Efficient cooling device for energy bar machining

By using a high-efficiency cooling device combined with a water tank system and a fan during the energy bar processing, clean water is circulated and the cooling capacity is transferred using the thermally conductive metal plate, the problems of natural cooling and air cooling are solved, and the rapid cooling of the energy bar is achieved.

CN223121755UActive Publication Date: 2025-07-18WENZHOU JINHENG PET PROD CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202422122013.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-08-30
Publication Date
2025-07-18
Estimated Expiration
2034-08-30

AI Technical Summary

Technical Problem

During the existing energy bar processing, the cooling method of chocolate coating mainly relies on natural cooling or air cooling, resulting in long cooling time and low efficiency.

Method used

A high-efficiency cooling device is adopted, using a combination of water tank system and fan, and circulates clean water through the water injection assembly and return water assembly, combining thermally conductive metal plates and fans to generate air flow, achieving rapid cooling.

Benefits of technology

It significantly shortens the cooling time of the energy bar and improves the cooling efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223121755U_ABST
    Figure CN223121755U_ABST
Patent Text Reader

Abstract

The utility model discloses an efficient cooling device for energy bar processing, which relates to the technical field of energy bar processing equipment and comprises a second water tank, a plurality of groups of supporting legs are fixed on the bottom wall of the second water tank, and a cooling tank body is fixed in the middle of the top wall of the second water tank. A plurality of first water tanks and mounting assemblies are evenly fixed to the inner wall of the cooling box body, second heat conduction metal plates are fixedly embedded in the top walls of the first water tanks, and a plurality of fans are evenly fixed to the bottom walls of the mounting assemblies. Clear water in the inner cavity of the second water tank is pumped by starting the water injection assembly to be injected into the inner cavity of the first water tank at the corresponding position, when the clear water in the inner cavity of the first water tank is too much, the clear water automatically flows back into the inner cavity of the second water tank through the water return assembly, and cold energy is transmitted to the second heat conduction metal plate through the clear water and the second heat conduction metal plate; multiple groups of fans are started to generate air flow, so that the cooling efficiency of the energy bar can be improved, and the cooling time is shortened.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of energy bar processing equipment, and particularly relates to an efficient cooling device for energy bar processing. Background Art

[0002] Pet energy bars are nutritional supplement products designed specifically for pets. These energy bars are usually rich in various nutrients such as protein, vitamins, and minerals, and can meet the nutritional needs of pets at different growth stages and health conditions. In the automated production of energy bars, the hot melt mixture of syrup and grains needs to go through four processes on the production line: cutting and forming, chocolate coating, cooling and forming, and blanking and packaging.

[0003] Currently, when the chocolate coating wrapped around the energy bar is cooled and formed, it mainly relies on natural cooling or air cooling. The methods of natural cooling and air cooling take a long time and have low efficiency. Therefore, the utility model proposes an efficient cooling device for energy bar processing that is different from the prior art to solve the above technical problems. Summary of the Invention

[0004] In order to improve the problems of long time consumption and low efficiency of the above-mentioned natural cooling and air cooling methods, the utility model provides an efficient cooling device for energy bar processing.

[0005] The utility model provides an efficient cooling device for energy bar processing, adopting the following technical scheme:

[0006] An efficient cooling device for energy bar processing includes a second water tank. A plurality of groups of support legs are fixed at the bottom wall position of the second water tank. A cooling box body is fixed at the middle position of the top wall of the second water tank. A plurality of groups of first water tanks and installation components are evenly fixed on the inner wall of the cooling box body. A second heat-conducting metal plate is fixedly inlaid at the top wall position of the plurality of groups of first water tanks. A plurality of groups of fans are evenly fixed at the bottom wall position of the installation components. A water injection component extending into the inner cavity of the first water tank is installed at one side position of the inner cavity of the second water tank. A water return component extending into the inner cavity of the first water tank is installed at the other side position of the inner cavity of the second water tank.

[0007] By adopting the above technical scheme, the energy bar to be cooled and formed is placed on the top walls of the plurality of groups of first water tanks. The water injection component is started to extract the clear water in the inner cavity of the second water tank and inject it into the inner cavity of the corresponding first water tank. When the amount of clear water in the inner cavity of the first water tank is too much, it automatically flows back to the inner cavity of the second water tank through the water return component. The cold quantity is transferred to the second heat-conducting metal plate by means of the clear water and the second heat-conducting metal plate. A plurality of groups of fans are started to generate an air flow, thereby accelerating the cooling efficiency of the energy bar and shortening the cooling time.

