By setting up a reinforced support connection mechanism between the dense rib floor cover and the prefabricated base plate, including components such as reinforced support frames and fixing bolts, the problem of unstable installation of the dense rib floor cover is solved, and higher installation stability and reinforcement effect are achieved.
Patent Information
- Application Number
- CN202422608867.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-28
- Publication Date
- 2025-07-08
- Estimated Expiration
- 2034-10-28
AI Technical Summary
When the existing dense rib floor cover is installed on a prefabricated assembly box, it is inconvenient to reinforce and install in the middle, resulting in a reduced stability after installation.
A reinforced support connection mechanism is designed, including reinforced support frames, fixing bolts and rotary reinforcement components. By setting up a reinforced support connection component between the dense rib floor cover and the prefabricated base plate, and fixed connection components are set on both sides of the rib beam body, the fixed connection steel plate and the internal threaded column are poured with concrete to achieve a stable connection between the main dense rib floor cover and the prefabricated base plate.
The installation stability of dense rib floor covers and prefabricated base plates is improved, ensuring more stable use under gravity, and enhancing the installation reinforcement.
Smart Images

Figure CN223075006U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of prefabricated assembled box ribbed floor slabs, and particularly relates to a prefabricated assembled box ribbed floor slab. Background Technique
[0002] The prefabricated assembled box is assembled by three components: a precast reinforced concrete top plate, a bottom plate, and a side wall cylinder made of hard materials. It is used as a box-shaped component for the internal mold and structural surface layer of the ribbed floor slab. The existing ribbed floor slab is a construction equipment that is closed on the upper surface during the construction of the prefabricated assembled box. When the ribbed floor slab is installed and used, it is convenient to strengthen the fixed installation and enhance the stability of the support for the ribbed floor slab during use, making it more stable to use.
[0003] When the existing ribbed floor slab is installed on the prefabricated assembled box, the ribbed floor slab is directly covered on the surface of the bottom plate at the top of the prefabricated assembled box and fixed by pouring rib beams on the sides of the two ribbed floor slabs. Therefore, it is not convenient to reinforce and install the middle position between the ribbed floor slab and the prefabricated bottom plate after installation. When the upper surface is subjected to gravity after installation, the stability between the ribbed floor slab and the prefabricated bottom plate is reduced, thus affecting the reinforcement of the installation when the ribbed floor slab is installed on the prefabricated assembled box. For this reason, the utility model provides a prefabricated assembled box ribbed floor slab. Summary of the Utility Model
[0004] The purpose of the utility model is to provide a prefabricated assembled box ribbed floor slab to solve the problem that the ribbed floor slab is covered on the surface of the bottom plate at the top of the prefabricated assembled box and fixed by pouring rib beams on the sides of the two ribbed floor slabs. Therefore, it is not convenient to reinforce and install the middle position between the ribbed floor slab and the prefabricated bottom plate after installation. When the upper surface is subjected to gravity after installation, the stability between the ribbed floor slab and the prefabricated bottom plate is reduced as mentioned in the above background technique.
[0005] To achieve the above purpose, the utility model provides the following technical solution: a prefabricated assembled box ribbed floor slab, including a ribbed floor slab main body. The ribbed floor slab main body includes a prefabricated bottom plate. A main ribbed floor slab body is arranged on the upper surface of the prefabricated bottom plate. Shear grooves are formed at the bottom ends on both sides of the main ribbed floor slab body. A rib beam body is formed by pouring with steel bars inside the shear grooves at the connection of the two main ribbed floor slab bodies. A concrete panel is poured on the upper surface of the main ribbed floor slab body. The following are further provided on the ribbed floor slab main body:
[0006] A strengthening support connection mechanism, and the strengthening support connection mechanism includes a strengthening support connection component arranged at the connection between the inside of the main ribbed floor slab body and the upper surface of the prefabricated bottom plate. Fixed installation components are arranged at the end and the middle position of the strengthening support connection component.
[0007] Reinforcement installation mechanism, and the reinforcement installation mechanism includes fixed connection components arranged on both sides of the rib beam body. Limiting rotation components are arranged on both sides of the main ribbed floor slab body, and a rotation reinforcement component is arranged at the connection between the side surface of the fixed connection component and the limiting rotation connection component.
