Dust suppression device for foundation pit construction for constructional engineering
Through the combination of rotating nozzles and water pumping filtration system, the problem of dust in the foundation pit cannot be suppressed in all directions is solved, and the all-round spraying and reuse of water resources is achieved, workers' health is protected and construction efficiency is improved.
Patent Information
- Application Number
- CN202421858931.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-02
- Publication Date
- 2025-08-05
- Estimated Expiration
- 2034-08-02
AI Technical Summary
The existing foundation pit dust suppression device cannot achieve all-round spraying, causing dust to fly and affecting workers' health.
The rotary spray head and the water pumping filtration system are used to spray dust in all directions through the rotary spray head, and water resources are reused through the filtration system.
All-round suppression of dust in the foundation pit is achieved, the possibility of dust flying is reduced, the damage to workers' respiratory system is reduced, and the utilization rate of water resources is improved.
Smart Images

Figure CN223184296U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of dust suppression devices for foundation pit construction, and more specifically, to a dust suppression device for foundation pit construction used in construction engineering. Background Art
[0002] Nowadays, in the construction industry, because the buildings under construction are relatively tall, the foundation of the building needs to be more firmly constructed at the beginning of construction, which requires a deeper and larger foundation pit to wrap the foundation; but the foundation pit will generate a lot of dust when in use. The raised dust will not only block the workers' vision and reduce construction efficiency, but also cause damage to the workers' respiratory system. This requires the use of certain equipment to suppress the dust inside the foundation pit.
[0003] Many dust suppression devices currently in use generally use water mist to suppress dust. However, current devices are basically connected to the sprinkler heads through copper tubes for threaded connection, and the connected sprinkler heads are basically direct-spray atomizing sprinkler heads. As a result, current devices can generally only spray at certain locations or in one direction. This results in insufficient spraying, resulting in a lot of dust still flying upwards, which will still cause damage to the workers' respiratory system. Utility Model Content
[0004] In order to overcome the deficiencies of the prior art, the utility model provides a dust suppression device for foundation pit construction in construction projects, which has the advantages of suppressing dust in all directions and extracting water inside the foundation pit, thereby improving the utilization rate of water resources.
[0005] To achieve the above purpose, the utility model provides the following technical solutions: a dust suppression device for foundation pit construction in construction engineering,
[0006] As an optimal technical solution of the present utility model, it includes a foundation pit, wherein the interior of the foundation pit is provided with drainage grooves interconnected with each other, a spray assembly is arranged inside the foundation pit, and a connecting assembly is arranged outside the spray assembly. The spray assembly includes a first water pump fixedly connected to the top of the foundation pit, the output end of the first water pump is fixedly connected to the diversion frame, two diversion frames are provided, and the two diversion frames are abutted, and six drainage pipes are connected to the bottom of the diversion frame, a rotating clamp is fixedly connected to the outside of the drainage pipe, and a rotating water diversion column is rotatably connected to the outside of the drainage pipe, the rotating clamp is rotatably connected to the inside of the rotating water diversion column, and an atomizing nozzle is connected to the outside of the rotating water diversion column, and the atomizing nozzle is arranged in an inclined shape.
[0007] As an optimal technical solution of the present utility model, an extraction component is provided at the top of the foundation pit, and the extraction component includes a second water pump fixedly connected to the top of the foundation pit, the extraction end of the second water pump is fixedly connected to a pumping pipe, the end of the pumping pipe is connected to a filtering pumping head, and the filtering pumping head is abutted against the drainage trough, the output end of the second water pump is fixedly connected to a transmission pipe, the end of the transmission pipe is connected to a filter box, and the bottom of the filter box is fixedly connected to the top of the foundation pit.
[0008] As an optimal technical solution of the present invention, the connecting assembly includes two clamping blocks fixedly connected to the outside of the diverter frame, two limit clamping frames fixedly connected to the outside of the diverter frame, the clamping blocks are adapted to the limit clamping frames, and the clamping blocks are slidably connected to the limit clamping frames.
[0009] As a preferred technical solution of the present invention, the connecting assembly also includes a first connecting water pipe connected to the top of the diversion frame, and the top of the diversion frame is connected to a second connecting water pipe. The first connecting water pipe and the second connecting water pipe are arranged opposite to each other, and two limiting clamps are fixedly connected to the outside of the second connecting water pipe. An internal threaded sleeve is slidably connected between the two limiting clamps, and the internal threaded sleeve is threadedly connected to the outside of the first connecting water pipe.