[0008] Optionally, the installation component includes a sliding frame fixed to the inner wall of the cooling box body. A slider is slidably sleeved in the inner cavity of the sliding frame, and an installation cross plate fixed to the fan is mounted on the outer wall of the slider.

[0009] By adopting the above technical solution, pulling the installation cross plate drives the slider to horizontally move in the inner cavity of the sliding frame, facilitating the adjustment of the position of the installation cross plate and the fan and facilitating the maintenance and repair of the fan.

[0010] Optionally, the water injection component includes a submersible pump fixed at the bottom wall position of the inner cavity of the second water tank. The output end of the submersible pump is provided with a first water injection pipe penetrating through the top wall of the second water tank, and a plurality of second water injection pipes extending into the inner cavity of the first water tank are connected to the first water injection pipe.

[0011] Optionally, the water return component includes a first water return pipe fixedly embedded in the top wall of the second water tank, and a plurality of second water return pipes extending into the inner cavity of the first water tank are obliquely installed on the first water return pipe.

[0012] By adopting the above technical solution, starting the submersible pump to extract the clear water in the inner cavity of the second water tank and injecting it into the inner cavity of the first water tank at the corresponding position through the first water injection pipe and the second water injection pipes. When the amount of clear water in the inner cavity of the first water tank is too much, it automatically flows back into the inner cavity of the second water tank through the second water return pipe and the first water return pipe, and the cold quantity is transferred to the second heat conduction metal plate by means of the clear water and the second heat conduction metal plate.

[0013] Optionally, water injection holes are provided at both sides of the top wall of the second water tank.

[0014] By adopting the above technical solution, clear water is injected into the inner cavity of the second water tank through the water injection holes.

[0015] Optionally, a first heat conduction metal plate is fixedly embedded at the bottom wall position of the second water tank. A plurality of heat conduction metal rods are uniformly fixed at the top wall position of the first heat conduction metal plate, and a semiconductor refrigeration sheet is fixed at the bottom wall position of the first heat conduction metal plate.

[0016] By adopting the above technical solution, starting the semiconductor refrigeration sheet to generate cold quantity and transferring it to the clear water in the inner cavity of the second water tank through the first heat conduction metal plate and the heat conduction metal rods, which is convenient for reducing the temperature of the clear water in the inner cavity of the second water tank.

[0017] Optionally, door bodies are hinged at both ends of the front surface of the cooling box body through hinges.

[0018] By adopting the above technical solution, it is convenient to take and place the energy rod by opening and closing the door body.

[0019] In summary, the present utility model has at least one of the following beneficial effects:

[0020] Inject an appropriate amount of clean water into the inner cavity of the second water tank through the water injection hole. Start the submersible pump to extract the clean water in the inner cavity of the second water tank and inject it into the inner cavity of the first water tank at the corresponding position through the first water injection pipe and the second water injection pipe. When the amount of clean water in the inner cavity of the first water tank is too much, it will automatically flow back to the inner cavity of the second water tank through the second return pipe and the first return pipe. Start multiple groups of fans to generate air flow, which can accelerate the cooling efficiency of the energy rod and shorten the cooling time.

[0021] Start the semiconductor refrigeration sheet to generate cold and transfer it to the clean water in the inner cavity of the second water tank through the first heat-conducting metal plate and the heat-conducting metal rod, which is convenient for reducing the temperature of the clean water in the inner cavity of the second water tank and ensuring the cooling efficiency of the energy rod. Description of the Drawings

[0022] Figure 1 It is a front view sectional structure schematic diagram of the present utility model;

[0023] Figure 2 It is a front view structure schematic diagram of the present utility model.

[0024] In the figure: 1, first water injection pipe; 2, first water tank; 3, second water injection pipe; 4, water injection hole; 5, submersible pump; 6, support leg; 7, semiconductor refrigeration sheet; 8, first heat-conducting metal plate; 9, heat-conducting metal rod; 10, second water tank; 11, first return pipe; 12, second return pipe; 13, second heat-conducting metal plate; 14, sliding frame; 15, cooling box body; 16, fan; 17, installation cross plate; 18, slider; 19, door body. Detailed Description of the Preferred Embodiment

[0025] The following is a further detailed description of the present utility model in conjunction with the attached Figure 1-2 figures.

