By designing a vertical water barrier wall structure extending along the length of the highway, the problem of water flow rushing onto the highway caused by the design elevation below the design flood level is solved, and a safe and stable highway construction is achieved, with the advantages of stable structure, easy implementation and economical efficiency.
Patent Information
- Application Number
- CN202422036768.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-21
- Publication Date
- 2025-06-20
- Estimated Expiration
- 2034-08-21
AI Technical Summary
During highway construction, due to terrain or other factors, the design elevation of the road may be lower than the design flood level, causing the water flow in the river/ditch or the Yongshui to rush onto the road, endangering driving safety. At the same time, raising the design elevation of the highway or lowering the design flood level will increase the project volume and cost.
A highway water barrier wall structure is designed, including a vertical water barrier wall extending along the length of the highway. The upper end of the water barrier wall is higher than the road driving surface, the lower end extends under the ground of the dirt shoulder, and is connected to the connecting ribs through steel pipe piles.
It effectively avoids the flow of water in rivers/ditches or Yongshui onto the road, ensures safe driving on the road, and has a stable structure, is easy to implement, and is economical and efficient.
Smart Images

Figure CN223003344U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of road and bridge engineering, and particularly relates to a highway water retaining wall structure. Background Art
[0002] There are a large number of sections adjacent to rivers or ditches in highway projects. Generally, the design flood frequency is determined according to the technical grade of the highway, so that the design elevation of the highway is higher than the corresponding design flood level elevation of the adjacent river / ditch under the design flood frequency, in order to prevent the water flow in the adjacent river / ditch from rushing onto the highway and endangering the driving safety on the road surface.
[0003] The following problems exist in the actual construction process of highway projects:
[0004] First, due to the constraints of terrain or other factors in the newly built highway, it is impossible to increase the design elevation of the highway or lower the design flood level elevation, resulting in the local design elevation of the highway being lower than the design flood level elevation.
[0005] Second, the corresponding design flood level elevation increases due to the improvement of the grade of the reconstructed highway, making the original highway design elevation lower than the current design flood level elevation. If the design elevation of the highway is increased or the current design flood level elevation is lowered, the project quantity will be greatly increased and the project cost will be raised.
[0006] Third, although the design elevation of the highway is higher than the design flood level elevation, in case of heavy precipitation, the water level in the river / ditch will rise rapidly, and the water flow or backwater will rush onto the highway, thus endangering the driving safety on the road surface. Content of the Utility Model
[0007] The technical problem to be solved by the utility model is to provide a highway water retaining wall structure, which can effectively prevent the water flow or backwater in the river / ditch from rushing onto the highway.
[0008] The technical solution adopted by the utility model to solve its technical problem is: the highway water retaining wall structure includes a water retaining wall vertically arranged and extending along the length direction of the highway. The upper end of the water retaining wall is higher than the driving surface of the highway, and the lower end of the water retaining wall extends below the ground of the earthen shoulder and is connected by structural members; the water retaining wall is located on the side of the highway close to the river / ditch.
[0009] Further, the structural member includes a steel pipe pile vertically arranged. The upper end of the steel pipe pile is located in the water retaining wall, and the lower end of the steel pipe pile is located below the ground of the earthen shoulder;
[0010] A plurality of steel pipe piles are provided, and the plurality of steel pipe piles are evenly distributed along the length direction of the water retaining wall.
[0011] Further, the structural member further includes connecting bars that are horizontally arranged and located in the water retaining wall, and multiple steel pipe piles are connected by the connecting bars; multiple connecting bars are provided, and the multiple connecting bars are evenly distributed in the vertical direction.
[0012] Further, the water retaining wall includes a connected main body part and a strengthening part, and the strengthening part is located on the side of the main body part close to the road;
[0013] The upper ends of the steel pipe piles are located in the main body part; the connecting bars are located in the main body part;
[0014] The strengthening part has a structure that is smaller at the top and larger at the bottom.
