Building curtain wall mounting device easy to carry

Through hydraulic devices and motor-driven building curtain wall installation devices, the problems of low curtain wall installation efficiency and difficulty in changing high-rise locations are solved, stable fixation and efficient lifting are achieved, and construction risks are reduced.

CN223075184UActive Publication Date: 2025-07-08SHANDONG SHENGBANG IND GRP CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202422110998.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-08-29
Publication Date
2025-07-08
Estimated Expiration
2034-08-29

AI Technical Summary

Technical Problem

The existing architectural curtain wall installation methods have low efficiency, difficulty in construction and high risks, especially in high-rise buildings, which are difficult to change locations, which affect the handling efficiency.

Method used

A building curtain wall installation device that is easy to carry is adopted, and components such as hydraulic devices, motors and electric suction cups are used to achieve stable fixation and efficient lifting of the curtain wall through the cooperation of fixed seats, gears and tooth rods.

Benefits of technology

It improves the stability and efficiency of curtain wall installation, reduces construction risks, and is suitable for convenient handling of high-rise buildings.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223075184U_ABST
    Figure CN223075184U_ABST
Patent Text Reader

Abstract

The utility model discloses a building curtain wall installation device easy to carry, and relates to the technical field of building curtain wall installation. The device comprises a mounting base, a hydraulic device is fixedly arranged at the position, close to the center, of the upper surface of the mounting base, the push-out end of the hydraulic device is fixedly connected with a fixing base, and a first sliding groove capable of enabling the fixing base to slide is formed in the upper surface of the mounting base. Second sliding grooves which are symmetrically formed are formed in the side, away from the hydraulic device, of the fixing base, second rotating rods are rotationally arranged at the centers in the second sliding grooves, third sliding grooves which are symmetrically formed are formed in the upper walls and the lower walls in the second sliding grooves, and toothed bars are slidably arranged in the two third sliding grooves; and a first gear meshed with the two toothed bars is fixedly arranged on the outer surface of the second rotating rod, a fixing plate is fixedly arranged at the ends, away from the fixing base, of the two toothed bars, and the problem that a building curtain wall is difficult to fix during installation is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building curtain wall installation, in particular to an easily transportable building curtain wall installation device. Background Art

[0002] With the development of modern architecture, building curtain walls have become an important part. However, there are many problems in traditional curtain wall installation methods, such as low efficiency, difficult construction, high risks, etc. Advanced curtain wall installation devices can not only improve efficiency, reduce labor, shorten the cycle, but also ensure the safety of construction workers and reduce risks, which is the key to the development of the construction industry;

[0003] Most of the existing curtain walls can only be lifted by a crane during installation. It is difficult to fix the curtain wall during installation, which easily causes damage to the curtain wall and affects work efficiency; when installing curtain walls on high-rise buildings, due to the high floors, the crane has difficulty and frequent position changes during the installation of walls in multiple directions, resulting in the affected handling efficiency of building curtain walls. Summary of the Utility Model

[0004] In order to solve the problems of difficult fixation during the installation of building curtain walls and low handling efficiency of building curtain walls during high-rise operations; the purpose of the utility model is to provide an easily transportable building curtain wall installation device.

[0005] To solve the above technical problems, the utility model adopts the following technical scheme: an easily transportable building curtain wall installation device, including an installation base. On the upper surface of the installation base, a hydraulic device is fixedly arranged near the center. The pushing end of the hydraulic device is fixedly connected with a fixed seat. A first chute is opened on the upper surface of the installation base, which can allow the fixed seat to slide. On the side of the fixed seat away from the hydraulic device, symmetrically arranged second chutes are opened. At the center of the second chute, a second rotating rod is rotatably arranged. On the upper and lower walls of the second chute, symmetrically arranged third chutes are opened. Two racks are slidably arranged in the two third chutes. On the outer surface of the second rotating rod, a first gear meshing with the two racks is fixedly arranged. At the ends of the two racks away from the fixed seat, fixing plates are fixedly arranged. At the end of the second rotating rod away from the first gear, a second gear is fixedly arranged.

[0006] Preferably, a second bevel gear is rotatably provided on the upper surface of the mounting base near the hydraulic device. A load-bearing column is fixedly provided on the upper surface of the second bevel gear. An engaged first bevel gear is rotatably provided on the outer surface of the second bevel gear. A first motor is fixedly provided on the side of the first bevel gear away from the load-bearing column. The output end of the first motor is coaxially fixedly provided on the first bevel gear. One end of the load-bearing column away from the mounting base is fixedly provided with a boom. A second motor is fixedly provided at the end of the boom away from the load-bearing column. On the side of the boom away from the load-bearing column, symmetrically arranged first fixing blocks are fixedly provided. A pulley is rotatably provided between the two first fixing blocks. The pulley is fixedly connected to the output end of the second motor. A steel wire is fixedly connected to the outer surface of the pulley. At each end of the steel wire away from the pulley, a first rotating rod is fixedly provided. The two ends of the first rotating rod are rotatably connected to a connecting plate. Electric suction cups are fixedly provided on the lower surface of the connecting plate at equal intervals.

