Tent pillar fixing structure

Through the combined structure of the pillar body, column head, rotary rod and fastener, the stable connection of the tent pillars is achieved, the stability problem caused by rope binding is solved, and the overall stability of the tent is improved.

CN223089033UActive Publication Date: 2025-07-11SOJOURN IN THE EAST OF CHONGQING ASSEMBLY BUILDING TECH & TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202422272883.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-09-18
Publication Date
2025-07-11
Estimated Expiration
2034-09-18

AI Technical Summary

Technical Problem

Existing tent post fixing uses rope binding to lead to lower stability.

Method used

The structure includes a pillar body, a pillar head, a rotary rod, a connection member and a fastener is adopted to achieve a stable connection of the pillar by adjusting the position of the pillar head and a fastener.

Benefits of technology

It improves the stability of the tent pillars and solves the problem of reduced stability caused by rope binding and fixing.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223089033U_ABST
    Figure CN223089033U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of tents, in particular to a tent supporting column fixing structure which comprises a plurality of supporting column bodies, a plurality of column heads, a plurality of rotating rods, connecting pieces and a plurality of fastening pieces, a tent can be supported through the supporting column bodies, the column heads provide installation conditions for the rotating rods and the fastening pieces, and the connecting pieces are arranged on the supporting column bodies. The multiple rotating rods can be connected through the connecting pieces, when the multiple supporting column bodies need to be fixed, the multiple column heads are adjusted to the preset positions along the multiple rotating rods according to the supporting angles of the multiple supporting column bodies, the multiple fastening pieces are rotated towards the sides close to the multiple supporting column bodies at the moment, and when the multiple fastening pieces are rotated to the preset positions, the multiple column heads are adjusted to the preset positions along the multiple rotating rods. Therefore, the problem that according to an existing tent supporting column, a plurality of supporting columns are bound and fixed through ropes, and consequently the stability of the tent supporting column is reduced is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of tents, in particular to a fixing structure for tent struts. Background Art

[0002] A tent is a shed supported on the ground to shelter from wind, rain and sunlight and for temporary residence. It is mostly made of canvas, together with the supporting things, and can be disassembled and transferred at any time. Tents are usually carried in parts and assembled on site.

[0003] At present, when setting up a tent, it is necessary to fix multiple struts of the tent to ensure the stability of the tent. The existing fixing of tent struts generally uses ropes to tie and fix multiple struts, but the strength of the rope tying is low, resulting in low stability of the tent struts. Content of the Utility Model

[0004] The purpose of the utility model is to provide a fixing structure for tent struts, aiming to solve the problem that the stability of the existing tent struts is reduced due to using ropes to tie and fix multiple struts.

[0005] To achieve the above purpose, the utility model provides a fixing structure for tent struts, which includes multiple strut bodies, multiple column heads, multiple rotating rods, a connecting piece and multiple fasteners. The multiple column heads are respectively sleeved on the multiple strut bodies. The multiple rotating rods are respectively rotatably connected to the multiple column heads and are respectively located on one side of the multiple column heads. The connecting piece is rotatably connected to the multiple rotating rods and is located between the multiple rotating rods. The multiple fasteners are respectively arranged on the multiple column heads.

[0006] Among them, the multiple column heads all have threaded holes, and the threaded holes all penetrate through the column heads.

[0007] Among them, the multiple column heads all have mounting holes, and the mounting holes are located on the side of the column head away from the threaded hole.

[0008] Among them, the fastener includes a screw rod and a knob. The screw rod is threadedly connected to the column head and is located on one side of the column head. The knob is arranged on the screw rod.

[0009] Among them, the knob includes a connecting seat and a ring. The connecting seat is fixedly connected to the screw rod and is located on one side of the screw rod. The ring is fixedly connected to the connecting seat and is located on one side of the connecting seat.

