Bridge construction hanging basket structure

Through the cooperation of components such as trolleys and electric hoists, the inconvenience of lateral movement and installation of the existing bridge construction hanging basket structure is solved, and the convenient movement of the hanging basket outside the bridge guardrail is achieved, and the operation process is simplified.

CN223088277UActive Publication Date: 2025-07-11CITIC CONSTR
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202422357636.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-09-26
Publication Date
2025-07-11
Estimated Expiration
2034-09-26

AI Technical Summary

Technical Problem

The existing bridge construction hanging basket structure cannot be used effectively when moving horizontally, and other equipment is needed to assist in lifting and installation, which is inconvenient to use.

Method used

The combination of components such as trolleys, hanging baskets, fixed pipe frames, rotary frames, electric hoists and other components is used to move the hanging baskets through the rotation of the electric hoist and rotary tube, simplifying the installation and retraction process.

Benefits of technology

The convenient movement of the hanging basket outside the bridge guardrail is achieved, reducing dependence on other equipment, and improving the convenience and practicality of use.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223088277U_ABST
    Figure CN223088277U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of hanging basket structures, and discloses a bridge construction hanging basket structure which comprises a trolley, a hanging basket is arranged on one side of the trolley, and a PLC is fixedly installed on one side of a handle of the trolley. Through mutual cooperative use of the trolley, the hanging basket, the fixing pipe frame, the rotating frame, the electric hoist, a hook-shaped plate, a first fixing plate and a first threaded hole, the effect of moving the hanging basket can be achieved, the hanging basket is supported through a plurality of rotating rotating pipes, and the trolley is pushed to drive the electric hoist to drive the hanging basket to move; the hanging basket can move on the outer side of the bridge guardrail wall, meanwhile, when the hanging basket is installed and retracted, the hanging basket is lifted and lowered through the electric hoist and put into the containing frame, then the hanging basket can be moved, other equipment does not need to be used for cooperation, use is convenient, and practicability is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of hanging basket structures, in particular to a hanging basket structure for bridge construction. Background Technique

[0002] With the rapid development of the transportation industry, more and more highway bridges are being built. At present, the beautification construction, daily maintenance, and outer wall construction of domestic highway bridges require the use of hanging baskets for auxiliary construction. Therefore, the safety of the hanging basket is very important.

[0003] An existing hanging basket structure for bridge construction (Publication No.: CN218621828U) has at least the following drawbacks:

[0004] In the above patent, the operating platform is suspended and supported by a set bottom plate and a lifting mechanism, etc. However, when it is necessary to horizontally move the operating platform to facilitate the operator to construct different positions on the outside of the bridge, the bottom plate is in direct contact with the bridge deck, making it impossible to move, inconvenient to use. At the same time, when the hanging basket is in use, other equipment is needed to lift and install it, making it more troublesome to use and inconvenient to use, with certain limitations. Content of the Utility Model

[0005] The purpose of the utility model is to solve the deficiencies existing in the prior art and to propose a hanging basket structure for bridge construction.

[0006] In order to achieve the above purpose, the utility model adopts the following technical solutions:

[0007] A hanging basket structure for bridge construction, comprising: a handcart, a hanging basket is arranged on one side of the handcart, a PLC controller is fixedly installed on one side of the handle of the handcart, and further comprising a moving component for moving the hanging basket, the moving component is arranged on the top surface of the handcart, and the moving component comprises: a fixed pipe rack, and the fixed pipe rack is fixedly installed on the top surface of the handcart.

[0008] As a further solution of the present utility model, the moving assembly further includes a rotating frame movably sleeved on the inner circumferential wall surface of the fixed pipe rack. An electric hoist is fixedly installed on the top surface of the rotating frame. A first circular through hole is formed on the top surface of the rotating frame. The inner circumferential wall surface of the first circular through hole is movably sleeved with the lifting steel cable of the electric hoist. A hook-shaped plate is fixedly installed on the bottom surface of the lifting steel cable of the electric hoist. The hook-shaped plate is movably sleeved with the hanging basket. A first fixing plate is fixedly installed inside the hanging basket. A first threaded hole is formed on one side of the first fixing plate. A threaded column is threadedly connected to the inner circumferential wall surface of the first threaded hole. A moving plate is arranged on one side of the first fixing plate. A second circular through hole is formed on one side of the moving plate. A bearing is fixedly sleeved on the inner circumferential wall surface of the second circular through hole. The bearing is movably sleeved with the threaded column. A plurality of second fixing plates are fixedly installed on the outer circumferential wall surface of the hanging basket. Fixing columns are respectively fixedly installed between two of the second fixing plates and inside the moving plate. A rotating pipe is movably sleeved on the outer circumferential wall surface of the fixing column. A fixed bottom plate is fixedly installed inside the hanging basket.

