Pull rod device for electric pole

A modular, quick-connect pole tensioning device addresses the complexity and transport issues of existing systems by enabling efficient assembly and disassembly, enhancing safety and reliability of power line installations.

CN223104265UActive Publication Date: 2025-07-15HONGHE POWER SUPPLY BUREAU OF YUNNAN POWER GRID
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202422234111.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-09-12
Publication Date
2025-07-15
Estimated Expiration
2034-09-12

AI Technical Summary

Technical Problem

The existing wire pulling system is difficult to make, the process is complicated, the on-site construction is inconvenient and difficult to carry, which affects the safe and stable operation of the power grid and the safety of construction personnel.

Method used

A tie rod device for electric pole is designed, using multiple segmented rod connections, and a quick connection is achieved using a fast connection mechanism, including a T-block, a locking sleeve and a locking nut, simplifying the operation process and improving the connection stability.

Benefits of technology

It reduces the labor intensity of construction workers, shortens construction time, improves the stability and power supply reliability of the power grid, and reduces operating risks and engineering costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223104265U_ABST
    Figure CN223104265U_ABST
Patent Text Reader

Abstract

The utility model provides a pull rod device for an electric pole, which comprises a pull rod with a pull ring at one end and a wire clamp at the other end, and is characterized in that the pull rod is formed by connecting a plurality of segmented rods end to end, and the wire clamp is connected with the pull rod through a quick connection mechanism on the wire clamp. A constructor can conveniently carry the pull rod through the multi-section structure, the constructor can conveniently assemble the pull rod on site through the quick connecting mechanism, the operation difficulty is reduced, the process steps are simplified, the file overturning accident caused by the fact that the pull rod is not manufactured in compliance is avoided, and safe and reliable operation of a power grid is guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to a guy wire, in particular to a tension rod device for an electric pole, belonging to the technical field of electrical engineering. Background Art

[0002] During the construction of power facilities, it is usually necessary to install guy wires at positions such as line corners, branches, strain, and terminal poles, with the aim of balancing the stress borne by the electric poles. The current guy wire system consists of materials such as guy wire clamps, extension rings, wedge-shaped wire clamps, UT wire clamps, steel strands, tension rods, pull plates, binding wires, insulators, ball head hanging rings, and bowl head hanging plates. Its manufacturing is difficult and the process is relatively complex. Moreover, the process quality of guy wire manufacturing is related to the safe and stable operation of the power grid and the personal safety of personnel. At present, the manufacturing process of distribution network power line guy wires is greatly affected by the professional level of personnel. Most construction workers only rely on traditional experience for construction, and the process quality varies. This results in long guy wire manufacturing time, damaged materials, the stability of the electric poles not meeting the standards, and being extremely prone to overturning accidents, seriously affecting the safe and reliable operation of the power grid. In addition, most existing guy wires are made on-site, and construction workers need to carry guy wires of corresponding lengths according to the height of the electric poles. Carrying steel guy wires in rolls like this not only greatly increases the labor burden of construction workers, but also makes on-site operations extremely inconvenient, and often requires the cooperation of various mechanical equipment to complete the manufacture of guy wires. Therefore, it is necessary to improve the existing technology. Summary of the Invention

[0003] In order to solve the problems existing in the existing guy wire manufacturing, such as complex process, large operation difficulty, inconvenient on-site construction, and difficult guy wire carrying, the utility model provides a tension rod device for an electric pole.

[0004] The technical solution of the utility model is as follows: A tension rod device for an electric pole includes a tension rod with a pull ring at one end and a wire clamp at the other end. The feature is that the tension rod is formed by connecting multiple segmented rods end to end, and the wire clamp is connected to the tension rod through a quick connection mechanism on it. The quick connection mechanism includes a T-shaped block connected to the end of the wire clamp. Jack holes are respectively arranged at both ends of the horizontal block of the T-shaped block, and an axial strip-shaped jack hole is arranged on the vertical block of the T-shaped block. A locking sleeve and a locking nut are arranged at the port of the strip-shaped jack hole. Among them: the port of the strip-shaped jack hole is set as a conical shape with a larger outer diameter and a smaller inner diameter, the locking sleeve is set as a conical sleeve adapted to the port, and the locking nut is screwed to the periphery of the port.

