Heat recovery device of textile dyeing and finishing shaping equipment
By using a combination of heat exchange box and cleaning rod in the heat recovery device of textile dyeing and shaping equipment, combined with PLC control and automatic cleaning system, the problems of impurities adhesion and filtration components in the waste gas treatment are solved, and efficient heat recovery and waste gas treatment are achieved.
Patent Information
- Application Number
- CN202420190376.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-26
- Publication Date
- 2025-05-02
- Estimated Expiration
- 2034-01-26
AI Technical Summary
After long-term use of the exhaust gas treatment device of the existing textile dyeing and shaping equipment, the heat exchange efficiency is reduced due to impurities such as dust and oil wax attached to the heat exchange pipe, and the filtering components are easily blocked, which affects the exhaust gas treatment efficiency.
A heat recovery device for textile dyeing and shaping equipment is designed, using a combination of heat exchange box and cleaning rod. The electric telescopic rod is controlled to drive the cleaning rod to move through the PLC controller, clean the impurities in the heat exchange copper tube, and filter the impurities in the exhaust gas through the filter plate and the filter cotton. The impurities on the surface of the filter cotton are automatically cleaned by using the air pump and the jet nozzle.
It effectively improves heat exchange efficiency, extends the service life of the heat exchange pipe, avoids clogging of the filter components, and improves the efficiency of waste gas treatment and energy utilization.
Smart Images

Figure CN222824866U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of textile equipment, in particular to a heat recovery device for textile dyeing and finishing equipment. Background Art
[0002] Textile dyeing and finishing equipment is one of the main energy-consuming equipment in the textile dyeing and finishing industry. Heat setting equipment is a device that uses hot air to dry, finish and set fabrics. Because the setting equipment uses high temperature to operate, and different fabrics have different substances left on textile fabrics, such as chemical fiber fabrics often have grease left on them, which will be vaporized and attached to the exhaust gas of the setting equipment after high-temperature steam treatment. In addition, cotton fiber fabrics have paraffin left on them, which will also be vaporized and attached to the exhaust gas of the setting equipment after high-temperature steam treatment. If the temperature and humidity of the discharged exhaust gas are greatly different from the temperature and humidity of the air in the external environment, steam tail flow will be generated at the final outlet of the exhaust gas, affecting air visibility, causing great environmental pollution and affecting environmental protection. Therefore, exhaust gas treatment is required. At present, the common high-temperature exhaust gas treatment method is to collect the high-temperature exhaust gas discharged from the drying room of the setting equipment through the exhaust branch pipe and the main pipe of the drying room and concentrate it at the end of the system for heat recovery and filtering of harmful substances in the exhaust gas.
[0003] At present, the common exhaust gas treatment device of the setting equipment is usually an air-to-air heat exchange structure, which makes the high-temperature hot exhaust gas flow inside or outside the heat exchange tube, and makes the low-temperature gas that needs heat exchange flow on the other side of the patient tube, so as to realize the recovery and utilization of the heat in the high-temperature exhaust gas. However, there are impurities such as dust and oil wax in the exhaust gas of the setting equipment. After the heat exchange tube is used for a long time, the impurities such as dust and oil wax will adhere to the heat exchange tube, which will affect the heat exchange effect and reduce the heat exchange efficiency. In addition, in order to avoid the impurities in the exhaust gas from being directly discharged into the air, a filter component is usually set during heat recovery to filter the impurities in the exhaust gas. However, due to the high content of impurities such as dust and oil wax in the exhaust gas, the filter component is very easy to be blocked, and the filter component needs to be cleaned or replaced frequently, resulting in low exhaust gas treatment efficiency. For this reason, we propose a heat recovery device for textile dyeing and finishing equipment to solve the above problems. Utility Model Content
[0004] In view of the deficiencies in the prior art, the utility model provides a heat recovery device for textile dyeing and finishing equipment, which solves the problems raised in the above-mentioned background technology.
