Quickly-assembled construction hoist foundation
By designing the quick-load construction elevator foundation and adopting steel structure and modular splicing technology, the problems of complex installation and inaccurate positioning of the construction elevator foundation in the existing technology are solved, a fast, safe and reliable installation process is achieved, and costs are reduced.
Patent Information
- Application Number
- CN202421628539.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-10
- Publication Date
- 2025-05-16
- Estimated Expiration
- 2034-07-10
AI Technical Summary
The installation process of the existing construction lift foundation is complicated, requires multiple processes and long time, and it is easy to cause inaccurate foundation positioning due to technical communication deviations, which increases waste and costs.
A quick-load construction elevator foundation is designed, using a steel structure, and the combination of multiple foundation sub-sections, wedges and male and female fasteners can be quickly spliced and installed, and the construction elevator chassis can be connected through anchor bolts.
It realizes a quick-load construction elevator foundation with reasonable structural design, safe and reliable, and easy to install and disassemble, saving the production time and cost of concrete structure foundations, and adjusts the installation position accuracy to avoid trimming or non-standard wall-attached design.
Smart Images

Figure CN222878744U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to a construction elevator foundation, in particular to a quick-installation construction elevator foundation, and belongs to the technical field of building hoisting and transportation machinery. Background Art
[0002] The foundation is the main component for the installation and fixation of the construction hoist. The quality of the foundation determines the reliability of the installation of the construction hoist, such as the verticality requirements of the guide rail frame and the safe distance between it and the building (structure).
[0003] The existing construction elevator foundations are all poured on-site by the construction unit. Before installation, technical communication is required with the elevator property unit. The production process requires multiple processes such as foundation laying, steel bar binding, pouring, etc., and concrete curing is also required. The entire construction period is relatively long. Once there is a deviation in technical communication, the foundation positioning is inaccurate, or it needs to be re-trimmed or made by making non-standard wall attachments to make up for the error, which will bring great waste and use costs; at the same time, after the construction is completed, the disposal of the foundation also requires a lot of effort and cost.
[0004] In order to solve the above technical problems, a quick-install construction elevator foundation has been developed; the foundation is a steel structure foundation that can be directly manufactured by the construction elevator manufacturer as a component of the product itself. During installation, the construction party only needs to meet the ground endurance requirements of the elevator installation location. If the ground endurance is insufficient, additional foundation sub-plates can be installed to increase the overall foundation area. Utility Model Content
[0005] The purpose of the utility model is to overcome the above-mentioned deficiencies in the prior art and to provide a reusable quick-install construction elevator foundation which has a reasonable structural design, is safe and reliable, is easy to install and disassemble, and is reusable.
[0006] The technical solution adopted by the utility model to solve the above-mentioned problem is: the quick-install construction elevator foundation is used for installing the construction elevator, and is characterized by: it also includes a plurality of foundation sub-plates, a plurality of wedges and a plurality of male and female fasteners, the plurality of foundation sub-plates are spliced together, male and female fasteners are arranged on the edges of the foundation sub-plates, the male buckles and female buckles of adjacent foundation sub-plates are fastened through the male and female fasteners, and wedges are arranged in the gaps between adjacent foundation sub-plates.
[0007] Preferably, the utility model further comprises an anchor bolt hole and an anchor bolt. The foundation sub-plate is provided with an anchor bolt hole, which is connected to the base frame bolt of the construction elevator via the anchor bolt.
[0008] Preferably, the utility model further comprises a lifting point, and a lifting point is provided above the foundation sub-plate to facilitate lifting and landing.
[0009] Preferably, the basic sub-plate of the utility model is in a square structure, with male buckles and female buckles welded on all four sides.
[0010] Preferably, the adjacent basic sub-plates of the present invention are connected and fixed by bolts to ensure the stability of the overall basic sub-plates.
