River slope greening construction device

By designing a device for river slope greening construction, fixing frames, positioning plates, guide plates and partitions form planting areas, the problem of turf laying position offset is solved and the greening effect and stability is ensured.

CN222982148UActive Publication Date: 2025-06-17WENZHOU LONGQIANG MUNICIPAL ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421064706.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-15
Publication Date
2025-06-17
Estimated Expiration
2034-05-15

AI Technical Summary

Technical Problem

During the construction of river slope greening, the turf laying position is prone to offset, affecting the greening effect.

Method used

A river slope greening construction device is designed, including fixing frames, positioning plates, inserting rods, guide plates and partitions. Through the combination and installation of these components, a planting area for fixing the turf is formed to ensure the accurate laying of the turf.

Benefits of technology

Effectively prevent the turf laying position offset, ensure that the turf is accurately laid in designated areas, improve the effect and stability of river slope greening, and further prevent turf landslides through partitions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222982148U_ABST
    Figure CN222982148U_ABST
Patent Text Reader

Abstract

The utility model relates to a river channel slope greening construction device which comprises a fixing frame used for being fixedly installed at the top of a slope, positioning plates are symmetrically arranged at the two ends of the fixing frame, and inserting rods used for being inserted into the slope are arranged on the side walls, facing the slope, of the fixing frame and the positioning plates. A plurality of inserting grooves are formed in the side wall, deviating from the inserting rod, of the fixing frame, and the inserting grooves are sequentially arranged at intervals in the length direction of the fixing frame; a guide plate is detachably mounted on the fixing frame through an inserting groove, the guide plate and the inserting groove are mutually inserted and fixed, and the guide plate is parallel to the positioning plates on the two sides; a planting area is formed between every two adjacent guide plates in a surrounding mode. The method has the advantages that the turf can be accurately laid in the designated area, and the greening effect of the slope surface of the final river channel is guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of greening construction devices, and in particular to a river slope greening construction device. Background Art

[0002] At present, slope protection structures pay more attention to integration with the environment, especially river slope protection, which pays more attention to ecology. Often after the slope protection structure is built, turf is laid on the surface of the slope for greening. In related technologies, when workers lay turf, they need to arrange the blocks of turf along the slope in sequence. However, since the river slope is an inclined surface, the workers are prone to the gradual shift of the turf laying position during the laying process. Once the laying position of part of the turf is shifted, it will eventually affect the greening effect of the entire river slope. Utility Model Content

[0003] The present application provides a river channel slope greening construction device, which can prevent the turf from shifting during the laying process, thereby ensuring the final river channel slope greening effect.

[0004] The present application provides a river slope greening construction device that adopts the following technical solution:

[0005] A river channel slope greening construction device comprises a fixing frame for being fixedly installed on the top of the slope, positioning plates are symmetrically arranged at both ends of the fixing frame, and the positioning plates and the fixing frame are perpendicular to each other; the fixing frame and the positioning plates are provided with plug rods for being inserted into the slope on the side walls facing the slope, and a plurality of plug-in slots are provided on the side walls of the fixing frame away from the plug-in slots, and the plug-in slots are arranged in sequence and at intervals along the length direction of the fixing frame; a guide plate is detachably mounted on the fixing frame through the plug-in slot, the guide plate and the plug-in slot are plugged and fixed to each other, and the guide plate is parallel to the positioning plates on both sides; a planting area is formed by enclosures between adjacent guide plates.

[0006] By adopting the above technical solution: when laying the turf, first fix the fixing frame and the positioning plates on both sides on the slope by plugging and fixing them through the plug rods, and then install each guide plate on the fixing frame through the plug-in groove. At this time, the adjacent guide plates will form a planting area for laying the turf. The planting position of the turf can be positioned under the action of the planting area, thereby effectively preventing the laying position of the turf from shifting during the laying process, ensuring that the turf can be accurately laid in the designated area, and ensuring the greening effect of the final river slope.

[0007] Preferably, a plurality of assembly grooves are provided on the side wall of the positioning plate facing away from the insertion rod, and the assembly grooves are arranged at intervals in the length direction of the positioning plate; a partition plate is detachably installed between the two positioning plates through the assembly grooves, and the partition plate is perpendicular to the guide plate; the partition plate is used to further divide the planting area.