[0005] To achieve the above objectives, the utility model is implemented through the following technical solutions: a heat recovery device for textile dyeing and finishing equipment, including a mounting base, a heat exchange box and an air intake fan are fixedly mounted on the top of the mounting base, and the air outlet of the air intake fan is fixedly connected to the air inlet of the heat exchange box, a plurality of heat exchange copper tubes are arranged inside the heat exchange box, one side of the heat exchange box is fixedly connected to a hot exhaust gas inlet box, and the other side is fixedly connected to a hot exhaust gas exhaust box, a cleaning rod matched with the heat exchange copper tube is movably mounted on the hot exhaust gas inlet box, and one end of the cleaning rod is fixedly connected to a transmission plate, the heat exchange box An electric telescopic rod 1 is fixedly installed on the top of the body, and the output shaft of the electric telescopic rod 1 is fixedly connected to the transmission plate, the bottom of the hot exhaust gas intake box is fixedly connected to a hot exhaust gas inlet, and a filter plate is clamped inside the hot exhaust gas inlet, and two groups of filter cottons are arranged on the filter plate, and an electric telescopic rod 2 is fixedly installed on the bottom of the heat exchange box body, and the electric telescopic rod 2 is fixedly connected to the filter plate, hollow air guide plates are arranged on both sides of the hot exhaust gas inlet, an air pump cooperating with the hollow air guide plates is fixedly installed on the side of the hot exhaust gas intake box, and a PLC controller is fixedly installed on the hot exhaust gas exhaust box.
[0006] Preferably, the heat exchange copper tubes are evenly distributed inside the heat exchange box, the positions of the heat exchange copper tubes correspond one to one with the positions of the cleaning rods, and the ends of the cleaning rods are fixedly connected with rubber heads that match the heat exchange copper tubes.
[0007] Preferably, a pipe is fixedly connected to the air outlet of the air pump, and the pipe is fixedly connected to the two groups of hollow air guide plates. A solenoid valve cooperating with the two groups of hollow air guide plates is provided on the pipe. A plurality of air nozzles are fixedly installed at the bottom of the hollow air guide plates. The air pump and the solenoid valve are electrically connected to the PLC controller.
[0008] Preferably, dust hoppers cooperating with the filter plates are fixedly mounted on both sides of the hot exhaust gas inlet, and a dust filter bag is fixedly mounted on the bottom of the dust hopper.
[0009] Preferably, the air intake fan, the electric telescopic rod 1 and the electric telescopic rod 2 are all electrically connected to the PLC controller, the electric telescopic rod 2 is located in the middle of the filter plate, and the electric telescopic rod 1 is located in the middle of the transmission plate.
[0010] Preferably, the bottom of the hot exhaust gas exhaust box is fixedly connected to a collecting hopper, and an electric gate valve is fixedly installed at the bottom of the collecting hopper, and the electric gate valve is electrically connected to the PLC controller.
[0011] Preferably, the collecting hopper and the dust collecting hopper are both funnel-shaped structures, and the size of the top of the dust collecting hopper is adapted to the size of the filter cotton on the filter plate.
[0012] The utility model provides a heat recovery device for textile dyeing and finishing equipment, which has the following beneficial effects:
[0013] 1. The heat recovery device of the textile dyeing and finishing equipment introduces high-temperature exhaust gas along the hot exhaust gas inlet, and makes the high-temperature exhaust gas flow inside the heat exchange copper tube. At the same time, cold air is introduced into the heat exchange box through the air intake fan, which can exchange heat with the high-temperature exhaust gas inside the heat exchange copper tube to achieve heat recovery of the high-temperature exhaust gas. In addition, the electric telescopic rod is controlled by the PLC controller to drive the transmission plate and several cleaning rods to move, so as to clean the inside of the heat exchange copper tube, avoid the heat exchange efficiency caused by impurities attached inside the heat exchange copper tube due to long-term operation, and improve the utilization rate of energy.