[0015] Further, the vertical cross-section of the main body part is a rectangular structure, and the vertical cross-section of the strengthening part is a triangular structure.
[0016] Further, the main body part and the strengthening part are an integrally formed integral structure.
[0017] Further, the length L1 of the steel pipe pile located in the water retaining wall is less than the length L2 of the steel pipe pile located in the earthen shoulder, and the length L2 of the steel pipe pile located in the earthen shoulder is greater than three-quarters of the height of the water retaining wall.
[0018] Further, the height L3 of the water retaining wall is greater than or equal to 1.5 meters and less than or equal to 3 meters, and the water retaining wall extends 0.2 meters to 0.3 meters below the ground of the earthen shoulder.
[0019] Compared with the prior art, the beneficial effects of the present utility model are: The present utility model provides a highway water retaining wall structure, which can effectively prevent the water flow or backwater in the river / gully from rushing onto the highway. It has the advantages of stable structure, convenient implementation, economy and high efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 is a schematic installation structure diagram of the present utility model;
[0021] Figure 2 is a schematic front view structure diagram of the present utility model;
[0022] Reference numerals: 1 - water retaining wall; 101 - main body part; 102 - strengthening part; 2 - steel pipe pile; 3 - connecting bar; 4 - road; 5 - earthen shoulder; 6 - river / gully slope protection. DETAILED DESCRIPTION OF THE EMBODIMENTS
[0023] The following further describes the present utility model in conjunction with the attached Figure 1 , 2 , and embodiments.
[0024] Highway water retaining wall structure, including a water retaining wall 1 vertically arranged and extending along the length direction of the highway 4, the upper end of the water retaining wall 1 is higher than the driving surface of the highway 4, and the lower end of the water retaining wall 1 extends below the ground of the earthen shoulder 5 and is connected by structural members; the water retaining wall 1 is located on one side of the highway 4 close to the river / gully. There is an earthen shoulder 5 between the river / gully slope protection 6 and the highway 4, which is the prior art. By arranging the water retaining wall 1 at the earthen shoulder 5, the water flow or backwater in the river / gully can be effectively prevented from flushing onto the highway 4, ensuring the driving safety on the road surface. The structural members provide stable support for the concrete water retaining wall 1, preventing the water retaining wall 1 from tipping towards or away from the highway 4.
[0025] The structural members can be diagonal braces arranged on both sides of the water retaining wall 1. Preferably, the structural members include vertically arranged steel pipe piles 2, the upper ends of the steel pipe piles 2 are located in the water retaining wall 1, and the lower ends of the steel pipe piles 2 are located below the ground of the earthen shoulder 5; multiple steel pipe piles 2 are provided, and the multiple steel pipe piles 2 are evenly distributed along the length direction of the water retaining wall 1. By arranging the steel pipe piles 2, the water retaining wall 1 is stably installed.
[0026] Preferably, the structural members further include connecting bars 3 horizontally arranged and located in the water retaining wall 1, and the multiple steel pipe piles 2 are connected by the connecting bars 3; multiple connecting bars 3 are provided, and the multiple connecting bars 3 are evenly distributed along the vertical direction. The connecting bars 3 are connected to the steel pipe piles 2 by welding or tying. By arranging the connecting bars 3, the structural strength and bearing capacity of the water retaining wall 1 are improved.
[0027] Preferably, the connecting bars 3 are installed through the through holes on the steel pipe piles 2 and are connected by welding. After the connecting bars 3 are connected to the steel pipe piles 2, concrete is poured into the steel pipe piles 2 to form a steel pipe concrete composite material, improving the structural strength and bearing capacity of the water retaining wall 1.
