high places.

Method used

Design a roof operating platform, including climbing frames, countertop support frames, guardrails, safety suspension points and horizontal mesh components, which can gradually increase with the construction height after the initial construction without the need to be built again, and provide stable operating tables and safety measures.

Benefits of technology

It greatly reduces the construction safety hazards of workers and provides higher construction safety and operation efficiency. Through protective railings and safe suspension points, workers have support points and safety guarantees at any location.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222810413U_ABST
    Figure CN222810413U_ABST
Patent Text Reader

Abstract

The utility model discloses a roof operating platform which comprises a climbing frame, the upper portion of the climbing frame is horizontally connected with a table top supporting frame, the top face of the front end of the table top supporting frame is provided with an operating table top, the top face of the operating table top is vertically connected with protective handrails arranged at equal intervals, and the lower portion of the rear end of the table top supporting frame is connected with a balance weight. A vertical frame is arranged on the side, close to the tail end of the table top supporting frame, of the climbing frame, the middle of the upper side of the vertical frame is connected with the table top supporting frame, a hanging point cornice is fixed to the position, located on the upper side of the operation table top, of the top of the vertical frame in an overhanging mode, and safe hanging points which are arranged at equal intervals horizontally penetrate through the inner side of the hanging point cornice. The lifting platform has the advantage of being fast to build and can climb step by step along with the construction position after primary building is completed, workers do not need to build the working platform again during high-position construction, the construction safety is higher, and meanwhile more safety measures are taken on the construction platform face.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building construction, in particular to a roof operating platform. Background Art

[0002] During the construction process of a building, the standing position provided for workers is called an operating platform. After the main structure of a building is cast, workers will use scaffolding to set up an operating platform on the outside of the roof to carry out construction on the roof. Ordinary roof construction generally involves installing trusses on the top of the scaffolding, and then setting up a horizontal net on the outside of the scaffolding trusses to improve the construction safety of workers.

[0003] The traditional scaffolding construction method requires workers to climb to a higher position to lay the construction table according to the construction height, and then set up safety facilities on the construction platform. This construction platform does not have stable safety measures to use, and there are very large safety hazards during the construction process of workers. Therefore, it is urgent to design a roof operating platform to solve the above problems. Utility Model Content

[0004] In order to solve the above technical problems, the utility model provides a roof operating platform, which has an overall operating table. After the initial construction is completed, there is no need to build it again at a high place. The climbing frame can be gradually increased with the construction height to allow construction personnel to have a sufficient height to carry out roof construction operations, which greatly reduces the safety hazards of workers in construction. At the same time, safety hanging points and guardrails are provided on the operating table, which can maximize the construction safety of workers.

[0005] The utility model provides a roof operating platform:

[0006] It includes a climbing frame, the upper part of the climbing frame is horizontally connected to a table support frame, the front end top surface of the table support frame is provided with an operating table, the top surface of the operating table is vertically connected to equidistantly arranged guardrails, a counterweight is connected to the lower rear end of the table support frame, a vertical frame is provided on one side of the climbing frame close to the tail end of the table support frame, the middle part of the upper side of the vertical frame is connected to the table support frame, the top of the vertical frame is located on the upper side of the operating table and is cantilevered and fixed with a hanging point eaves, and the inner side of the hanging point eaves is horizontally penetrated with equidistantly arranged safety hanging points.

[0007] Preferably, two symmetrical groups of horizontal nets are provided on both sides of the table support frame, and both ends of the horizontal nets are horizontally fixed to the outer surface of the table support frame. The setting of the horizontal nets can increase the safety protection performance of the periphery of the operating table, and the horizontal nets can prevent construction workers from falling. The cooperation of the safety rope of the safety hanging point and the horizontal nets provides workers with a safer construction environment.

[0008] Preferably, a horizontally connected reinforcement grid is fixed at the position where the table support frame is connected to the horizontal net, and both ends of the horizontal net are horizontally fixed to the outer surface of the reinforcement grid. The reinforcement grid arranged at the connection position between the table support frame and the horizontal net can improve the connection strength between the horizontal net and the table support frame, so that the horizontal net has a higher falling interception performance.

[0009] Preferably, the operating table includes a wooden surface layer, and the thickness of the wooden surface layer is 50 mm thick. The operating table adopts a wooden surface layer, which can reduce the load on the upper part of the table support frame while ensuring the flatness of the surface layer, allowing workers to walk more steadily. The use of 50 mm thick wooden boards can ensure the stepping strength of the operating table.