[0014] 2. The heat recovery device of the textile dyeing and finishing equipment, when the high-temperature exhaust gas enters the hot exhaust gas inlet, filters the dust, oil wax and other impurities in the exhaust gas through the filter cotton in the filter plate to avoid direct discharge into the air to cause pollution. At the same time, the filter plate is driven to move by the second electric telescopic rod, so that the two groups of filter cotton on the filter plate can work alternately, and the air pump generates airflow and discharges it along the air nozzle on the hollow air guide plate, which can automatically clean the impurities on the surface of the filter cotton, and the impurities can be collected centrally through the dust removal filter bag. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 This is a schematic diagram of the overall structure of one side of the utility model;
[0016] Figure 2 It is a structural schematic diagram of the other side of the utility model as a whole;
[0017] Figure 3 This is a schematic diagram of the structure of the connection between the heat exchange copper tube and the cleaning rod of the utility model;
[0018] Figure 4 It is a structural schematic diagram of the connection between the hot exhaust gas intake box and the cleaning rod of the utility model;
[0019] Figure 5 This is a schematic diagram of the structure of the hot exhaust gas exhaust box of the utility model;
[0020] Figure 6 This is a structural schematic diagram of the installation position of the hot exhaust gas inlet of the utility model;
[0021] Figure 7 It is a structural schematic diagram of the installation position of the filter plate of the utility model.
[0022] In the figure: 1. Installation base; 2. Heat exchange box; 3. Air intake fan; 4. Heat exchange copper tube; 5. Hot exhaust gas inlet box; 6. Cleaning rod; 7. Transmission plate; 8. Electric telescopic rod 1; 9. Hot exhaust gas exhaust box; 10. Collection bucket; 11. Electric gate valve; 12. Hot exhaust gas inlet; 13. Filter plate; 14. Electric telescopic rod 2; 15. Hollow air guide plate; 16. Air nozzle; 17. Air pump; 18. PLC controller; 19. Dust hopper; 20. Dust filter bag. DETAILED DESCRIPTION
[0023] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.
[0024] See also Figure 1 , 2, 6, 7, the utility model provides a technical solution: a heat recovery device for textile dyeing and finishing equipment, comprising a mounting base 1, a heat exchange box 2 and an air intake fan 3 are fixedly mounted on the top of the mounting base 1, and the air outlet of the air intake fan 3 is fixedly connected to the air inlet of the heat exchange box 2, a plurality of heat exchange copper tubes 4 are arranged inside the heat exchange box 2, high-temperature exhaust gas is introduced along the hot exhaust gas inlet 12, and the high-temperature exhaust gas flows inside the heat exchange copper tube 4, and at the same time, cold air is introduced into the heat exchange box 2 through the air intake fan 3, and heat can be exchanged with the high-temperature exhaust gas inside the heat exchange copper tube 4, so as to realize heat recovery of the high-temperature exhaust gas, and one side of the heat exchange box 2 is fixedly connected with a hot exhaust gas inlet The hot exhaust gas box 5 is fixedly connected to the other side with a hot exhaust gas exhaust box 9. A collecting bucket 10 is arranged at the bottom of the hot exhaust gas exhaust box 9, which can collect the impurities cleaned out of the heat exchange copper tube 4. A cleaning rod 6 cooperating with the heat exchange copper tube 4 is movably installed on the hot exhaust gas inlet box 5, and one end of the cleaning rod 6 is fixedly connected with a transmission plate 7. The transmission plate 7 and a plurality of cleaning rods 6 are driven by an electric telescopic rod 8 to move, so as to clean the inside of the heat exchange copper tube 4 and avoid the heat exchange efficiency being affected by impurities attached to the inside of the heat exchange copper tube 4 during long-term operation. An electric telescopic rod 8 is fixedly installed on the top of the heat exchange box 2. The electric telescopic rod 8 is a common existing technology at present, and the model is JINJE- 1601, the output shaft of the electric telescopic rod 1 8 is fixedly connected to the transmission plate 7, the bottom of the hot exhaust gas intake box 5 is fixedly connected to the