[0008] Preferably, the strengthening support connection component includes a reinforcement support frame arranged inside the main ribbed floor slab body. The lower surface of the reinforcement support frame is in contact with the surface of the precast floor slab. Fixed closing plates are integrally formed at both ends of the reinforcement support frame, and the fixed closing plates are in contact with the inner surface of the main ribbed floor slab body.
[0009] Preferably, the fixed installation component includes two side fixing bolts arranged at both ends of the main ribbed floor slab body. Two internal threaded holes are formed inside the fixed closing plate, and two bottom fixing bolts are rotated at the middle position of the reinforcement support frame.
[0010] Preferably, the middle position of the reinforcement support frame is fixed to the surface of the precast floor slab through bottom fixing bolts, and the end of the reinforcement support frame is rotationally fixed to the main ribbed floor slab body through side fixing bolts and internal threaded holes.
[0011] Preferably, the fixed connection component includes connection steel plates fixed on both sides of the rib beam body by concrete pouring, and the connection steel plates are of rectangular structure.
[0012] Preferably, the limiting rotation component includes internal threaded column bodies fixed on both sides of the main ribbed floor slab body by concrete pouring, and limiting rings are integrally formed at the ends of the internal threaded column bodies.
[0013] Preferably, the rotation reinforcement component includes threaded rods penetrating through both sides of the connection steel plate. The ends of the threaded rods are rotationally fixed to the inside of the internal threaded column bodies, and fixing nuts are rotated at the ends of the threaded rods inside the connection steel plates.
[0014] Compared with the prior art, the beneficial effects of the present utility model are:
[0015] By designing the strengthening support connection mechanism, before installation, the reinforcement support frame can be closed on the surface of the precast floor slab and the bottom fixing bolts can be rotated to fix it. After the main ribbed floor slab body is closed on the surface of the precast floor slab, the fixed closing plate is in contact with the inner surface of the main ribbed floor slab body, and the side fixing bolts are rotated to be embedded into the internal threaded holes to fix and install the fixed closing plate and the reinforcement support frame. After the reinforcement support frame is fixed and installed, the main ribbed floor slab body and the precast floor slab are strengthened in connection after being closed, and it is more stable to use when the upper surface is subjected to gravity, improving the stability of the strengthening support connection for the installation and use of the main ribbed floor slab on the upper surface of the precast assembly box. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 is a schematic structural diagram of the present utility model;
[0017] Figure 2 is a schematic cross-sectional structural diagram of the present utility model;
[0018] Figure 3 is the present utility model Figure 2 schematic enlarged structural diagram of part A therein;
[0019] Figure 4 is a schematic cross-sectional structural diagram of the reinforcement support frame, fixed closing plate and main ribbed floor slab body of the present utility model;
[0020] Figure 5 is the present utility model Figure 2 schematic enlarged structural diagram of part B therein;
[0021] Figure 6 is a schematic structural diagram of the connecting steel plate, internal thread column body and threaded rod of the present utility model;
[0022] In the figure: 100, main body of ribbed floor slab; 101, precast bottom slab; 1011, reinforcement support frame; 1012, fixed closing plate; 1013, bottom fixing bolt; 1014, side fixing bolt; 1015, internal thread hole; 102, main ribbed floor slab body; 1021, connecting steel plate; 1022, internal thread column body; 1023, limiting ring; 1024, threaded rod; 1025, fixing nut; 103, rib beam body; 104, concrete panel; 105, shear groove. Specific embodiments
[0023] Next, the technical solutions in the embodiments of the present utility model will be clearly and completely described in conjunction with the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only a part of the embodiments of the present utility model, rather than all of the embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative efforts shall fall within the protection scope of the present utility model.