[0008] Preferably, a positioning groove for inserting the guide plate is provided on the side wall of the partition plate facing the guide plate, the guide plates are respectively inserted into the corresponding positioning grooves, and the guide plates are fixed on the partition plate by being inserted into the positioning grooves.

[0009] Preferably, positioning rods for inserting into the slope are provided on the partition plate, and the positioning rods are arranged at intervals in the length direction of the partition plate where they are located.

[0010] Preferably, water injection holes are formed through the positioning rods.

[0011] Preferably, a water storage seat is provided at the top of the partition plate, and the water storage seat is fixedly installed on the positioning rod; the water injection holes are in communication with the inside of the water storage seat.

[0012] In summary, the present application includes at least one of the following beneficial technical effects:

[0013] 1. It can effectively prevent the turf from shifting during the laying process, ensure that the turf can be accurately laid in the designated area, and guarantee the final greening effect of the river slope;

[0014] 2. By using the partition plate to further divide the planting area, it can prevent the turf from sliding during the laying process, and further improve the stability of the turf during the laying process;

[0015] 3. By injecting water into the water storage seat, the water will finally flow into the slope through the water injection holes on the positioning rod, so as to achieve the purpose of timely watering the turf in the planting area. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 is the overall structural schematic diagram of the embodiment of the present application;

[0017] Figure 2 is Figure 1 the partial structural explosion schematic diagram of

[0018] Figure 3 is Figure 2 the partial structural schematic diagram of the partition plate in

[0019] Description of the reference numerals: 1, fixing frame; 10, insertion slot; 2, positioning plate; 20, assembly slot; 3, insertion rod; 4, guide plate; 5, planting area; 6, partition plate; 60, positioning slot; 61, positioning rod; 62, water injection hole; 7, water storage base. Detailed implementation manners

[0020] The following further describes the present application in detail with reference to the accompanying drawings.

[0021] The embodiment of the present application discloses a river slope greening construction device.

[0022] Referring to Figure 1 , Figure 2 , the river slope greening construction device includes a fixing frame 1 for fixedly installing at the top of the slope. Symmetrically arranged positioning plates 2 are inserted and fixed at both ends of the fixing frame 1. The two positioning plates 2 are parallel to each other, and the length of the positioning plate 2 is perpendicular to the length of the fixing frame 1. Insertion rods 3 for inserting into the slope are fixedly installed on the side walls of the fixing frame 1 and the positioning plates 2 facing the slope. The insertion rods 3 on the positioning plates 2 are arranged at intervals along the length direction of the positioning plates 2.

[0023] As Figure 1 , Figure 2 shown, a plurality of insertion slots 10 are provided on the side wall of the fixing frame 1 facing away from the insertion rod 3. The insertion slots 10 are arranged at intervals along the length direction of the fixing frame 1. A plurality of parallel guide plates 4 are detachably installed on the fixing frame 1 through the insertion slots 10. The guide plates 4 are inserted into and fixed on the fixing frame 1 with the insertion slots 10. The length direction of the guide plates 4 is parallel to the length direction of the two positioning plates 2. The guide plates 4 are arranged at intervals along the length direction of the fixing frame 1. A planting area 5 for laying turf is formed by enclosing between adjacent guide plates 4.

[0024] As Figure 1 , Figure 2 shown, a plurality of assembly slots 20 are provided on the side wall of the positioning plate 2 facing away from the insertion rod 3. The assembly slots 20 are arranged at intervals along the degree direction of their respective positioning plates 2. A partition plate 6 is detachably installed between the two positioning plates 2 through the assembly slots 20. The partition plate 6 is perpendicular to the guide plates 4. The partition plate 6 installed between the two positioning plates 2 is used to further divide each planting area 5. By further dividing the planting area 5 with the partition plate 6, the situation of turf landslide during the laying process can be prevented, and the stability of the turf during the laying process is further improved.

[0025] As Figure 2 , Figure 3 shown, a positioning slot 60 for inserting the guide plate 4 is provided on the side wall of the partition plate 6 facing the guide plate 4. The guide plates 4 are respectively inserted into the positioning slots 60 opposite to them, and the guide plates 4 are fixed on the partition plate 6 by inserting into the positioning slots 60.

