Temporary pipeline comprehensive arrangement frame

By designing a comprehensive layout frame for temporary pipelines and using storage baskets and storage tanks to organize pipelines, the problems of mopping, tripping and leakage of pipelines on the construction site are solved, and the safety and work efficiency of the construction site are improved.

CN222814214UActive Publication Date: 2025-04-29CHINA 19TH METALLURGICAL CORP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421321237.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-06-11
Publication Date
2025-04-29
Estimated Expiration
2034-06-11

AI Technical Summary

Technical Problem

In construction of building foundation pits, temporary pipelines are prone to mopping the floor and tripping workers. Due to the contact between the lines and water pipes, leakage accidents are prone to occur. The movement and re-bundling of the pipelines are cumbersome, which can easily lead to winding and knotting.

Method used

A temporary pipeline comprehensive layout frame is designed, including a base, installation frame, cantilever frame, connecting rod and storage basket. A storage groove is installed on the storage basket to standardize the organization of temporary pipelines and avoid problems of mopping and winding.

Benefits of technology

Through this arrangement frame, the pipelines are organized in a standardized manner and the storage basket is located on the ground, avoiding the phenomenon of pipeline mopping, improving the safety of the construction site, and reducing miscellaneous work and safety hazards during construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222814214U_ABST
    Figure CN222814214U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of building construction, in particular to a comprehensive arrangement frame for temporary pipelines. Comprising a base, a mounting frame is arranged on the base, an overhanging frame is arranged at the top of the mounting frame, at least two connecting rods are arranged below the overhanging frame, storage baskets are arranged at the bottoms of the connecting rods, and a storage groove is formed in each storage basket. According to the utility model, the connecting rod is arranged below the cantilever frame, the storage basket is arranged at the bottom of the connecting rod, and the storage groove is formed in the storage basket, so that during construction of a construction site, temporary pipelines are placed in the storage groove to realize standard arrangement of the temporary pipelines, and the storage basket is positioned above the ground, so that the pipeline mopping phenomenon is avoided; and the safety of a construction site is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building construction, in particular to a temporary pipeline comprehensive arrangement frame. Background Art

[0002] In traditional building foundation pit construction, because a lot of electrical equipment is needed at the construction site, various lines need to be temporarily laid. It is common for various lines to be dragged on the ground at the workplace. In addition, a large amount of water is also needed at the construction site, and water pipes need to be laid. When the lines come into contact with water, it is easy to cause accidents of electric leakage and injury. There are many odd jobs at the construction site, and the moving range of the lines is large. Therefore, the lines laid on the ground are easy to trip the workers. Usually, the pipelines are tied with ropes and hung on the equipment around the construction site. When the construction site is moved, the ropes need to be untied or the active length of the pipelines needs to be changed, and then they need to be re-bundled and hung. The bundled pipelines are easy to get tangled and knotted. Utility Model Content

[0003] The technical problem to be solved by the utility model is to provide a temporary pipeline comprehensive arrangement frame for arranging pipelines on a construction site.

[0004] The technical solution adopted by the utility model to solve its technical problems is a temporary pipeline integrated layout frame, comprising a base, a mounting frame is arranged on the base, a cantilever frame is arranged on the top of the mounting frame, at least two connecting rods are arranged below the cantilever frame, a storage basket is arranged at the bottom of the connecting rod, and each of the storage baskets is provided with a storage groove.

[0005] Furthermore, the storage basket includes two inclined connecting plates, one end of the two connecting plates is fixedly connected to the connecting rod, and the other end is connected through the storage plate, and at least one partition is provided on the upper surface of the storage plate, and the partition extends along the width direction of the storage plate.

[0006] Furthermore, a T-shaped block extending along the width direction of the storage plate is provided at the bottom of the partition, and a T-shaped groove used in conjunction with the T-shaped block is provided on the upper surface of the storage plate.

[0007] Furthermore, a support rod is obliquely arranged on the base, the upper end of the support rod is fixedly connected to the installation frame, and the lower end of the support rod is fixedly connected to the base.

