Integrated urban domestic sewage and sludge treatment equipment
The integration of aeration and filtration systems with monitoring and alerting features addresses the inefficiencies in coagulant management and maintenance, improving sedimentation and filtration efficiency in water treatment.
Patent Information
- Application Number
- CN202422184530.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-06
- Publication Date
- 2025-07-15
- Estimated Expiration
- 2034-09-06
AI Technical Summary
Existing sewage sludge treatment equipment is not convenient for sewage flocculation and precipitation, cannot effectively monitor the flocculation dose, and is not convenient for maintenance and replacement, resulting in reduced practicality.
An integrated urban domestic sewage sludge treatment equipment is designed, including an aeration mechanism, a flocculation and precipitation mechanism, an alarm mechanism, a sewage discharge mechanism and a filtration mechanism. The sewage is treated through aeration, and the flocculation and precipitation mechanism is flocculation and precipitation. The alarm mechanism monitors the flocculation dose, the sewage discharge mechanism discharges the precipitation, the filter mechanism filters water, and the installation mechanism is easy to clean.
Improve the flocculation and precipitation efficiency, timely replenish flocculants, improve the quality of sewage treatment, and facilitate equipment cleaning and maintenance.
Smart Images

Figure CN223102865U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of sludge treatment, in particular to an integrated urban domestic sewage sludge treatment device. Background Technique
[0002] Urban domestic sewage is the wastewater discharged in residents' daily life, mainly from residential buildings and public buildings, such as residences, government agencies, schools, hospitals, stores, public places, and industrial enterprise restrooms. With the improvement of people's living standards, the discharge of domestic sewage is becoming more and more serious. The organic matter in domestic sewage is extremely unstable, easily rots and produces malodors. Bacteria and pathogens multiply in large numbers using the organic matter in domestic sewage as nutrients, and it will also lead to the spread of infectious diseases. Therefore, domestic sewage must be treated before discharge.
[0003] In the existing sewage sludge treatment technologies, for example, the prior art with the application number CN202320030724.5 includes a treatment equipment main body, a first rotation drive mechanism, a water inlet, a filter screen, a fixed frame, a conveying mechanism, and a second rotation drive mechanism, etc. Sewage enters the treatment equipment main body through the water inlet, and impurities such as floating objects in the sewage are intercepted and filtered by the filter screen. When the impurities in the filter screen accumulate, the first rotation drive mechanism drives the fixed frame on the filter screen to rotate through a rotating shaft, so that the filter screen flips.
[0004] However, the prior art is not convenient for flocculating and precipitating sewage, and it is not convenient to monitor the amount of flocculant, resulting in reduced practicability. Moreover, the prior art is not convenient for maintenance and replacement, resulting in reduced practicability. Content of the Utility Model
[0005] To solve the above technical problems, the utility model provides an integrated urban domestic sewage sludge treatment device that is convenient for monitoring the amount of flocculant, reminding the operator to replenish the flocculant in time, improving the quality of sewage treatment, and being convenient for cleaning.
[0006] The integrated urban domestic sewage and sludge treatment equipment of the utility model includes an aeration mechanism; it also includes a flocculation and sedimentation mechanism, an alarm mechanism, a sewage discharge mechanism, a filtration mechanism and an installation mechanism. The flocculation and sedimentation mechanism is installed in the aeration mechanism, the alarm mechanism is installed on the flocculation and sedimentation mechanism, the sewage discharge mechanism is installed at the bottom of the aeration mechanism, the filtration mechanism is connected to the aeration mechanism, and the installation mechanism is installed on the filtration mechanism. The sewage is aerated by the aeration mechanism, the sewage is flocculated and sedimented by the flocculation and sedimentation mechanism, the amount of flocculant is detected by the alarm mechanism, the flocculated sediment is discharged by the sewage discharge mechanism, the water after flocculation treatment is filtered by the filtration mechanism, and the installation mechanism facilitates the opening and closing of the filtration mechanism; the sewage is aerated by the aeration mechanism to improve the flocculation and sedimentation efficiency of the flocculation and sedimentation mechanism. The flocculation and sedimentation mechanism flocculates and sediments the sewage, the alarm mechanism detects the amount of flocculant, and reminds the operator to replenish in time when the liquid level of the flocculant is low. The sewage discharge mechanism discharges the flocculated sediment, improving convenience. The filtration mechanism filters the water after flocculation treatment, and the installation mechanism facilitates the opening and closing of the filtration mechanism, improving the convenience of cleaning the inside of the filtration mechanism.
