Lightweight spar unit wall transportation packaging frame

By designing the light crystal unit wall transportation packaging rack, the light crystal unit wall is fixed by using bolt positioning holes and fasteners on the keel frame, the instability and high cost problems during transportation are solved, and the effect of stable transportation and reduced transportation costs is achieved.

CN223072931UActive Publication Date: 2025-07-08LUOYANG NORTH GLASS SINEST NEW MATERIALS CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421790065.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-07-26
Publication Date
2025-07-08
Estimated Expiration
2034-07-26

AI Technical Summary

Technical Problem

The walls of light crystal unit cannot be loaded into standard containers due to scatteredness during ocean transportation, resulting in high transportation costs and unstable conditions, and there is a risk of lifting.

Method used

A light crystal unit wall transportation packaging rack is designed, and the light crystal unit wall is fixed to the main frame using bolt positioning holes and fasteners on the keel frame, including partitions, support plates, strips and positioning side rods at the top and bottom to ensure stability during transportation.

Benefits of technology

The stability of the light crystal unit wall during transportation is achieved, the transportation costs are reduced, and the transportation can be directly loaded into standard containers, reducing transportation risks.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223072931U_ABST
    Figure CN223072931U_ABST
Patent Text Reader

Abstract

According to the transportation packaging frame for the light crystal unit wall, an exposed keel frame is arranged on the light crystal unit wall, the edge of the keel frame is provided with an open sectional material, the side face of the open sectional material is provided with a bolt positioning hole, and the transportation packaging frame comprises a main body frame with a hoisting hole; partition plates and a bearing plate are fixed to the top and the bottom of the body frame respectively, and the light crystal unit wall bodies and the keel frame vertically penetrate through gaps between the adjacent partition plates and then fall on the bearing face on the upper side of the bearing plate. Wherein bolt positioning holes in the bottom of the keel frame are detachably connected with the bearing plate through fasteners I, and the number of the fasteners I is at least two; a batten is rotationally connected to the partition plate, and the batten is detachably connected with a bolt positioning hole in the top of the keel frame through at least one fastener II. The transportation packaging frame for the light crystal unit wall body is designed according to the structural characteristics of the light crystal unit wall body, can lock the wall body, avoids shaking, can be directly loaded into a standard container, and is convenient to transport.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of barytes wall transportation equipment, in particular to a barytes unit wall transportation and packaging rack. Background Technique

[0002] A barytes unit wall is a modular building wall material with barytes plates and a keel structure, having many integrated characteristics such as an integrated finish, light weight and high strength, and environmental friendliness, and can be widely used in buildings.

[0003] With the expansion of overseas business, the barytes unit wall faces the problem of ocean transportation. When using an ordinary frame for packaging, it is relatively scattered and cannot be loaded into a standard container, and can only be transported by a bulk carrier. This leads to an excessive proportion of transportation costs and low economic benefits. At the same time, the barytes unit wall is prone to shaking within the frame, is unstable during hoisting and transportation, and there are certain risks.

[0004] Therefore, there is an urgent need for a barytes unit wall transportation and packaging rack that is convenient for transportation. Content of the Utility Model

[0005] The purpose of the utility model is to provide a barytes unit wall transportation and packaging rack. The device is designed according to the structural characteristics of the barytes unit wall, can lock the wall to avoid shaking, can be directly loaded into a standard container, and is convenient for transportation.

[0006] The technical solution adopted by the utility model is: a barytes unit wall transportation and packaging rack, an exposed keel frame is provided on the barytes unit wall, the edge of the keel frame has an open-profile section, bolt positioning holes are provided on the side of the open-profile section, and the transportation and packaging rack includes a main frame with a hoisting hole;

[0007] Partition boards and a supporting plate are respectively fixed at the top and bottom of the main frame. The barytes unit wall and the keel frame vertically pass through the gap between adjacent partition boards and then fall on the supporting surface above the supporting plate;

[0008] Among them: the bolt positioning holes at the bottom of the keel frame are detachably connected to the supporting plate through fasteners I, and there are at least two fasteners I; strip plates are rotatably connected to the partition boards, and the strip plates are detachably connected to the bolt positioning holes at the top of the keel frame through at least one fastener II.