[0005] The pull rod is set to at least three segmented rods, wherein: one end of the first segmented rod is connected to the pull ring, and the other end is provided with a first plug; one end of the second segmented rod is provided with a first slot matched with the first plug of the first segmented rod, and the other end is provided with a second plug; one end of the third segmented rod is provided with a second slot matched with the second plug of the second segmented rod, and the other end is connected to the wire clamp through a quick-connect mechanism, so as to facilitate construction workers to carry and assemble the pull rod on site. After the assembly is completed, one end of the pull rod is connected to the electric pole through the pull ring, and the other end of the pull rod is connected to the foundation through the wire clamp.

[0006] The first and second plugs are both disc-shaped and connected to the end of the segmented rod; the first and second slots are both arranged on the connecting block of the end of the segmented rod, the connecting block is arranged as a cylinder, the slot is arranged as a T-shaped groove adapted to the shape of the corresponding plug and the segmented rod, the radial side and axial end of the T-shaped groove are both arranged as open, and an elastic locking block is arranged in the T-shaped groove so that the plug and the segmented rod can be inserted through the radial side opening of the T-shaped groove. After insertion, the plug is located in the horizontal groove of the T-shaped groove, and the segmented rod extends outward from the axial end opening of the T-shaped groove, and the elastic locking block is used to prevent the plug from falling out of the slot.

[0007] The quick-connect mechanism includes a T-shaped block connected to the end of the wire clamp, and sockets are respectively provided at both ends of the horizontal block of the T-shaped block. An axial strip socket is provided on the vertical block of the T-shaped block, and a locking sleeve and a locking nut are provided at the port of the strip socket, wherein: the port of the strip socket is set to be a cone with a larger outside and a smaller inside, the locking sleeve is set to be a conical sleeve adapted to the port, and the locking nut is threadedly connected to the periphery of the port so that the rod head can be inserted into the strip socket 19, and the locking sleeve 18 can be inserted into the strip socket through the port, and then the locking nut is rotated to make the locking sleeve gradually penetrate into the strip socket, thereby realizing the locking of the pull rod and the T-shaped block, and then completing the quick connection of the pull rod and the wire clamp.

[0008] The wire clamp is configured as a U-shaped rod, the two rod heads of the U-shaped rod are respectively plugged into the sockets on the horizontal block of the T-shaped block, and the two rod head ends of the U-shaped rod are respectively screwed into the adjusting nuts, so that the position of the T-shaped block on the wire clamp can be adjusted by the adjusting nuts.

[0009] A screw hole with an observation window coaxial with the strip socket is provided on the horizontal block of the T-shaped block, and a screw is provided in the screw hole. The flat head end of the screw extends outward from the T-shaped block, and the pointed end of the screw is screwed into the screw hole and connected to the end of the third segmented rod inserted into the strip socket without being connected, so that the rod head of the third segmented rod can be propped open by the pointed end of the screw, thereby further preventing the pull rod from detaching from the wire clamp, thereby ensuring the safety and stability of the pole.

[0010] The utility model has the following advantages and effects:

[0011] 1. Solve the problem of connecting the traditional UT clamp to the guy wire by means of back binding. The traditional installation method has high requirements for the professional skills of personnel, and strict requirements for the tightness and length of binding. It is only applicable to personnel with relatively high skill levels for installation, and the installation process is time-consuming and laborious, with a large physical consumption and high labor intensity for the operators. Making guy wires in a unified manner can greatly reduce the labor intensity of personnel, minimize the operation risks, improve work efficiency, and have significant social benefits.

[0012] 2. Shorten the construction time and save the project cost. According to the conventional installation method of guy wires, excluding the pre-burial of the guy wire plate, it takes about 30 minutes from the preparatory work before installation to the end of installation. However, when using the quick connection method for installation, the entire installation process only takes about 10 minutes. The operation process is stable and fast, the control method is simple and easy to learn, the operation time is flexible, and the work efficiency is high. Ordinary general workers can carry out the installation, which can save more than 70% of the installation cost, and the economic benefits are very obvious.