[0007] Preferably, the aeration mechanism includes a sewage treatment tank, an air pipe, an air diffuser and a pump body. The air pipe is installed on the inner wall of the sewage treatment tank through a bracket, the air diffuser is installed on the air pipe, the pump body is installed on the outer wall of the sewage treatment tank, and the air outlet end of the pump body is communicated with the air pipe through a pipeline; by opening the pump body, air is passed through the air pipe and then added to the sewage in the sewage treatment tank through the air diffuser, thereby aerating the sewage and improving the flocculation and sedimentation efficiency and quality of the flocculation and sedimentation mechanism.
[0008] Preferably, the flocculation and sedimentation mechanism includes an installation frame, a spray pipe, a spray head, a first water pump, a storage tank and a first water pipe. The installation frame is installed on the inner wall of the sewage treatment tank, the spray pipe is installed on the installation frame, the spray head is installed on the spray pipe, the first water pump is installed at the top of the installation frame, and the storage tank is connected to the first water pump through the first water pipe; first, the flocculant is added to the storage tank, and then the first water pump is opened to make the flocculant in the storage tank enter the spray pipe through the first water pipe, and the flocculant is sprayed out through the spray head, thereby spraying the flocculant into the sewage in the sewage treatment tank.
[0009] Preferably, the alarm mechanism includes a water level cylinder, a buoyancy plate, a chute, a slider, a U-shaped rod, a proximity switch and a buzzer. The water level cylinder is installed on the outer wall of the sewage treatment tank which is installed on the outer wall of the storage bucket. The water level cylinder is communicated with the storage bucket. The buoyancy plate is slidably installed in the water level cylinder by buoyancy. A chute is arranged on the outer wall of the water level cylinder. The slider is slidably installed in the chute. The U-shaped rod is U-shaped. One end of the U-shaped rod is installed on the buoyancy plate, and the other end of the U-shaped rod is installed on the slider. The U-shaped rod is slidably installed on the water level cylinder. The proximity switch is installed on the outer wall of the water level cylinder through a bracket, and the buzzer is installed at the top of the storage bucket. As the flocculant in the storage bucket is used and the liquid level drops, the buoyancy plate slides in the water level cylinder, and then drives the slider to slide in the chute through the U-shaped rod. When the slider approaches the proximity switch, the proximity switch sends an electrical signal to control the buzzer to alarm, reminding the operator to replenish in time.
[0010] Preferably, the sewage discharge mechanism includes a sewage discharge cylinder, a stirring shaft, screw conveyor blades and a motor. The sewage discharge cylinder is installed at the bottom end of the sewage treatment tank. The sewage discharge cylinder is communicated with the sewage treatment tank. The stirring shaft is rotatably installed in the sewage discharge cylinder. The screw conveyor blades are installed on the stirring shaft. A sewage discharge port is arranged on the sewage discharge cylinder. The motor is installed on the side wall of the sewage discharge cylinder, and the output end of the motor is connected to the stirring shaft. When the flocculant precipitate in the sewage treatment tank needs to be discharged, the motor is turned on to drive the stirring shaft to rotate, and then drive the screw conveyor blades to rotate to discharge the flocculant precipitate through the discharge port of the sewage discharge cylinder.
[0011] Preferably, the filtering mechanism includes a second water pump, a filtering barrel, a top plate, a water guide pipe and a filter plate. The second water pump is installed on the outer wall of the sewage treatment tank. The top plate is installed on the filtering barrel through an installation mechanism. One end of the water guide pipe is installed on the top plate, and the other end of the water guide pipe is installed on the second water pump. The filter plate is installed on the inner wall of the filtering barrel. The second water pump is turned on to add the sewage in the sewage treatment tank into the filtering barrel through the water guide pipe, and the sewage is filtered by the filter plate.
[0012] Preferably, the installation mechanism includes a ball, a threaded rod and a wing nut. An installation plate is arranged at the top of the filtering barrel. Fixed grooves are arranged on both the top plate and the installation plate. The ball is rotatably installed in the fixed groove of the installation plate. The threaded rod is installed on the ball. The wing nut is installed on the threaded rod through a threaded connection. When the top plate needs to be fixed after cleaning the filtering barrel, the top plate is placed on the installation plate, and then the ball is rotated to make the threaded rod penetrate through the fixed grooves of the top plate and the installation plate, and then the wing nut is rotated to fix the top plate and the installation plate through the threaded connection.