hot exhaust gas intake port 12, and the inside of the hot exhaust gas intake port 12 is clamped with a filter plate 13, and two groups of filter cottons are arranged on the filter plate 13. The dust, oil wax and other impurities in the exhaust gas are filtered through the filter cotton in the filter plate 13 to avoid direct discharge into the air to cause pollution, and the bottom of the heat exchange box body 2 is fixedly installed with an electric telescopic rod 2 14, and the electric telescopic rod 2 14 is fixedly connected to the filter plate 13, and the electric telescopic rod 2 14 can drive the filter plate 13 to move, and adjust the position of the two groups of filter cottons on the filter plate 13. 14 is a common existing technology at present, and its model is JINJE-1601. Hollow air guide plates 15 are arranged on both sides of the hot exhaust gas inlet 12. An air pump 17 cooperating with the hollow air guide plate 15 is fixedly installed on the side of the hot exhaust gas inlet box 5. The filter plate 13 is driven to move by the electric telescopic rod 14, so that the two groups of filter cottons on the filter plate 13 can work alternately, and the air flow is generated by the air pump 17 and discharged along the air nozzle 16 on the hollow air guide plate 15, so that the impurities on the surface of the filter cotton can be automatically cleaned. A PLC controller 18 is fixedly installed on the hot exhaust gas exhaust box 9. The PLC controller 18 is a common existing technology at present, and a Siemens controller can be used.
[0025] See also Figure 3 , 4The heat exchange copper tube 4 is evenly distributed inside the heat exchange box 2, and the position of the heat exchange copper tube 4 corresponds to the position of the cleaning rod 6. The PLC controller 18 controls the electric telescopic rod 8 to drive the transmission plate 7 and several cleaning rods 6 to move, so as to clean the inside of the heat exchange copper tube 4, thereby avoiding the influence of impurities attached to the inside of the heat exchange copper tube 4 due to long-term operation on the heat exchange efficiency, and improving the utilization rate of energy. The end of the cleaning rod 6 is fixedly connected with a rubber head matched with the heat exchange copper tube 4. By setting the rubber head, the cleaning effect of the cleaning rod 6 on the impurities on the inner wall of the heat exchange copper tube 4 is improved.
[0026] See also Figure 6 , a pipeline is fixedly connected to the air outlet of the air pump 17. The air pump 17 is a common existing technology with a model of CN61M. The pipeline is fixedly connected to the two groups of hollow air guide plates 15. The gas is transported through the pipeline, and the gas can be introduced into the hollow air guide plate 15 and discharged along the air nozzle 16 at the bottom of the hollow air guide plate 15, so that the filter cotton on the filter plate 13 can be cleaned. A solenoid valve that cooperates with the two groups of hollow air guide plates 15 is provided on the pipeline. The solenoid valve can control the on and off of the pipeline that cooperates with the two groups of hollow air guide plates 15, thereby controlling the working state of the two groups of hollow air guide plates 15, so as to clean the filter cotton on the filter plate 13. A plurality of air nozzles 16 are fixedly installed at the bottom of the hollow air guide plate 15. The air pump 17 and the solenoid valve are both connected to the PLC control The PLC controller 18 is electrically connected to the air pump 17 and the solenoid valve, so as to realize automatic cleaning of the filter cotton on the filter plate 13. The solenoid valve is a common existing technology at present, and its principle and working process are not repeated here. Dust hoppers 19 cooperating with the filter plate 13 are fixedly installed on both sides of the hot exhaust gas inlet 12. When cleaning impurities on the filter cotton, the impurities can be collected centrally through the dust hopper 19, and a dust filter bag 20 is fixedly installed at the bottom of the dust hopper 19. When the impurities on the filter cotton enter the dust hopper 19, the cleaned impurities can be collected centrally through the dust filter bag 20 at the bottom of the dust hopper 19, and at the same time, they are blocked by the dust filter bag 20 to prevent the impurities from being released into the air.
