Trough type pipe cleaning complete equipment

By designing a complete set of tank pipe cleaning equipment for automatic loading and unloading, the problems of low automation and poor cleaning effect of existing equipment are solved, and efficient automatic cleaning of pipe fittings is achieved.

CN222830272UActive Publication Date: 2025-05-06NINGBO KONY TUBE CLEANING TECH CO LTD

Patent Information

Application Number
CN202421349743.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-06-13
Publication Date
2025-05-06
Estimated Expiration
2034-06-13

AI Technical Summary

Technical Problem

The existing tank pipe cleaning equipment lacks automatic loading and unloading mechanisms, has low degree of automation, high labor intensity, low efficiency, and due to disorderly stacking of pipe fittings, it is difficult to ensure the cleaning effect.

Method used

A complete set of trough pipe cleaning equipment including a pipe mount, a cleaning tank, a crane, a feeding mechanism and a feeding mechanism is designed. Automatic feeding and unloading of pipe fittings is achieved through feeding chain and feeding chain. The vertical partition groove of the pipe holder makes the pipe fittings form an orderly spaced arrangement in the cleaning tank. The pipe clamping mechanism and the moving pipe connection device ensure effective clamping and cleaning of the pipe fittings.

Benefits of technology

It realizes automatic and orderly loading, cleaning and unloading of pipe fittings, improves cleaning efficiency, reduces manual labor intensity, and ensures the stability of cleaning effect.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222830272U_ABST
    Figure CN222830272U_ABST
Patent Text Reader

Abstract

The utility model relates to complete equipment for cleaning a groove type pipe. The complete equipment comprises a pipe placing frame, a cleaning groove and a crane, a pipe containing groove is formed in one side of the pipe containing frame, a feeding mechanism and a discharging mechanism are arranged on the two sides of the cleaning groove, the feeding mechanism comprises a to-be-cleaned material frame and a feeding chain row, the discharging mechanism comprises a material storage frame and a discharging chain row, and a feeding station and a first electric trolley for driving the pipe containing frame are arranged on one side of the feeding chain row. A discharging station and a second electric trolley are arranged on one side of the discharging chain row, and the first electric trolley and the second electric trolley horizontally move to drive the pipe containing frame to achieve pipe fitting feeding and discharging relative to the feeding chain row and the discharging chain row; one end of the cleaning tank is provided with a movable pipe connecting device which translates to drive a pipe connecting part to be inserted and sealed with a pipe fitting port on the built-in pipe frame of the cleaning tank, and an external cleaning pipeline is connected with the cleaning tank through a circulating pump after being inserted and sealed to form pipe inner wall circulating cleaning. The pipe fittings in the cleaning tank are orderly arranged and cleaned, the inner walls of the pipes are automatically and circularly cleaned, the cleaning efficiency is high, and the effect is good.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of pipe cleaning, and is a complete set of trough type pipe cleaning equipment. Background Art

[0002] At present, in the existing pipe cleaning field, the common method used for batch cleaning of pipe fittings is tank cleaning, that is, a batch of pipe fittings are placed in a cleaning tank, and corresponding ultrasonic devices, heating devices, etc. are arranged in the cleaning tank to achieve effective cleaning of the pipe fittings. However, the defect of this method is that due to the stacking of pipe fittings in the cleaning tank, the stacking state needs to be constantly changed during cleaning to achieve effective cleaning, otherwise the pipe fittings are stacked on each other, resulting in poor cleaning effect of the pipe fittings. In order to solve this technical problem, as the authorization announcement number CN201012362Y published in the Chinese patent literature, the authorization announcement date is January 30, 2008, and the utility model name is "An ultrasonic cleaning tank for degreasing titanium pipes", which includes a cleaning tank, a heater arranged in the cleaning tank, an ultrasonic transducer arranged on the inner side of the cleaning tank, and a turning mechanism arranged in the cleaning tank, and the turning mechanism includes a driving mechanism and a shifting tooth connected to the driving mechanism. It mainly realizes the slow turning of bundled titanium pipes while cleaning through the turning mechanism, thereby improving the cleaning effect. However, the above scheme still cannot completely avoid the situation of pipes stacking, and the pipes are easily squeezed and worn during the turning process. The overall cleaning process is relatively disordered, and the loading and unloading process also requires manual loading and unloading operations, which is labor-intensive and has low work efficiency, making it difficult to achieve automated batch cleaning. Therefore, the existing trough pipe cleaning equipment needs to be improved. Summary of the invention

[0003] In order to overcome the above shortcomings, the purpose of the utility model is to provide a complete set of tank-type pipe cleaning equipment in the art, so as to solve the technical problems that the existing similar tank-type pipe cleaning equipment lacks automatic loading and unloading mechanisms, has a low degree of automation, high labor intensity, low efficiency, and the pipes in the cleaning tank are stacked in disorder, making it difficult to ensure the cleaning effect. The purpose is achieved through the following technical solutions.