[0013] The beneficial effects of the present utility model compared with the prior art are as follows: The sewage is aerated by the aeration mechanism to improve the flocculation and precipitation efficiency of the flocculation and precipitation mechanism. The flocculation and precipitation mechanism flocculates and precipitates the sewage. The alarm mechanism detects the amount of flocculant. When the liquid level of the flocculant is low and needs to be replenished, it reminds the operator to replenish it in time. The sewage discharge mechanism discharges the flocculated precipitate, improving convenience. The filtration mechanism filters the water after flocculation treatment. The installation mechanism facilitates the opening and closing of the filtration mechanism, improving the convenience of cleaning the inside of the filtration mechanism. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 is the first axonometric structural schematic diagram of the present utility model;
[0015] Figure 2 is the second axonometric structural schematic diagram of the present utility model;
[0016] Figure 3 is the third axonometric structural schematic diagram of the present utility model;
[0017] Figure 4 is the first front view sectional axonometric structural schematic diagram of the present utility model;
[0018] Figure 5 is the second front view sectional axonometric structural schematic diagram of the present utility model;
[0019] Figure 6 is the front view sectional structural schematic diagram of the present utility model;
[0020] Figure 7 is of the present utility model Figure 3 magnified structural schematic diagram at position A;
[0021] Reference numerals in the drawings: 01, aeration mechanism; 11, sewage treatment tank; 12, aeration pipe; 13, aeration head; 14, pump body; 02, flocculation and precipitation mechanism; 21, mounting bracket; 22, spray pipe; 23, spray head; 24, first water pump; 25, storage bucket; 26, first water pipe; 03, alarm mechanism; 31, water level cylinder; 32, buoyancy plate; 33, chute; 34, slider; 35, U-shaped rod; 36, proximity switch; 37, buzzer; 04, sewage discharge mechanism; 41, sewage discharge cylinder; 42, stirring shaft; 43, auger blade; 44, motor; 05, filtration mechanism; 51, second water pump; 52, filter barrel; 53, top plate; 54, water guide pipe; 55, filter plate; 06, installation mechanism; 61, ball; 62, threaded rod; 63, wing nut. DETAILED DESCRIPTION OF THE EMBODIMENTS
[0022] To facilitate the understanding of the present utility model, the present utility model will be described more comprehensively with reference to the relevant drawings. The present utility model can be implemented in many different forms and is not limited to the embodiments described herein. On the contrary, these embodiments are provided to make the disclosure of the present utility model more thorough and comprehensive.
[0023] Embodiment 1: As Figure 2 , Figure 5 and Figure 6 shown, the integrated urban domestic sewage sludge treatment equipment includes an aeration mechanism 01, and further includes a flocculation and precipitation mechanism 02, an alarm mechanism 03, a sewage discharge mechanism 04, a filtration mechanism 05 and a mounting mechanism 06. The flocculation and precipitation mechanism 02 is installed in the aeration mechanism 01, the alarm mechanism 03 is installed on the flocculation and precipitation mechanism 02, the sewage discharge mechanism 04 is installed at the bottom of the aeration mechanism 01, the filtration mechanism 05 is connected to the aeration mechanism 01, and the mounting mechanism 06 is installed on the filtration mechanism 05;
[0024] The aeration mechanism 01 performs aeration treatment on the sewage, the flocculation and precipitation mechanism 02 performs flocculation and precipitation on the sewage, the alarm mechanism 03 detects the amount of the flocculant, the sewage discharge mechanism 04 discharges the flocculated precipitate, the filtration mechanism 05 filters the water after flocculation treatment, and the mounting mechanism 06 facilitates the opening and closing of the filtration mechanism 05;
[0025] The aeration mechanism 01 includes a sewage treatment tank 11, an aeration pipe 12, an aeration head 13 and a pump body 14. The aeration pipe 12 is installed on the inner wall of the sewage treatment tank 11 through a bracket, the aeration head 13 is installed on the aeration pipe 12, the pump body 14 is installed on the outer wall of the sewage treatment tank 11, and the air outlet end of the pump body 14 is communicated with the aeration pipe 12 through a pipeline;
[0026] The flocculation and precipitation mechanism 02 includes a mounting frame 21, a spray pipe 22, a spray head 23, a first water pump 24, a storage bucket 25 and a first water pipe 26. The mounting frame 21 is installed on the inner wall of the sewage treatment tank 11, the spray pipe 22 is installed on the mounting frame 21, the spray head 23 is installed on the spray pipe 22, the first water pump 24 is installed at the top of the mounting frame 21, and the storage bucket 25 is connected to the first water pump 24 through the first water pipe 26;