[0027] See also Figure 3 , 6 The air intake fan 3, the electric telescopic rod 18 and the electric telescopic rod 2 14 are all electrically connected to the PLC controller 18. The electric telescopic rod 2 14 is located in the middle of the filter plate 13 to ensure that the forces on both sides of the filter plate 13 are balanced, so that the electric telescopic rod 2 14 can drive the filter plate 13 to move stably. The electric telescopic rod 18 is located in the middle of the transmission plate 7 to ensure that the forces on both sides of the transmission plate 7 are balanced, so that the electric telescopic rod 18 can drive the transmission plate 7 to move stably.
[0028] See also Figure 5 , 6The bottom of the hot exhaust gas exhaust box 9 is fixedly connected with a collecting hopper 10, and the impurities cleaned out are guided by the collecting hopper 10, so that the impurities can be discharged along the electric gate valve 11, and the electric gate valve 11 is fixedly installed at the bottom of the collecting hopper 10, and the electric gate valve 11 is electrically connected to the PLC controller 18. The impurities cleaned out by the heat exchange copper tube 4 by the cleaning rod 6 can fall into the collecting hopper 10, and the electric gate valve 11 is controlled by the PLC controller 18 to be opened regularly to discharge the impurities. The collecting hopper 10 and the dust collecting hopper 19 are both funnel-shaped structures. The collecting hopper 10 and the dust collecting hopper 19 are set to a funnel structure, which is convenient for centralized collection of impurities and discharge along the bottom. The size of the top of the dust collecting hopper 19 is adapted to the size of the filter cotton on the filter plate 13. When the filter cotton on the filter plate 13 is in an unworking state, it cooperates with the dust collecting hopper 19, and the filter cotton is sprayed by the airflow, and the impurities filtered out from the bottom of the filter cotton can be blown into the dust collecting hopper 19, so as to realize the centralized collection of impurities.
[0029] In summary, when the heat recovery device for textile dyeing and finishing equipment is used, the high-temperature exhaust gas of the textile dyeing and finishing equipment is introduced into the device along the hot exhaust gas inlet 12, and the high-temperature exhaust gas enters the hot exhaust gas inlet box 5 along the hot exhaust gas inlet 12, flows into a plurality of heat exchange copper tubes 4, and is finally discharged along the hot exhaust gas exhaust box 9. After working for a period of time, the electric telescopic rod 8 is controlled by the PLC controller 18 to drive the transmission plate 7 and a plurality of cleaning rods 6 to move, and the impurities attached to the inner wall of the heat exchange copper tube 4 are cleaned, and the impurities fall into the collecting bucket 10 at the bottom of the cleaning rod 6. The PLC controller 18 regularly controls the electric gate valve 11 to open to discharge the impurities. When the filter plate 13 is in the working state, the impurities in the high-temperature exhaust gas are filtered through the filter cotton in the filter plate 13. The electric telescopic rod 14 is controlled by the PLC controller 18 to drive the filter plate 13 to move, so that the two groups of filter cotton on the filter plate 13 can work alternately. After the position of the filter plate 13 is adjusted, the air pump 17 is controlled to start by the PLC controller 18, and the solenoid valve on the hollow air guide plate 15 that cooperates with the non-working state is controlled to open. The air pump 17 generates airflow, and is introduced into the hollow air guide plate 15 along the pipeline, and is sprayed out along the air nozzle 16 at the bottom of the hollow air guide plate 15. The impurities on the surface of the filter cotton in the non-working state are jetted and cleaned, and the impurities are collected through the dust collecting hopper 19 and the dust removal filter bag 20.
[0030] In the description of the present utility model, it should be noted that the orientation or position relationship indicated by the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inside", "outside", etc. is based on the orientation or position relationship shown in the drawings, which is only for the convenience of describing the present utility model and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation of the present utility model; the terms "first", "second", and "third" are only used for descriptive purposes, and cannot be understood as indicating or implying relative importance. In addition, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present utility model can be understood according to specific circumstances. Moreover, the terms "comprises," "comprising," or any other variations thereof are intended to cover non-exclusive inclusion, such that a process, method, article, or apparatus that includes a list of elements includes not only those elements but also other elements not expressly listed, or also includes elements inherent to such process, method, article, or apparatus.