[0004] A complete set of trough-type pipe cleaning equipment, the complete set of equipment includes a pipe rack for placing pipes to be cleaned, a cleaning trough for cleaning the pipes, a hoist for hanging the pipe rack, a loading mechanism for loading pipes on the pipe rack, and a unloading mechanism for unloading pipes on the pipe rack. The key points of its structure are that one side of the pipe rack is provided with vertically spaced pipe troughs for horizontally supporting the pipes, the length direction of the cleaning trough corresponds to the length direction of the pipes, the loading mechanism is arranged on the left side of the width direction of the cleaning trough, and the unloading mechanism is arranged on the right side of the width direction of the cleaning trough; the loading mechanism includes a rack for cleaning and a loading chain row, the loading chain row includes a vertically arranged transmission chain, the chain portion of the transmission chain is evenly spaced with pipe support racks, and when the pipe support rack rotates to a vertical plane on one side with the transmission chain, it forms vertical support for the pipes, and the spacing of the vertically supported pipes is consistent with the spacing of the vertical pipe troughs on one side of the pipe rack. The vertical spacing is matched; one side of the feeding chain row supporting the pipe fittings is provided with a feeding station corresponding to the pipe rack, and a first electric trolley is provided in the feeding station for horizontally limiting movement and supporting the pipe rack. When the first electric trolley drives the pipe rack to move into position toward one side of the feeding chain row, the pipe placement groove of the pipe placement rack is vertically corresponding to the pipe support rack on this side of the feeding chain row, that is, when the feeding chain row is driven through one station, the pipe fittings on the pipe support rack fall into the pipe placement groove of the pipe placement rack; when the first electric trolley drives the pipe placement rack to move toward the other side until the pipe placement groove of the pipe placement rack is separated from the feeding chain row, the pipe placement rack reaches the loading state. The lifting station of the work station; the material rack to be washed is provided with an inclined support platform for arranging and placing the pipe fittings, and the discharging end at the inclined bottom of the support platform is fixedly provided with a guide plate for guiding the pipe fittings into the pipe support frame at the top of the feeding chain row, and the pipe support frame drives one pipe fitting at the end of the guide plate at a time when it is driven by the feeding chain row; the unloading mechanism includes a storage rack and an unloading chain row, the structure of the unloading chain row is the same as that of the feeding chain row, and a unloading station corresponding to the pipe rack is arranged on one side of the unloading chain row, and the unloading station is provided with a second electric trolley identical to the first electric trolley, when the second electric trolley drives the pipe rack toward the lower When one side of the material chain row moves into position, each pipe placement groove of the pipe placement rack is vertically corresponding to each pipe support rack on this side of the material unloading chain row, and when the material unloading chain row is driven to one station, the pipe fittings in the pipe placement groove fall into the pipe support rack; when the second electric trolley drives the pipe placement rack to move to the other side until the pipe placement groove of the pipe placement rack is separated from the material unloading chain row, the pipe placement rack reaches the lifting station of the material unloading station; the material storage rack is located on the other side of the material unloading chain row, and a material storage trough is formed in the middle of the material storage rack, and a material drop guide plate is provided on the top of one side of the material storage rack to diagonally guide the pipe fittings in the pipe support rack driven to the top by the material unloading chain row into the material storage trough;The cleaning tank is provided with a pipe clamping mechanism for clamping the pipe fittings on the pipe rack when the pipe rack hanging device is placed in the cleaning tank. A mobile pipe connection device is provided at one end of the cleaning tank. The mobile pipe connection device includes a mobile platform and a pipe connection part that moves with the mobile platform. The moving direction of the mobile platform corresponds to the axial direction of the pipe fittings in the cleaning tank. The pipe connection part is fixed with a pipe sealing joint corresponding to one end of each pipe fitting on the pipe rack in the cleaning tank. Each pipe sealing joint merges and connects to the external cleaning pipeline. When the pipe clamping mechanism clamps the pipe fittings and the mobile platform drives the pipe connection part to move to one end, the pipe sealing joint of the pipe connection part is plugged into the pipe end of the corresponding pipe fitting on the pipe rack to form a sealed pipe connection. When the mobile platform drives the pipe connection part to move to the other end, the pipe sealing joint of the pipe connection part is separated from the pipe end of the corresponding pipe fitting. ;

[0005] Through the above structure, the automatic loading and unloading of pipes on the pipe rack is realized, and when the pipe rack is hoisted into the cleaning tank by the crane, the pipe rack is vertically separated by the pipe slots, so that the pipes are arranged in an orderly interval in the cleaning tank, which is conducive to cleaning. In addition, the pipe clamping mechanism can effectively clamp the pipes, and the mobile pipe connection device can be used to connect the pipes with the external cleaning pipeline, so that the inner wall of the pipe is effectively cleaned, and the cleaning effect is good.

[0006] The pipe rack is configured with the pipe slots vertically spaced on both sides, and the loading mechanism is provided on both sides of the corresponding loading station, and the unloading mechanism is provided on both sides of the unloading station, and the moving range of the first electric trolley and the second electric trolley includes an intermediate station, and the intermediate station corresponds to the lifting station of the pipe rack. Through this structure, the single-sided pipe placement of the above-mentioned pipe rack is changed to double-sided pipe placement, and the double-station loading and unloading mechanisms are used, which can greatly increase the number of pipes cleaned at a time, and the pipe slots on both sides of the pipe rack can hold pipes of different sizes, so that pipes of two specifications can be cleaned in batches at the same time, which has a wider range of applications and higher efficiency.