[0026] Please refer to the drawings in the specification Figure 1 , an embodiment provided by the present utility model: An efficient cooling device for energy rod processing, including a second water tank 10. A plurality of groups of support legs 6 are fixed at the bottom wall position of the second water tank 10. The longitudinal section of the support legs 6 is set as an I-shaped. A cooling box body 15 is fixed at the middle position of the top wall of the second water tank 10. A plurality of groups of first water tanks 2 and installation components are evenly fixed on the inner wall of the cooling box body 15. A second heat-conducting metal plate 13 is fixedly embedded at the top wall position of the plurality of groups of first water tanks 2. The installation component includes a sliding frame 14. The sliding frame 14 is fixed on the inner wall of the cooling box body 15. A slider 18 is slidably sleeved in the inner cavity of the sliding frame 14. An installation cross plate 17 is installed on the outer wall of the slider 18. A plurality of groups of fans 16 are evenly fixed at the bottom wall position of the installation cross plate 17. The plurality of groups of fans 16 are respectively arranged above the plurality of groups of second heat-conducting metal plates 13.

[0027] Please refer to the drawings in the specification Figure 1, a water injection component is installed at one side of the inner cavity of the second water tank 10. The water injection component includes a submersible pump 5. The submersible pump 5 is fixed at the bottom wall position of the inner cavity of the second water tank 10. A first water injection pipe 1 passing through the top wall of the second water tank 10 is installed at the output end of the submersible pump 5. Multiple groups of second water injection pipes 3 extending to the bottom of the inner cavity of the first water tank 2 are connected to the first water injection pipe 1. A water return component is installed at the other side position of the inner cavity of the second water tank 10. The water return component includes a first water return pipe 11. The first water return pipe 11 is fixedly embedded in the top wall of the second water tank 10. Multiple groups of second water return pipes 12 extending to the top of the inner cavity of the first water tank 2 are obliquely installed on the first water return pipe 11.

[0028] Place the energy rod to be cooled and formed on the top walls of multiple groups of first water tanks 2. Start the submersible pump 5 to pump the clear water in the inner cavity of the second water tank 10 and inject it into the inner cavity of the corresponding first water tank 2 through the first water injection pipe 1 and the second water injection pipes 3. When the amount of clear water in the inner cavity of the first water tank 2 is excessive, it automatically flows back to the inner cavity of the second water tank 10 through the second water return pipes 12 and the first water return pipe 11. Transfer the cold quantity to the second heat conduction metal plate 13 with the help of the clear water and the second heat conduction metal plate 13. At this time, start multiple groups of fans 16 to generate an air flow, which can accelerate the cooling efficiency of the energy rod and shorten the cooling time.

[0029] Please refer to the attached drawings in the specification Figure 1 , water injection holes 4 are provided at both sides of the top wall of the second water tank 10. Inject clear water into the inner cavity of the second water tank 10 through the water injection holes 4.

[0030] Please refer to the attached drawings in the specification Figure 1 , a first heat conduction metal plate 8 is fixedly embedded at the bottom wall position of the second water tank 10. Multiple groups of heat conduction metal rods 9 are uniformly fixed at the top wall position of the first heat conduction metal plate 8. A semiconductor refrigeration sheet 7 is fixed at the bottom wall position of the first heat conduction metal plate 8. Start the semiconductor refrigeration sheet 7 to generate cold quantity and transfer it to the clear water in the inner cavity of the second water tank 10 through the first heat conduction metal plate 8 and the heat conduction metal rods 9, which is convenient for reducing the temperature of the clear water in the inner cavity of the second water tank 10.

[0031] Please refer to the attached drawings in the specification Figure 1 and 2 , doors 19 are hinged at both ends of the front of the cooling box 15 through hinges. A vertical handle and a lock body are installed on the front side wall of the door 19. It is convenient to take and place the energy rod by opening and closing the door 19.

[0032] Working principle: When using this efficient cooling device for energy bar processing, use multiple sets of support legs 6 to stably place this efficient cooling device for energy bar processing in an appropriate position. Open the door body 19 and place the energy bar to be cooled and formed on the top walls of multiple sets of first water tanks 2. Inject an appropriate amount of clean water into the inner cavity of the second water tank 10 through the water injection hole 4. Start the submersible pump 5 to pump the clean water in the inner cavity of the second water tank 10 into the inner cavity of the first water tank 2 at the corresponding position through the first water injection pipe 1 and the second water injection pipe 3. When the amount of clean water in the inner cavity of the first water tank 2 is excessive, it will automatically flow back to the inner cavity of the second water tank 10 through the second water return pipe 12 and the first water return pipe 11. With the help of clean water and the second heat-conducting metal plate 13, transfer the cold quantity to the second heat-conducting metal plate 13. At this time, start multiple sets of fans 16 to generate an air flow, which can accelerate the cooling efficiency of the energy bar and shorten the cooling time.

