Wind power foundation auxiliary equipment

Through the connection mechanism and support structure of wind power basic auxiliary equipment, convenient connection and stable fixation of wind power foundation formwork is achieved, time-consuming bolt matching in the existing technology is solved, and construction efficiency and stability are improved.

CN223189727UActive Publication Date: 2025-08-05零柯(天津)智能科技有限公司
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202422108488.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-08-29
Publication Date
2025-08-05
Estimated Expiration
2034-08-29

AI Technical Summary

Technical Problem

The existing wind power foundation module construction brackets require multiple bolts to cooperate when connecting multiple wind power, resulting in a cumbersome combination process, long time, and affecting construction efficiency.

Method used

The connecting mechanism is adopted, including the first groove, push block, spring, clamp block, third groove, fourth groove, insert block and fifth groove, and convenient connection is achieved through the cooperation of the insert block and the clamp block, and stable fixation is achieved through the cooperation of the first threaded pipe, the first threaded rod, the knob, the second threaded pipe, the second threaded rod, and the fixing head.

Benefits of technology

It improves the combination efficiency and stability of wind power foundation formwork, simplifies the installation and disassembly process, and improves construction efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223189727U_ABST
    Figure CN223189727U_ABST
Patent Text Reader

Abstract

The utility model discloses wind power foundation auxiliary equipment, which relates to the technical field of wind power foundation template construction and comprises a wind power foundation template, a plurality of connecting strips are fixedly connected to one side of the wind power foundation template, a plurality of connecting blocks are fixedly connected to one side of the wind power foundation template and located on two sides of the connecting strips, and the connecting blocks are connected with the wind power foundation template. The wind power foundation formwork connecting device has the advantages that by the adoption of the connecting mechanisms, when the wind power foundation formwork connecting device is used, the first groove, the push block, the spring, the clamping block, the third groove, the fourth groove, the inserting block and the fifth groove are matched with one another, the first groove, the push block, the spring, the clamping block, the third groove, the fourth groove, the inserting block and the fifth groove are matched with one another, and therefore the wind power foundation formwork connecting device is convenient to use. And a worker only needs to insert the insertion blocks of other supports into the third grooves, so that the clamping blocks can be clamped into the fourth grooves to fix the other supports, connection is more convenient, the combination efficiency is improved, and the operation efficiency is effectively improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of wind power foundation template construction, in particular to wind power foundation auxiliary equipment. Background Art

[0002] Wind power generation refers to the conversion of wind kinetic energy into electrical energy. Wind energy is a clean, pollution-free, renewable energy source. The use of wind power for power generation is very environmentally friendly, and the wind energy reserves are huge. Therefore, it is increasingly valued by countries around the world. At present, the foundation structure of the wind turbine is annular, the tower of the wind turbine is conical, and the foundation of the wind turbine is cast with concrete. In the foundation casting technology of the wind turbine, it is necessary to make the generator base mold in advance. As the basic supporting unit in modern buildings, circular concrete columns are widely used in some high-rise or large buildings. In order to improve the strength of the circular concrete columns and strengthen the connection relationship with the connected structures, the circular concrete columns are usually supported on-site to implement cast-in-place structures.

[0003] According to the disclosed frustum-type wind power foundation module construction support with application number 202320150870.1, it includes an arc-shaped wind power foundation template body, a support rod with adjustable length hinged at one end on the outer wall of the wind power foundation template body, a rotation control mechanism connected to the other end of the support rod, a sleeve connected to the rotation control mechanism, a fixing nail arranged in the sleeve and connected to the rotation control mechanism, and a clamping mechanism arranged on the outer wall of the wind power foundation template body and capable of clamping the support rod, the rotation control mechanism can drive the fixing nail to pop out from the sleeve or retract into the sleeve; the utility model can adjust the length and angle of the support rod according to the distance between the wind power foundation template body and the foundation pit wall, thereby improving the supporting strength and stability of the support rod, the setting of the fixing nail improves the stability of the support rod during support, the installation and disassembly process is convenient and quick, which can effectively reduce the time and manpower used in the installation and disassembly process, thereby improving the construction efficiency of the project, with high flexibility and strong practicality.

[0004] The existing wind power foundation module construction bracket can effectively reduce the time and manpower used in the installation and disassembly process, and improve the construction efficiency of the project. However, the existing wind power foundation module construction bracket requires multiple bolts for installation when connecting multiple components. Due to the large number of combinations, it is more troublesome and the combination is very time-consuming. Therefore, we propose a wind power foundation module construction bracket. Utility Model Content

[0005] In view of the deficiencies in the prior art, the present invention provides a wind power foundation auxiliary device, which solves the problems raised in the above background technology.

