Transformer comprehensive tester

By designing component storage grooves, sealing protective frames and combination frames on the transformer comprehensive tester, the magnetic connection between the iron-absorbing stones and the positioning iron sheets is used to solve the problem of contamination on the external interface, and effective protection and convenient operation are achieved.

CN223123057UActive Publication Date: 2025-07-18FUJIAN RUINENGBOER ELECTRICAL EQUIP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421379840.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-06-17
Publication Date
2025-07-18
Estimated Expiration
2034-06-17

AI Technical Summary

Technical Problem

The external interface of the existing transformer comprehensive tester is exposed to the outside world and is prone to impurities.

Method used

The assembly storage groove, sealing protective frame and combination frame structure are designed, and the magnetic connection between the absorbing stone and the positioning iron sheet is used to achieve protection against the external wiring interface and manual operation switch.

Benefits of technology

It effectively prevents external impurities from entering, improves combination stability, and facilitates disassembly and storage, avoids loss.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223123057U_ABST
    Figure CN223123057U_ABST
Patent Text Reader

Abstract

The utility model discloses a transformer comprehensive tester, which comprises a transformer comprehensive tester, an external line interface and a manual operation switch, and is characterized in that the front side frame of the transformer comprehensive tester is provided with an assembly accommodating groove, and the assembly accommodating groove is internally provided with the external line interface and the manual operation switch; the external circuit interface and the manual operation switch are fixedly connected with the transformer comprehensive test instrument, and the inner side of the front end of the transformer comprehensive test instrument is provided with a first positioning iron sheet. According to the comprehensive tester for the transformer, the sealing protection frame and the combined frame can be clamped with an assembly accommodating groove in the comprehensive tester for stabilization according to the arranged sealing protection frame and the combined frame, so that an external circuit interface and a manual operation switch in the assembly accommodating groove can be conveniently protected; and the magnet blocks on the combined frame and the first positioning iron sheets are attracted through magnetic force, so that the combination stability is improved, and subsequent splitting is convenient.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of transformer detection, in particular to a transformer comprehensive tester. Background Technique

[0002] In the process of detecting a transformer, a test instrument is needed to detect the transformer, and a transformer comprehensive tester is required for the detection work. However, the current transformer comprehensive testers on the market still have the following problems:

[0003] The transformer comprehensive tester is provided with a plurality of interfaces for combination with external wires. When the transformer comprehensive tester is held, the interfaces are directly exposed, making it easy for external impurities to enter.

[0004] In view of the above problems, an innovative design is made on the basis of the original transformer comprehensive tester. Content of the Utility Model

[0005] The purpose of the utility model is to provide a transformer comprehensive tester to solve the problem that in the currently common transformer comprehensive testers on the market, the transformer comprehensive tester is provided with a plurality of interfaces for combination with external wires. When the transformer comprehensive tester is held, the interfaces are directly exposed, making it easy for external impurities to enter, as mentioned in the above background technique.

[0006] To achieve the above purpose, the utility model provides the following technical solution: A transformer comprehensive tester includes a transformer comprehensive test instrument, an external circuit interface, and a manual operation switch. A component storage groove is opened on the front side frame of the transformer comprehensive test instrument, and the external circuit interface and the manual operation switch are installed inside the component storage groove, and the external circuit interface and the manual operation switch are fixedly connected to the transformer comprehensive test instrument. A first positioning iron sheet is installed on the inner side of the front end of the transformer comprehensive test instrument, and a second positioning iron sheet is installed on the left surface of the transformer comprehensive test instrument. A sealing protection frame is installed on the front side of the transformer comprehensive test instrument, and a stable straight bar and a combined frame are installed on the outer surface of the frame of the sealing protection frame, and the combined frame is located inside the component storage groove. A magnetic attraction stone is installed on the frame of the combined frame, and the magnetic attraction stone is connected to the first positioning iron sheet.

[0007] Preferably, the connection method of the first positioning iron sheet and the second positioning iron sheet to the transformer comprehensive test instrument is inlaid and fixed, and the connection method of the first positioning iron sheet and the second positioning iron sheet to the magnetic attraction stone is magnetic connection.

[0008] Preferably, the connection method of the sealing protection frame and the stable straight bar is hot melt fixing, and the stable straight bars are symmetrically distributed on the sealing protection frame.