[0031] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A heat recovery device for textile dyeing and finishing equipment, comprising a mounting base (1), a heat exchange box (2) and an air intake fan (3) are fixedly mounted on the top of the mounting base (1), and an air outlet of the air intake fan (3) is fixedly connected to an air inlet of the heat exchange box (2), characterized in that: A plurality of heat exchange copper tubes (4) are arranged inside the heat exchange box (2); one side of the heat exchange box (2) is fixedly connected to a hot exhaust gas intake box (5), and the other side is fixedly connected to a hot exhaust gas exhaust box (9); a cleaning rod (6) cooperating with the heat exchange copper tube (4) is movably installed on the hot exhaust gas intake box (5), and one end of the cleaning rod (6) is fixedly connected to a transmission plate (7); an electric telescopic rod (8) is fixedly installed on the top of the heat exchange box (2); the output shaft of the electric telescopic rod (8) is fixedly connected to the transmission plate (7); the bottom of the hot exhaust gas intake box (5) is fixedly connected to a hot exhaust gas outlet box (9); An exhaust gas inlet (12) is provided, and a filter plate (13) is clamped inside the hot exhaust gas inlet (12), and two groups of filter cottons are arranged on the filter plate (13). An electric telescopic rod (14) is fixedly installed at the bottom of the heat exchange box (2), and the electric telescopic rod (14) is fixedly connected to the filter plate (13). Hollow air guide plates (15) are arranged on both sides of the hot exhaust gas inlet (12). An air pump (17) matched with the hollow air guide plate (15) is fixedly installed on the side of the hot exhaust gas inlet box (5), and a PLC controller (18) is fixedly installed on the hot exhaust gas exhaust box (9).
2. A heat recovery device for textile dyeing and finishing equipment according to claim 1, characterized in that: The heat exchange copper tubes (4) are evenly distributed inside the heat exchange box (2); the positions of the heat exchange copper tubes (4) correspond one to one with the positions of the cleaning rods (6); and the ends of the cleaning rods (6) are fixedly connected with rubber heads that match the heat exchange copper tubes (4).
3. A heat recovery device for textile dyeing and finishing equipment according to claim 2, characterized in that: A pipeline is fixedly connected to the air outlet of the air pump (17), and the pipeline is fixedly connected to the two groups of hollow air guide plates (15). The pipeline is provided with a solenoid valve that cooperates with the two groups of hollow air guide plates (15). A plurality of air nozzles (16) are fixedly installed at the bottom of the hollow air guide plates (15). The air pump (17) and the solenoid valve are both electrically connected to the PLC controller (18).
4. A heat recovery device for textile dyeing and finishing equipment according to claim 3, characterized in that: Dust collecting hoppers (19) matched with the filter plate (13) are fixedly installed on both sides of the hot exhaust gas inlet (12), and a dust removal filter bag (20) is fixedly installed at the bottom of the dust collecting hopper (19).
5. A heat recovery device for textile dyeing and finishing equipment according to claim 4, characterized in that: The air intake fan (3), the electric telescopic rod 1 (8) and the electric telescopic rod 2 (14) are all electrically connected to the PLC controller (18); the electric telescopic rod 2 (14) is located in the middle of the filter plate (13); and the electric telescopic rod 1 (8) is located in the middle of the transmission plate (7).
6. A heat recovery device for textile dyeing and finishing equipment according to claim 5, characterized in that: The bottom of the hot waste gas exhaust box (9) is fixedly connected to a collecting bucket (10), and the bottom of the collecting bucket (10) is fixedly installed with an electric gate valve (11), and the electric gate valve (11) is electrically connected to a PLC controller (18).
7. A heat recovery device for textile dyeing and finishing equipment according to claim 6, characterized in that: The collecting hopper (10) and the dust collecting hopper (19) are both funnel-shaped structures, and the size of the top of the dust collecting hopper (19) is adapted to the size of the filter cotton on the filter plate (13).