[0010] As a preferred technical solution of the present invention, a filter assembly is provided on the top of the foundation pit, and the filter assembly includes an impurity filter plate fixedly connected to the inside of the filter box, and a bamboo charcoal adsorption plate is fixedly connected to the inside of the filter box.
[0011] As an optimal technical solution of the present invention, the filter assembly also includes a first connecting pipe connected to the interior of the filter box, the end of the first connecting pipe is connected to a water storage tank, and the bottom of the water storage tank is fixedly connected to the top of the foundation pit.
[0012] As a preferred technical solution of the present invention, the filter assembly further includes a second connecting pipe communicated with the interior of the water tank, and the end of the second connecting pipe is fixedly connected to the extraction end of the first water pump.
[0013] Compared with the prior art, the beneficial effects of the present invention are as follows:
[0014] 1. The utility model transmits water to the inside of the diversion frame through the first water pump, and then transmits the water to the inside of the rotating water diversion column through the drain pipe, so that the water is atomized and sprayed out through the atomizing nozzle, thereby suppressing the dust inside the foundation pit. At the same time, the spraying of water mist will produce a reverse thrust, thereby driving the rotating water diversion column to rotate along the rotating clamp ring, thereby spraying the dust inside the foundation pit in all directions, thereby reducing the possibility of dust flying, thereby reducing the possibility of workers suffering from respiratory diseases.
[0015] 2. The utility model starts the second water pump, and thereby uses the pumping pipe and the filter pumping head to pump the water inside the drainage trough into the filter box, and then filters the impurities in the water through the impurity filter plate and the bamboo charcoal adsorption plate, so that the water can be used again, and then transmits the water to the water tank, so as to facilitate the subsequent spray component to reuse the water inside the water tank, thereby reducing resource waste. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 This is a schematic diagram of the overall structure of the utility model;
[0017] Figure 2 This is a schematic diagram of the disassembled structure of some components of the utility model;
[0018] Figure 3 This is a bottom view schematic diagram of the disassembled structure of some components of the utility model;
[0019] Figure 4 This is a side view schematic diagram of the disassembled structure of some components of the utility model;
[0020] Figure 5 This is a schematic diagram of the internal structure of some components of the utility model;
[0021] Figure 6 For this utility model Figure 4 Schematic diagram of the enlarged structure of area A;
[0022] Figure 7 This is an enlarged top view of the disassembled structure of some components of the utility model;
[0023] Figure 8 This is a schematic diagram of an enlarged side view of some components of the utility model.
[0024] In the figure: 1. foundation pit; 2. drainage trough; 3. first water pump; 4. diversion frame; 5. drainage pipe; 6. rotating clamp; 7. rotating water distribution column; 8. atomizing nozzle; 9. clamping block; 10. limiting clamp frame; 11. first connecting water pipe; 12. second connecting water pipe; 13. limiting clamp; 14. internal threaded sleeve; 15. second water pump; 16. water pumping pipe; 17. filter pumping head; 18. transmission pipe; 19. filter box; 20. impurity filter plate; 21. bamboo charcoal adsorption plate; 22. first connecting pipe; 23. water storage tank; 24. second connecting pipe. DETAILED DESCRIPTION
[0025] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the embodiments described are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative efforts are within the scope of protection of the present invention.
[0026] like Figures 1 to 8 As shown, the utility model provides a dust suppression device for foundation pit construction for construction projects, including a foundation pit 1, wherein drainage grooves 2 interconnected are opened inside the foundation pit 1, a spray assembly is arranged inside the foundation pit 1, and a connecting assembly is arranged outside the spray assembly, and the spray assembly includes a first water pump 3 fixedly connected to the top of the foundation pit 1, the output end of the first water pump 3 is fixedly connected to the diversion frame 4, two diversion frames 4 are provided, and the two diversion frames 4 are abutted, and six drainage pipes 5 are connected to the bottom of the diversion frame 4, and a rotating clamp 6 is fixedly connected to the outside of the drainage pipe 5, and a rotating water diversion column 7 is rotatably connected to the outside of the drainage pipe 5, and the rotating clamp 6 is rotatably connected to the inside of the rotating water diversion column 7, and the outside of the rotating water diversion column 7 is connected to an atomizing nozzle 8, and the atomizing nozzle 8 is arranged in an inclined shape.
[0027] The water is transferred to the inside of the diversion frame 4 through the first water pump 3, and then transferred to the inside of the rotating water diversion column 7 through the drain pipe 5, so that the water is atomized and sprayed out through the atomizing nozzle 8, thereby suppressing the dust inside the foundation pit 1. At the same time, the spraying of water mist will produce a reverse thrust, thereby driving the rotating water diversion column 7 to rotate along the rotating clamp 6, thereby spraying the dust inside the foundation pit 1 in all directions, thereby reducing the possibility of dust flying, thereby reducing the possibility of workers suffering from respiratory diseases.