[0009] The fastener I includes a stud and a second nut;

[0010] One end of the stud is fixed on the supporting surface of the supporting plate, and the other end passes through the bolt positioning hole at the bottom of the keel frame and is threadedly connected to the second nut located in the corresponding open-profile section.

[0011] As a preferred solution, the fastener II includes a first bolt and a first nut;

[0012] A shaft hole is provided on the slat, and the threaded portion of the first bolt passes through the shaft hole and the bolt positioning hole at the top of the keel frame and is threadedly connected to the first nut located in the corresponding open-profile section.

[0013] As a preferred solution, a positioning side rod is provided on the side of the main frame, and the positioning side rod is detachably connected to the keel frame through fastener III.

[0014] As a preferred solution, the fastener III is a second bolt;

[0015] A positioning side hole is provided on the side of the keel frame, and the second bolt passes through the threaded hole on the positioning side rod and extends into the corresponding positioning side hole.

[0016] As a preferred solution, the bolt positioning hole is a round hole or an oval hole.

[0017] As a preferred solution, the partition board and the slat are connected by hinges.

[0018] As a preferred solution, the main frame is a cuboid frame.

[0019] As a preferred solution, a reinforcing rod is provided on the side of the main frame.

[0020] As a preferred solution, the lifting holes are provided at the four corners of the main frame.

[0021] Based on the defects existing in the prior art, a transportation packaging rack for a celestite unit wall is provided. Compared with the prior art, the beneficial effects are as follows:

[0022] 1. The keel frame of the celestite unit wall has bolt positioning holes, and the keel frame is fixed on the main frame through the bolt positioning holes and fasteners, which can prevent the celestite unit wall from shaking in the main frame during hoisting and transportation, improving stability.

[0023] 2. Studs are fixed at the bottom of the main frame. When the celestite unit wall is placed into the main frame from top to bottom, the studs position the lower bolt positioning holes, quickly determining the installation positions;

[0024] Nuts are provided on the studs, which can completely lock the lower side of the celestite unit wall.

[0025] 3. The slat and the fasteners thereon can be turned over, and there is no obstruction when the celestite unit wall is placed vertically and taken out.

[0026] 4. For the celestite unit wall with bolt positioning holes on the side, fasteners are provided on the side of the main frame, which can further play a locking effect and be more stable.

[0027] 5. The overall frame structure is stable and simple, with low processing costs, and can be directly loaded into standard containers, reducing transportation costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] In order to more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the following will briefly introduce the drawings required for the description of the embodiments or the prior art. Obviously, the drawings in the following description are only some embodiments of the present invention. For those of ordinary skill in the art, without creative efforts, other drawings can be obtained based on these drawings.

[0029] Figure 1 Isometric schematic diagram of the whole of the present invention;

[0030] Figure 2 Isometric schematic diagram of the main frame of the present invention;

[0031] Figure 3 Schematic diagram of the fastener II of the present invention;

[0032] Figure 4 Schematic diagram of the fastener I of the present invention;

[0033] Figure 5 Schematic diagram of the main frame of the present invention with a positioning side rod;

[0034] Figure 6 Schematic diagram of the fastener III of the present invention;

[0035] Figure 7 Schematic diagram of the open-profile of the present invention.

[0036] Reference numerals:

[0037] 1. Main frame, 101. Lifting hole, 2. Partition board, 3. Supporting plate, 4. Strip board, 5. Celestite unit wall, 501. Keel frame, 502. Open-profile, 503. Bolt positioning hole, 504. Positioning side hole, 6. Second nut, 7. First bolt, 8. First nut, 9. Positioning side rod, 10. Second bolt, 11. Hinge, 12. Reinforcing rod, 13. Stud. DETAILED DESCRIPTION OF THE EMBODIMENTS

[0038] Hereinafter, the present invention will be specifically described by way of exemplary embodiments. However, it should be understood that, without further elaboration, the elements, structures, and features in one embodiment can also be beneficially combined into other embodiments.