[0008] Furthermore, the support rods are provided in pairs, each of the support rods is horizontally provided with a cross bar, one end of the cross bar is fixedly connected to the support rod, and the other end is fixedly connected to the mounting frame, and the two cross bars are connected by a connecting rod.

[0009] Furthermore, an oblique support rod is obliquely arranged on the installation frame, and the lower end of the oblique support rod is fixedly connected to the installation frame, and the upper end of the oblique support rod is fixedly connected to the cantilever frame.

[0010] Furthermore, a counterweight is provided on the upper surface of the base.

[0011] The beneficial effects of the utility model are as follows: by arranging a connecting rod below the cantilever frame, arranging a storage basket at the bottom of the connecting rod, and arranging a storage groove on the storage basket, temporary pipelines are placed in the storage groove during construction at the construction site to achieve standardized arrangement of the temporary pipelines; the storage basket is located above the ground, avoiding the occurrence of pipeline dragging on the ground and improving the safety of the construction site. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] Figure 1 It is a structural schematic diagram of the utility model;

[0013] Figure 2 Schematic diagram of a storage basket.

[0014] Figure numerals: 1-base; 2-installation frame; 3-cantilever frame; 4-connecting rod; 5-storage basket; 501-connecting plate; 502-storage plate; 503-partition; 504-T-block; 505-T-slot; 6-storage slot; 7-support rod; 8-cross bar; 9-connecting rod; 10-diagonal support rod; 11-counterweight block. DETAILED DESCRIPTION

[0015] The embodiments of the present invention are described in detail below, and examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present invention, and cannot be understood as limiting the present invention.

[0016] like Figure 1 As shown, the utility model is a temporary pipeline integrated layout rack, including a base 1, a mounting frame 2 is arranged on the base 1, a cantilever frame 3 is arranged on the top of the mounting frame 2, at least two connecting rods 4 are arranged below the cantilever frame 3, a storage basket 5 is arranged at the bottom of the connecting rod 4, and each of the storage baskets 5 is provided with a storage groove 6.

[0017] Among them, the base 1 can be made of concrete or steel plate; the installation frame 2 is a rectangular frame, which is welded by multiple rectangular steel pipes. The connection method between the installation frame 2 and the base 1 can be bolted. When the installation frame 2 and the base 1 are both made of steel, welding can also be used; the cantilever frame 3 is also a rectangular frame, which is formed by welding steel pipes, and the cantilever frame 3 and the installation frame 2 are connected by welding; the connecting rod 4 can be made of steel pipes, and the connecting rod 4 and the cantilever beam can be welded or bolted; the storage basket 5 can be a U-shaped steel plate, which is welded under the connecting rod 4, with two protrusions of the U-shaped steel plate facing upward, and a storage groove 6 is formed between the two protrusions of the U-shaped steel plate and the connecting rod 4; when in use, multiple layout racks can be set up at the construction site, and the pipelines can be placed in the storage grooves 6 of different layout racks in turn to achieve standardized arrangement of the pipelines.

[0018] In the above embodiment, the storage basket 5 is made of a U-shaped steel plate, and a storage groove 6 is formed between the two protrusions of the U-shaped steel plate and the connecting rod 4, so that the pipeline in the storage groove 6 can easily slide out of the storage basket 5. Figure 2 The storage basket 5 includes two inclined connecting plates 501, one end of the two connecting plates 501 is fixedly connected to the connecting rod 4, and the other end is connected through a storage plate 502, and at least one partition 503 is provided on the upper surface of the storage plate 502, and the partition 503 extends along the width direction of the storage plate 502. The connecting plate 501 can be made of a plastic plate and fixed to the connecting rod 4 by bolts, or it can be fixed to the connecting rod 4 by bonding with AB glue. The connecting plate 501 is tilted downward, and the lower ends of the two connecting plates 501 are connected by a storage plate 502. The storage plate 502 is in the shape of a long strip, and the two ends in the length direction are connected to the two connecting plates 501. A partition 503 is arranged on the upper surface of the storage plate 502; when there is one partition 503, the side wall of the partition 503, the upper surface of the storage plate 502 and the side wall of the connecting plate 501 form a storage groove 6; when there are two or more partitions 503, the storage groove 6 can also be surrounded by two partitions 503 and the upper surface of the storage plate 502; such a setting can ensure that the pipeline is always located inside the storage basket 5 to prevent the pipeline from falling off from the storage basket 5.

