Hydraulic engineering construction equipment
By using the driving motor of anti-blocking device to drive the brushing device in the construction equipment of water conservancy engineering, the problem of dirt blockage during the water pumping process is solved to ensure the smooth progress of construction.
Patent Information
- Application Number
- CN202421938418.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-12
- Publication Date
- 2025-08-08
- Estimated Expiration
- 2034-08-12
AI Technical Summary
During the pumping process, existing water conservancy construction equipment is prone to blockage of dead branches, aquatic plants, floating garbage and other dirt, which affects the construction progress.
The driving motor in the anti-blocking device drives the cover brush and the cylinder brush to brush the front and outer surface of the filter cartridge to clean the dirt and prevent clogging.
Effectively remove dead branches, aquatic plants, floating garbage and other dirt to ensure the normal progress of water conservancy projects.
Smart Images

Figure CN223196625U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of water conservancy project construction equipment, in particular to water conservancy project construction equipment. Background Art
[0002] A water conservancy project refers to a series of engineering activities carried out to improve or utilize water resources. Before the construction of a water conservancy project, sufficient preparation work is required. At the same time, the construction site must be surveyed to understand the topography, geological conditions, etc., and a construction plan and safety measures must be formulated.
[0003] Current water conservancy project construction equipment includes pumps, and pumps on the market are all similar. During the construction of water conservancy projects, it is inevitable to pump water out of rivers or ditches to form partitions and flow restrictions. However, existing pumps are generally only equipped with simple filters to pump water, and dead branches, aquatic plants, floating garbage, etc. carried in the water flow can easily clog them, making it inconvenient for the normal progress of water conservancy project construction. Utility Model Content
[0004] In response to the above problems, the utility model provides a water conservancy project construction equipment, which triggers the driving motor in the anti-clogging device through the cooperation of the wiring harness inside the wiring harness sleeve, driving the cover brush and the cylinder brush to brush the front and outer surface of the filter cylinder, thereby cleaning the dead branches, aquatic plants, floating garbage and other dirt sucked into the water pump when it is working, and preventing the occurrence of blockage.
[0005] In order to achieve the above-mentioned purpose, the present invention is realized through the following technical solutions: a water conservancy project construction equipment, including a joint conduit, the joint conduit is connected to an anti-clogging device, a connecting tube is provided in the anti-clogging device, a wiring harness sleeve is provided on the outer surface of the connecting tube, one end of the connecting tube is connected to a filter cartridge, a guide groove plate is fixed on the outer surface of one end of the filter cartridge, a filter cartridge cover is installed on the other end of the filter cartridge, a cover brush is provided on the outer surface of the filter cartridge, a barrel brush is provided on the outer surface of the filter cartridge, and a fixed cover is provided in front of the filter cartridge cover. The cover brush and the barrel brush both clean the surface of the filter cartridge, so that when the water pump is working, the dirt brought in by the water flow sucked into the water pump is cleaned, and the filter cartridge surface is prevented from being clogged by dirt and affecting the progress of water conservancy project construction.
[0006] Furthermore, a communicating cavity is formed within the filter cartridge, the inner wall of which is fixed with an internal support frame, and a driving motor is fixed at the center of the internal support frame. The driving motor is mainly powered by a wiring harness inserted through the wiring harness sleeve, thereby driving the cover door brush and the drum surface brush to rotate in a circular manner, thereby driving the cover door brush and the drum surface brush.
[0007] Furthermore, the drive motor is connected via a wiring harness running through the wiring harness sleeve. The central axis of the drive motor passes through the filter cartridge cover, and the top of the axis is connected to the fixed cover. The cover brush and the cartridge brush are both fixed to the central axis of the drive motor. The other end of the connecting tube is connected to the joint conduit, and the top of the cartridge brush slides with the guide groove plate. The filter cartridge cover is fixed to the surface of the filter cartridge by bolts. The filter cartridge and the filter cartridge cover are both provided with a plurality of through-grooves with filter screens on the surface to ensure that the water source is clean when the water pump is working, providing clean water for water conservancy project construction.
