Device for placing scaffold steel pipes
By designing a placement device for scaffolding steel pipes, the problem of steel pipes being rusted and scattered due to the moisture on the ground at the construction site is solved, and the safe, stable and efficient stacking of steel pipes is achieved.
Patent Information
- Application Number
- CN202421816573.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-30
- Publication Date
- 2025-06-06
- Estimated Expiration
- 2034-07-30
AI Technical Summary
During construction, scaffolding steel pipes are prone to rust due to moisture or rainwater on the ground before assembly or after disassembly, and random stacking can easily lead to scattered steel pipes, affecting construction space and safety.
A device for the placement of scaffolding steel pipes is designed, including two symmetrical placement frames and connecting rods, with support columns, placement plates, limit blocks and baffles on the placement frames. Through these components, the steel pipes are placed on the placement frames, away from the ground, and the rolling and drop of the steel pipes are restricted by the limit blocks and baffles.
It effectively avoids rust caused by contact between steel pipes and wet ground, and through the unified stacking and limiting block design, the steel pipes are prevented from being scattered, improving construction safety and efficiency.
Smart Images

Figure CN222945526U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building construction, in particular to a device for placing scaffolding steel pipes. Background Art
[0002] During the construction process, the scaffolding steel pipes at the construction site are generally piled together before assembly or after disassembly. If they are placed on the ground, rain, water on the bottom or wet ground will easily cause the steel pipes to rust, which can easily affect the strength of the steel pipes. Since the steel pipes are cylindrical, they are easily scattered after being hit or scratched by external forces if they are randomly piled on the ground. The scattered steel pipes not only affect the normal construction space operations but also easily cause safety accidents without knowing it. Utility Model Content
[0003] In view of the deficiencies in the prior art, the utility model provides a device for placing scaffolding steel pipes, which solves the problem in the prior art that the scaffolding steel pipes are directly stacked in contact with the ground, which easily leads to rust and scattering of the steel pipes.
[0004] In order to achieve the above purpose, the utility model adopts the following technical solutions:
[0005] A device for placing scaffold steel pipes, comprising: two symmetrically arranged placement racks;
[0006] A connecting rod is connected between the two placement racks, and the placement rack includes two connected support columns. A placement plate is fixedly connected between the upper ends of the two support columns. A plurality of limit blocks are arranged on the placement plate at intervals along the length direction of the placement plate. The cross-section of the limit blocks is triangular, and baffles are provided at both ends of the placement plate.
[0007] Preferably, a slide groove is provided on the placement plate and along the length direction of the placement plate, the limit block is slidably connected in the slide groove, a compression spring is connected between the two limit blocks, and the upper end of the limit block extends out of the slide groove, the baffle plate is slidably sleeved on the placement rod, and a space for the limit block to pass through is provided on the baffle plate, a plurality of threaded holes are provided at intervals on one side of the placement plate, and a through hole is provided on one side of the baffle plate, and a screw threadedly connected to the threaded hole is passed through the through hole.
[0008] Preferably, a horizontal plate is connected between the two support columns, two connecting rods are provided, and the ends of the two connecting rods are respectively fixed on the two horizontal plates, one of the connecting rods is fixedly connected to the inner rod, the other end of the inner rod is slidably connected to the other connecting rod, and the other connecting rod is provided with a bolt for fixing the inner rod.
[0009] Preferably, the lower end of the support column is provided with support legs symmetrically provided on both sides.
[0010] Preferably, two reinforcing rods are symmetrically provided between the placement plate and the support column.
[0011] The utility model has the following beneficial effects:
[0012] By setting up placement racks and placing steel pipes on two placement racks, the steel pipes can be kept away from the ground when stacked together to avoid ground water or wet ground coming into contact with the steel pipes and causing rust to the steel pipes. In addition, several limit blocks are set to limit the rolling of the steel pipes placed on the placement board.
[0013] Other advantages, objectives and features of the present invention will be embodied in part through the following description, and in part will be understood by those skilled in the art through research and practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 It is a side view schematic diagram of the overall structure of the utility model;
[0015] Figure 2 It is a front view schematic diagram of the overall structure of the utility model;
[0016] Figure 3 for Figure 1 A cross-sectional view at point A in FIG.
[0017] Figure 4 for Figure 2 Schematic diagram of the cross-section at point B in FIG.
[0018] In the above drawings: 1. Support column; 11. Cross plate; 2. Placement plate; 21. Slide groove; 22. Threaded hole; 3. Limit block; 4. Baffle; 41. Screw; 5. Compression spring; 6. Connecting rod; 7. Inner rod; 8. Support leg; 9. Reinforcement rod. DETAILED DESCRIPTION
[0019] In order to make the technical means, creative features, objectives and functions achieved by the present invention clearer and easier to understand, the technical solutions in the present invention are further described below in conjunction with the accompanying drawings and embodiments.
[0020] See also Figures 1 to 4 , a device for placing scaffold steel pipes, comprising: two symmetrically arranged placement racks;
[0021] A connecting rod 6 is connected between the two placement racks, and the placement rack includes two connected support columns 1. A placement plate 2 is fixedly connected between the upper ends of the two support columns 1. A plurality of limit blocks 3 are arranged on the placement plate 2 at intervals along the length direction of the placement plate 2. The cross-section of the limit blocks 3 is triangular, and baffles 4 are provided at both ends of the placement plate 2.