[0033] When cooling the energy bar, start the semiconductor refrigeration sheet 7 to generate cold quantity and transfer it to the clean water in the inner cavity of the second water tank 10 through the first heat-conducting metal plate 8 and the heat-conducting metal rod 9, which is convenient for reducing the temperature of the clean water in the inner cavity of the second water tank 10 and ensuring the cooling efficiency of the energy bar. Pull the installation cross plate 17 to drive the slider 18 to move horizontally in the inner cavity of the sliding frame 14, which is convenient for adjusting the positions of the installation cross plate 17 and the fan 16 and facilitating the maintenance of the fan 16.

[0034] The standard parts used in this utility model document can all be purchased from the market. Each component in this utility model document can be customized according to the description in the specification and the drawings. The specific connection methods of each part all adopt conventional means such as bolts, rivets, and welding that are mature in the prior art. The machinery, parts, and equipment all adopt conventional models in the prior art. Coupled with the circuit connection adopting the conventional connection method in the prior art, no specific description will be made here.

[0035] The above are all the preferred embodiments of this utility model. It does not limit the protection scope of this utility model accordingly. Therefore, all equivalent changes made according to the structure, shape, and principle of this utility model should be covered within the protection scope of this utility model.

Claims

1. An efficient cooling device for energy bar processing, including a second water tank (10), characterized in that: A plurality of groups of support legs (6) are fixedly arranged at the bottom wall position of the second water tank (10). A cooling box body (15) is fixedly arranged at the middle position of the top wall of the second water tank (10). A plurality of groups of first water tanks (2) and mounting components are uniformly fixed on the inner wall of the cooling box body (15). A second heat-conducting metal plate (13) is fixedly embedded at the top wall position of the plurality of first water tanks (2). A plurality of groups of fans (16) are uniformly fixed at the bottom wall position of the mounting components. A water injection component extending into the inner cavity of the first water tank (2) is mounted at one side position in the inner cavity of the second water tank (10). A water return component extending into the inner cavity of the first water tank (2) is mounted at the other side position in the inner cavity of the second water tank (10).

2. An efficient cooling device for energy bar processing according to claim 1, characterized in that: The mounting component includes a sliding frame (14). The sliding frame (14) is fixed on the inner wall of the cooling box body (15). A sliding block (18) is slidably sleeved in the inner cavity of the sliding frame (14). A mounting cross plate (17) fixed to the fan (16) is mounted on the outer wall of the sliding block (18).

3. An efficient cooling device for energy bar processing according to claim 1, characterized in that: The water injection component includes a submersible pump (5). The submersible pump (5) is fixed at the bottom wall position of the inner cavity of the second water tank (10). A first water injection pipe (1) penetrating through the top wall of the second water tank (10) is mounted at the output end of the submersible pump (5). A plurality of second water injection pipes (3) extending into the inner cavity of the first water tank (2) are connected to the first water injection pipe (1).

4. An efficient cooling device for energy bar processing according to claim 1, characterized in that: The water return component includes a first water return pipe (11). The first water return pipe (11) is fixedly embedded in the top wall of the second water tank (10). A plurality of second water return pipes (12) extending into the inner cavity of the first water tank (2) are obliquely mounted on the first water return pipe (11).

5. An efficient cooling device for energy bar processing according to claim 1, characterized in that: Water injection holes (4) are formed in both side positions of the top wall of the second water tank (10).

6. The high-efficiency cooling device for energy bar processing according to claim 1, wherein: A first heat-conducting metal plate (8) is fixedly embedded at the bottom wall position of the second water tank (10). A plurality of groups of heat-conducting metal rods (9) are uniformly fixed at the top wall position of the first heat-conducting metal plate (8). A semiconductor refrigeration sheet (7) is fixed at the bottom wall position of the first heat-conducting metal plate (8).

7. The high-efficiency cooling device for energy bar processing according to claim 1, characterized in that: Doors (19) are hinged at both front end positions of the cooling box body (15) through hinges.