[0039] It should be noted that: Unless otherwise defined, the technical terms or scientific terms used in this article should have the ordinary meanings understood by those with general skills in the field to which this utility model belongs. The words such as "a", "an", or "the" used in the description and claims of this utility model patent application do not express a quantity limitation, but rather indicate the existence of at least one; the "first", "second", and "third" used in this article should not be regarded as a limitation on the order of components, but only to distinguish different components; words such as "including" or "comprising" indicate that the elements or objects appearing before "including" or "comprising" cover the elements or objects listed after "including" or "comprising" and their equivalents, but do not exclude other elements or objects with the same functions.

[0040] In order to more clearly describe the specific structural composition of the transport packaging rack for celestite unit walls, the following combines the attached Figure 1-7 to describe this embodiment:

[0041] As Figure 1 、 Figure 2 and Figure 7 shown, a transport packaging rack for celestite unit walls, the celestite unit wall 5 is provided with an externally exposed keel frame 501, the edge of the keel frame 501 has an open-profile 502, and the side of the open-profile 502 is provided with bolt positioning holes 503. The transport packaging rack includes a main frame 1 having a lifting hole 101; the bolt positioning holes 503 are common on the keel frame 501 and are used for fixing the celestite unit wall 5 during construction. In this utility model, the bolt positioning holes 503 are used to position and lock the celestite unit wall 5 during transportation. One side of the open-profile 502 is open, which is convenient for operating the fasteners. The lifting hole 101, in cooperation with a crane, can lift the entire main frame 1;

[0042] A partition 2 and a supporting plate 3 are respectively fixed at the top and bottom of the main frame 1. The celestite unit wall 5 and the keel frame 501 vertically pass through the gap between adjacent partitions 2 and then fall on the supporting surface on the upper side of the supporting plate 3; the bolt positioning holes 503 at the bottom of the keel frame 501 are detachably connected to the supporting plate 3 through fasteners I, and there are at least two fasteners I; a strip plate 4 is rotatably connected to the partition 2, and the strip plate 4 is detachably connected to the bolt positioning holes 503 at the top of the keel frame 501 through at least one fastener II;

[0043] Two fasteners I can play a positioning role to prevent the celestite unit wall 5 from rotating;

[0044] The bolt positioning holes 503 at the top and bottom of the celestite unit wall 5 are respectively fitted with fasteners II and fasteners I to fix the keel frame 501 on the main frame 1, which can prevent the celestite unit wall 5 from swaying within the main frame 1 during hoisting and transportation, improving stability; the strip board 4 and the fasteners thereon can be flipped, and there is no obstruction when the celestite unit wall 5 is placed vertically and taken out.

[0045] See Figure 4 , specifically, the fastener I includes a stud 13 and a second nut 6. One end of the stud 13 is fixed on the bearing surface of the bearing plate 3, and the other end passes through the bolt positioning hole 503 at the bottom of the keel frame 501 and is threadedly connected to the second nut 6 in the corresponding open-profile 502; when the celestite unit wall 5 is placed into the main frame 1 from top to bottom, the stud 13 positions the bolt positioning hole 503 on the lower side of the celestite unit wall 5, quickly determining the installation position. By setting the second nut 6 on the stud 13, the lower side of the celestite unit wall 5 can be completely locked.

[0046] See Figure 3 , specifically, the fastener II includes a first bolt 7 and a first nut 8; there is a shaft hole on the strip board 4. The threaded part of the first bolt 7 passes through this shaft hole and the bolt positioning hole 503 at the top of the keel frame 501 and is threadedly connected to the first nut 8 in the corresponding open-profile 502; the strip board 4 is in small pieces, and its width is the same as the width of the upper surface of the celestite unit wall 5, as long as it does not affect the flipping of other strip boards 4. During use, the strip board 4 is flipped and pressed on the celestite unit wall 5. The first bolt 7 passes through the shaft hole on the strip board 4 and the bolt positioning hole 503 at the top and extends into the open-profile 502, and the first nut 8 is manually screwed onto the corresponding first bolt 7 through the opening on the inner side of the open-profile 502;

[0047] The partition 2 and the strip board 4 can be connected by a hinge 11.