[0013] 3. Improve the power supply reliability and ensure the stable operation of the power grid. The use of this guy wire avoids the problem of strand damage and broken strands of the traditional guy wire caused by binding, which can greatly improve the power supply reliability and ensure the stable operation of the power grid. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] In order to more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the following will briefly introduce the drawings required for the description of the embodiments or the prior art. Obviously, for those of ordinary skill in the art, without creative efforts, other drawings can also be obtained based on these drawings.

[0015] Figure 1 It is the front view structure diagram of the present invention;

[0016] Figure 2 It is the side view structure diagram of the present invention;

[0017] Figure 3 It is the cross-sectional view of the T-shaped block of the present invention.

[0018] In the figure, 1. pull ring, 2. pull rod, 3. first segmented rod, 4. second segmented rod, 5. first plug, 6. clamp, 7. second plug, 8. screw, 9. T-shaped block, 10. adjusting nut, 11. locking nut, 12. third segmented rod, 13. second slot, 14. first slot, 15. connecting block, 16. elastic locking block, 17. T-shaped groove, 18. locking sleeve, 19. strip-shaped jack, 20. jack, 21. screw hole, 22. observation window. DETAILED DESCRIPTION OF THE INVENTION

[0019] The following will clearly and completely describe the technical solutions in the embodiments of the present utility model with reference to the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only a part of the embodiments of the present utility model, rather than all of the embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without making creative efforts belong to the scope of protection of the present utility model. Embodiment

[0020] The tension rod device for electric poles provided by the present utility model includes a tension rod 2 with a pull ring 1 at one end and a wire clamp 6 at the other end. The tension rod 2 is formed by connecting multiple segmented rods end to end. The wire clamp 6 is connected to the tension rod 2 through a quick connection mechanism thereon, so as to facilitate the construction personnel to carry the tension rod 2 through the multi-section structure. Through the quick connection mechanism, the construction personnel can conveniently assemble the tension rod 2 on site, and reduce the operation difficulty and simplify the process steps, avoiding the accident of pole overturning caused by the non-compliance of the production of the tension rod 2, and ensuring the safe and reliable operation of the power grid. The quick connection mechanism includes a T-shaped block 9 connected to the end of the wire clamp 6. Jacks 20 are respectively provided at both ends of the horizontal block of the T-shaped block 9. An axially strip-shaped jack 19 is provided on the vertical block of the T-shaped block 9. A locking sleeve 18 and a locking nut 11 are provided at the port of the strip-shaped jack 19. Among them: the port of the strip-shaped jack 19 is set as a conical shape with a large outer and a small inner diameter. The locking sleeve 18 is set as a conical sleeve adapted to the port. The locking nut 11 is screwed to the periphery of the port, so as to sleeved the locking sleeve 18 on the rod head of the third segmented rod 12. By inserting the rod head into the strip-shaped jack 19, the locking sleeve 18 is inserted into the strip-shaped jack 19 through the port. Then, the locking nut 11 is rotated, so that the locking sleeve 18 gradually penetrates into the strip-shaped socket 19, thereby realizing the locking of the tension rod 2 and the T-shaped block 9, and then completing the quick connection of the tension rod 2 and the wire clamp 6. A screw hole 21 with an observation window 22 thereon coaxial with the strip-shaped jack 19 is provided on the horizontal block of the T-shaped block 9. A screw 8 is provided in the screw hole 21. The flat head end of the screw 8 extends out of the T-shaped block 9. After the pointed end of the screw 8 is screwed into the screw hole 21, it abuts against the end of the third segmented rod 12 inserted into the strip-shaped jack 19 but is not connected, so as to expand the rod head of the third segmented rod 12 through the pointed end of the screw 8, thereby further preventing the situation that the tension rod 2 is separated from the wire clamp 6 and ensuring the safety and stability of the electric pole.

[0021] The tension rod 2 is at least provided with three segmented rods. Among them: one end of the first segmented rod 3 is connected to the pull ring 1, and a first plug 5 is provided at the other end; a first socket 14 adapted to the first plug 5 of the first segmented rod 3 is provided at one end of the second segmented rod 4, and a second plug 7 is provided at the other end; a second socket 13 adapted to the second plug 7 of the second segmented rod 4 is provided at one end of the third segmented rod 12, and the other end is connected to the wire clamp 6 through a quick connection mechanism, so as to facilitate the construction personnel to carry and assemble the tension rod 2 on site. After assembly, one end of the tension rod 2 is connected to the electric pole through the pull ring 1, and the other end of the tension rod 2 is connected to the foundation through the wire clamp 6.