[0007] The mobile platform includes a third electric trolley and an electric lifting bracket. The third electric trolley is horizontally limited and movable. The lifting part of the electric lifting bracket is connected to the pipe connection part, and the bracket part of the electric lifting bracket is fixed to the third electric trolley. When the lifting part of the electric lifting bracket is lowered into place, the pipe sealing joint of the pipe connection part is opposite to the pipe end of the pipe fitting in the cleaning tank. When the lifting part of the electric lifting bracket is raised into place, the pipe connection part is out of the cleaning tank. This structure is used as a specific implementation structure of the mobile platform. The third electric trolley moves horizontally to realize the sealing operation between the pipe connection part and the pipe connection in the cleaning tank. The lifting operation of the electric lifting bracket facilitates the pipe connection part to be out of the cleaning tank for replacement or maintenance.

[0008] The pipe clamping mechanism includes clamping assemblies distributed on both sides of the pipe fittings in the cleaning tank, each clamping assembly includes an electric cylinder, a roller shaft, a clamping wheel, and a synchronous gear, wherein the synchronous gear is axially fixed to the lower end of the roller shaft and is rotatably positioned at the bottom of the cleaning tank, and two synchronous gears in the two clamping assemblies are meshed to form synchronous rotation, the top of the roller shaft is rotatably positioned on the bracket plate, the bracket plate is fixed on the top of the cleaning tank, and the roller shaft is axially fixed with an eccentric clamping wheel, that is, the wheel axle of the clamping wheel is eccentrically arranged with the axis of the roller shaft, the wheel axle of the clamping wheel passes through the arc-shaped sliding hole at the top of the bracket plate and is hinged to one end of the push rod of the electric cylinder, the arc-shaped sliding hole is adapted to the eccentric swing of the clamping wheel relative to the roller shaft, and the cylinder seat end of the electric cylinder is rotatably positioned on the bracket plate; in the initial state, a clamping space for placing the pipe fittings is formed between the clamping wheels in the two clamping assemblies, and when each electric cylinder of the two clamping assemblies pushes the push rod to drive the clamping wheel and the roller shaft to rotate, the clamping wheels on both sides rotate in opposite directions and clamp the pipe fittings relatively. Through this structure, effective clamping of the pipe fittings on one side of the pipe rack can be achieved, and through the above-mentioned synchronous gear, synchronous clamping of the clamping wheels on both sides can be achieved, and the clamping of the pipe fittings is relatively stable and reliable.

[0009] The pipe clamping mechanism comprises a left clamping deformation block, a middle clamping block and a right clamping deformation block, each of which has one end connected to the pipe connection portion of the mobile pipe connection device, and the left clamping deformation block after connection is located on one side of the cleaning tank, the right clamping deformation block is located on the other side of the cleaning tank, the middle clamping block is located in the middle of the pipe fittings on both sides of the built-in pipe rack of the cleaning tank, and the other ends of the left clamping deformation block and the right clamping deformation block are fixed to the corresponding side in the cleaning tank When the pipe rack is placed in the cleaning tank, and the movable pipe connection device drives the pipe connection part to move toward the end of the pipe fitting, the middle clamping block enters the middle position of the pipe fittings on both sides of the pipe rack, and the left clamping deformation block and the right clamping deformation block are pushed by the pipe connection part to form a convex deformation toward the middle clamping block and clamp the pipe fittings on both sides of the pipe rack, and the clamping state of the pipe fitting precedes the plugging and sealing of the pipe sealing joint of the pipe connection part with the end of the pipe fitting, or the clamping state of the pipe fitting is synchronized with the plugging and sealing of the pipe sealing joint of the pipe connection part with the end of the pipe fitting. Through this structure, the effective clamping operation of the pipe fittings on both sides of the pipe rack can be realized, and the clamping is more reliable.

[0010] The cleaning equipment set is provided with a plurality of cleaning tanks arranged side by side in the width direction, and the movable pipe connection device is provided at one end of each cleaning tank. Through this structure, it is convenient to perform repeated cleaning according to actual cleaning needs, or put different cleaning liquids into different cleaning tanks to achieve different cleaning effects, and the application range is wider.

[0011] The cleaning equipment set includes a purge tank with the same structure as the cleaning tank, and the purge tank and the cleaning tank are arranged side by side in the width direction. The purge tank is provided with the same pipe clamping mechanism and mobile pipe connection device as those in the cleaning tank. The cleaning pipeline connected to the pipe connection part of the mobile pipe connection device is connected to an external high-pressure air pump. Through this structure, it is convenient to purge the inner wall of the pipe after cleaning.

[0012] The inner wall of the purge tank is provided with a heating plate for heating the outer wall of the pipe on the pipe rack, and the bottom of the purge tank is provided with a drainage port and is externally connected to a drainage pump. Through this structure, the effect of purge and air drying of the pipe is further improved.

[0013] The unloading chain is driven to the pipe position supported by the pipe support frame at the top as a pipe processing station. Through this structure, other functional expansions of pipe processing are achieved.

[0014] The cleaning tank is provided with an ultrasonic vibration plate for ultrasonic cleaning of the pipes of the pipe rack, and / or a heating device for heating the liquid in the cleaning tank. The cleaning pipelines connected to the sealing joints of each pipe in the pipe connection part are connected to a circulation pump, and the liquid inlet of the circulation pump is connected to the cleaning tank. Through this structure, the cleaning liquid in the cleaning tank can circulate and clean the inner wall of the pipe, thereby improving the cleaning effect.