[0048] See Figure 5 and Figure 6 , for the celestite unit wall 5 with bolt positioning holes 503 on the side, a corresponding positioning side bar 9 is provided on the side of the main frame 1, and the positioning side bar 9 is detachably connected to the keel frame 501 through fasteners III; the fasteners III can further play a locking effect and are more stable;

[0049] Specifically, the fastener III is a second bolt 10; there is a positioning side hole 504 on the side of the keel frame 501, and the second bolt 10 passes through the threaded hole on the positioning side bar 9 and extends into the corresponding positioning side hole 504.

[0050] In the above embodiment, the main frame 1 is a cuboid frame. The side surface of the main frame 1 is provided with a reinforcing bar 12, and the lifting holes 101 are arranged at the four corners of the main frame 1. The overall frame structure is stable and simple, with a low processing cost, can be directly loaded into a standard container, reducing the transportation cost, and the reinforcing bar 12 plays a role in reinforcement.

[0051] In the above embodiment, the bolt positioning hole 503 can be a round hole or an oval hole as Figure 7 shown.

[0052] The parts not detailed in this embodiment are prior arts.

[0053] It should be noted that although the present invention has been described through the above embodiments, the present invention can also have many other embodiments. Without departing from the spirit and scope of the present invention, those skilled in the art can obviously make various corresponding changes and deformations to the present invention, but these changes and deformations should all fall within the scope protected by the appended claims of the present invention and their equivalents.

Claims

1. A transportation packaging rack for baryte unit walls, wherein an exposed keel frame (501) is provided on the baryte unit wall (5), an open-profile section (502) is provided at the edge of the keel frame (501), and bolt positioning holes (503) are provided on the side of the open-profile section (502), and it is characterized in that: The transportation packaging rack includes a main body frame (1) with a hoisting hole (101); Partition boards (2) and supporting plates (3) are respectively fixed to the top and bottom of the main body frame (1). The light spar unit wall (5) and the keel frame (501) vertically pass through the gap between adjacent partition boards (2) and then rest on the supporting surface on the upper side of the supporting plate (3); Wherein: the bolt positioning holes (503) at the bottom of the keel frame (501) are detachably connected to the supporting plate (3) through fasteners I, and there are at least two fasteners I; a strip board (4) is rotatably connected to the partition board (2), and the strip board (4) is detachably connected to the bolt positioning holes (503) at the top of the keel frame (501) through at least one fastener II.

2. The transport packaging rack for a celestite unit wall according to claim 1, wherein: The fastener I includes a stud (13) and a second nut (6); One end of the stud (13) is fixed to the supporting surface of the supporting plate (3), and the other end passes through the bolt positioning hole (503) at the bottom of the keel frame (501) and is threadedly connected to the second nut (6) located in the corresponding open-profile section (502).

3. The transport packaging rack for celestite unit wall according to claim 1, wherein: The fastener II includes a first bolt (7) and a first nut (8); A shaft hole is provided on the strip board (4). The threaded part of the first bolt (7) passes through the shaft hole and the bolt positioning hole (503) at the top of the keel frame (501) and is threadedly connected to the first nut (8) located in the corresponding open-profile section (502).

4. A barytes unit wall transportation packaging rack according to claim 1, characterized in that: A positioning side rod (9) is provided on the side of the main body frame (1), and the positioning side rod (9) is detachably connected to the keel frame (501) through a fastener III.

5. The transport packaging rack for a celestite unit wall according to claim 4, characterized in that: The fastener III is a second bolt (10); A positioning side hole (504) is provided on the side of the keel frame (501). The second bolt (10) passes through the threaded hole on the positioning side rod (9) and extends into the corresponding positioning side hole (504).

6. A barytes unit wall transportation packaging rack according to claim 1, characterized in that: The bolt positioning hole (503) is a round hole or an oval hole.

7. A barytes unit wall transportation packaging rack according to claim 1, characterized in that: The partition board (2) and the strip board (4) are connected through a hinge (11).

8. A barytes unit wall transportation packaging rack according to claim 1, characterized in that: The main body frame (1) is a cuboid frame.

9. A baryte unit wall transportation packaging rack according to claim 1, characterized in that: Reinforcing rods (12) are provided on the side of the main body frame (1).

10. The transport packaging rack for a celestite unit wall according to claim 1, characterized in that: The hoisting holes (101) are arranged at the four corners of the main body frame (1).