[0024] Please refer to Figures 1 to 6, the present utility model provides a technical solution: a prefabricated assembled box ribbed floor slab, including a ribbed floor slab main body 100. The ribbed floor slab main body 100 includes a precast bottom slab 101. The upper surface of the precast bottom slab 101 is provided with a main ribbed floor slab body 102. Shear grooves 105 are formed at the bottom ends on both sides of the main ribbed floor slab body 102. At the connection of two main ribbed floor slab bodies 102, a rib beam body 103 is formed by pouring concrete into the interior of the shear groove 105 through steel bars. The precast bottom slab 101 is fixed on the upper surface of the prefabricated assembled box. Then, the main ribbed floor slab body 102 is closed on the upper surface of the precast bottom slab 101. Concrete is poured between the sides of two ribbed floor slab main bodies 100 and infiltrates into the interior of the shear groove 105 to form the rib beam body 103. A concrete panel 104 is poured on the upper surface of the main ribbed floor slab body 102. Then, the concrete panel 104 is poured on the upper surface of the main ribbed floor slab body 102 again, so as to facilitate the installation of the ribbed floor slab main body 100 on the upper surface of the prefabricated assembled box for use. The following are further provided on the ribbed floor slab main body 100:
[0025] A strengthened support connection mechanism, and this strengthened support connection mechanism includes a strengthened support connection component arranged at the connection between the interior of the main ribbed floor slab body 102 and the upper surface of the precast bottom slab 101. Fixed installation components are arranged at the ends and the middle positions of the strengthened support connection component. When the ribbed floor slab main body 100 is installed and used, after the main ribbed floor slab body 102 is closed on the surface of the precast bottom slab 101, the strengthened support connection mechanism strengthens and supports between the main ribbed floor slab body 102 and the precast bottom slab 101, improving the stability of the strengthened support connection during the installation and use of the ribbed floor slab main body 100 on the upper surface of the prefabricated assembled box.
[0026] In order to facilitate the strengthened support installation between the main ribbed floor slab body 102 and the precast bottom slab 101 through the strengthened support connection component, in this embodiment, preferably, the strengthened support connection component includes a reinforcement support frame 1011 arranged inside the main ribbed floor slab body 102. The lower surface of the reinforcement support frame 1011 contacts the surface of the precast bottom slab 101. Fixed closing plates 1012 are integrally formed at both ends of the reinforcement support frame 1011. The fixed closing plates 1012 contact the inner surface of the main ribbed floor slab body 102. After the reinforcement support frame 1011 is closed on the surface of the precast bottom slab 101, the main ribbed floor slab body 102 can be closed on the surface of the precast bottom slab 101 and installed and used through the reinforcement support frame 1011, making the strengthening and fixing more stable during use.
[0027] In order to facilitate the fixed installation and use of the reinforced support frame 1011 after closing through the fixed installation components, in this embodiment, preferably, the fixed installation components include two side fixing bolts 1014 arranged at both end parts on both sides of the main ribbed floor slab body 102. Two internal threaded holes 1015 are formed inside the fixed closing plate 1012. After the main ribbed floor slab body 102 is closed on the surface of the precast bottom plate 101, the side fixing bolts 1014 can be rotated and embedded into the internal threaded holes 1015 to fix the end part of the reinforced support frame 1011 to the main ribbed floor slab body 102. Two bottom fixing bolts 1013 are rotated at the middle position of the reinforced support frame 1011. At the same time, before installation, after the reinforced support frame 1011 is closed on the surface of the precast bottom plate 101, the bottom fixing bolts 1013 are rotated to fix it, which is convenient for the fixed installation and strengthening of the support.
[0028] A reinforcement installation mechanism, and the reinforcement installation mechanism includes fixed connection components arranged on both sides of the rib beam body 103. Limit rotation components are arranged on both sides of the main ribbed floor slab body 102. A rotation reinforcement component is arranged at the connection part between the side of the fixed connection component and the limit rotation connection component. After the ribbed floor slab main body 100 is installed, the reinforcement installation mechanism can strengthen the fixed installation between the main ribbed floor slab body 102 and the rib beam body 103, making it more stable to use and improving the strengthening of the fixity between two main ribbed floor slab bodies 102 when the ribbed floor slab main body 100 is installed on the precast assembly box.
[0029] In order to facilitate the rotation and reinforcement of the threaded rod 1024 after closing through the fixed connection components, in this embodiment, preferably, the fixed connection components include connection steel plates 1021 fixed on both sides of the rib beam body 103 by concrete pouring. The connection steel plates 1021 are rectangular structures. After the connection steel plates 1021 are poured and fixed on the surface of the rib beam body 103, it is convenient to install and fix the threaded rod 1024 between the rib beam body 103 and the main ribbed floor slab body 102 through the connection steel plates 1021.
