Steel wire rope conveying device for bridge construction
By designing a wire rope conveying device for bridge construction, the problems of low efficiency and high risk in hanging basket operation are solved, efficient improvement and transportation of materials are achieved, and rainproof functions are provided.
Patent Information
- Application Number
- CN202421957852.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-13
- Publication Date
- 2025-06-13
- Estimated Expiration
- 2034-08-13
AI Technical Summary
During bridge construction, when the hanging basket operators are carrying materials manually, there are problems of low efficiency and high risk.
A wire rope conveying device for bridge construction is designed, including a hanging basket body, support rod, roof plate, hanging ring, electric hoist, wire rope and tool box. The electric hoist is coiled with the wire rope to achieve the lifting of the tool box and the material is directly transported into the hanging basket body.
It achieves efficient improvement and transportation of materials or tools, improves the efficiency of bridge construction, reduces the risks of staff, and provides shelter in rainy weather.
Smart Images

Figure CN222975680U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of bridge construction equipment, and particularly relates to a wire rope conveying device for bridge construction. Background Technique
[0002] Bridge construction is the process of building a bridge according to the design content; it mainly refers to bridge construction technology, construction organization, construction management, construction quality, etc.; during the bridge maintenance process, a hanging basket is usually required to provide a working platform for maintenance personnel. The hanging basket is erected on a building or structure through a cantilever mechanism, and the suspension platform is driven by a lifting mechanism, and runs up and down along the facade of the building or structure through a wire rope. In bridge construction, the conveying of materials is an important link. Especially when the operating personnel of the hanging basket are working, if the materials are conveyed by manual handling, there are problems of low efficiency and risk. Therefore, it has become an urgent problem to provide a wire rope conveying device based on the operation of the hanging basket. Content of the Utility Model
[0003] (I) Technical Problems to be Solved
[0004] In order to solve the above problems of the prior art, the utility model provides a wire rope conveying device for bridge construction.
[0005] (II) Technical Solutions
[0006] In order to achieve the above purpose, the main technical solutions adopted by the utility model include:
[0007] A wire rope conveying device for bridge construction, including a hanging basket body, a support rod, a top plate, a lifting ring, an electric hoist, a wire rope, and a tool box;
[0008] Four support rods are provided, and are arranged in a rectangular array on the hanging basket body;
[0009] The top plate is fixed on the tops of the four support rods, and lifting rings are arranged at the four corners of the upper surface of the top plate;
[0010] The electric hoist is installed on the top of the top plate, and the electric hoist is connected to the tool box through the wire rope;
[0011] A material taking hole corresponding to the tool box is opened at the bottom of the inner wall of the hanging basket body.
[0012] Preferably, a guardrail is arranged inside the hanging basket body, and the guardrail surrounds the material taking hole.
[0013] Preferably, it further includes a rainproof mechanism, and the rainproof mechanism includes an upper rectangular frame body, a lower rectangular frame body, and a rainproof cloth;
[0014] The lower rectangular box body is fixed at the bottom of the hanging basket body;
[0015] A connecting ring corresponding to the support rod is arranged inside the upper rectangular box body, and the connecting ring is slidably installed on the corresponding support rod;
[0016] The upper rectangular box body is connected to the steel wire rope through a connecting piece;
[0017] The rainproof cloth is arranged to block between the upper rectangular box body and the lower rectangular box body.
[0018] Preferably, the connecting piece is detachably installed between two connecting rings on one side close to the steel wire rope.
[0019] Preferably, the connecting piece includes a connecting plate and a binding rope. Installation grooves corresponding to the connecting plate are formed in two connecting rings on one side close to the steel wire rope. The connecting plate is laterally inserted into the installation grooves, one end of the binding rope is connected to the connecting plate, and the other end of the binding rope is tied to the steel wire rope.
[0020] (III) Beneficial effects
[0021] The beneficial effects of the present utility model are as follows:
[0022] 1. When the staff is working inside the hanging basket body, materials or tools can be placed in the toolbox, and the steel wire rope is wound by the electric hoist to lift the toolbox, lift the toolbox into the hanging basket body, and directly convey the materials into the hanging basket body, which is convenient for the staff to carry out bridge construction;
[0023] 2. When the staff is working inside the hanging basket body and encounters rainy weather, the connecting plate is laterally inserted between the installation grooves of two connecting rings, and then tied to the connecting steel wire rope through the binding rope. After the electric hoist winds the steel wire rope, the upper rectangular box body rises, and then the rainproof cloth is pulled up to cover between the top plate and the hanging basket body, so that a temporary rain shelter is formed inside the hanging basket body. Description of the drawings
[0024] Figure 1 It is a schematic structural diagram of a steel wire rope conveying device for bridge construction;
[0025] Figure 2 It is a schematic structural diagram of the second embodiment of the present utility model;
[0026] Figure 3 It is Figure 2 The enlarged schematic diagram of part A in
[0027] Description of the reference numerals:
[0028] 1. Hanging basket body;
[0029] 2. Support rod;
[0030] 3. Top plate;
[0031] 4. Hoisting ring;
[0032] 5. Electric hoist;
[0033] 6. Guardrail;
[0034] 7. Toolbox;
[0035] 8. Steel wire rope;
[0036] 9. Connecting plate;
[0037] 10. Upper rectangular frame;
[0038] 11. Rainproof cloth;
[0039] 12. Lower rectangular frame;
[0040] 13. Connecting ring; 131. Installation groove;
[0041] 14. Binding rope. Detailed implementation manners
[0042] For better explaining the present utility model for easy understanding, the present utility model will be described in detail below in conjunction with the accompanying drawings through specific implementation manners.