[0015] The utility model realizes the orderly loading, cleaning and unloading operations of automated trough type pipe cleaning, does not require manual intervention, has high work efficiency, and can flush the inner wall of the pipe in the cleaning trough, with good cleaning effect. The utility model is suitable for use as trough type pipe cleaning equipment for various pipe fittings, or as a structural improvement of similar pipe cleaning equipment. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a structural schematic diagram of scheme 1 of the utility model.

[0017] Figure 2 It is a structural schematic diagram of scheme 2 of the present utility model.

[0018] Figure 3 It is a schematic diagram of the cleaning tank structure of the utility model.

[0019] Figure 4 It is a schematic diagram of the side structure of the pipe placement rack of the utility model.

[0020] Figure 5 This is a schematic diagram of the structure of the pipe clamping mechanism in the cleaning tank of the utility model.

[0021] Figure 6 yes Figure 5 Schematic diagram of the clamping mechanism in the open state.

[0022] Figure 7 yes Figure 6 Schematic diagram of the internal structure from the side.

[0023] Figure 8 yes Figure 6 Schematic diagram of the clamping state of the middle clamping mechanism.

[0024] Fig. 9 This is a schematic diagram of the structure of the second solution of the pipe clamping mechanism in the cleaning tank of the utility model.

[0025] Fig.10 yes Fig. 9 Schematic diagram of the clamping mechanism in the open state.

[0026] Fig.11 yes Fig. 9 Schematic diagram of the clamping state of the middle clamping mechanism.

[0027] The serial numbers and names in the figure are: 1. pipe rack, 101. vertical bracket, 102. pipe slot, 2. feeding chain, 201. pipe support frame, 3. support platform, 301. guide plate, 4. pipe fittings, 5. first electric trolley, 6. cleaning tank, 601. ultrasonic vibration plate, 7. unloading chain, 8. storage rack, 801. blanking guide plate, 9. second electric trolley, 10. pipe clamping mechanism, 1001. bracket plate, 1 002, electric cylinder, 1003, roller shaft, 1004, clamping wheel, 10041, axle, 1005, synchronous gear, 1006, arc-shaped sliding hole, 1007, left clamping deformation block, 1008, middle clamping block, 1009, right deformation clamping block, 11, pipe connection, 1101, pipe sealing joint, 12, the third electric trolley, 13, electric lifting bracket, 14, cleaning pipeline, 15, circulation pump. Implementation

[0028] The utility model is now further described with reference to the accompanying drawings.

[0029] like Figure 1 , Figure 3 , Figure 4 As shown, the tank-type pipe cleaning equipment includes a pipe rack 1 for placing pipes 4 to be cleaned, a cleaning tank 6 for cleaning the pipes, a hoist for hanging the pipe rack, a loading mechanism for loading pipes on the pipe rack, and a unloading mechanism for unloading pipes on the pipe rack. The specific structure is: vertical brackets 101 are fixedly arranged at intervals along the length direction on one side of the pipe rack, and the vertical brackets are provided with pipe troughs 102 for horizontally supporting the pipes at intervals. There are several cleaning tanks arranged side by side along the width direction, and the length direction of the cleaning tank corresponds to the length direction of the pipe. A loading mechanism is arranged on the left side of the cleaning tank in the width direction, and an unloading mechanism is arranged on the right side of the cleaning tank in the width direction. The inner side of the cleaning tank is provided with an ultrasonic vibration plate 601 for ultrasonic cleaning of the pipes, and / or a heating device for heating the liquid in the cleaning tank.

[0030] The above-mentioned loading mechanism includes a rack for washing materials and a loading chain 2, the loading chain includes a vertically arranged transmission chain, the chain portion of the transmission chain is evenly spaced with pipe support frames 201, and when the pipe support frames rotate to a vertical plane on one side with the transmission chain, vertical support is formed for the pipe fittings 4, and the spacing between the vertically supported pipe fittings matches the vertical spacing of the vertical pipe grooves 102 on one side of the pipe rack. One side of the feeding chain supporting the pipe fittings is provided with a feeding station corresponding to the pipe rack 1, and the feeding station is provided with a first electric trolley 5 that moves horizontally and supports the pipe rack. When the first electric trolley drives the pipe rack to move to one side of the feeding chain into position, the pipe slot of the pipe rack is vertically corresponding to the pipe support frame on that side of the feeding chain, that is, when the feeding chain is driven to one station, the pipe fittings on the pipe support frame fall into the pipe slot of the pipe rack; when the first electric trolley drives the pipe rack to move to the other side until the pipe slot of the pipe rack is separated from the feeding chain, the pipe rack reaches the lifting station of the feeding station. The above-mentioned rack for washing is provided with an oblique support platform 3 for arranging and placing pipe fittings, and a guide plate 301 is fixedly provided at the oblique bottom discharge end of the support platform to guide the pipe fittings into the pipe support frame at the top of the feeding chain, and the pipe support frame drives one pipe fitting at the end of the guide plate at a time when it is driven with the feeding chain.

[0031] The above-mentioned unloading mechanism includes a storage rack 8 and an unloading chain row 7. The structure of the unloading chain row is the same as that of the loading chain row, and a unloading station corresponding to the pipe rack 1 is arranged on one side of the unloading chain row. The unloading station is provided with a second electric trolley 9 which is the same as the first electric trolley 5. When the second electric trolley drives the pipe rack to move to one side of the unloading chain row into position, the pipe groove 102 of the pipe rack is vertically corresponding to the pipe support frame 201 on this side of the unloading chain row, and when the unloading chain row is driven through one station, the pipe fittings 4 in the pipe groove fall into the pipe support frame; when the second electric trolley drives the pipe rack to move to the other side until the pipe groove of the pipe rack is separated from the unloading chain row, the pipe rack reaches the lifting station of the unloading station. The above-mentioned storage rack is located on the other side of the unloading chain, and a storage trough is formed in the middle of the storage rack. A drop guide plate 801 is provided on the top of one side of the storage rack to obliquely guide the pipe fittings in the pipe support frame at the top of the unloading chain to the storage trough.