[0008] Furthermore, the connector conduit is provided with a conduit body, a plurality of float hooks are fixed to the outer surface of the conduit body, a sealing gasket is provided at the end of the conduit body, a sealing ring is nested in the sealing gasket, and an internal cavity is formed within the conduit body. The sealing gasket mainly cooperates with the sealing ring to form a flange connection with the water pump pipeline, ensuring a tight connection during the connection and preventing leakage, thereby pumping the water flow from the anti-clogging device into the water pump.
[0009] Furthermore, the inner cavity is connected to the interconnecting cavity, the conduit body is connected to the external flange via the sealing gasket and the sealing ring, and the top end of the conduit body is bolted to one end of the connecting tube. The inner cavity and the interconnecting cavity are interconnected so that water entering the anti-clogging device can be conducted into the conduit body and then discharged to the outside through a water pump.
[0010] Beneficial effects
[0011] Compared with the prior art, the present invention has the following beneficial effects:
[0012] The utility model connects the joint pipe with the water pump pipe, and then triggers the driving motor in the anti-clogging device with the cooperation of the wire harness in the wire harness sleeve, so that during the pumping operation of the water pump, the cover brush and the cylinder brush brush the front and outer surface of the filter cartridge to clean the dead branches, water plants, floating garbage and other dirt sucked in, thereby preventing the water pump from interfering with the progress of water conservancy project construction due to dirt during the pumping operation. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Figure 1 This is a structural diagram of a water conservancy project construction equipment of the utility model;
[0014] Figure 2 This is a rear structural diagram of a water conservancy project construction equipment of the present utility model;
[0015] Figure 3 This is a schematic diagram of the three-dimensional structure of the anti-blocking device of the utility model;
[0016] Figure 4This is a rear structural diagram of the connecting tube of the utility model;
[0017] Figure 5 This is a schematic diagram of the internal structure of the filter cartridge of the present invention.
[0018] In the figure: joint catheter -1, anti-clogging device -2, catheter body -11, float hook -12, sealing gasket -13, sealing ring -14, inner cavity -15, connecting tube -21, wiring harness sleeve -22, guide groove plate -23, filter cartridge -24, filter cartridge cover -25, fixing cover -26, cover surface brush -27, tube surface brush -28, intercommunication cavity -241, inner support frame -242, drive motor -243. DETAILED DESCRIPTION
[0019] The technical solution of the present invention will be clearly and completely described below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments. Based on the embodiments in the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.
[0020] In the description of this utility model, it should be noted that the terms "center," "upper," "lower," "left," "right," "vertical," "horizontal," "inner," and "outer," etc., indicating positions or relationships, are based on the positions or relationships shown in the accompanying drawings and are intended solely to facilitate the description of this utility model and simplify the description. They do not indicate or imply that the devices or components referred to must have a specific orientation, be constructed, or operate in a specific orientation. Therefore, they should not be construed as limitations on this utility model. Furthermore, the terms "first," "second," and "third" are used for descriptive purposes only and should not be construed as indicating or implying relative importance.
[0021] Example
[0022] like Figure 1-Figure 5 As shown, Figure 1 This is a structural diagram of a water conservancy project construction equipment of the utility model; Figure 2 This is a rear structural diagram of a water conservancy project construction equipment of the present utility model; Figure 3 This is a schematic diagram of the three-dimensional structure of the anti-blocking device of the utility model;
[0023] Figure 4 This is a rear structural diagram of the connecting tube of the utility model; Figure 5 This is a schematic diagram of the internal structure of the filter cartridge of the present invention.
[0024] The utility model provides a water conservancy project construction equipment, including a joint conduit 1, the joint conduit 1 is connected to an anti-clogging device 2, a conduit body 11 is provided in the joint conduit 1, a plurality of float hooks 12 are fixed to the outer surface of the conduit body 11, a sealing gasket 13 is provided at the end of the conduit body 11, a sealing ring 14 is nested on the sealing gasket 13, and an inner cavity 15 is formed inside the conduit body 11. A connecting tube 21 is provided in the anti-clogging device 2, a wiring harness sleeve 22 is provided on the outer surface of the connecting tube 21, one end of the connecting tube 21 is connected to a filter cartridge 24, one end of the filter cartridge 24 is fixed to the outer surface of a guide groove disk 23, the other end of the filter cartridge 24 is installed with a filter cartridge cover 25, the outer surface of the filter cartridge cover 25 is provided with a cover brush 27, the outer surface of the filter cartridge 24 is provided with a cartridge surface brush 28, and a fixed cover 26 is provided in front of the filter cartridge cover 25. An interconnecting cavity 241 is formed in the filter cartridge 24 . An inner support frame 242 is fixed to the inner wall of the interconnecting cavity 241 . A driving motor 243 is fixed at the center of the inner support frame 242 .