[0028] Among them, an extraction component is provided at the top of the foundation pit 1, and the extraction component includes a second water pump 15 fixedly connected to the top of the foundation pit 1, the extraction end of the second water pump 15 is fixedly connected to a pumping pipe 16, the end of the pumping pipe 16 is connected to a filter pumping head 17, and the filter pumping head 17 is abutted against the drainage trough 2. The output end of the second water pump 15 is fixedly connected to a transmission pipe 18, and the end of the transmission pipe 18 is connected to a filter box 19, and the bottom of the filter box 19 is fixedly connected to the top of the foundation pit 1.
[0029] By starting the second water pump 15 , the water inside the drainage tank 2 is pumped into the filter box 19 through the cooperation of the water pumping pipe 16 and the filter pumping head 17 .
[0030] Among them, the connecting component includes two card blocks 9 fixedly connected to the outside of the diverter frame 4, and two limit card frames 10 are fixedly connected to the outside of the diverter frame 4. The card blocks 9 are adapted to the limit card frames 10, and the card blocks 9 are slidably connected to the limit card frames 10.
[0031] The positions of the two diverter frames 4 are preliminarily fixed by sliding the clamping block 9 on the outside of the first diverter frame 4 into the inside of the limiting clamping frame 10 on the outside of the second diverter frame 4 .
[0032] Among them, the connecting component also includes a first connecting water pipe 11 connected to the top of the diversion frame 4, and a second connecting water pipe 12 is connected to the top of the diversion frame 4. The first connecting water pipe 11 and the second connecting water pipe 12 are arranged opposite to each other. Two limiting clamps 13 are fixedly connected to the outside of the second connecting water pipe 12, and an internal threaded sleeve 14 is slidably connected between the two limiting clamps 13. The internal threaded sleeve 14 is threadedly connected to the outside of the first connecting water pipe 11.
[0033] By cooperating with the clamping block 9 and the limiting clamping frame 10, the first connecting water pipe 11 at the top of the first diversion frame 4 and the second connecting water pipe 12 at the top of the second diversion frame 4 are docked, and then the internal threaded sleeve 14 is threadedly connected to the first connecting water pipe 11, so that the water inside the first diversion frame 4 can flow to the inside of the second diversion frame 4, thereby realizing the coordinated operation of multiple spray components, so that the inside of a larger foundation pit 1 can be sprayed, so as to adapt to foundation pits 1 of different sizes.
[0034] A filter assembly is provided on the top of the foundation pit 1 , and the filter assembly includes an impurity filter plate 20 fixedly connected to the inside of the filter box 19 , and a bamboo charcoal adsorption plate 21 is fixedly connected to the inside of the filter box 19 .
[0035] The water is pumped into the filter box 19 by the second water pump 15 , and then the impurities in the water are filtered through the impurity filter plate 20 and the bamboo charcoal adsorption plate 21 , so that the water can be reused.
[0036] The filter assembly further includes a first connecting pipe 22 connected to the interior of the filter box 19 , an end of the first connecting pipe 22 is connected to a water storage tank 23 , and the bottom of the water storage tank 23 is fixedly connected to the top of the foundation pit 1 .
[0037] The filter assembly further includes a second connecting pipe 24 communicating with the interior of the water storage tank 23 , and an end portion of the second connecting pipe 24 is fixedly connected to the extraction end of the first water pump 3 .
[0038] The filtered water is then transferred to the interior of the water storage tank 23 to store the filtered water, thereby facilitating the subsequent secondary use of the water in the water storage tank 23 by the subsequent spraying assembly.
[0039] The working principle and use process of this utility model:
[0040] Used to describe the use instructions or operating methods of the technology; water is transferred to the interior of the diversion frame 4 through the first water pump 3, and then transferred to the interior of the rotating water diversion column 7 through the drain pipe 5, so that the water is atomized and sprayed out through the atomizing nozzle 8, thereby suppressing the dust inside the foundation pit 1. At the same time, the spraying of the water mist will generate a reverse thrust, thereby driving the rotating water diversion column 7 to rotate along the rotating clamp ring 6, thereby spraying the dust inside the foundation pit 1 in all directions, thereby reducing the possibility of dust flying, thereby reducing the possibility of respiratory diseases among workers;
[0041] When the water mist circulates and enters the drainage trough 2, the second water pump 15 can be started to extract the water inside the drainage trough 2 into the filter box 19 through the cooperation of the water pumping pipe 16 and the filter pumping head 17. Then, the impurities in the water are filtered through the impurity filter plate 20 and the bamboo charcoal adsorption plate 21, so that the water can be used again. The water is then transmitted to the water storage tank 23, which facilitates the subsequent spray component to reuse the water inside the water storage tank 23.