[0006] To achieve the above objectives, the present invention is implemented through the following technical solutions: a wind power foundation auxiliary equipment, including a wind power foundation template, one side of the wind power foundation template is fixedly connected to several connecting strips, one side of the wind power foundation template and both sides of the connecting strip are fixedly connected to several connecting blocks, a support mechanism is provided on the side where the connecting blocks and the connecting strips are close to each other, and a connecting mechanism is provided on both sides of the wind power foundation template, wherein two first fixed blocks are fixedly connected to one side where two connecting strips are close to each other, and a mounting block is rotatably connected to one side where the two first fixed blocks are close to each other, the outer side of the mounting block is fixedly connected to a second threaded tube, the inner part of the second threaded tube is threadedly connected to a first threaded rod, the top of the first threaded rod and located above the second threaded tube is fixedly connected to a knob, the bottom of the first threaded rod is fixedly connected to the first threaded tube, the inner part of the first threaded tube and near the bottom position is threadedly connected to the second threaded rod, and the bottom of the second threaded rod is fixedly connected to a fixing head.

[0007] Preferably, the supporting mechanism includes two second fixing blocks, the two second fixing blocks are fixedly connected to one side of the wind power foundation template and close to the top, the two second fixing blocks are located on the side where the connecting block and the connecting bar are close to each other, the two second fixing blocks are threadedly connected to the second support frame on the side where they are close to each other, and a second groove is provided on the top of the second support frame, and the first support frame is rotatably connected to the side where the connecting block and the connecting bar are close to each other and located above the second support frame, and one end of the first support frame is located inside the second groove, which effectively increases the supporting strength and capacity of the bracket.

[0008] Preferably, the connecting mechanism includes two third slots, and the two third slots are opened on one side of the wind power foundation template. A fifth slot is opened inside the wind power foundation template and located at the top and bottom of the third slot. A spring is provided inside the fifth slot, and a card block is fixedly connected to the bottom of the spring. The card block and the fifth slot are slidably connected. Two plug-ins are fixedly connected to the side of the wind power foundation template away from the third slot, and a fourth slot is opened on the top and bottom of the plug-in block, which is convenient for the staff to connect the brackets and improves the installation efficiency.

[0009] Preferably, a first groove is provided on one side of the wind power foundation template and close to the card block, and a push block is fixedly connected to one side of the card block and located inside the first groove. The push block and the first groove are slidably connected, and one end of the push block is located on the outside of the wind power foundation template, which is conducive to unlocking the brackets, and is convenient and quick.

[0010] Preferably, the bottom of the second support frame is fixedly connected to a plurality of ground spikes, and the top of the wind power foundation template is fixedly installed with a handle, which is beneficial to increase the friction and stability of the second support frame, and the wind power foundation template can be lifted for easy transportation.

[0011] Preferably, the wind power foundation template, the first threaded pipe, the first support frame and the second support frame are all made of metal, which effectively increases the service life of the support and is corrosion-resistant.

[0012] The utility model provides a wind power foundation auxiliary equipment, which has the following beneficial effects:

[0013] 1. The wind power foundation auxiliary equipment adopts a connecting mechanism. When in use, through the mutual cooperation of the first slot, the push block, the spring, the clamping block, the third slot, the fourth slot, the plugging block and the fifth slot, the staff only needs to insert the plugging block of other brackets into the inside of the third slot, and the clamping block can be inserted into the inside of the fourth slot to fix the other brackets, making the connection more convenient, improving the efficiency of the combination, and effectively improving the working efficiency.

[0014] 2. The wind power foundation auxiliary equipment is equipped with a first support frame, a second support frame, and a second groove, so that the support strength of the wind power foundation template can be increased, the stability of the wind power foundation template is effectively increased, and the stability is higher by using the mutual cooperation of the first threaded tube, the first fixed block, the mounting block, the knob, the second threaded tube, the first threaded rod, the second threaded rod, and the fixed head. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 This is a schematic diagram of the structure of the utility model;

[0016] Figure 2 It is a cross-sectional view of the utility model;

[0017] Figure 3 It is a side view of the present utility model.

[0018] In the figure: 1. Wind turbine foundation template; 2. First groove; 3. First threaded pipe; 4. Connecting block; 5. Connecting strip; 6. First fixing block; 7. Mounting block; 8. Knob; 9. Second threaded pipe; 10. First threaded rod; 11. First support frame; 12. Second support frame; 13. Second fixing block; 14. Second threaded rod; 15. Fixing head; 16. Push block; 17. Second groove; 18. Spring; 19. Block; 20. Third groove; 21. Ground spike; 22. Fourth groove; 23. Insert block; 24. Fifth groove; 25. Handle. DETAILED DESCRIPTION

[0019] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.