[0010] A fixing structure for tent struts of the present utility model includes a plurality of strut bodies, a plurality of column heads, a plurality of rotating rods, a connecting member, and a plurality of fasteners. The plurality of column heads are respectively sleeved on the plurality of strut bodies. The plurality of rotating rods are respectively rotatably connected to the plurality of column heads and are respectively located on one side of the plurality of column heads. The connecting member is rotatably connected to the plurality of rotating rods and is located between the plurality of rotating rods. The plurality of fasteners are respectively arranged on the plurality of column heads. The tent can be supported by the plurality of strut bodies. The plurality of column heads provide installation conditions for the plurality of rotating rods and the plurality of fasteners. The plurality of rotating rods can be connected by the connecting member. When it is necessary to fix the plurality of strut bodies, the plurality of column heads are adjusted along the plurality of rotating rods to a preset position according to the support angles of the plurality of strut bodies. At this time, the plurality of fasteners are rotated towards the side close to the plurality of strut bodies. When the plurality of fasteners are rotated to the preset position, the connection of the plurality of strut bodies can be completed, thus solving the problem that the stability of the existing tent struts is reduced due to bundling and fixing the plurality of struts with ropes. Brief Description of the Drawings

[0011] In order to more clearly illustrate the technical solutions in the embodiments of the present application or the prior art, the following will briefly introduce the drawings required for the description of the embodiments or the prior art.

[0012] Figure 1 It is a schematic structural diagram of a fixing structure for tent struts of the present utility model.

[0013] Figure 2 It is a schematic structural diagram of the column head.

[0014] Figure 3 It is a schematic structural diagram of the rotating rod and the connecting member.

[0015] Figure 4 It is a structural view of Example 2.

[0016] In the figure: 1 - strut body, 2 - column head, 3 - rotating rod, 4 - connecting member, 5 - threaded hole, 6 - mounting hole, 7 - screw rod, 8 - connecting seat, 9 - ring. Detailed Description of the Embodiments

[0017] The following will describe in detail the embodiments of the present utility model. The examples of the embodiments are shown in the drawings, where the same or similar reference numerals indicate the same or similar elements or elements with the same or similar functions throughout. The embodiments described below with reference to the drawings are exemplary and are intended to explain the present utility model and should not be construed as a limitation of the present utility model.

[0018] Please refer to Figures 1-4, the present utility model provides a tent strut fixing structure, which includes a plurality of strut bodies 1, a plurality of column heads 2, a plurality of rotating rods 3, a connecting member 4 and a plurality of fasteners. The plurality of column heads 2 are respectively sleeved on the plurality of strut bodies 1. The plurality of rotating rods 3 are respectively rotatably connected to the plurality of column heads 2 and are respectively located on one side of the plurality of column heads 2. The connecting member 4 is rotatably connected to the plurality of rotating rods 3 and is located between the plurality of rotating rods 3. The plurality of fasteners are respectively arranged on the plurality of column heads 2.

[0019] In this embodiment, the tent can be supported by the plurality of strut bodies 1. The plurality of column heads 2 provide installation conditions for the plurality of rotating rods 3 and the plurality of fasteners. The plurality of rotating rods 3 can be connected by the connecting member 4. When it is necessary to fix the plurality of strut bodies 1, the plurality of column heads 2 are adjusted to a preset position along the plurality of rotations according to the support angles of the plurality of strut bodies 1. At this time, the plurality of fasteners are rotated towards the side close to the plurality of strut bodies 1. When the plurality of fasteners are rotated to the preset position, the connection of the plurality of strut bodies 1 can be completed, thus solving the problem that the stability of the existing tent struts is reduced due to bundling and fixing the plurality of struts with ropes.

[0020] Furthermore, the plurality of column heads 2 all have threaded holes 5, and the threaded holes 5 penetrate through the column heads 2.

[0021] In this embodiment, the screw rod 7 can be installed through the threaded holes 5 on the column heads 2.

[0022] Furthermore, the plurality of column heads 2 all have mounting holes 6, and the mounting holes 6 are located on the side of the column heads 2 away from the threaded holes 5.

[0023] In this embodiment, the rotating rods 3 can be installed through the mounting holes 6 on the column heads 2.