[0042] It should be noted that, in this document, relational terms such as first and second, etc., are used only to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any actual relationship or order between these entities or operations. Moreover, the terms "comprises," "comprising," or any other variations thereof are intended to cover non-exclusive inclusion, such that a process, method, article, or apparatus that includes a list of elements includes not only those elements but also other elements not explicitly listed, or elements inherent to such process, method, article, or apparatus.
[0043] Although the embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and variations may be made to these embodiments without departing from the principles and spirit of the present invention, and the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A dust suppression device for foundation pit construction in a construction project, comprising a foundation pit (1), wherein interconnected drainage grooves (2) are provided inside the foundation pit (1), and characterized in that: A spray assembly is provided inside the foundation pit (1), and a connection assembly is provided outside the spray assembly. The spray assembly comprises a first water pump (3) fixedly connected to the top of the foundation pit (1), an output end of the first water pump (3) is fixedly connected to a diversion frame (4), two diversion frames (4) are provided, and the two diversion frames (4) are abutted against each other. Six drainage pipes (5) are connected to the bottom of the diversion frame (4), the drainage pipes (5) are fixedly connected to the outside with a rotating clamp (6), the drainage pipes (5) are rotatably connected to the outside with a rotating water diversion column (7), the rotating clamp (6) is rotatably connected to the inside of the rotating water diversion column (7), the rotating water diversion column (7) is connected to the outside with an atomizing nozzle (8), and the atomizing nozzle (8) is arranged in an inclined shape.
2. The dust suppression device for foundation pit construction in construction engineering according to claim 1, characterized in that: The top of the foundation pit (1) is provided with an extraction assembly, which includes a second water pump (15) fixedly connected to the top of the foundation pit (1); the extraction end of the second water pump (15) is fixedly connected to a water pumping pipe (16); the end of the water pumping pipe (16) is connected to a filter pumping head (17); the filter pumping head (17) is in contact with the drainage trough (2); the output end of the second water pump (15) is fixedly connected to a transmission pipe (18); the end of the transmission pipe (18) is connected to a filter box (19); the bottom of the filter box (19) is fixedly connected to the top of the foundation pit (1).
3. The dust suppression device for foundation pit construction in construction engineering according to claim 2, characterized in that: The connecting assembly comprises two clamping blocks (9) fixedly connected to the outside of the diverter frame (4); two limit clamping frames (10) are fixedly connected to the outside of the diverter frame (4); the clamping blocks (9) are adapted to the limit clamping frames (10); and the clamping blocks (9) are slidably connected to the limit clamping frames (10).
4. A dust suppression device for foundation pit construction in construction engineering according to claim 3, characterized in that: The connection assembly further comprises a first connecting water pipe (11) connected to the top of the diverter frame (4), the top of the diverter frame (4) is connected to a second connecting water pipe (12), the first connecting water pipe (11) and the second connecting water pipe (12) are arranged opposite to each other, two limiting clamps (13) are fixedly connected to the outside of the second connecting water pipe (12), an internal threaded sleeve (14) is slidably connected between the two limiting clamps (13), and the internal threaded sleeve (14) is threadedly connected to the outside of the first connecting water pipe (11).
5. The dust suppression device for foundation pit construction in construction engineering according to claim 4, characterized in that: A filter assembly is provided on the top of the foundation pit (1), and the filter assembly comprises an impurity filter plate (20) fixedly connected to the inside of a filter box (19), and a bamboo charcoal adsorption plate (21) is fixedly connected to the inside of the filter box (19).
6. The dust suppression device for foundation pit construction in construction engineering according to claim 5, characterized in that: The filter assembly further comprises a first connecting pipe (22) in communication with the interior of the filter box (19); the end of the first connecting pipe (22) is in communication with a water storage tank (23); the bottom of the water storage tank (23) is fixedly connected to the top of the foundation pit (1).
7. A dust suppression device for foundation pit construction in construction engineering according to claim 6, characterized in that: The filter assembly further comprises a second connecting pipe (24) in communication with the interior of the water storage tank (23), and an end portion of the second connecting pipe (24) is fixedly connected to the extraction end of the first water pump (3).