[0011] Compared with the prior art, the utility model has the following advantages and effects: the overall structural design is reasonable, safe and reliable, and the construction party does not need to prefabricate or cast-in-place concrete structure foundation, saving the production time and cost of the concrete structure foundation, and the installation position accuracy can be adjusted to avoid trimming or non-standard wall attachment design and production; if the ground endurance is insufficient, foundation sub-plates can be added to increase the overall foundation grounding area, thereby appropriately reducing the ground endurance requirements. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] Figure 1 It is a schematic diagram of the top structure of an embodiment of the utility model.
[0013] Figure 2 It is a left-side structural schematic diagram of an embodiment of the utility model.
[0014] Figure 3 yes Figure 2 Schematic diagram of the local enlarged structure at point A in the middle.
[0015] In the figure: foundation sub-plate 1, wedge 2, male and female fasteners 3, anchor bolt holes 4, anchor bolts 5, and construction elevator base frame 6. DETAILED DESCRIPTION
[0016] The present invention will be further described in detail below with reference to the accompanying drawings and through examples. The following examples are provided to explain the present invention, but the present invention is not limited to the following examples.
[0017] Example
[0018] See also Figures 1 to 3 The quick-install construction elevator foundation of this embodiment includes a plurality of foundation sub-plates 1, which are spliced into an integral plate that can meet the installation requirements of the construction elevator chassis.
[0019] In this embodiment, male and female fasteners 3 are arranged at the edges of the basic sub-panels 1 , the male and female fasteners of adjacent basic sub-panels 1 are fastened together by the male and female fasteners 3 , and wedges 2 are arranged in the gaps between the adjacent basic sub-panels 1 .
[0020] In this embodiment, adjacent foundation sub-plates 1 are connected and fixed by bolts to ensure the stability of the entire foundation sub-plates.
[0021] In this embodiment, the foundation sub-plate 1 is provided with anchor bolt holes 4 for inserting anchor bolts 5, which are bolted to the construction elevator chassis 6. The construction elevator chassis 6 in the figure is a schematic diagram of a partial structure.
[0022] In this embodiment, a lifting point is provided above the foundation sub-plate 1 to facilitate lifting and lowering.
[0023] This embodiment can meet the basic requirements of the construction hoist, and is easy to install and disassemble, and can be reused. Compared with the concrete structure foundation, the steel structure has higher manufacturing accuracy and can better meet the installation accuracy of the construction hoist.
[0024] Through the above description, those skilled in the art can already implement it.
[0025] In addition, it should be noted that the shapes and names of the parts and components of the specific embodiments described in this specification may be different, and the above content described in this specification is only an example of the structure of the utility model. All equivalent changes or simple changes made based on the structure, features and principles described in the patent concept of the utility model are included in the protection scope of the utility model patent. Technicians in the technical field of the utility model can make various modifications or supplements to the specific embodiments described or replace them in a similar manner, as long as they do not deviate from the structure of the utility model or exceed the scope defined by the claims, they should all fall within the protection scope of the utility model.
Claims
1. A quick-install construction hoist foundation, used for installing a construction hoist, characterized by: It also comprises a plurality of basic sub-plates (1), a plurality of wedges (2) and a plurality of male and female fasteners (3), wherein the plurality of basic sub-plates (1) are spliced together, male and female fasteners (3) are arranged at the edges of the basic sub-plates, male buckles and female buckles of adjacent basic sub-plates (1) are buckled together via the male and female fasteners (3), and wedges (2) are arranged in the gaps between adjacent basic sub-plates (1).
2. The quick-install construction hoist foundation according to claim 1, characterized in that: It also comprises an anchor bolt hole (4) and an anchor bolt (5); the foundation sub-plate (1) is provided with an anchor bolt hole (4) and is bolted to the construction hoist chassis (6) via the anchor bolt (5).
3. The quick-install construction hoist foundation according to claim 1, characterized in that: It also includes a hanging point, and a hanging point is provided above the foundation sub-plate (1).
4. The quick-install construction hoist foundation according to claim 1, characterized in that: The basic sub-plate (1) is in a square structure, with male buckles and female buckles welded to the four sides.
5. The quick-install construction hoist foundation according to claim 1, characterized in that: The adjacent foundation sub-plates (1) are connected and fixed by bolts.