[0009] As a further solution of the present utility model, two limiting holes are formed on one side of the first fixing plate. A limiting column is movably sleeved on the inner circumferential wall surface of the limiting hole. The limiting column is fixedly installed with the moving plate.

[0010] As a further solution of the present utility model, a side plate is fixedly installed on one side of the hanging basket. A material bucket is arranged on the top surface of the side plate. A limiting ring is fixedly installed on the top surface of the side plate. The limiting ring is movably sleeved with the material bucket.

[0011] As a further solution of the present utility model, a placing rack is fixedly installed on the top surface of the trolley. A counterweight bin is fixedly installed on the top surface of the trolley.

[0012] As a further solution of the present utility model, a fixed bin is fixedly installed on the top surface of the trolley. A storage battery is fixedly installed on the inner bottom surface of the fixed bin. The storage battery is electrically connected to the PLC controller.

[0013] As a further solution of the present utility model, a pushing frame is fixedly installed on the bottom surface of the rotating frame. Third fixing plates are respectively fixedly installed on one side of the fixed pipe rack and on the outer circumferential wall surface of the pushing frame. A second threaded hole is formed on the top surface of the third fixing plate. A bolt is movably sleeved on the inner circumferential wall surface of the second threaded hole.

[0014] Compared with the prior art, the present utility model has the following beneficial effects:

[0015] By using the trolley, hanging basket, fixed pipe rack, rotating frame, electric hoist, hook-shaped plate, first fixing plate and first threaded hole in cooperation, the effect of moving the hanging basket can be achieved, so that the hanging basket is supported by several rotating rotating pipes, and the hanging basket is driven to move by pushing the trolley to drive the electric hoist, so that the hanging basket can move outside the bridge guardrail wall. At the same time, when installing and retracting the hanging basket, the hanging basket can be lifted and lowered by the electric hoist and placed inside the placement rack to move it, without the need to cooperate with other equipment, which is convenient to use and quite practical. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 FIG. is an overall structural schematic diagram of a bridge construction hanging basket structure proposed by the present utility model;

[0017] Figure 2 FIG. is a structural schematic diagram of the hanging basket of a bridge construction hanging basket structure proposed by the present utility model;

[0018] Figure 3 FIG. is a structural schematic diagram of the counterweight bin of a bridge construction hanging basket structure proposed by the present utility model;

[0019] Figure 4 is Figure 2 a partial structural schematic diagram of A in;

[0020] Figure 5 is Figure 3 a partial structural schematic diagram of B in.

[0021] In the figure: 1, trolley; 2, hanging basket; 3, fixed pipe rack; 4, rotating frame; 5, electric hoist; 6, hook-shaped plate; 7, first fixing plate; 8, first threaded hole; 9, threaded column; 10, moving plate; 11, fixed column; 12, rotating pipe; 13, limiting hole; 14, limiting column; 15, bearing; 16, second fixing plate; 17, fixed bottom plate; 18, side plate; 19, limiting ring; 20, material bucket; 21, placement rack; 22, counterweight bin; 23, fixed bin; 24, storage battery; 25, bolt; 26, third fixing plate; 27, second threaded hole; 28, pushing frame. DETAILED DESCRIPTION OF THE EMBODIMENTS

[0022] In order to make the technical means, creative features, achieved purposes and effects of the present utility model easy to understand, the present utility model will be further described below in conjunction with specific embodiments.

[0023] In the description of the present utility model, it should be noted that the orientation or positional relationship indicated by terms such as "upper", "lower", "inner", "outer", "front end", "rear end", "both ends", "one end", "the other end", etc. is based on the orientation or positional relationship shown in the drawings. It is only for the convenience of describing the present utility model and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation. Therefore, it should not be construed as a limitation to the present utility model. In addition, the terms "first" and "second" are only used for descriptive purposes and cannot be construed as indicating or implying relative importance.

[0024] In the description of the present utility model, it should be noted that unless otherwise clearly specified and defined, terms such as "installation", "provided with", "connection", etc. should be understood in a broad sense. For example, "connection" can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be directly connected or indirectly connected through an intermediate medium, and it can be the communication inside two elements. For those of ordinary skill in the art, the specific meanings of the above terms in the present utility model can be understood according to specific circumstances.