[0027] The alarm mechanism 03 includes a water level cylinder 31, a buoyancy plate 32, a chute 33, a slider 34, a U-shaped rod 35, a proximity switch 36, and a buzzer 37. The water level cylinder 31 is installed on the outer wall of the sewage treatment tank 11 which is installed on the outer wall of the storage bucket 25. The water level cylinder 31 communicates with the storage bucket 25. The buoyancy plate 32 is slidably installed in the water level cylinder 31 by buoyancy. A chute 33 is provided on the outer wall of the water level cylinder 31. The slider 34 is slidably installed in the chute 33. The U-shaped rod 35 is U-shaped. One end of the U-shaped rod 35 is installed on the buoyancy plate 32, and the other end of the U-shaped rod 35 is installed on the slider 34. The U-shaped rod 35 is slidably installed on the water level cylinder 31. The proximity switch 36 is installed on the outer wall of the water level cylinder 31 through a bracket, and the buzzer 37 is installed at the top of the storage bucket 25;
[0028] By turning on the pump body 14, air is passed through the aeration pipe 12 and then added to the sewage in the sewage treatment tank 11 through the aeration head 13, thereby aerating the sewage and improving the flocculation and sedimentation efficiency and quality of the flocculation and sedimentation mechanism 02. First, the flocculant is added to the storage bucket 25, and then the first water pump 24 is turned on to send the flocculant in the storage bucket 25 into the spray pipe 22 through the first water pipe 26. The flocculant is sprayed out through the nozzle 23, and then the flocculant is sprayed into the sewage in the sewage treatment tank 11. As the flocculant in the storage bucket 25 is used and the liquid level drops, the buoyancy plate 32 slides in the water level cylinder 31, and then drives the slider 34 to slide in the chute 33 through the U-shaped rod 35. When the slider 34 approaches the proximity switch 36, the proximity switch 36 sends an electrical signal to control the buzzer 37 to alarm, reminding the operator to replenish in time.
[0029] Embodiment 2: As Figures 3 to 7 shown, the integrated urban domestic sewage sludge treatment equipment includes an aeration mechanism 01, and also includes a flocculation and sedimentation mechanism 02, an alarm mechanism 03, a sewage discharge mechanism 04, a filtration mechanism 05, and a mounting mechanism 06. The flocculation and sedimentation mechanism 02 is installed in the aeration mechanism 01, the alarm mechanism 03 is installed on the flocculation and sedimentation mechanism 02, the sewage discharge mechanism 04 is installed at the bottom of the aeration mechanism 01, the filtration mechanism 05 is connected to the aeration mechanism 01, and the mounting mechanism 06 is installed on the filtration mechanism 05;
[0030] The sewage is aerated by the aeration mechanism 01, the sewage is flocculated and sedimented by the flocculation and sedimentation mechanism 02, the amount of the flocculant is detected by the alarm mechanism 03, the flocculated sediment is discharged by the sewage discharge mechanism 04, the water after flocculation treatment is filtered by the filtration mechanism 05, and the mounting mechanism 06 facilitates the opening and closing of the filtration mechanism 05;
[0031] The sewage discharge mechanism 04 includes a sewage discharge cylinder 41, a stirring shaft 42, screw conveyor blades 43 and a motor 44. The sewage discharge cylinder 41 is installed at the bottom end of the sewage treatment tank 11. The sewage discharge cylinder 41 is communicated with the sewage treatment tank 11. The stirring shaft 42 is rotatably installed in the sewage discharge cylinder 41. The screw conveyor blades 43 are installed on the stirring shaft 42. A sewage discharge port is arranged on the sewage discharge cylinder 41. The motor 44 is installed on the side wall of the sewage discharge cylinder 41. The output end of the motor 44 is connected to the stirring shaft 42;
[0032] The filtering mechanism 05 includes a second water pump 51, a filtering barrel 52, a top plate 53, a water guide pipe 54 and a filtering plate 55. The second water pump 51 is installed on the outer wall of the sewage treatment tank 11. The top plate 53 is installed on the filtering barrel 52 through the installation mechanism 06. One end of the water guide pipe 54 is installed on the top plate 53, and the other end of the water guide pipe 54 is installed on the second water pump 51. The filtering plate 55 is installed on the inner wall of the filtering barrel 52;
[0033] The installation mechanism 06 includes a ball 61, a threaded rod 62 and a wing nut 63. An installation plate is arranged at the top of the filtering barrel 52. Fixing grooves are arranged on both the top plate 53 and the installation plate. The ball 61 is rotatably installed in the fixing groove of the installation plate. The threaded rod 62 is installed on the ball 61. The wing nut 63 is installed on the threaded rod 62 through a threaded connection;
[0034] When it is necessary to discharge the flocculent precipitate in the sewage treatment tank 11, the motor 44 is turned on to drive the stirring shaft 42 to rotate, and then drive the screw conveyor blades 43 to rotate to discharge the flocculent precipitate through the discharge port of the sewage discharge cylinder 41. The second water pump 51 is turned on to add the sewage in the sewage treatment tank 11 into the filtering barrel 52 through the water guide pipe 54. The sewage is filtered by the filtering plate 55. When it is necessary to fix the top plate 53 after cleaning the filtering barrel 52, the top plate 53 is placed on the installation plate, and then the ball 61 is rotated so that the threaded rod 62 penetrates through the fixing grooves of the top plate 53 and the installation plate, and then the wing nut 63 is rotated to fix the top plate 53 and the installation plate through a threaded connection.