[0020] See also Figures 1 to 3The utility model provides a technical solution: a wind power foundation auxiliary equipment, including a wind power foundation template 1, one side of the wind power foundation template 1 is fixedly connected to a plurality of connecting bars 5, one side of the wind power foundation template 1 and on both sides of the connecting bar 5 are fixedly connected to a plurality of connecting blocks 4, the side where the connecting block 4 and the connecting bar 5 are close to each other is provided with a supporting mechanism, and the two sides of the wind power foundation template 1 are provided with a connecting mechanism, wherein the side where two connecting bars 5 are close to each other is fixedly connected to two first fixing blocks 6, the side where the two first fixing blocks 6 are close to each other is rotatably connected to a mounting block 7, the outer side of the mounting block 7 is fixedly connected to a second threaded tube 9, and the inner side of the second threaded tube 9 is threadedly connected to the first threaded tube 9. The threaded rod 10, the top of the first threaded rod 10 and the top of the second threaded tube 9 are fixedly connected with a knob 8, the bottom of the first threaded rod 10 is fixedly connected with the first threaded tube 3, the inside of the first threaded tube 3 and near the bottom are threadedly connected with the second threaded rod 14, the bottom of the second threaded rod 14 is fixedly connected with a fixed head 15, by rotating the second threaded rod 14 to drive the fixed head 15 to adjust the length, and by rotating the mounting block 7 to drive the fixed head 15 to adjust the angle and insert it into the ground for fixation, by rotating the knob 8 to drive the first threaded rod 10 to rotate inside the second threaded tube 9, the first threaded tube 3 can be folded up, and the second threaded rod 14 can be rotated again to fold up the fixed head 15.

[0021] The supporting mechanism includes two second fixed blocks 13, which are fixedly connected to one side of the wind power foundation template 1 and close to the top. The two second fixed blocks 13 are located on the side where the connecting block 4 and the connecting bar 5 are close to each other. The side where the two second fixed blocks 13 are close to each other is threadedly connected to the second support frame 12. A second groove 17 is provided on the top of the second support frame 12. The side where the connecting block 4 and the connecting bar 5 are close to each other and is located above the second support frame 12 is rotatably connected to the first support frame 11. One end of the first support frame 11 is located inside the second groove 17. By rotating the first support frame 11, one end of the first support frame 11 is inserted into the inside of the second groove 17, so that the wind power foundation template 1 is supported, which effectively increases the supporting strength and capacity of the bracket.

[0022] The connecting mechanism includes two third slots 20, and the two third slots 20 are opened on one side of the wind power foundation template 1. The interior of the wind power foundation template 1 and the top and bottom of the third slot 20 are provided with a fifth slot 24. A spring 18 is provided inside the fifth slot 24, and the bottom of the spring 18 is fixedly connected with a card block 19. The card block 19 and the fifth slot 24 are slidably connected. The wind power foundation template 1 is fixedly connected to one side away from the third slot 20 with two plug-in blocks 23. The top and bottom of the plug-in block 23 are provided with a fourth slot 22, which is conducive to the connection between the staff brackets and improves the installation efficiency. A first slot 2 is opened on one side of the wind power foundation template 1 and close to the card block 19. A side of the card block 19 and the inside of the first slot 2 are fixedly connected. A push block 16 is connected, and the push block 16 is slidably connected to the first slot 2. One end of the push block 16 is located on the outside of the wind power foundation template 1. By inserting the plug block 23 of one of the wind power foundation templates 1 into the third slot 20 opened by the other wind power foundation template 1, the card block 19 will be squeezed back into the fifth slot 24 during insertion, and the spring 18 will be compressed so that the compressed spring 18 will insert the card block 19 into the fourth slot 22, thereby completing the mutual connection between the two wind power foundation templates 1. When disassembly is required, the push block 16 is pushed so that the push block 16 slides inside the first slot 2 and drives the card block 19 to leave the fourth slot 22, thereby completing the disassembly, which is conducive to untangling the brackets, and is convenient and quick.

[0023] The bottom of the second support frame 12 is fixedly connected with several ground spikes 21, and the top of the wind power foundation template 1 is fixedly installed with a handle 25, which is beneficial to increase the friction and stability of the second support frame 12. The wind power foundation template 1, the first threaded tube 3, the first support frame 11, and the second support frame 12 are all made of metal, which effectively improves the service life of the bracket and is corrosion-resistant.