[0032] The cleaning tank 6 is provided with a pipe clamping mechanism 10 for clamping the pipe fittings 4 on the pipe rack when the pipe rack 1 is hoisted into the cleaning tank. A movable pipe connection device is provided at one end of the cleaning tank. The movable pipe connection device includes a movable platform and a pipe connection part 11 that moves with the movable platform. The moving direction of the movable platform corresponds to the axial direction of the pipe fittings in the cleaning tank. The pipe connection part is fixedly provided with pipe sealing joints 1101 corresponding to one end of each pipe fitting on the pipe rack in the cleaning tank. Each pipe sealing joint merges and connects to an external cleaning pipeline. When the pipe clamping mechanism clamps the pipe fitting and the movable platform drives the pipe connection part to move to one end, the pipe sealing joint of the pipe connection part is plugged into the pipe end of the corresponding pipe fitting on the pipe rack to form a sealed pipe connection. When the movable platform drives the pipe connection part to move to the other end, the pipe sealing joint of the pipe connection part is separated from the pipe end of the corresponding pipe fitting. Figure 5-Figure 8 As shown, the pipe clamping mechanism includes clamping components distributed on both sides of the pipe fittings in the cleaning tank, each clamping component includes an electric cylinder 1002, a roller shaft 1003, a clamping wheel 1004, and a synchronous gear 1005, wherein the synchronous gear is axially connected and fixed to the lower end of the roller shaft and is rotatably positioned at the bottom of the cleaning tank, and two synchronous gears in the two clamping components are meshed to form synchronous rotation, the top of the roller shaft is rotatably positioned on the bracket plate 1001, the bracket plate is fixed to the top of the cleaning tank, and the roller shaft is axially connected and fixed with an eccentric clamping wheel, that is, the wheel of the clamping wheel The axis of the shaft and the roller shaft are eccentrically arranged, and the wheel axle 10041 of the clamping wheel passes through the arc-shaped sliding hole 1006 on the top of the bracket plate and is hinged to one end of the push rod of the electric cylinder. The arc-shaped sliding hole adapts to the eccentric swing of the clamping wheel relative to the roller shaft, and the cylinder seat end of the electric cylinder is rotated and positioned on the bracket plate; in the initial state, a clamping space for placing the pipe fitting is formed between the clamping wheels in the two clamping assemblies. When the electric cylinders of the two clamping assemblies push the push rod to drive the clamping wheels and the roller shaft to rotate, the clamping wheels on both sides rotate synchronously in opposite directions and clamp the pipe fitting relatively.

[0033] The mobile platform includes a third electric trolley 12 and an electric lifting bracket 13. The third electric trolley is horizontally limited and movable. The lifting part of the electric lifting bracket is connected to the pipe connection part 11, and the bracket part of the electric lifting bracket is fixed to the third electric trolley. When the lifting part of the electric lifting bracket is lowered into place, the pipe sealing joint 1101 of the pipe connection part is opposite to the pipe end of the pipe fitting 4 in the cleaning tank 6. When the lifting part of the electric lifting bracket is raised into place, the pipe connection part is out of the cleaning tank.

[0034] like Figure 2 As shown, the pipe rack 1 can also be configured with pipe slots 102 vertically spaced on both sides, and loading mechanisms are provided on both sides of the corresponding loading station, and unloading mechanisms are provided on both sides of the unloading station, and the moving range of the first electric trolley 5 and the second electric trolley 9 includes an intermediate station, and the intermediate station corresponds to the lifting station of the pipe rack. Based on this solution, Figure 9-11As shown, the scheme of the pipe clamping mechanism in the cleaning tank is changed to: the pipe clamping mechanism includes a left clamping deformation block 1007, a middle clamping block 1008 and a right clamping deformation block 1009, and one end of the left clamping deformation block, the middle clamping block and the right clamping deformation block are connected to the pipe connection part 11 of the movable pipe connection device, and the left clamping deformation block after connection is located on one side of 6 of the cleaning tank, the right clamping deformation block is located on the other side of the cleaning tank, and the middle clamping block is located in the middle position of the pipe fittings 4 on both sides of the built-in pipe rack in the cleaning tank, and the other ends of the left clamping deformation block and the right clamping deformation block are fixed to the corresponding side in the cleaning tank. When the pipe rack is placed in the cleaning tank and the mobile pipe connection device drives the pipe connection part to move toward the end of the pipe fitting, the middle clamping block enters the middle position of the pipe fittings on both sides of the pipe rack and contacts the pipe fittings on both sides, and the left clamping deformation block and the right clamping deformation block are pushed by the pipe connection part to form a convex deformation toward the middle clamping block and clamp the pipe fittings on both sides of the pipe rack, and the clamping state of the pipe fitting precedes the pipe sealing joint 1101 of the pipe connection part being plugged in to seal the end of the pipe fitting, or the clamping state of the pipe fitting is synchronized with the plugging of the pipe sealing joint of the pipe connection part to seal the end of the pipe fitting.