[0035] Such as Figures 1 to 7As shown, for the integrated urban domestic sewage and sludge treatment equipment of the present utility model, when it works, air is introduced into the sewage in the sewage treatment tank 11 through the air delivery pipe 12 by turning on the pump body 14, and then added into the sewage through the air diffuser 13, thereby aerating the sewage and improving the flocculation and sedimentation efficiency and quality of the flocculation and sedimentation mechanism 02. First, the flocculant is added into the storage barrel 25, and then the first water pump 24 is turned on to make the flocculant in the storage barrel 25 enter the spray pipe 22 through the first water pipe 26, and the flocculant is sprayed out through the nozzle 23, thereby spraying the flocculant into the sewage in the sewage treatment tank 11. As the flocculant in the storage barrel 25 is used and the liquid level drops, the buoyancy plate 32 slides in the water level cylinder 31, thereby driving the slider 34 to slide in the chute 33 through the U-shaped rod 35. When the slider 34 approaches the proximity switch 36, the proximity switch 36 sends an electrical signal to control the buzzer 37 to alarm, reminding the operator to replenish in time. When the flocculation sediment in the sewage treatment tank 11 needs to be discharged, the motor 44 is turned on to drive the stirring shaft 42 to rotate, thereby driving the auger blade 43 to rotate to discharge the flocculation sediment through the discharge port of the sewage discharge cylinder 41. The second water pump 51 is turned on to add the sewage in the sewage treatment tank 11 into the filter barrel 52 through the water guide pipe 54, and the sewage is filtered by the filter plate 55. When the top plate 53 needs to be fixed after cleaning the filter barrel 52, the top plate 53 is placed on the mounting plate, and then the ball 61 is rotated to make the threaded rod 62 pass through the fixing grooves of the top plate 53 and the mounting plate, and then the wing nut 63 is rotated to fix the top plate 53 and the mounting plate through the thread relationship.
[0036] The pump body 14, the first water pump 24, the proximity switch 36, the buzzer 37, the second water pump 51 and the motor 44 of the present utility model are purchased on the market. Technicians in this industry only need to install and operate according to the attached operation manuals, without creative labor from technicians in this field.
[0037] The main functions achieved by the present utility model are: during the sludge treatment process, it is convenient to monitor the amount of the flocculant, remind the operator to replenish the flocculant in time, improve the quality of sewage treatment, and is convenient for cleaning.
[0038] The above are only the preferred embodiments of the present utility model. It should be noted that for those of ordinary skill in the art in this technical field, without departing from the technical principle of the present utility model, several improvements and modifications can be made, and these improvements and modifications should also be regarded as the protection scope of the present utility model.
Claims
1. Integrated urban domestic sewage sludge treatment equipment, including an aeration mechanism (01); characterized in that, It also includes a flocculation precipitation mechanism (02), an alarm mechanism (03), a sewage discharge mechanism (04), a filtration mechanism (05) and a mounting mechanism (06). The flocculation precipitation mechanism (02) is installed in the aeration mechanism (01), the alarm mechanism (03) is installed on the flocculation precipitation mechanism (02), the sewage discharge mechanism (04) is installed at the bottom of the aeration mechanism (01), the filtration mechanism (05) is connected to the aeration mechanism (01), and the mounting mechanism (06) is installed on the filtration mechanism (05); The aeration mechanism (01) performs aeration treatment on the sewage, the flocculation precipitation mechanism (02) performs flocculation precipitation on the sewage, the alarm mechanism (03) detects the amount of flocculant, the sewage discharge mechanism (04) discharges the flocculated precipitate, the filtration mechanism (05) filters the water after flocculation treatment, and the mounting mechanism (06) facilitates the opening and closing of the filtration mechanism (05).