[0007] Compared with the prior art, the beneficial effects of the present utility model are as follows:

[0008] 1. When the present utility model works, the building curtain wall is vertically placed on the second fixing block. With the rotation of the first gear, the rack is driven to slide, realizing the effect of squeezing the building curtain wall from both sides by the fixing plate. By using the limiting rod to stop the second gear, the building curtain wall is fixed, making it more stable for workers to install the building curtain wall.

[0009] 2. Workers push this device to the place where the building curtain wall is placed. By operating the second motor, the steel wire drives the connecting plate to descend to an appropriate height and angle. Then, the building curtain wall is adsorbed by using the electric suction cups and lifted. At this time, by operating the first motor, the load-bearing column rotates, and the building curtain wall is placed on the fixing structure, which is more convenient for handling during the installation of high-rise building curtain walls. BRIEF DESCRIPTION OF THE DRAWINGS

[0010] In order to more clearly illustrate the technical solutions in the embodiments of the present utility model or the prior art, the following will briefly introduce the drawings required for use in the description of the embodiments or the prior art. Obviously, the following drawings are only some embodiments of the present utility model. For those of ordinary skill in the art, other drawings can be obtained based on these drawings without creative efforts.

[0011] Figure 1 It is a schematic diagram of the overall structure of the present utility model.

[0012] Figure 2 It is a schematic diagram of the split of the fixing structure of the present utility model.

[0013] Figure 3This is a schematic diagram of the fixed structure of the structure of the present utility model, split.

[0014] Figure 4 This is a schematic diagram of the handling structure of the structure of the present utility model, split.

[0015] In the figure: 1, mounting base; 11, universal wheel; 12, counterweight platform; 13, first handle; 14, first chute; 2, first motor; 21, first bevel gear; 22, second bevel gear; 23, load-bearing column; 24, boom; 25, second motor; 26, first fixing block; 27, pulley; 28, connecting plate; 29, electric suction cup; 3, first rotating rod; 31, steel wire; 32, support rod; 4, fixing seat; 41, second chute; 42, third chute; 43, first gear; 44, second rotating rod; 45, rack; 46, fixing plate; 47, second fixing block; 48, second gear; 49, second handle; 5, hydraulic device; 6, limiting block; 61, limiting rod; 62, connecting rod. Specific embodiments

[0016] Next, the technical solutions in the embodiments of the present utility model will be clearly and completely described in conjunction with the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only a part of the embodiments of the present utility model, rather than all the embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative efforts shall fall within the protection scope of the present utility model.

[0017] Embodiment: As Figures 1-4As shown in the figure, the utility model provides an easily portable installation device for building curtain walls, which includes an installation base 1. A hydraulic device 5 is fixedly arranged on the upper surface of the installation base 1 near the center. The pushing end of the hydraulic device 5 is fixedly connected with a fixed seat 4. A first sliding groove 14 allowing the fixed seat 4 to slide is formed on the upper surface of the installation base 1. Symmetrically arranged second sliding grooves 41 are formed on one side of the fixed seat 4 away from the hydraulic device 5. A second rotating rod 44 is rotatably arranged at the center of the second sliding groove 41. Symmetrically arranged third sliding grooves 42 are formed on the upper and lower walls of the second sliding groove 41. Two rack bars 45 are slidably arranged in the two third sliding grooves 42. A first gear 43 meshing with the two rack bars 45 is fixedly arranged on the outer surface of the second rotating rod 44. Fixing plates 46 are fixedly arranged at the ends of the two rack bars 45 away from the fixed seat 4. A second gear 48 is fixedly arranged at the second rotating rod 44 away from the first gear 43. A limiting block 6 corresponding to the second gear 48 is fixedly arranged on one side of the fixed seat 4 close to the second gear 48. Limiting rods 61 are slidably arranged inside the two limiting blocks 6. A connecting rod 62 is fixedly connected to the outer surfaces of the two limiting rods 61. Second fixing blocks 47 are symmetrically arranged at one end of the fixed seat 4 close to the installation base 1. A second handle 49 is fixedly arranged at the end of the second rotating rod 44 away from the fixed seat 4. When the building curtain wall is vertically placed on the second fixing blocks 47 of the fixed seat 4, rotate the second handle 49 to drive the first gear 43. Through the sliding of the first gear 43, the rack bars 45 meshing with the first gear 43 slide inwards, enabling the fixing plates 46 to achieve the effect of squeezing the building curtain wall. Next, push the connecting rod 62 to make the limiting rods 61 slide out of the limiting blocks 6. The limiting rods 61 will block the second gear 48 to stop the second gear 48, thereby fixing the building curtain wall. At this time, the hydraulic device 5 will push the fixed seat 4 to a suitable position through the first sliding groove 14.