[0024] Furthermore, the fastener includes a screw rod 7 and a knob. The screw rod 7 is threadedly connected to the column head 2 and is located on one side of the column head 2. The knob is arranged on the screw rod 7.

[0025] In this embodiment, rotating the knob can drive the screw rod 7 to rotate. The screw rod 7 rotates in the threaded hole 5 and can move towards the side close to the strut body 1 or away from the strut body 1.

[0026] Furthermore, the knob includes a connecting seat 8 and a ring 9. The connecting seat 8 is fixedly connected to the screw rod 7 and is located on one side of the screw rod 7. The ring 9 is fixedly connected to the connecting seat 8 and is located on one side of the connecting seat 8.

[0027] In this embodiment, the connecting seat 8 provides an installation condition for the ring 9. When the screw 7 is too tight to be unscrewed, a stick can be inserted into the ring 9, and the stick is held to rotate the connecting seat 8, which is more labor-saving.

[0028] When it is necessary to fix a plurality of the pillar bodies 1, the plurality of column heads 2 are adjusted along the plurality of rotating rods 3 to a preset position according to the supporting angles of the plurality of pillar bodies 1. At this time, the ring 9 is held and rotated, and the ring 9 drives the screw 7 on the connecting seat 8 to move toward the side close to the plurality of pillar bodies 1 until the screw 7 rotates to the preset position, and then the connection of the plurality of pillar bodies 1 can be completed, thereby solving the problem that the stability of the existing tent pillars is reduced due to bundling and fixing the plurality of pillars with ropes.

[0029] Example 1:

[0030] As Figure 1 shown, when it is necessary to fix a plurality of the pillar bodies 1, the plurality of column heads 2 are adjusted along the plurality of rotating rods 3 to a preset position according to the supporting angles of the plurality of pillar bodies 1. At this time, the ring 9 is held and rotated, and the ring 9 drives the screw 7 on the connecting seat 8 to move toward the side close to the plurality of pillar bodies 1 until the screw 7 rotates to the preset position, and then the connection of the plurality of pillar bodies 1 can be completed.

[0031] Example 2:

[0032] As Figure 4 shown, when it is necessary to fix two of the pillar bodies 1, the two column heads 2 are adjusted along the two rotating rods 3 to a preset position according to the supporting angles of the two pillar bodies 1. At this time, the ring 9 is held and rotated, and the ring 9 drives the screw 7 on the connecting seat 8 to move toward the side close to the two pillar bodies 1 until the screw 7 rotates to the preset position, and then the connection of the two pillar bodies 1 can be completed.

[0033] The above-disclosed are only one or more preferred embodiments of the present application, and the scope of rights of the present application cannot be limited thereby. Those of ordinary skill in the art can understand all or part of the processes of implementing the above embodiments, and the equivalent changes made according to the claims of the present application still fall within the scope covered by the present application.

Claims

1. A tent support fixing structure, characterized in that it includes a plurality of support bodies, a plurality of column heads, a plurality of rotating rods, a connecting member and a plurality of fasteners. The plurality of column heads are respectively sleeved on the plurality of support bodies. The plurality of rotating rods are respectively rotatably connected to the plurality of column heads and are respectively located on one side of the plurality of column heads. The connecting member is rotatably connected to the plurality of rotating rods and is located between the plurality of rotating rods. The plurality of fasteners are respectively arranged on the plurality of column heads.

2. The tent support fixing structure according to claim 1, characterized in that the plurality of column heads all have threaded holes, and the threaded holes penetrate through the column heads.

3. The tent support fixing structure according to claim 2, characterized in that the plurality of column heads all have mounting holes, and the mounting holes are located on the side of the column head away from the threaded hole.

4. The tent support fixing structure according to claim 3, characterized in that the fastener includes a screw rod and a knob. The screw rod is threadedly connected to the column head and is located on one side of the column head. The knob is arranged on the screw rod.

5. The tent support fixing structure according to claim 4, characterized in that the knob includes a connecting seat and a ring. The connecting seat is fixedly connected to the screw rod and is located on one side of the screw rod. The ring is fixedly connected to the connecting seat and is located on one side of the connecting seat.