[0009] Preferably, the combined frame and the sealing protection frame are integrally structured, and the length and width of the combined frame are greater than those of the sealing protection frame. The connection between the combined frame and the component storage groove is a snap connection.

[0010] Preferably, the connection between the magnetic block and the combined frame is an inlaid fixation. The magnetic blocks are symmetrically distributed on the combined frame, and the outer surface of the magnetic block is flush with the outer surface of the combined frame.

[0011] Compared with the prior art, the beneficial effects of the present utility model are as follows: This transformer comprehensive tester

[0012] 1. According to the provided sealing protection frame and combined frame, it can be snapped into the component storage groove on the transformer comprehensive test instrument for firm fixation, facilitating the protection of the external circuit interface and manual operation switch inside the component storage groove. Moreover, the magnetic adsorption between the magnetic blocks on the combined frame and the first positioning iron sheet improves the stability of the combination and is convenient for subsequent disassembly.

[0013] 2. After disassembling the sealing protection frame and the combined frame, they can be magnetically adsorbed to the side of the transformer comprehensive test instrument through the magnetic blocks and the second positioning iron sheet for convenient storage, avoiding the phenomenon of loss due to separation. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 is a schematic three-dimensional structure diagram of the overall seal of the present utility model;

[0015] Figure 2 is a schematic three-dimensional structure diagram of the overall open state of the present utility model;

[0016] Figure 3 is a schematic three-dimensional structure diagram of the sealing protection frame of the present utility model;

[0017] Figure 4 is a schematic three-dimensional structure diagram of the flipped sealing protection frame of the present utility model.

[0018] In the figure: 1. Transformer comprehensive test instrument; 2. Component storage groove; 3. External circuit interface; 4. Manual operation switch; 5. First positioning iron sheet; 6. Second positioning iron sheet; 7. Sealing protection frame; 8. Stable straight bar; 9. Combined frame; 10. Magnetic block. DETAILED DESCRIPTION OF THE EMBODIMENTS

[0019] The following will clearly and completely describe the technical solutions in the embodiments of the present utility model with reference to the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only a part of the embodiments of the present utility model, rather than all the embodiments. All other embodiments obtained by those of ordinary skill in the art based on the embodiments of the present utility model without creative efforts shall fall within the protection scope of the present utility model.

[0020] Please refer to Figures 1-4 , the present utility model provides a technical solution: a transformer comprehensive tester, including a transformer comprehensive test instrument 1, an external circuit interface 3, and a manual operation switch 4. A component storage groove 2 is provided on the front side frame of the transformer comprehensive test instrument 1, and the external circuit interface 3 and the manual operation switch 4 are installed inside the component storage groove 2, and the external circuit interface 3 and the manual operation switch 4 are fixedly connected to the transformer comprehensive test instrument 1. A first positioning iron sheet 5 is installed on the inner side of the front end of the transformer comprehensive test instrument 1, and a second positioning iron sheet 6 is installed on the left surface of the transformer comprehensive test instrument 1. A sealing protection frame 7 is installed on the front side of the transformer comprehensive test instrument 1, and a stable straight bar 8 and a combined frame 9 are installed on the outer surface of the frame of the sealing protection frame 7, and the combined frame 9 is located inside the component storage groove 2. A magnetic attraction stone 10 is installed on the frame of the combined frame 9, and the magnetic attraction stone 10 is connected to the first positioning iron sheet 5.

[0021] The first positioning iron sheet 5 and the second positioning iron sheet 6 are fixedly connected to the transformer comprehensive test instrument 1 by inlaying, and the connection method between the first positioning iron sheet 5 and the second positioning iron sheet 6 and the magnetic attraction stone 10 is magnetic connection, so that the first positioning iron sheet 5 and the second positioning iron sheet 6 can be fixed on the transformer comprehensive test instrument 1 and then stabilized by magnetic connection with the magnetic attraction stone 10, improving the installation positioning stability.

[0022] The connection method between the sealing protection frame 7 and the stable straight bar 8 is heat fusion fixing, and the stable straight bars 8 are symmetrically distributed on the sealing protection frame 7, so that the stable straight bars 8 can be fixed on the sealing protection frame 7. When the sealing protection frame 7 is disassembled later, it can be pulled through the stable straight bars 8, and the operation is convenient and fast.

[0023] The combined frame 9 and the sealing protection frame 7 are integrally structured, and the length and width of the combined frame 9 are greater than those of the sealing protection frame 7, and the connection method between the combined frame 9 and the component storage groove 2 is snap connection, so that the sealing protection frame 7 can be snap-positioned with the component storage groove 2 through the combined frame 9, which is convenient, stable and suitable for performing protection work.