[0043] Please refer to Figure 1 , the first embodiment of the present utility model:
[0044] A steel wire rope 8 conveying device for bridge construction includes a hanging basket body 1, a support rod 2, a top plate 3, a hoisting ring 4, an electric hoist 5, a steel wire rope 8, and a toolbox 7;
[0045] Four support rods 2 are provided and are arranged in a rectangular array on the hanging basket body 1;
[0046] The top plate 3 is fixed to the tops of the four support rods 2, and hoisting rings 4 are arranged at the four corners of the upper surface of the top plate 3;
[0047] The electric hoist 5 is installed on the top, and the electric hoist 5 is connected to the toolbox 7 through a steel wire rope 8;
[0048] A material taking hole corresponding to the toolbox 7 is opened at the bottom of the inner wall of the hanging basket body 1;
[0049] During use, when the staff is working in the hanging basket body 1, materials or tools can be placed in the toolbox 7, and the steel wire rope 8 is wound by the electric hoist 5 to lift the toolbox 7 to the inside of the hanging basket body 1, and the materials are directly conveyed into the hanging basket body 1, facilitating the bridge construction of the staff.
[0050] In this embodiment, a guardrail 6 is provided inside the hanging basket body 1, and the guardrail 6 surrounds the material taking hole, thereby ensuring the use safety.
[0051] Reference Figure 2 and Figure 3 , the second embodiment of the present utility model:
[0052] On the basis of the above-mentioned first embodiment, it further includes a rain-proof mechanism, and the rain-proof mechanism includes an upper rectangular frame body 10, a lower rectangular frame body 12 and a rain-proof cloth 11;
[0053] The lower rectangular frame body 12 is fixed to the bottom of the hanging basket body 1;
[0054] Inside the upper rectangular frame body 10, connection rings 13 corresponding to the support rods 2 are provided, and the connection rings 13 are slidably installed on the corresponding support rods 2;
[0055] The upper rectangular frame body 10 is connected to the steel wire rope 8 through a connecting piece;
[0056] The rain-proof cloth 11 is arranged to cover between the upper rectangular frame body 10 and the lower rectangular frame body 12.
[0057] In this embodiment, a connecting piece is detachably installed between two connection rings 13 on the side close to the steel wire rope 8.
[0058] In this embodiment, the connecting piece includes a connecting plate 9 and a binding rope 14. Installation grooves 131 corresponding to the connecting plate 9 are provided on two connection rings 13 on the side close to the steel wire rope 8. The connecting plate 9 is laterally inserted into the installation grooves 131. One end of the binding rope 14 is connected to the connecting plate 9, and the other end of the binding rope 14 is tied to the steel wire rope 8;
[0059] During use, when the staff is working inside the hanging basket body 1 and encounters rainy weather, the connecting plate 9 is laterally inserted between the installation grooves of the two connection rings 13, and then tied to the connecting steel wire rope 8 through the binding rope 14. After the electric hoist 5 winds up the steel wire rope 8, the upper rectangular frame body 10 is lifted, thereby pulling the rain-proof cloth 11 to rise and covering between the top plate 3 and the hanging basket body 1, so that a temporary rain shelter is formed inside the hanging basket body 1, achieving a rain-proof effect on the staff inside the hanging basket body 1.
[0060] The circuits, electronic components and modules involved are all prior arts, which can be fully realized by those skilled in the art without further elaboration. The content protected by the present utility model does not involve improvements to software and methods either.
[0061] The above are only the embodiments of the present utility model, and thus do not limit the patent scope of the present utility model. Any equivalent transformation made by using the specification and drawings of the present utility model, or directly or indirectly applied in the relevant technical fields, shall be equally included in the patent protection scope of the present utility model.
[0062] In addition, it should be understood that although this specification is described according to embodiments, not every embodiment only contains an independent technical solution. This narrative way of the specification is only for clarity. Those skilled in the art should regard the specification as a whole, and the technical solutions in each embodiment can also be appropriately combined to form other embodiments that can be understood by those skilled in the art.
Claims
1. A steel wire rope conveying device for bridge construction, characterized in that: It includes the hanging basket body, support rods, top plate, lifting rings, electric hoist, wire rope and tool box; There are four support rods arranged in a rectangular array on the hanging basket body; The top plate is fixed on the top of the four support rods, and the four corners on the upper surface of the top plate are provided with the hanging rings; The electric hoist is installed on the top of the top, and the electric hoist is connected to the tool box through the wire rope; A material taking hole corresponding to the tool box is provided at the bottom of the inner wall of the hanging basket body.
2. A steel wire rope conveying device for bridge construction according to claim 1, characterized in that: A guardrail is arranged inside the hanging basket body, and the guardrail surrounds the material taking hole.
3. A steel wire rope conveying device for bridge construction according to claim 1, characterized in that: It also includes a rainproof mechanism, which includes an upper rectangular frame, a lower rectangular frame and a rainproof cloth; The lower rectangular frame is fixed to the bottom of the hanging basket body; A connecting ring corresponding to the supporting rod is arranged inside the upper rectangular frame, and the connecting ring is slidably mounted on the corresponding supporting rod; The upper rectangular frame is connected to the steel wire rope via a connecting piece; The rainproof cloth shield is arranged between the upper rectangular frame and the lower rectangular frame.
4. A steel wire rope conveying device for bridge construction according to claim 3, characterized in that: The connecting piece is detachably installed between the two connecting rings close to one side of the steel wire rope.
5. A steel wire rope conveying device for bridge construction according to claim 4, characterized in that: The connecting member includes a connecting plate and a binding rope. The two connecting rings close to the side of the steel wire rope are provided with mounting grooves corresponding to the connecting plate. The connecting plate is laterally inserted into the mounting grooves. One end of the binding rope is connected to the connecting plate, and the other end of the binding rope is tied to the steel wire rope.