[0030] In order to facilitate the rotation and fixed installation of the threaded rod 1024 through the limit rotation components and make it convenient for installation and use, in this embodiment, preferably, the limit rotation components include internal threaded column bodies 1022 fixed on both sides of the main ribbed floor slab body 102 by concrete pouring. A limit ring 1023 is integrally formed at the end of the internal threaded column body 1022. The internal threaded column bodies 1022 can be poured and fixed inside the main ribbed floor slab body 102, and when the threaded rod 1024 is rotated and tightened inside the internal threaded column bodies 1022, it is limited and fixed by the limit ring 1023.
[0031] In order to facilitate the rotational fixation between the connecting steel plate 1021 and the internal threaded cylinder 1022 by means of the rotational reinforcement component, so as to reinforce and install between the rib beam body 103 and the main multi-ribbed floor body 102, in this embodiment, preferably, the rotational reinforcement component includes a threaded rod 1024 penetrating through both sides of the connecting steel plate 1021. The end of the threaded rod 1024 is rotationally fixed to the inside of the internal threaded cylinder 1022. A fixing nut 1025 is rotated inside the connecting steel plate 1021 at the end of the threaded rod 1024. After the threaded rod 1024 is penetrated through the inside of the connecting steel plate 1021 and rotationally fixed to the inside of the internal threaded cylinder 1022, the fixing nut 1025 is rotated inside the connecting steel plate 1021 at the end of the threaded rod 1024 again to tighten the threaded rod 1024, so as to be used for re-reinforcing and installing after pouring between the main multi-ribbed floor body 102 and the rib beam body 103.
[0032] The working principle and usage process of the present utility model: When installing and using this prefabricated assembled box multi-ribbed floor, first fix the precast bottom plate 101 on the upper surface of the prefabricated assembled box. Then, close the main multi-ribbed floor body 102 on the upper surface of the precast bottom plate 101. Pour concrete between the sides of the two main multi-ribbed floor bodies 100 and let it soak into the internal shear groove 105 to form the rib beam body 103. Then, pour the concrete panel 104 on the upper surface of the main multi-ribbed floor body 102, so as to facilitate the installation of the main multi-ribbed floor body 100 on the upper surface of the prefabricated assembled box for use.
[0033] Then, before installing the main multi-ribbed floor body 100, after the precast bottom plate 101 is fixedly installed, close the reinforcement support frame 1011 on the surface of the precast bottom plate 101 and rotate the bottom fixing bolt 1013 for fixed installation. Then, after closing the main multi-ribbed floor body 102 on the surface of the precast bottom plate 101, make the fixed closing plate 1012 contact with the inner surface of the main multi-ribbed floor body 102, and rotate the side fixing bolt 1014 to embed it into the internal threaded hole 1015 to fix the fixed closing plate 1012 and the reinforcement support frame 1011, so as to strengthen the connection after the reinforcement support frame 1011 is fixedly installed and the main multi-ribbed floor body 102 is closed with the precast bottom plate 101. Then, pour concrete on the sides of the two main multi-ribbed floor bodies 100, so as to facilitate the reinforcement between the precast bottom plate 101 and the main multi-ribbed floor body 102 after the main multi-ribbed floor body 100 is closed and installed, and make it more stable when the upper surface is subjected to gravity, and improve the stability of the strengthened support connection when the main multi-ribbed floor body 100 is installed on the upper surface of the prefabricated assembled box.
[0034] Finally, when the ribbed floor slab main body 100 is pouring the rib beam body 103 after installation, close the connecting steel plate 1021 at both ends of the connection of the two main ribbed floor slab bodies 102, and pour and fix the connecting steel plate 1021 inside the rib beam body 103. At the same time, when prefabricating the main ribbed floor slab body 102, pour and fix the internal threaded column body 1022 on both sides inside the main ribbed floor slab body 102. After closing, pass the threaded rod 1024 through the side of the connecting steel plate 1021 and rotate and fix it inside the internal threaded column body 1022. Then, rotate and fix the nut 1025 at the end of the threaded rod 1024 inside the connecting steel plate 1021 to tighten the threaded rod 1024. When tightening, the limiting ring 1023 strengthens the limit of the internal threaded column body 1022 and is not easy to loosen, so as to reinforce and install the main ribbed floor slab body 102 and the rib beam body 103 again after pouring. After installation, it is more stable to use, and the fixing between the two main ribbed floor slab bodies 102 is strengthened when the ribbed floor slab main body 100 is installed on the prefabricated assembly box.