[0024] The connection mode of the magnet block 10 and the combined frame 9 is inlaid and fixed. The magnet blocks 10 are symmetrically distributed on the combined frame 9, and the outer surface of the magnet block 10 is flush with the outer surface of the combined frame 9. According to the magnet blocks 10 on the combined frame 9, it is beneficial to magnetically stabilize the combined frame 9 through the magnet blocks 10 subsequently, which is convenient for positioning.

[0025] Working principle: According to Figures 1-4 , when it is necessary to conduct a comprehensive test on the transformer through the external circuit interface 3 and the manual operation switch 4 on the transformer comprehensive test instrument 1, the stable straight bar 8 on the sealed protection frame 7 can be manually toggled. The stable straight bar 8 pulls the sealed protection frame 7, and the sealed protection frame 7 drives the combined frame 9 to slide and separate from the component storage groove 2. At the same time, the magnet block 10 on the combined frame 9 is magnetically separated from the first positioning iron sheet 5, which is convenient for opening operation. Then, after the sealed protection frame 7 and the combined frame 9 are installed on the left side of the transformer comprehensive test instrument 1, the magnet block 10 on the combined frame 9 is attached to the second positioning iron sheet 6 on the transformer comprehensive test instrument 1, so as to perform magnetic positioning and avoid the phenomenon of mutual separation and loss. Then, the operation can be carried out through the external circuit interface 3 and the manual operation switch 4 on the transformer comprehensive test instrument 1. The transformer comprehensive test instrument 1, the external circuit interface 3 and the manual operation switch 4 are known and existing technologies in the market, and will not be described in detail here. The above is the working process of the entire device, and the content not described in detail in this specification belongs to the prior art well-known to those skilled in the art.

[0026] Although the embodiments of the present invention have been shown and described, for those of ordinary skill in the art, it can be understood that various changes, modifications, substitutions, and variations can be made to these embodiments without departing from the principle and spirit of the present invention. The scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A comprehensive transformer tester, comprising a comprehensive transformer testing instrument (1), an external circuit interface (3) and a manual operation switch (4), characterized in that: A component storage groove (2) is provided on the front side frame of the transformer comprehensive test instrument (1), and an external circuit interface (3) and a manual operation switch (4) are installed inside the component storage groove (2), and the external circuit interface (3) and the manual operation switch (4) are fixedly connected to the transformer comprehensive test instrument (1). A first positioning iron sheet (5) is installed on the inner side of the front end of the transformer comprehensive test instrument (1), and a second positioning iron sheet (6) is installed on the left surface of the transformer comprehensive test instrument (1). A sealing protection frame (7) is installed on the front side of the transformer comprehensive test instrument (1), and a stabilizing straight bar (8) and a combined frame (9) are installed on the outer surface of the frame of the sealing protection frame (7), and the combined frame (9) is located inside the component storage groove (2). A magnetic attraction stone (10) is installed on the frame of the combined frame (9), and the magnetic attraction stone (10) is connected to the first positioning iron sheet (5).

2. The integrated transformer tester according to claim 1, wherein: The connection method of the first positioning iron sheet (5) and the second positioning iron sheet (6) to the transformer comprehensive test instrument (1) is inlaid and fixed, and the connection method of the first positioning iron sheet (5) and the second positioning iron sheet (6) to the magnetic attraction stone (10) is magnetic connection.

3. The integrated transformer tester according to claim 1, wherein: The connection method of the sealing protection frame (7) and the stabilizing straight bar (8) is heat fusion fixed, and the stabilizing straight bars (8) are symmetrically distributed on the sealing protection frame (7).

4. A transformer comprehensive tester according to claim 1, characterized in that: The combined frame (9) and the sealing protection frame (7) are integrally structured, and the length and width of the combined frame (9) are greater than those of the sealing protection frame (7), and the connection method of the combined frame (9) and the component storage groove (2) is snap connection.

5. A comprehensive transformer tester according to claim 1, characterized in that: The connection method of the magnetic attraction stone (10) and the combined frame (9) is inlaid and fixed, and the magnetic attraction stones (10) are symmetrically distributed on the combined frame (9), and the outer surface of the magnetic attraction stone (10) is flush with the outer surface of the combined frame (9).