[0025] The working principle of the utility model is described as follows:
[0026] The utility model connects the joint conduit 1 with the anti-clogging device 2, and then cooperates with the sealing gasket 13 and the sealing ring 14 at one end of the conduit body 11 to complete the flange connection of the top pipe of the water pump, and then hangs the float at the float hook 12, so that the anti-clogging device 2 can be suspended in the water, or can be directly sunk to the bottom of the water without installation. Later, with the cooperation of the external water pump and the wiring harness, the driving motor 243 on the inner side frame 242 in the interconnecting cavity 241 in the filter cartridge 24 is turned on, so that the central axis of the driving motor 243 passing through the filter cartridge cover 25 rotates, driving the cover brush 27 and the barrel surface brush 28 to rotate in a circular manner, and the barrel surface brush 28 cooperates with the guide groove plate 23 to move on the track, thereby completing the cleaning of the filter cartridge 24 surface and the through groove with filter screen on the filter cartridge cover 25 covering the filter cartridge 24 surface, ensuring that the filter cartridge 24 is not blocked by dirt such as dead branches, water plants, floating garbage, etc. sucked into the water pump, and completing the cleaning of the filter cartridge surface.
[0027] The technical features of the above-mentioned embodiments can be combined arbitrarily. In order to make the description concise, not all possible combinations of the technical features in the above-mentioned embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.
[0028] Therefore, no matter from which point of view, the embodiments should be regarded as illustrative and non-restrictive, and the scope of the present invention is defined by the appended claims rather than the foregoing description, and it is intended that all changes that fall within the meaning and range of equivalents of the claims be included in the present invention. Any reference sign in the claims should not be construed as limiting the claim involved.
Claims
1. A water conservancy project construction equipment, characterized in that: The invention comprises a joint conduit (1), the joint conduit (1) is connected to an anti-clogging device (2), a connecting tube (21) is arranged in the anti-clogging device (2), the outer surface of the connecting tube (21) is provided with a wiring harness sleeve (22), one end of the connecting tube (21) is connected to a filter cartridge (24), the outer surface of one end of the filter cartridge (24) is fixed with a guide groove disk (23), the other end of the filter cartridge (24) is installed with a filter cartridge cover (25), the outer surface of the filter cartridge cover (25) is provided with a cover brush (27), the outer surface of the filter cartridge (24) is provided with a cartridge brush (28), and a fixing cover (26) is provided in front of the filter cartridge cover (25).
2. A water conservancy project construction equipment according to claim 1, characterized in that: An interconnecting cavity (241) is formed in the filter cartridge (24), an inner support frame (242) is fixed to the inner wall of the interconnecting cavity (241), and a driving motor (243) for driving is fixed at the center of the inner support frame (242).
3. A water conservancy project construction equipment according to claim 2, characterized in that: The driving motor (243) is connected via a wiring harness passing through the wiring harness sleeve (22); the central axis of the driving motor (243) passes through the filter cartridge cover (25), and the top of the axis is connected to the fixed cover (26); the cover brush (27) and the cartridge brush (28) are both fixed on the central axis of the driving motor (243); the other end of the connecting tube (21) is connected to the joint conduit (1); and the top of the cartridge brush (28) is in sliding engagement with the guide groove disc (23).
4. A water conservancy project construction equipment according to claim 3, characterized in that: A catheter body (11) is provided in the joint catheter (1), a plurality of float hooks (12) are fixed to the outer surface of the catheter body (11), a sealing gasket (13) is provided at the end of the catheter body (11), a sealing ring (14) is nested on the sealing gasket (13), and an inner cavity (15) is formed inside the catheter body (11).
5. The water conservancy project construction equipment according to claim 4, characterized in that: The inner cavity (15) is connected to the intercommunication cavity (241), the catheter body (11) is connected to the external flange through the sealing gasket (13) and the sealing ring (14), and the top end of the catheter body (11) is fixed to one end of the connecting tube (21) by bolts.