[0010] Preferably, a suspension rod is vertically fixed at the position where the table support frame is connected to the counterweight, and the bottom end of the suspension rod is bidirectionally fixed to the counterweight. The position where the table support frame is connected to the counterweight is connected by the suspension rod, which can enable the table support frame to maintain connection with the counterweight during the climbing process. At the same time, the suspension rod has the function of bidirectionally connecting the counterweight, and can connect to higher counterweight blocks, thereby improving the counterweight load performance of the table support frame.

[0011] Preferably, a steel structure frame is provided on the inner bottom surface of the hanging point overhanging eaves, and the steel structure frame is staggered with the safety hanging point. A weight-reducing groove is provided on the top surface of the hanging point overhanging eaves. The steel structure frame on the inner side of the hanging point overhanging eaves can support the inner bottom surface of the hanging point overhanging eaves, thereby improving the cantilever strength of the end of the hanging point overhanging eaves. The weight-reducing groove provided on the top surface of the hanging point overhanging eaves can reduce the weight of the hanging point overhanging eaves, thereby ensuring the safe use of the counterweight connected to the safety rope of the workers on the safety hanging point.

[0012] Compared with the related art, the roof operation platform provided by the utility model has the following beneficial effects:

[0013] 1. The utility model has the advantage of fast construction, and can gradually climb with the construction position after the initial construction is completed. There is no need for workers to build a working platform again during high-position construction. The construction safety is higher. At the same time, there are more safety measures on the construction table. Through the protective railings, workers can have support points at any position. The hanging eaves can allow workers to hang safety ropes on their bodies during the construction process, which increases the workers' mobile safety and can greatly improve the construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 A structural schematic diagram of a preferred embodiment of a roof operating platform provided by the utility model;

[0015] Figure 2 for Figure 1 The structure of the climbing frame is shown in an enlarged exploded view;

[0016] Figure 3 for Figure 1 The enlarged schematic diagram of the cross-section of the structure at the hanging point and eaves position shown;

[0017] Figure 4 for Figure 1 A schematic diagram of the structure of the front view is shown.

[0018] Numbers in the figure: 1. Climbing frame; 2. Table support frame; 3. Vertical shelf; 4. Operating table; 41. Wooden surface layer; 5. Guardrail; 6. Counterweight; 61. Suspension rod; 7. Hanging point eaves; 71. Steel structure frame; 72. Weight reduction slot; 8. Safety hanging point; 9. Horizontal net; 91. Reinforcement grid. DETAILED DESCRIPTION

[0019] In order to make the purpose, technical solution and advantages of the utility model more clear, the utility model is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the utility model and are not used to limit the utility model.

[0020] The specific implementation of the present utility model is described in detail below in conjunction with specific embodiments.

[0021] Please see attached Figure 1-Figure 4 , an embodiment of the utility model provides a roof operating platform, the roof operating platform comprising:

[0022] The climbing frame 1 has a reinforced concrete foundation at the bottom to ensure the bottom support strength of the climbing frame 1. The top of the climbing frame 1 is connected to a table support frame 2. Both sides of the table support frame 2 are divided into an operating table 4 and a counterweight 6 connecting end. The counterweight 6 connecting end provides a safe cantilever construction table for the operating table 4.

[0023] The operating table 4 of the table support frame 2 adopts a wooden surface layer 41. The use of the wooden surface layer 41 can reduce the laying weight of the operating table 4 while ensuring the horizontality of the surface layer of the operating table 4. A guardrail 5 is vertically set up on the surface of the wooden surface layer 41. The guardrail 5 is provided in multiple groups, and the bottom end of the guardrail 5 is vertically fixedly connected to the table support frame 2. Through the establishment of the guardrail 5, the construction workers can have a support point when moving on the upper part of the wooden surface layer 41, thereby ensuring the safety of walking.

[0024] A counterweight 6 is provided below the connection end of the counterweight 6 of the table support frame 2, and a suspension rod 61 is connected inside the counterweight 6. The top of the suspension rod 61 is fixedly connected to the tail end of the table support frame 2. By setting the suspension rod 61, the connection between the counterweight 6 and the table support frame 2 can be completed. At the same time, by increasing the length of the suspension rod 61, the table support frame 2 can climb and move upward.

[0025] A vertical frame 3 is provided on one side of the climbing frame 1 close to the counterweight 6, and the upper position of the vertical frame 3 is fixedly connected to the table support frame 2. Through the connection between the vertical frame 3 and the table support frame 2, the table support frame 2 and the vertical frame 3 can be connected and supported, thereby enhancing the supporting strength of climbing and enhancing the structural stability. The top of the vertical frame 3 is connected with a hanging point eaves 7, and the hanging point eaves 7 is cantilevered above the operating table 4. The hanging point eaves 7 can give the upper part of the operating table 4 a shielding function, which can provide shade for workers during the construction process.