[0025] Referring to Figures 1 - 5 , a bridge construction hanging basket structure, comprising: a trolley 1, a hanging basket 2 is arranged on one side of the trolley 1, a PLC controller is fixedly installed on one side of the handle of the trolley 1, and further comprising a moving component for moving the hanging basket 2, the moving component is arranged on the top surface of the trolley 1, and the moving component comprises: a fixed pipe rack 3, the fixed pipe rack 3 is fixedly installed on the top surface of the trolley 1, the moving component further comprises a rotating frame 4 movably sleeved on the inner circular wall surface of the fixed pipe rack 3, an electric hoist 5 is fixedly installed on the top surface of the rotating frame 4, a first circular through hole is opened on the top surface of the rotating frame 4, and the inner circular wall surface of the first circular through hole is movably sleeved with the lifting steel cable of the electric hoist 5. The bottom surface of the lifting steel cable of the electric hoist 5 is fixedly installed with a hook-shaped plate 6, the hook-shaped plate 6 is movably sleeved with the hanging basket 2, a first fixing plate 7 is fixedly installed inside the hanging basket 2, a first threaded hole 8 is opened on one side of the first fixing plate 7, a threaded column 9 is threadedly connected to the inner circular wall surface of the first threaded hole 8, a moving plate 10 is arranged on one side of the first fixing plate 7, a second circular through hole is opened on one side of the moving plate 10, a bearing 15 is fixedly sleeved on the inner circular wall surface of the second circular through hole, the bearing 15 is movably sleeved with the threaded column 9, a plurality of second fixing plates 16 are fixedly installed on the outer circular wall surface of the hanging basket 2, fixing columns 11 are respectively fixedly installed between two second fixing plates 16 and inside the moving plate 10, a rotating pipe 12 is movably sleeved on the outer circular wall surface of the fixing column 11, and a fixed bottom plate 17 is fixedly installed inside the hanging basket 2.

[0026] In this embodiment, two limiting holes 13 are formed on one side of the first fixing plate 7. The inner wall surface of the limiting hole 13 is movably sleeved with a limiting column 14. The limiting column 14 is fixedly installed with the moving plate 10. One side of the hanging basket 2 is fixedly installed with a side plate 18. A material bucket 20 is arranged on the top surface of the side plate 18. A limiting ring 19 is fixedly installed on the top surface of the side plate 18. The limiting ring 19 is movably sleeved with the material bucket 20. A placing rack 21 is fixedly installed on the top surface of the trolley 1. A counterweight bin 22 is fixedly installed on the top surface of the trolley 1. A fixed bin 23 is fixedly installed on the top surface of the trolley 1. A storage battery 24 is fixedly installed on the inner bottom surface of the fixed bin 23. The storage battery 24 is electrically connected to the PLC controller. A pushing frame 28 is fixedly installed on the bottom surface of the rotating frame 4. Third fixing plates 26 are respectively fixedly installed on one side of the fixed pipe rack 3 and the outer wall surface of the pushing frame 28. A second threaded hole 27 is formed on the top surface of the third fixing plate 26. The inner wall surface of the second threaded hole 27 is movably sleeved with a bolt 25.

[0027] From the above description, it can be seen that the above embodiments of the present utility model achieve the following technical effects: By providing the trolley 1, when the user needs to construct the outside of the bridge railing, the user then pushes the trolley 1 to move to the side of the bridge railing. The user takes out the bolt 25 from the inside of the second threaded hole 27, and then starts the electric hoist 5 to hook the hook-shaped plate 6 to the hanging basket 2 and lift it. Thus, manually grasping the bearing 15 drives the rotating frame 4 to rotate and then drives the hanging basket 2 to rotate, so as to put the hanging basket 2 on the bridge deck concrete railing. And the main body of the hanging basket 2 is on the outside of the bridge. Thus, the hanging basket 2 is supported by a plurality of provided rotating pipes 12. The plurality of rotating pipes 12 can rotate, so that the hanging basket 2 can move horizontally under external pushing. Thus, rotate the threaded column 9 to make it enter the inside of the first threaded hole 8, and push the moving plate 10 to drive two rotating pipes 12 on one side to squeeze the guardrail wall under the limitation of the limiting hole 13 and the limiting column 14, reducing the gap between the hanging basket 2 and the guardrail wall. Thus, insert the bolt 25 into the inside of the second threaded hole 27, and place sandbags and the like in the counterweight bin 22 for counterweight. Thus, the user climbs over the guardrail wall and enters the inside of the hanging basket 2, and climbs to the bottom through the frame of the hanging basket 2. Thus, the construction materials are contained in the material bucket 20, and then the construction is carried out. When it is necessary to move the hanging basket 2, at this time, another worker slightly lifts the hanging basket 2 by a certain distance, and then pushes the trolley 1 to drive the hanging basket 2 to move through the electric hoist 5, so that the hanging basket 2 moves. After the construction is completed, lift the hanging basket 2 and place it inside the placement rack 21. The placement rack 21 supports the hanging basket 2 to prevent it from tipping over, thus comprehensively achieving the effect of moving the hanging basket 2. By supporting the hanging basket 2 with a plurality of rotating rotating pipes 12, driving the hanging basket 2 to move by pushing the trolley 1 to drive the electric hoist 5, the hanging basket 2 can move on the outside of the bridge guardrail wall. At the same time, when installing and retracting the hanging basket 2, the hanging basket 2 can be lifted and lowered by the electric hoist 5 and placed inside the placement rack 21 to move it, without the need to cooperate with other equipment, which is convenient to use and relatively practical.