[0028] Preferably, the water retaining wall 1 includes a connected main body part 101 and a strengthening part 102, and the strengthening part 102 is located on the side of the main body part 101 close to the highway 4; the upper ends of the steel pipe piles 2 are located in the main body part 101; the connecting bars 3 are located in the main body part 101; the strengthening part 102 has a structure that is smaller at the top and larger at the bottom. By arranging the strengthening part 102, the water retaining ability can be effectively improved.
[0029] Preferably, the vertical cross-section of the main body part 101 is a rectangular structure, and the vertical cross-section of the strengthening part 102 is a triangular structure.
[0030] Preferably, the main body part 101 and the strengthening part 102 are an integrally formed integral structure.
[0031] Preferably, the length L1 of the steel pipe pile 2 located in the water retaining wall 1 is less than the length L2 of the steel pipe pile 2 located in the earthen shoulder 5, and the length L2 of the steel pipe pile 2 located in the earthen shoulder 5 is greater than three-quarters of the height L3 of the water retaining wall 1.
[0032] Preferably, the height L3 of the water retaining wall 1 is greater than or equal to 1.5 m and less than or equal to 3 m, and the water retaining wall 1 extends 0.2 m to 0.3 m below the ground surface of the earthen shoulder 5.
[0033] The embodiments of this specific implementation manner are all preferred embodiments of the present invention, and do not limit the protection scope of the present invention accordingly. Any equivalent changes made according to the structure, shape, and principle of the present invention shall be covered within the protection scope of the present invention.
Claims
1. Highway retaining wall structure, characterized by: The invention comprises a retaining wall (1) which is arranged vertically and extends along the length direction of a highway (4); the upper end of the retaining wall (1) is higher than the driving surface of the highway (4); the lower end of the retaining wall (1) extends below the ground of the earth shoulder (5) and is connected via a structural member; the retaining wall (1) is located on a side of the highway (4) close to a river / ditch.
2. The highway retaining wall structure according to claim 1, characterized in that: The structural member comprises a vertically arranged steel pipe pile (2), the upper end of the steel pipe pile (2) being located in the retaining wall (1), and the lower end of the steel pipe pile (2) being located below the ground of the earth shoulder (5); A plurality of the steel pipe piles (2) are provided, and the plurality of the steel pipe piles (2) are evenly distributed along the length direction of the retaining wall (1).
3. The highway retaining wall structure according to claim 2, characterized in that: The structural member further comprises connecting bars (3) arranged horizontally and located in the retaining wall (1), and a plurality of the steel pipe piles (2) are connected via the connecting bars (3); a plurality of the connecting bars (3) are arranged, and the plurality of the connecting bars (3) are evenly distributed in the vertical direction.
4. The highway water retaining wall structure according to claim 3, characterized in that: The retaining wall (1) comprises a main body (101) and a reinforcement part (102) connected to each other, wherein the reinforcement part (102) is located on a side of the main body (101) close to the road (4); The upper end of the steel pipe pile (2) is located in the main body (101); the connecting rib (3) is located in the main body (101); The reinforcing portion (102) has a structure that is smaller at the top and larger at the bottom.
5. The highway retaining wall structure according to claim 4, characterized in that: The vertical cross-section of the main body (101) is a rectangular structure, and the vertical cross-section of the reinforcement portion (102) is a triangular structure.
6. The highway retaining wall structure according to claim 4, characterized in that: The main body (101) and the reinforcement part (102) are an integral structure formed in one piece.
7. The highway retaining wall structure according to claim 2, characterized in that: The length L1 of the steel pipe pile (2) in the retaining wall (1) is less than the length L2 of the steel pipe pile (2) in the earth shoulder (5), and the length L2 of the steel pipe pile (2) in the earth shoulder (5) is greater than three quarters of the height L3 of the retaining wall (1).
8. The highway retaining wall structure according to claim 1, characterized in that: The height L3 of the retaining wall (1) is greater than or equal to 1.5 meters and less than or equal to 3 meters, and the retaining wall (1) extends 0.2 meters to 0.3 meters below the ground of the earth shoulder (5).