[0018] On the upper surface of the mounting base 1, a second bevel gear 22 is rotatably provided near the hydraulic device 5. On the upper surface of the second bevel gear 22, a load-bearing column 23 is fixedly arranged. On the outer surface of the second bevel gear 22, a meshing first bevel gear 21 is rotatably arranged. On one side of the first bevel gear 21 away from the load-bearing column 23, a first motor 2 is fixedly provided. The output end of the first motor 2 is coaxially fixedly arranged on the first bevel gear 21. At one end of the load-bearing column 23 away from the mounting base 1, a boom 24 is fixedly arranged. At one end of the boom 24 away from the load-bearing column 23, a second motor 25 is fixedly arranged. On one side of the boom 24 away from the load-bearing column 23, symmetrically arranged first fixing blocks 26 are fixedly arranged. Between the two first fixing blocks 26, a pulley 27 is rotatably arranged. The pulley 27 is fixedly connected to the output end of the second motor 25. On the outer surface of the pulley 27, a steel wire 31 is fixedly connected. At each end of the steel wire 31 away from the pulley 27, a first rotating rod 3 is fixedly arranged. At both ends of the first rotating rod 3, connecting plates 28 are rotatably connected. On the lower surface of the connecting plate 28, equally spaced electric suction cups 29 are fixedly arranged. On the upper surface of the mounting base 1, near one end of the first motor 2, a counterweight platform 12 is fixedly arranged. On the side wall of the counterweight platform 12 away from the first motor 2, symmetrically arranged first handles 13 are fixedly arranged. Near the boom 24, a support rod 32 is fixedly arranged on the load-bearing column 23. The support rod 32 is fixedly connected to the boom 24. At the four corners of the lower surface of the mounting base 1, universal wheels 11 are fixedly arranged. When the device is not working, the boom 24, the connecting plate 28 and the fixing seat 4 are in the same direction. Workers can push this device to the placement location of the building curtain wall through the action of the first handle 13 and the universal wheels 11. The boom 24 and the connecting plate 28 will rotate to the direction of the building curtain wall placement through the action of the first motor 2. The second motor 25 works, and through the action of the pulley 27, the connecting plate 28 connected by the steel wire 31 is lowered to an appropriate angle and height, so that the electric suction cup 29 with a model of XR-G600 and an adsorption force of 600 kilograms adsorbs the building curtain wall. The support rod 32 will support the boom 24. After adsorption, the building curtain wall is lifted, and the building curtain wall is rotated to the direction of the fixing seat 4. When the building curtain wall descends, the upper end of the fixing seat 4 will support one side of the building curtain wall. The building curtain wall will rotate to the vertical direction through the action of the first rotating rod 3 when descending. At this time, it can be placed on the fixing seat 4 for fixation. Finally, the worker pushes this device to the edge of the floor, and the counterweight platform 12 is used to place counterweights to prevent the device from tipping up.

[0019] Working principle: When the device is not working, the jib 24, the connecting plate 28 and the fixed seat 4 are in the same direction. Workers can push this device to the placement location of the building curtain wall through the action of the first handle 13 and the universal wheels 11. The jib 24 and the connecting plate 28 will rotate to the direction where the building curtain wall is placed through the action of the first motor 2. The second motor 25 operates, and through the action of the pulley 27, the connecting plate 28 connected by the steel wire 31 is lowered to an appropriate angle and height, so that the electric suction cup 29 adsorbs the building curtain wall. The support rod 32 will support the jib 24. After the adsorption is completed, the building curtain wall is lifted, and the building curtain wall is rotated to the direction of the fixed seat 4. When the building curtain wall descends, the upper end of the fixed seat 4 will support one side of the building curtain wall. The building curtain wall will rotate to the vertical direction through the action of the first rotating rod 3 when descending. When the building curtain wall is vertically placed on the second fixing block 47 of the fixed seat 4, rotate the second handle 49 to drive the first gear 43. Through the sliding of the first gear 43, the rack 45 meshing with the first gear 43 slides inwards, so that the fixing plate 46 can achieve the effect of squeezing the building curtain wall. Next, push the connecting rod 62, so that the limiting rod 61 slides out of the limiting block 6. The limiting rod 61 will block the second gear 48 and stop the second gear 48, thereby fixing the building curtain wall. Finally, the worker pushes this device to the edge of the floor, and the counterweight platform 12 is placed with counterweights to prevent the device from tipping. At this time, the hydraulic device 5 will push the fixed seat 4 through the first chute 14 to an appropriate position to install the building curtain wall.