[0026] As shown Figure 1 , Figure 2 , Figure 3 As shown, a positioning rod 61 for inserting into the slope is fixedly arranged on the partition plate 6. The length direction of the positioning rod 61 is perpendicular to the length direction of the partition plate 6. The positioning rods 61 are arranged at intervals in sequence along the length direction of the respective partition plates 6 where they are located, and the positioning rods 61 are respectively located in their respective planting areas 5. A water injection hole 62 runs through the positioning rod 61 from top to bottom. A water storage base 7 for storing water is arranged at the top of the partition plate 6. The bottom of the water storage base 7 is fixedly installed at the tops of the respective positioning rods 61 located on the same partition plate 6. The top opening of the water injection hole 62 communicates with the inside of the respective water storage base 7 opposite thereto. By injecting water into the water storage base 7, the water will finally flow into the slope through the water injection holes 62 on the positioning rods 61, so as to achieve the purpose of timely replenishing water to the turf in the planting area 5.

[0027] The implementation principle is as follows: When laying the turf, first insert and fix the fixing frame 1 and the two side positioning plates 2 on the slope through the inserting rods 3, and then insert and fix the respective guide plates 4 on the fixing frame 1 through the inserting slots 10. At this time, a planting area 5 for laying the turf will be formed by enclosing between adjacent guide plates 4. In addition, during laying, the partition plate 6 can also be inserted and fixed between the two side positioning plates 2 through the assembling slots 20. The planting area 5 is further divided by the partition plate 6. Under the action of the planting area 5, the planting position of the turf can be positioned, thereby effectively preventing the laying position of the turf from shifting during the laying process, ensuring that the turf can be accurately laid in the designated area, and guaranteeing the final greening effect of the river slope. In addition, it can also prevent the turf from landsliding during the laying process, further improving the stability of the turf during the laying process.

[0028] The above are all the preferred embodiments of this application. The protection scope of this application is not limited accordingly. Therefore, all equivalent changes made according to the structure, shape, and principle of this application should be covered within the protection scope of this application.

Claims

1. A river slope greening construction device, characterized in that: The invention comprises a fixing frame (1) for fixing on the top of a slope, wherein positioning plates (2) are symmetrically arranged at both ends of the fixing frame (1), and the positioning plates (2) are perpendicular to each other; the fixing frame (1) and the positioning plates (2) are both provided with insertion rods (3) for inserting into the slope on the side walls facing the slope, and the fixing frame (1) is provided with a plurality of insertion slots (10) on the side wall facing away from the insertion rods (3), and the insertion slots (10) are arranged in sequence along the length direction of the fixing frame (1); the fixing frame (1) is detachably provided with guide plates (4) through the insertion slots (10), the guide plates (4) and the insertion slots (10) are mutually plugged and fixed, and the guide plates (4) are parallel to the positioning plates (2) on both sides; and a planting area (5) is formed by enclosures between adjacent guide plates (4); A plurality of assembly grooves (20) are provided on the side wall of the positioning plate (2) facing away from the insertion rod (3), and the assembly grooves (20) are arranged in sequence and at intervals along the length direction of the positioning plate (2); a partition plate (6) is detachably mounted between the positioning plates (2) on both sides through the assembly grooves (20), and the partition plate (6) and the guide plate (4) are perpendicular to each other; the partition plate (6) is used to further separate the planting area (5); The partition (6) is provided with positioning rods (61) for inserting into the slope surface, and the positioning rods (61) are arranged in sequence at intervals along the length direction of the partition (6); the positioning rods (61) are penetrated by water injection holes (62); a water storage seat (7) is provided on the top of the partition (6), and the water storage seat (7) is fixedly mounted on the positioning rods (61); the water injection holes (62) are communicated with the inside of the water storage seat (7).

2. The river slope greening construction device according to claim 1 is characterized in that: Positioning grooves (60) for inserting the guide plates (4) are provided on the side walls of the partition (6) facing the guide plates (4); the guide plates (4) are respectively inserted into the respective opposite positioning grooves (60); and the guide plates (4) are fixed to the partition (6) by mutual insertion with the positioning grooves (60).