[0019] Since the sizes of pipelines are different, in order to improve the applicability of the storage tank 6, further, see Figure 2 The bottom of the partition 503 is provided with a T-block 504 extending along the width direction of the storage plate 502, and the upper surface of the storage plate 502 is provided with a T-slot 505 used in conjunction with the T-block 504. When the size of the pipeline is larger than the size of a single storage slot 6, some of the partitions 503 can be removed from the T-slot 505, so that multiple small storage slots 6 become a large storage slot 6 to accommodate the large-sized pipeline.

[0020] In order to improve the stability of the mounting frame 2, further see Figure 1 A support rod 7 is obliquely arranged on the base 1 , and the upper end of the support rod 7 is fixedly connected to the installation frame 2 , and the lower end of the support rod 7 is fixedly connected to the base 1 .

[0021] In order to further improve the stability of the mounting frame 2, further, see Figure 1 The support rods 7 are provided in pairs, each of which is horizontally provided with a cross bar 8, one end of the cross bar 8 is fixedly connected to the support rod 7, and the other end is fixedly connected to the mounting frame 2, and the two cross bars 8 are connected by a connecting rod 9.

[0022] In order to improve the stability of the cantilever frame 3, further see Figure 1 A diagonal brace rod 10 is obliquely arranged on the installation frame 2 , and the lower end of the diagonal brace rod 10 is fixedly connected to the installation frame 2 , and the upper end of the diagonal brace rod 10 is fixedly connected to the cantilever frame 3 .

[0023] When there are many pipelines in the basket 5, this may easily cause the arrangement rack to overturn. Figure 1 A counterweight block 11 is arranged on the upper surface of the base 1 .

[0024] The embodiments of this specific implementation method are all preferred embodiments of the utility model, and are not intended to limit the protection scope of the utility model. Therefore, all equivalent changes made based on the structure, shape, and principle of the utility model should be included in the protection scope of the utility model.

Claims

1. A temporary pipeline integrated layout frame, comprising a base (1), a mounting frame (2) being arranged on the base (1), a cantilever frame (3) being arranged on the top of the mounting frame (2), characterized in that: At least two connecting rods (4) are arranged below the cantilever frame (3); a storage basket (5) is arranged at the bottom of the connecting rod (4); each storage basket (5) is provided with a storage groove (6); the storage basket (5) comprises two obliquely arranged connecting plates (501); one end of the two connecting plates (501) is fixedly connected to the connecting rod (4), and the other end is connected through a storage plate (502); at least one partition plate (503) is arranged on the upper surface of the storage plate (502); and the partition plate (503) extends along the width direction of the storage plate (502).

2. A temporary pipeline integrated layout frame as claimed in claim 1, characterized in that: The bottom of the partition (503) is provided with a T-shaped block (504) extending along the width direction of the storage plate (502), and the upper surface of the storage plate (502) is provided with a T-shaped slot (505) used in conjunction with the T-shaped block (504).

3. A temporary pipeline integrated layout frame as claimed in claim 1, characterized in that: A support rod (7) is obliquely arranged on the base (1); the upper end of the support rod (7) is fixedly connected to the installation frame (2), and the lower end of the support rod (7) is fixedly connected to the base (1).

4. A temporary pipeline integrated layout frame as claimed in claim 3, characterized in that: The support rods (7) are provided in pairs, each of the support rods (7) is horizontally provided with a cross rod (8), one end of the cross rod (8) is fixedly connected to the support rod (7), and the other end is fixedly connected to the installation frame (2), and the two cross rods (8) are connected by a connecting rod (9).

5. A temporary pipeline integrated layout frame as claimed in claim 3, characterized in that: An oblique support rod (10) is obliquely arranged on the installation frame (2); the lower end of the oblique support rod (10) is fixedly connected to the installation frame (2), and the upper end is fixedly connected to the cantilever frame (3).

6. A temporary pipeline integrated layout frame as claimed in claim 1, characterized in that: A counterweight (11) is provided on the upper surface of the base (1).