[0035] Although the embodiments of the present invention have been shown and described (see the above detailed description), for those of ordinary skill in the art, it can be understood that various changes, modifications, substitutions, and variations can be made to these embodiments without departing from the principles and spirit of the present invention. The scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A prefabricated assembled box ribbed floor slab, comprising a ribbed floor slab main body (100), the ribbed floor slab main body (100) includes a precast bottom slab (101), the upper surface of the precast bottom slab (101) is provided with a main ribbed floor slab body (102), shear grooves (105) are formed at the bottom ends on both sides of the main ribbed floor slab body (102), a rib beam body (103) is formed by pouring inside the shear grooves (105) through steel bars at the connection of the two main ribbed floor slab bodies (102), and a concrete panel (104) is poured on the upper surface of the main ribbed floor slab body (102), characterized in that: The main ribbed floor slab (100) is further provided with: a strengthened support connection mechanism, and the strengthened support connection mechanism includes a strengthened support connection assembly arranged at the connection position between the inside of the main ribbed floor slab body (102) and the upper surface of the precast floor slab (101), and fixed installation assemblies are arranged at the end and the middle position of the strengthened support connection assembly; a reinforcement installation mechanism, and the reinforcement installation mechanism includes fixed connection assemblies arranged on both sides of the rib beam body (103), limit rotation assemblies are arranged on both sides of the main ribbed floor slab body (102), and a rotation reinforcement assembly is arranged at the connection position between the side surface of the fixed connection assembly and the limit rotation connection assembly.
2. The prefabricated assembled box ribbed floor according to claim 1, wherein: The strengthened support connection assembly includes a reinforcement support frame (1011) arranged inside the main ribbed floor slab body (102), the lower surface of the reinforcement support frame (1011) is in contact with the surface of the precast floor slab (101), fixed closing plates (1012) are integrally formed at both ends of the reinforcement support frame (1011), and the fixed closing plates (1012) are in contact with the inner surface of the main ribbed floor slab body (102).
3. A prefabricated assembled box ribbed floor according to claim 2, characterized in that: The fixed installation assembly includes two side fixing bolts (1014) arranged at both ends of the side surface of the main ribbed floor slab body (102), two internal threaded holes (1015) are opened inside the fixed closing plate (1012), and two bottom fixing bolts (1013) are rotated at the middle position of the reinforcement support frame (1011).
4. A prefabricated assembled box ribbed floor according to claim 3, characterized in that: The middle position of the reinforcement support frame (1011) is fixed to the surface of the precast floor slab (101) through the bottom fixing bolt (1013), and the end of the reinforcement support frame (1011) is rotatably fixed to the main ribbed floor slab body (102) through the side fixing bolt (1014) and the internal threaded hole (1015).
5. A prefabricated assembled box ribbed floor according to claim 1, characterized in that: The fixed connection assembly includes connection steel plates (1021) fixed on both sides of the rib beam body (103) by concrete pouring, and the connection steel plates (1021) are of a rectangular structure.
6. The prefabricated assembled box ribbed floor according to claim 5, characterized in that: The limit rotation assembly includes internal threaded column bodies (1022) fixed on both sides of the main ribbed floor slab body (102) by concrete pouring, and limit rings (1023) are integrally formed at the ends of the internal threaded column bodies (1022).
7. A prefabricated assembled box ribbed floor according to claim 6, characterized in that: The rotation reinforcement assembly includes threaded rods (1024) penetrating through both sides of the connection steel plate (1021), the ends of the threaded rods (1024) are rotatably fixed to the inside of the internal threaded column bodies (1022), and fixing nuts (1025) are rotated at the ends of the threaded rods (1024) inside the connection steel plate (1021).