[0028] The above has shown and described the basic principles, main features and advantages of the present utility model. Those skilled in the art should understand that the present utility model is not limited by the above embodiments. What is described in the above embodiments and the specification only illustrates the principle of the present utility model. Without departing from the spirit and scope of the present utility model, the present utility model will have various changes and improvements, and these changes and improvements all fall within the scope of the present utility model claimed. The scope of protection claimed by the present utility model is defined by the appended claims and their equivalents.

Claims

1. A bridge construction hanging basket structure, including a trolley (1), a hanging basket (2) is arranged on one side of the trolley (1), and a PLC controller is fixedly installed on one side of the handle of the trolley (1), characterized in that, It further includes a moving component for moving the hanging basket (2), and the moving component is arranged on the top surface of the trolley (1). The moving component includes: a fixed pipe rack (3), and the fixed pipe rack (3) is fixedly installed on the top surface of the trolley (1).

2. The structure of a bridge construction hanging basket according to claim 1, characterized in that, The moving component further includes a rotating frame (4) movably sleeved on the inner circumferential wall surface of the fixed pipe rack (3). An electric hoist (5) is fixedly installed on the top surface of the rotating frame (4). A first circular through hole is formed in the top surface of the rotating frame (4), and the inner circumferential wall surface of the first circular through hole is movably sleeved with the lifting steel cable of the electric hoist (5). A hook-shaped plate (6) is fixedly installed on the bottom surface of the lifting steel cable of the electric hoist (5), and the hook-shaped plate (6) is movably sleeved with the hanging basket (2). A first fixed plate (7) is fixedly installed inside the hanging basket (2). A first threaded hole (8) is formed in one side of the first fixed plate (7), and a threaded column (9) is threadedly connected to the inner circumferential wall surface of the first threaded hole (8). A moving plate (10) is arranged on one side of the first fixed plate (7). A second circular through hole is formed in one side of the moving plate (10), and a bearing (15) is fixedly sleeved on the inner circumferential wall surface of the second circular through hole. The bearing (15) is movably sleeved with the threaded column (9). A plurality of second fixed plates (16) are fixedly installed on the outer circumferential wall surface of the hanging basket (2). Fixed columns (11) are respectively fixedly installed between two of the second fixed plates (16) and inside the moving plate (10). A rotating pipe (12) is movably sleeved on the outer circumferential wall surface of the fixed column (11). A fixed bottom plate (17) is fixedly installed inside the hanging basket (2).

3. The structure of a bridge construction hanging basket according to claim 2, characterized in that, Two limiting holes (13) are formed in one side of the first fixed plate (7), and limiting columns (14) are movably sleeved on the inner circumferential wall surfaces of the limiting holes (13). The limiting columns (14) are fixedly installed with the moving plate (10).

4. The structure of a bridge construction hanging basket according to claim 2, characterized in that, A side plate (18) is fixedly installed on one side of the hanging basket (2). A material bucket (20) is arranged on the top surface of the side plate (18). A limiting ring (19) is fixedly installed on the top surface of the side plate (18), and the limiting ring (19) is movably sleeved with the material bucket (20).

5. A bridge construction hanging basket structure according to claim 1, characterized in that, A placing rack (21) is fixedly installed on the top surface of the trolley (1). A counterweight bin (22) is fixedly installed on the top surface of the trolley (1).

6. The structure of a bridge construction hanging basket according to claim 1, characterized in that, A fixed bin (23) is fixedly installed on the top surface of the trolley (1). A storage battery (24) is fixedly installed on the inner bottom surface of the fixed bin (23), and the storage battery (24) is electrically connected to the PLC controller.

7. A bridge construction hanging basket structure according to claim 2, characterized in that, A pushing frame (28) is fixedly installed on the bottom surface of the rotating frame (4). Third fixed plates (26) are respectively fixedly installed on one side of the fixed pipe rack (3) and on the outer circumferential wall surface of the pushing frame (28). A second threaded hole (27) is formed in the top surface of the third fixed plate (26), and a bolt (25) is movably sleeved on the inner circumferential wall surface of the second threaded hole (27).

Citation Information

Patent Citations

  • Bridge construction hanging basket structure