[0035] Furthermore, the cleaning equipment includes a purge tank with the same structure as the cleaning tank 6, and the purge tank and the cleaning tank are arranged side by side in the width direction. The purge tank is provided with a pipe clamping mechanism and a movable pipe connecting device with the same structure as those in the cleaning tank. The cleaning pipeline connected to the pipe connecting part 11 of the movable pipe connecting device is connected to an external high-pressure air pump, and air is supplied to the pipe fitting through the high-pressure air pump, thereby realizing the purge operation of the inner wall of the pipe and realizing rapid drying of the inner wall of the pipe.

[0036] In order to improve the effect of blowing and drying, the inner wall of the above-mentioned purge tank is provided with a heating plate for heating the outer wall of the pipe fittings on the pipe rack, and the bottom of the purge tank is provided with a drain port and an external drain pump, so as to dry the pipe fittings on the one hand and discharge the liquid in the purge tank in time on the other hand.

[0037] In addition to the above-mentioned scheme structure of the purge slot, the unloading chain row 7 can also be driven by a stepper motor, and the unloading chain row is driven to the position of the pipe 4 supported by the pipe support frame 201 at the top as a pipe processing station. For example, the pipe processing station is a pipe inner wall drying device, and the pipe inner wall drying device is provided with a non-contact high-pressure air nozzle with a pipe port, and the high-pressure air nozzle is externally connected to a high-pressure air pump, that is, the non-contact high-pressure air nozzle is used to blow air to the inner wall of the pipe to achieve the operation of drying the inner wall of the pipe. For another example, the pipe processing station is a device that combines the cleanliness detection and drying of the inner wall of the pipe, and a sponge ball machine is used. The method of translation docking is used between the pipe port to achieve pipe connection. After the pipe connection, the sponge ball machine is used to send sponge balls into the pipe, and the sponge balls are collected at the end of the pipe. The cleanliness of the sponge balls is checked to judge the cleanliness of the pipe, and the sponge balls form a scrubbing and drying function on the inner wall of the pipe. Of course, the pipe processing station is not limited to the above, and other existing equipment can also be used to achieve the corresponding pipe processing function.

[0038] A circulation pump 15 is arranged in the external cleaning pipeline where the pipe sealing joints 1101 of the pipe connection part 11 in the cleaning tank 6 merge, and the liquid inlet of the circulation pump is connected to the cleaning tank, so as to realize the circulation cleaning of the inner wall of the pipe in the cleaning tank.

[0039] The working method of the trough type pipe cleaning hoisting and feeding mechanism is as follows: the pipes 4 to be cleaned are placed obliquely on the support platform 3 of the material rack to be cleaned, the pipe rack 1 is first hoisted by a crane and placed on the first electric trolley 5 of the loading station, the loading chain row 2 is turned on, and the pipes enter the loading chain row one by one and are transmitted to the pipe support frame 201 at the top until a row of vertical pipe supports is formed on one side of the loading chain row. At this time, the loading chain row transmission is stopped, and the first electric trolley of the loading station drives the pipe rack to move into position in the direction of the loading chain row. After moving into position, each pipe slot 102 of the pipe rack corresponds vertically to the pipe supported by the loading chain row, and each pipe slot is located below the corresponding pipe. The loading chain row is controlled to rotate one more station, and the pipes of the loading chain row fall into the pipe slots of the pipe rack accordingly, and the electric trolley drives the pipe rack to separate from the loading chain row and reach the lifting station of the loading station. The pipe rack is suspended by a crane and enters the corresponding cleaning tank 6. The pipe fittings on the pipe rack are clamped by controlling the pipe clamping mechanism 10. After clamping, the third electric trolley 12 of the mobile pipe connection device is controlled to drive the pipe connection part 11 to move toward the pipe fitting port until the pipe sealing joint 1101 of the pipe connection part is plugged into the end of the pipe fitting to form a sealed pipe connection. The ultrasonic vibration plate 601 in the cleaning tank and the external circulation pump 15 are turned on. The ultrasonic vibration plate mainly cleans the outer wall of the pipe fitting, and the circulation pump circulates the cleaning liquid in the cleaning tank into the pipe fitting to clean the inner wall of the pipe fitting. After one cleaning is completed, the pipe rack is lifted out of the cleaning tank by the crane and transferred to the next cleaning tank for repeated cleaning, or lifted out and transferred to the second electric trolley 9 of the unloading station, and the second electric trolley drives the pipe rack to move to the unloading chain row 7 in the direction of the unloading chain row. After moving into position, each pipe slot of the pipe rack corresponds to the vertical pipe support frame on one side of the unloading chain row. The unloading chain row is turned on and rotated one station, and the pipe fittings on the pipe rack enter the pipe support frame on one side of the unloading chain row. After that, the second electric trolley drives the pipe rack to separate from the unloading chain row and reach the lifting station of the unloading station. The unloading chain row continues to drive and transports the pipe fittings on the pipe support frame to the top of the unloading chain row. The pipe fittings are self-weighted and fall off the pipe support frame and enter the storage rack 8 along the unloading guide plate 801. After completing the above work, the crane suspends the pipe rack and resets it to the loading station, and the cleaning operation of the next group of pipe fittings can be carried out.