[0022] The first plug 5 and the second plug 7 are both disk-shaped and are connected to the end of the segmented rod; the first slot 14 and the second slot 13 are both arranged on the connecting block 15 at the end of the segmented rod. The connecting block 15 is a cylinder, and the slot is a T-shaped groove 17 adapted to the shapes of the corresponding plug and the segmented rod. The radial side and the axial end of the T-shaped groove 17 are both open, and an elastic locking block 16 is arranged in the T-shaped groove 17 so that the plug and the segmented rod can be inserted through the open radial side of the T-shaped groove 17. After insertion, the plug is located in the horizontal groove of the T-shaped groove 17, and the segmented rod extends outward from the open axial end of the T-shaped groove 17. The elastic locking block 16 is used to prevent the plug from disengaging from the slot;

[0023] The wire clamp 6 is a U-shaped rod. The two rod ends of the U-shaped rod are respectively inserted into the jacks 20 on the horizontal block of the T-shaped block 9, and the two rod ends of the U-shaped rod are respectively screwed with the adjusting nuts 10 so as to adjust the position of the T-shaped block 9 on the wire clamp 6 through the adjusting nuts 10;

[0024] The above shows and describes the basic principle, main features and advantages of the present invention. Those skilled in the art should understand that the present invention is not limited by the above embodiments. What is described in the above embodiments and the specification only illustrates the principle of the present invention. Without departing from the spirit and scope of the present invention, the present invention will have various changes and improvements, and these changes and improvements all fall within the scope of the present invention claimed. The scope of protection of the present invention is defined by the appended claims and their equivalents.

Claims

1. A tie rod device for an electric pole, comprising a tie rod with a pull ring at one end and a wire clamp at the other end, characterized in that: The pull rod is formed by connecting multiple segmented rods end to end, and the wire clamp is connected to the pull rod through the quick connection mechanism thereon; the quick connection mechanism includes a T-shaped block connected to the end of the wire clamp, sockets are respectively arranged at both ends of the horizontal block of the T-shaped block, an axial strip-shaped socket is arranged on the vertical block of the T-shaped block, a locking sleeve and a locking nut are arranged at the port of the strip-shaped socket, wherein: the port of the strip-shaped socket is set as a conical shape with a large outer and a small inner diameter, the locking sleeve is set as a conical sleeve adapted to the port, and the locking nut is screwed to the periphery of the port.

2. The tie rod device for utility poles according to claim 1, characterized in that: The pull rod is at least provided with three segmented rods, wherein: one end of the first segmented rod is connected to the pull ring and the other end is provided with a first plug; one end of the second segmented rod is provided with a first slot adapted to the first plug of the first segmented rod and the other end is provided with a second plug; one end of the third segmented rod is provided with a second slot adapted to the second plug of the second segmented rod and the other end is connected to the wire clamp through the quick connection mechanism.

3. The tie rod device for a utility pole according to claim 2, wherein: The first and second plugs are both set as disc-shaped and are connected to the end of the segmented rod; the first and second slots are both arranged on the connecting block at the end of the segmented rod, the connecting block is set as a cylinder, the slot is set as a T-shaped groove adapted to the shape of the corresponding plug and the segmented rod, the radial side and the axial end of the T-shaped groove are both open, and an elastic locking block is arranged in the T-shaped groove, so that the plug can be inserted through the radial side, and the end of the segmented rod can be inserted through the open end of the axial end and then connected to the plug.

4. The tie rod device for utility poles according to claim 1, characterized in that: A screw hole with an observation window thereon coaxial with the strip-shaped socket is arranged on the horizontal block of the T-shaped block, a screw is arranged in the screw hole, the flat head end of the screw extends out of the T-shaped block, and after the pointed head end of the screw is screwed into the screw hole, it contacts but is not connected to the end of the pull rod inserted into the strip-shaped socket.

5. The tie rod device for utility poles according to claim 1, characterized in that: The wire clamp is set as a U-shaped rod, the two rod ends of the U-shaped rod are respectively inserted into the sockets on the horizontal block of the T-shaped block, and the two rod ends of the U-shaped rod are respectively screwed to the adjusting nuts.