[0022] The connecting rod 6 connects the two placement racks together, so that the two placement racks support the steel pipe together. The steel pipe is placed on the placement plate 2, and the placement plate 2 is provided with a limit block 3. The steel pipe is placed between the limit blocks 3. The limit block 3 has a triangular cross section. When the steel pipe is placed, it contacts two inclined surfaces. The baffle 4 shields both sides of the steel pipe where the steel pipe is placed to prevent it from falling. By setting up the placement rack, the steel pipe is placed on two placement racks, so that the steel pipe can be kept away from the ground when it is uniformly stacked, and the steel pipe can be prevented from rusting due to contact between the ground water or the wet ground and the steel pipe, and a number of limit blocks 3 are provided to limit the rolling of the steel pipe placed on the placement plate 2.
[0023] Furthermore, if Figures 1 to 4 As shown, a slide groove 21 is provided on the placement plate 2 and along the length direction of the placement plate 2, the limit block 3 is slidably connected in the slide groove 21, a compression spring 5 is connected between the two limit blocks 3, and the upper end of the limit block 3 extends out of the slide groove 21, the baffle plate 4 is slidably sleeved on the placement plate 2, and the baffle plate 4 is provided with a space for the limit block 3 to pass through, a plurality of threaded holes 22 are provided at intervals on one side of the placement plate 2, and a through hole is provided on one side of the baffle plate 4, and a screw 41 threadably connected to the threaded hole 22 is penetrated through the through hole. The limit block 3 is set to slide in the slide groove 21 and a compression spring 5 is connected between the two limit blocks 3, so that there is a gap between the limit blocks 3, and steel pipes of different diameters can be placed. When the diameter is larger, the distance between the limit blocks 3 becomes larger for placement. The limit block 3 located at the edge cannot move due to the limitation of the slide groove 21, so that the distance between the two limit blocks 3 on the edge is smaller and no steel pipe can be placed. At this time, the movable baffle 4 limits the steel pipe. After moving to the appropriate position, the screw 41 passes through the through hole on the baffle 4 and is threadedly connected with the threaded hole 22, thereby fixing the position of the baffle 4.
[0024] Furthermore, if Figure 2 As shown, a horizontal plate 11 is connected between the two support columns 1, two connecting rods 6 are provided, and the ends of the two connecting rods 6 are respectively fixed on the two horizontal plates 11, one of the connecting rods 6 is fixedly connected to the inner rod 7, the other end of the inner rod 7 is slidably connected in the other connecting rod 6, and the other connecting rod 6 is provided with a bolt for fixing the inner rod 7. A hole is provided on the inner rod 7, and a connecting threaded hole is provided on the other connecting rod 6. The bolt is threadedly connected in the connecting threaded hole on the connecting rod 6 and the bolt extends into the hole of the inner rod 7, so that the connecting rod 6 and the inner rod 7 are connected and fixed, and the distance between the two horizontal plates 11 is adjusted by adjusting the fixed position of the inner rod 7 on the other connecting rod 6, so as to adjust the distance between the two placement racks, so that steel pipes of different lengths can be placed.
[0025] Furthermore, in order to improve the stability of the device when placed on the ground, the lower end of the support column 1 is provided with support legs 8 symmetrically arranged on both sides.
[0026] Furthermore, two reinforcing rods 9 are symmetrically provided between the placement plate 2 and the support column 1 to increase the connection strength and strengthen the support.
[0027] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the utility model rather than to limit it. Although the utility model has been described in detail with reference to the preferred embodiments, ordinary technicians in the field should understand that the technical solution of the utility model can be modified or replaced by equivalents without departing from the purpose and scope of the technical solution of the utility model, which should be included in the scope of the claims of the utility model.
Claims
1. A device for placing scaffolding steel pipes, characterized in that: include: Two symmetrically arranged placement racks; A connecting rod (6) is connected between the two placement racks. The placement rack comprises two connected support columns (1). A placement plate (2) is fixedly connected between the upper ends of the two support columns (1). A plurality of limit blocks (3) are arranged on the placement plate (2) at intervals along the length direction of the placement plate (2). The cross section of the limit blocks (3) is triangular. Baffle plates (4) are sleeved on both ends of the placement plate (2).
2. A device for placing scaffolding steel pipes as claimed in claim 1, characterized in that: A slide groove (21) is provided on the placement plate (2) and along the length direction of the placement plate (2); the limit block (3) is slidably connected in the slide groove (21); a compression spring (5) is connected between the two limit blocks (3); and the upper end of the limit block (3) extends out of the slide groove (21); the baffle plate (4) is slidably sleeved on the placement plate (2); a space for the limit block (3) to pass through is provided on the baffle plate (4); a plurality of threaded holes (22) are provided at intervals on one side of the placement plate (2); a through hole is provided on one side of the baffle plate (4); a screw (41) threadably connected to the threaded hole (22) is passed through the through hole.
3. A device for placing scaffolding steel pipes as claimed in claim 1, characterized in that: A transverse plate (11) is connected between the two support columns (1), two connecting rods (6) are provided, and the ends of the two connecting rods (6) are respectively fixed on the two transverse plates (11), one of the connecting rods (6) is fixedly connected to an inner rod (7), the other end of the inner rod (7) is slidably connected to the other connecting rod (6), and a bolt for fixing the inner rod (7) is provided on the other connecting rod (6).
4. A device for placing scaffolding steel pipes as claimed in claim 1, characterized in that: The lower end of the support column (1) is provided with support legs (8) symmetrically arranged on both sides.
5. A device for placing scaffolding steel pipes as claimed in claim 1, characterized in that: Two reinforcing rods (9) are symmetrically arranged between the placement plate (2) and the support column (1).