[0024] In summary, when using the wind power foundation auxiliary equipment, the staff inserts the plug 23 of one wind power foundation template 1 into the third slot 20 opened by the other wind power foundation template 1. When inserting, the card block 19 will be squeezed back into the fifth slot 24, and the spring 18 will be compressed, so that the compressed spring 18 will insert the card block 19 into the fourth slot 22, and the two wind power foundation templates 1 can be connected to each other. When disassembly is required, the push block 16 is pushed so that the push block 16 slides inside the first slot 2 and drives the card block 19 to leave the fourth slot 22, and the disassembly is completed. Unload, and insert one end of the first support frame 11 into the interior of the second groove 17 by rotating the first support frame 11, so as to support the wind power foundation template 1, hold the first threaded tube 3, and rotate the second threaded rod 14 to make the second threaded rod 14 screw outward in the first threaded tube 3, and the length of the second threaded rod 14 in the inner cavity of the first threaded tube 3 can be adjusted, thereby adjusting the height of the fixing head 15, and then rotating the mounting block 7 to adjust the angle, and insert the fixing head 15 into the ground with the adjusted angle, and press hard to make the second threaded rod 14 tilted, and the fixing head 15 is inserted into the soil for fixation,

[0025] When taking it out, you can directly pull it out, or you can turn the rotary knob 8 to drive the first threaded rod 10 to move inside the second threaded tube 9, and then you can lift the first threaded tube 3 upward, drive the second threaded rod 14 to move upward, and then pull the fixed head 15 out of the soil, and then hold the first threaded tube 3 and rotate the second threaded rod 14 in the opposite direction again to retract the fixed head 15.

[0026] The above is only a preferred specific implementation method of the present invention, but the protection scope of the present invention is not limited to this. Any technician familiar with the technical field within the technical scope disclosed by the present invention can make equivalent replacements or changes based on the technical solution and utility model concept of the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A wind power foundation auxiliary device, comprising a wind power foundation template (1), characterized in that: One side of the wind power foundation template (1) is fixedly connected to a plurality of connecting bars (5), and one side of the wind power foundation template (1) and on both sides of the connecting bar (5) are fixedly connected to a plurality of connecting blocks (4), and a supporting mechanism is provided on the side where the connecting block (4) and the connecting bar (5) are close to each other. Connecting mechanisms are provided on both sides of the wind power foundation template (1), wherein two first fixing blocks (6) are fixedly connected to the side where two connecting bars (5) are close to each other, and the side where the two first fixing blocks (6) are close to each other is rotatably connected to a mounting block ( 7), the outer side of the mounting block (7) is fixedly connected to a second threaded tube (9), the inner side of the second threaded tube (9) is threadedly connected to a first threaded rod (10), the top of the first threaded rod (10) and located above the second threaded tube (9) is fixedly connected to a knob (8), the bottom of the first threaded rod (10) is fixedly connected to a first threaded tube (3), the inner side of the first threaded tube (3) and near the bottom is threadedly connected to a second threaded rod (14), and the bottom of the second threaded rod (14) is fixedly connected to a fixing head (15).

2. A wind power foundation auxiliary equipment according to claim 1, characterized in that: The support mechanism comprises two second fixing blocks (13), the two second fixing blocks (13) are fixedly connected to one side of the wind power foundation template (1) and close to the top, the two second fixing blocks (13) are located on the side where the connecting block (4) and the connecting bar (5) are close to each other, the side where the two second fixing blocks (13) are close to each other is threadedly connected to the second support frame (12), a second groove (17) is provided on the top of the second support frame (12), the side where the connecting block (4) and the connecting bar (5) are close to each other and is located above the second support frame (12) is rotatably connected to the first support frame (11), and one end of the first support frame (11) is located inside the second groove (17).

3. The wind power foundation auxiliary equipment according to claim 1, characterized in that: The connecting mechanism comprises two third slots (20), the two third slots (20) being opened on one side of the wind power foundation template (1), a fifth slot (24) being opened inside the wind power foundation template (1) and located at the top and bottom of the third slots (20), a spring (18) being arranged inside the fifth slot (24), a clamping block (19) being fixedly connected to the bottom of the spring (18), the clamping block (19) and the fifth slot (24) being slidably connected, two plugging blocks (23) being fixedly connected to the side of the wind power foundation template (1) away from the third slots (20), and a fourth slot (22) being opened at the top and bottom of the plugging block (23).

4. The wind power foundation auxiliary equipment according to claim 1, characterized in that: A first groove (2) is provided on one side of the wind power foundation template (1) and close to the clamping block (19); a push block (16) is fixedly connected to one side of the clamping block (19) and located inside the first groove (2); the push block (16) and the first groove (2) are slidably connected, and one end of the push block (16) is located outside the wind power foundation template (1).

5. The wind power foundation auxiliary equipment according to claim 2, characterized in that: A plurality of ground spikes (21) are fixedly connected to the bottom of the second support frame (12), and a handle (25) is fixedly installed on the top of the wind power foundation template (1).

6. The wind power foundation auxiliary equipment according to claim 1, characterized in that: The wind power foundation template (1), the first threaded pipe (3), the first support frame (11), and the second support frame (12) are all made of metal.

Citation Information

Patent Citations

  • Circular truncated cone type wind power foundation formwork construction support

    CN219060880U