[0020] Obviously, those skilled in the art can make various modifications and variations to the present utility model without departing from the spirit and scope of the present utility model. Thus, if these modifications and variations of the present utility model fall within the scope of the claims of the present utility model and their equivalent technologies, the present utility model also intends to include these modifications and variations.

Claims

1. An easily portable building curtain wall installation device, comprising an installation base (1), characterized in that: On the upper surface of the installation base (1), a hydraulic device (5) is fixedly arranged near the center. The pushing end of the hydraulic device (5) is fixedly connected to a fixed seat (4). A first sliding groove (14) allowing the fixed seat (4) to slide is formed on the upper surface of the installation base (1). On one side of the fixed seat (4) away from the hydraulic device (5), symmetrically arranged second sliding grooves (41) are formed. A second rotating rod (44) is rotatably arranged at the center of the second sliding grooves (41). Symmetrically arranged third sliding grooves (42) are formed on the upper and lower walls of the second sliding grooves (41). Two rack bars (45) are slidably arranged in the two third sliding grooves (42). A first gear (43) meshing with the two rack bars (45) is fixedly arranged on the outer surface of the second rotating rod (44). At the ends of the two rack bars (45) away from the fixed seat (4), fixing plates (46) are fixedly arranged. A second gear (48) is fixedly arranged at the end of the second rotating rod (44) away from the first gear (43).

2. The installation device for building curtain walls that is easy to carry as described in claim 1, characterized in that: A second bevel gear (22) is rotatably arranged on the upper surface of the installation base (1) near the hydraulic device (5). A load-bearing column (23) is fixedly arranged on the upper surface of the second bevel gear (22). A first bevel gear (21) in meshing rotation is arranged on the outer surface of the second bevel gear (22). A first motor (2) is fixedly arranged on one side of the first bevel gear (21) away from the load-bearing column (23). The output end of the first motor (2) is coaxially fixedly arranged on the first bevel gear (21). At the end of the load-bearing column (23) away from the installation base (1), a boom (24) is fixedly arranged. A second motor (25) is fixedly arranged at the end of the boom (24) away from the load-bearing column (23). Symmetrically arranged first fixing blocks (26) are fixedly arranged on one side of the boom (24) away from the load-bearing column (23). A pulley (27) is rotatably arranged between the two first fixing blocks (26). The pulley (27) is fixedly connected to the output end of the second motor (25). A steel wire (31) is fixedly connected to the outer surface of the pulley (27). First rotating rods (3) are fixedly arranged at the ends of the steel wire (31) away from the pulley (27). Connecting plates (28) are rotatably connected to both ends of the first rotating rod (3). Electric suction cups (29) arranged at equal distances are fixedly arranged on the lower surface of the connecting plates (28).

3. The installation device for building curtain walls that is easy to carry as described in claim 1, wherein: On one side of the fixed seat (4) near the second gear (48), a limiting block (6) corresponding to the second gear (48) is fixedly arranged. Limiting rods (61) are slidably arranged inside the two limiting blocks (6). A connecting rod (62) is fixedly connected to the outer surfaces of the two limiting rods (61).

4. The installation device for a building curtain wall that is easy to carry as described in claim 1, wherein: A counterweight platform (12) is fixedly arranged at one end of the upper surface of the installation base (1) near the first motor (2).

5. The installation device for building curtain wall that is easy to carry as claimed in claim 4, wherein: Symmetrically arranged first handles (13) are fixedly arranged on the side wall of the counterweight platform (12) away from the first motor (2). A second handle (49) is fixedly arranged at the end of the second rotating rod (44) away from the fixed seat (4).

6. The installation device for a building curtain wall that is easy to carry as described in claim 2, wherein: A support rod (32) is fixedly arranged on the load-bearing column (23) near the boom (24), and the support rod (32) is fixedly connected to the boom (24).

7. The installation device for building curtain wall that is easy to carry as described in claim 1, wherein: On one end of the fixed seat (4) close to the mounting base (1), symmetrically arranged second fixing blocks (47) are fixedly arranged.

8. The installation device for an easily transportable building curtain wall according to claim 1, wherein: Universal wheels (11) are fixedly arranged at the four corners of the lower surface of the mounting base (1).

Citation Information

Cited By

  • Conveying device for glass curtain wall installation

    CN120739348A