2. The integrated urban domestic sewage sludge treatment equipment according to claim 1, characterized in that, The aeration mechanism (01) includes a sewage treatment tank (11), an aeration pipe (12), an aeration head (13) and a pump body (14). The aeration pipe (12) is installed on the inner wall of the sewage treatment tank (11) through a bracket, the aeration head (13) is installed on the aeration pipe (12), the pump body (14) is installed on the outer wall of the sewage treatment tank (11), and the air outlet end of the pump body (14) is communicated with the aeration pipe (12) through a pipeline.
3. The integrated urban domestic sewage sludge treatment equipment according to claim 2, characterized in that, The flocculation precipitation mechanism (02) includes a mounting frame (21), a spray pipe (22), a spray head (23), a first water pump (24), a storage bucket (25) and a first water pipe (26). The mounting frame (21) is installed on the inner wall of the sewage treatment tank (11), the spray pipe (22) is installed on the mounting frame (21), the spray head (23) is installed on the spray pipe (22), the first water pump (24) is installed at the top of the mounting frame (21), and the storage bucket (25) is connected to the first water pump (24) through the first water pipe (26).
4. The integrated urban domestic sewage sludge treatment equipment according to claim 3, characterized in that, The alarm mechanism (03) includes a water level cylinder (31), a buoyancy plate (32), a chute (33), a slider (34), a U-shaped rod (35), a proximity switch (36) and a buzzer (37). The water level cylinder (31) is installed on the outer wall of the sewage treatment tank (11) and on the storage bucket (25), the water level cylinder (31) is communicated with the storage bucket (25), the buoyancy plate (32) is slidably installed in the water level cylinder (31) by buoyancy, a chute (33) is provided on the outer wall of the water level cylinder (31), the slider (34) is slidably installed in the chute (33), the U-shaped rod (35) is U-shaped, one end of the U-shaped rod (35) is installed on the buoyancy plate (32), the other end of the U-shaped rod (35) is installed on the slider (34), the U-shaped rod (35) is slidably installed on the water level cylinder (31), the proximity switch (36) is installed on the outer wall of the water level cylinder (31) through a bracket, and the buzzer (37) is installed at the top of the storage bucket (25).
5. The integrated urban domestic sewage sludge treatment equipment according to claim 2, characterized in that, The sewage discharge mechanism (04) includes a sewage discharge cylinder (41), a stirring shaft (42), auger blades (43) and a motor (44). The sewage discharge cylinder (41) is installed at the bottom end of the sewage treatment tank (11), and the sewage discharge cylinder (41) communicates with the sewage treatment tank (11). The stirring shaft (42) is rotatably installed in the sewage discharge cylinder (41), the auger blades (43) are installed on the stirring shaft (42), a sewage discharge port is provided on the sewage discharge cylinder (41), the motor (44) is installed on the side wall of the sewage discharge cylinder (41), and the output end of the motor (44) is connected to the stirring shaft (42).
6. The integrated urban domestic sewage sludge treatment equipment according to claim 2, characterized in that, The filtering mechanism (05) includes a second water pump (51), a filtering barrel (52), a top plate (53), a water guide pipe (54) and a filter plate (55). The second water pump (51) is installed on the outer wall of the sewage treatment tank (11). The top plate (53) is installed on the filtering barrel (52) through an installation mechanism (06). One end of the water guide pipe (54) is installed on the top plate (53), the other end of the water guide pipe (54) is installed on the second water pump (51), and the filter plate (55) is installed on the inner wall of the filtering barrel (52).
7. The integrated urban domestic sewage sludge treatment equipment according to claim 6, characterized in that, The installation mechanism (06) includes balls (61), threaded rods (62) and wing nuts (63). An installation plate is provided at the top of the filtering barrel (52). Fixed grooves are provided on both the top plate (53) and the installation plate. The balls (61) are rotatably installed in the fixed grooves of the installation plate. The threaded rods (62) are installed on the balls (61), and the wing nuts (63) are installed on the threaded rods (62) through a threaded relationship.
Citation Information
Patent Citations
Integrated urban domestic sewage and sludge treatment equipment
CN218961917U