[0040] The above contents are intended to illustrate the technical means of the utility model, but not to limit the technical scope of the utility model. Those skilled in the art can make obvious improvements or substitutions to the present invention in combination with existing common knowledge, which also fall within the protection scope of the claims of the present invention.

Claims

1. A complete set of tank-type pipe cleaning equipment, the complete set of equipment comprising a pipe rack (1) for placing pipes (4) to be cleaned, a cleaning tank (6) for cleaning the pipes, a hoist for hoisting the pipe rack, a loading mechanism for loading pipes on the pipe rack, and a unloading mechanism for unloading pipes from the pipe rack; characterized in that One side of the pipe rack (1) is provided with pipe placement grooves (102) for horizontally supporting the pipe fittings (4) and arranged at intervals in a vertical direction, the length direction of the cleaning groove corresponds to the length direction of the pipe fittings, the loading mechanism is arranged on the left side in the width direction of the cleaning groove, and the unloading mechanism is arranged on the right side in the width direction of the cleaning groove; The feeding mechanism comprises a material rack to be washed and a feeding chain row (2), the feeding chain row comprising a vertically arranged transmission chain, the chain portion of the transmission chain being evenly spaced with pipe support frames (201), and when the pipe support frames rotate with the transmission chain to a vertical plane on one side, vertical support is formed for the pipe fittings, and the spacing of the vertically supported pipe fittings matches the vertical spacing of the vertical pipe placement grooves on one side of the pipe placement rack; a feeding station corresponding to the pipe placement rack is provided on one side of the feeding chain row supporting the pipe fittings, and a first electric trolley (5) is provided in the feeding station for horizontally limiting movement and supporting the pipe placement rack, and when the first electric trolley drives the pipe placement rack to move into position toward one side of the feeding chain row, the pipe placement rack The pipe placement groove of the rack corresponds vertically to the pipe support rack on the side of the feeding chain, that is, when the feeding chain is driven to a station, the pipe fittings on the pipe support rack fall into the pipe placement groove of the pipe placement rack; when the first electric trolley drives the pipe placement rack to move to the other side until the pipe placement groove of the pipe placement rack is separated from the feeding chain, the pipe placement rack reaches the lifting station of the feeding station; the rack for washing is provided with an inclined support platform (3) for arranging and placing the pipe fittings, and a guide plate (301) is fixedly provided at the discharge end of the inclined bottom of the support platform for guiding the pipe fittings into the pipe support rack at the top of the feeding chain, and the pipe support rack drives one pipe fitting at the end of the guide plate at a time when the feeding chain is driven; The unloading mechanism comprises a material storage rack (8) and an unloading chain row (7), the structure of the unloading chain row being the same as that of the loading chain row, and an unloading station corresponding to the pipe placing rack is arranged on one side of the unloading chain row, and the unloading station is provided with a second electric trolley (9) identical to the first electric trolley, when the second electric trolley drives the pipe placing rack to move to the side of the unloading chain row, the pipe placing groove of the pipe placing rack is vertically corresponding to the pipe supporting rack on the side of the unloading chain row, and is driven by the unloading chain row to move a pipe placing groove to the pipe supporting rack on the side of the unloading chain row. When the pipe is in the unloading station, the pipes in the pipe slot fall into the pipe support frame; when the second electric trolley drives the pipe rack to move to the other side until the pipe slot of the pipe rack is separated from the unloading chain row, the pipe rack reaches the lifting station of the unloading station; the storage rack is located on the other side of the unloading chain row, and a storage trough is formed in the middle of the storage rack, and a drop guide plate (801) is provided on the top of one side of the storage rack to guide the pipes in the pipe support frame driven by the unloading chain row to the top obliquely into the storage trough; The cleaning tank is provided with a pipe clamping mechanism (10) for clamping the pipe fittings on the pipe rack when the pipe rack hanging device is inserted into the cleaning tank. A movable pipe connection device is provided at one end of the cleaning tank. The movable pipe connection device comprises a movable platform and a pipe connection part (11) that moves with the movable platform. The moving direction of the movable platform corresponds to the axial direction of the pipe fittings in the cleaning tank. The pipe connection part is fixedly provided with a pipe sealing joint (1101) corresponding to one end of each pipe fitting on the pipe rack in the cleaning tank. Each pipe sealing joint is merged and connected to an external cleaning pipeline. When the pipe clamping mechanism clamps the pipe fitting and the movable platform drives the pipe connection part to move to one end, the pipe sealing joint of the pipe connection part is plugged into the pipe end of the corresponding pipe fitting on the pipe rack to form a sealed pipe connection. When the movable platform drives the pipe connection part to move to the other end, the pipe sealing joint of the pipe connection part is separated from the pipe end of the corresponding pipe fitting.

2. The trough pipe cleaning equipment according to claim 1 is characterized in that The pipe rack (1) is configured such that both sides thereof are provided with the pipe slots (102) distributed vertically at intervals, and the corresponding loading mechanisms are provided on both sides of the loading station, and the unloading mechanisms are provided on both sides of the unloading station, and the moving range of the first electric trolley (5) and the second electric trolley (9) includes an intermediate station, and the intermediate station corresponds to the lifting station of the pipe rack.