[0026] The bottom surface of the hanging point eaves 7 is connected with equidistantly arranged steel structure frames 71. The steel structure frames 71 can make the front end of the hanging point eaves 7 have higher supporting strength, thereby increasing the end cantilever weight of the hanging point eaves 7 and improving the construction safety of workers when moving to the end. The top surface of the hanging point eaves 7 is provided with equidistantly arranged weight-reducing grooves 72. The weight-reducing grooves 72 can reduce the weight of the hanging point eaves 7 itself, thereby increasing the weight of the safety rope hanging of the workers below, and further improving the safety of the workers during construction.

[0027] The interior of the hanging point cantilever 7 is connected with equidistantly arranged safety hanging points 8, and the safety hanging points 8 and the steel structure frame 71 are staggered. The setting of the safety hanging points 8 can increase the construction security of the workers by hanging the safety rope on the outside during the construction process, and provide guarantee for the safety of the workers when the workers slip or fall. The staggered design of the safety hanging points 8 and the steel structure frame 71 can facilitate the hanging connection of the safety rope of the construction workers, and at the same time can avoid the friction between the safety rope and the steel structure frame 71 during the movement, thereby increasing the service life and safety of the safety rope.

[0028] A horizontal net 9 is provided on the outer periphery of the table support frame 2, located outside the operating table 4. The setting of the horizontal net 9 can provide elastic support for the construction personnel when the workers fall off the operating table 4, thereby increasing the work safety of the construction personnel. The table support frame 2 adopts a reinforced grid 91 connected to the horizontal net 9, which can improve the strength of the connection between the horizontal net 9 and the table support frame 2, and improve the structural support strength of the position where the table support frame 2 is connected to the reinforced grid 91.

[0029] Usage process:

[0030] The installation position of the climbing frame 1 is cast on the ground, and then a construction platform is established on the upper part of the climbing frame 1. When the construction platform is established, workers can perform roof construction operations on the operating table 4. During the construction process, the workers are tied with safety ropes, and the top of the safety ropes is connected to the outside of the safety hanging point 8. Construction workers can move freely on the operating table 4 to work.

[0031] When it is necessary to rise, the height of the climbing frame 1 can be raised, and then the operating table 4 will move up, so that the construction workers can carry out construction at any height.

[0032] The circuits and controls involved in the present invention are all prior art and will not be described in detail here.

[0033] The above description is only an embodiment of the present invention, and does not limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made by using the contents of the specification and drawings of the present invention, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.

Claims

1. A roof operating platform, characterized in that: The invention comprises a climbing frame (1), wherein the upper part of the climbing frame (1) is horizontally connected to a table support frame (2), the front end top surface of the table support frame (2) is provided with an operating table (4), the top surface of the operating table (4) is vertically connected to an equidistantly arranged guardrail (5), the lower part of the rear end of the table support frame (2) is connected to a counterweight (6), the climbing frame (1) is provided with an upright frame (3) on one side close to the rear end of the table support frame (2), the upper middle part of the upright frame (3) is connected to the table support frame (2), the top of the upright frame (3) is located on the upper side of the operating table (4) and is cantilevered and fixed with a hanging point overhang (7), and the inner side of the hanging point overhang (7) is horizontally penetrated with equidistantly arranged safety hanging points (8).

2. A roof operating platform according to claim 1, characterized in that: Two symmetrical groups of horizontal nets (9) are provided on both sides of the table support frame (2), and both ends of the horizontal nets (9) are horizontally fixed to the outer surface of the table support frame (2).

3. A rooftop operating platform according to claim 2, characterized in that: A horizontally connected reinforcing grid frame (91) is fixed at the position where the table support frame (2) is connected to the horizontal net (9), and the two ends of the horizontal net (9) are horizontally fitted and fixed to the outer surface of the reinforcing grid frame (91).

4. A rooftop operating platform according to claim 1, characterized in that: The operating table top (4) comprises a wooden board surface layer (41), and the thickness of the wooden board surface layer (41) is a 50 mm thick wooden board.

5. A rooftop operating platform according to claim 1, characterized in that: A suspension rod (61) is vertically fixed at the position where the table support frame (2) is connected to the counterweight (6), and the bottom end of the suspension rod (61) is bidirectionally fixed to the counterweight (6).

6. A rooftop operating platform according to claim 1, characterized in that: A steel structure frame (71) is provided on the inner bottom surface of the hanging point overhanging eaves (7), the steel structure frame (71) and the safety suspension points (8) are arranged in a staggered manner, and a weight-reducing notch (72) is provided on the top surface of the hanging point overhanging eaves (7).