3. The trough pipe cleaning equipment according to claim 1 is characterized in that The mobile platform comprises a third electric trolley (12) and an electric lifting bracket (13); the third electric trolley is capable of horizontal limited movement; the lifting portion of the electric lifting bracket is connected to the pipe connection portion (11); and the bracket portion of the electric lifting bracket is fixed to the third electric trolley; when the lifting portion of the electric lifting bracket descends into position, the pipe sealing joint (1101) of the pipe connection portion is opposite to the pipe end of the pipe fitting (4) in the cleaning tank (6); and when the lifting portion of the electric lifting bracket rises into position, the pipe connection portion is removed from the cleaning tank.

4. The trough pipe cleaning equipment according to claim 1 is characterized in that The pipe clamping mechanism (10) comprises clamping assemblies distributed on both sides of the pipe fitting (4) in the cleaning tank (6), each clamping assembly comprising an electric cylinder (1002), a roller shaft (1003), a clamping wheel (1004), and a synchronous gear (1005), wherein the synchronous gear is axially fixed to the lower end of the roller shaft and is rotatably positioned at the bottom of the cleaning tank, and two synchronous gears in the two clamping assemblies are meshed to form synchronous rotation, the top of the roller shaft is rotatably positioned on a bracket plate (1001), the bracket plate is fixed to the top of the cleaning tank, and the roller shaft is axially fixed with an eccentric The clamping wheel, that is, the wheel axle (10041) of the clamping wheel is eccentrically arranged with respect to the axis of the roller shaft. The wheel axle of the clamping wheel passes through the arc-shaped sliding hole (1006) at the top of the support plate and is hinged to one end of the push rod of the electric cylinder. The arc-shaped sliding hole is adapted to the eccentric swing of the clamping wheel relative to the roller shaft. The cylinder seat end of the electric cylinder is rotated and positioned on the support plate. In the initial state, a clamping space for placing the pipe fitting is formed between the clamping wheels in the two clamping assemblies. When the electric cylinders of the two clamping assemblies push the push rod to drive the clamping wheel and the roller shaft to rotate, the clamping wheels on both sides rotate in opposite directions and clamp the pipe fitting relatively.

5. The trough pipe cleaning equipment according to claim 2 is characterized in that The pipe clamping mechanism (10) comprises a left clamping deformation block (1007), a middle clamping block (1008) and a right clamping deformation block (1009), wherein one end of each of the left clamping deformation block, the middle clamping block and the right clamping deformation block is connected to the pipe connection portion (11) of the mobile pipe connection device, and after the connection, the left clamping deformation block is located on one side of the cleaning tank (6), the right clamping deformation block is located on the other side of the cleaning tank, the middle clamping block is located in the middle of the pipe fittings (4) on both sides of the built-in pipe rack (1) of the cleaning tank, and the other ends of each of the left clamping deformation block and the right clamping deformation block are connected to the pipe connection portion (11) of the mobile pipe connection device. One end is fixed to the corresponding side in the cleaning tank; when the pipe rack is placed in the cleaning tank and the movable pipe connection device drives the pipe connection part (11) to move toward the end of the pipe fitting, the middle clamping block enters the middle position of the pipe fittings on both sides of the pipe rack, and the left clamping deformation block and the right clamping deformation block are pushed by the pipe connection part to form a convex deformation in the direction of the middle clamping block and clamp the pipe fittings on both sides of the pipe rack, and the clamping state of the pipe fitting precedes the plugging of the pipe sealing joint of the pipe connection part to seal the end of the pipe fitting, or the clamping state of the pipe fitting is synchronized with the plugging of the pipe sealing joint of the pipe connection part to seal the end of the pipe fitting.

6. The tank pipe cleaning equipment according to claim 1 is characterized in that The cleaning equipment set is provided with a plurality of cleaning tanks (6) arranged side by side in the width direction, and the movable pipe connection device is provided at one end of each cleaning tank.

7. The tank pipe cleaning equipment according to claim 1 is characterized in that The cleaning equipment set comprises a purge tank having the same structure as the cleaning tank (6), and the purge tank and the cleaning tank are arranged side by side in the width direction. The purge tank is provided with a pipe clamping mechanism (10) and a mobile pipe connection device having the same structure as those in the cleaning tank, and the cleaning pipeline connected to the pipe connection part (11) of the mobile pipe connection device is connected to an external high-pressure air pump.

8. The trough pipe cleaning equipment according to claim 7, characterized in that The inner wall of the purge tank is provided with a heating plate which is arranged opposite to the outer wall of the pipe fitting (4) on the pipe rack (1) to form a heating plate for heating, and the bottom of the purge tank is provided with a liquid discharge port which is externally connected to a liquid discharge pump.

9. The tank pipe cleaning equipment according to claim 1, characterized in that The unloading chain (7) is driven to the position of the pipe fitting (4) supported by the pipe support frame (201) at the top as a pipe processing station.

10. The tank pipe cleaning equipment according to claim 1, characterized in that The inner side of the cleaning tank (6) is provided with an ultrasonic vibration plate (601) for ultrasonic cleaning of the pipe fittings (4) of the pipe rack (1) and / or a heating device for heating the liquid in the cleaning tank. The cleaning pipelines externally connected to the pipe sealing joints (1101) of the pipe connection part (11) are connected to a circulation pump (15), and the liquid inlet of the circulation pump is connected to the cleaning tank.

Citation Information

Patent Citations

  • Ultrasonic cleaning groove for removing oil for the titanium tube

    CN201012362Y

Cited By

  • Groove type pipe cleaning, hoisting and feeding mechanism and working method thereof

    CN118651587A