Top protection device for steel platform of building machine

By assembling the beret frame on the ground with the ground positioned and pre-tightened bolts, combined with the design of protective mesh columns and corner auxiliary columns, the construction hazards and gaps of the top protection device of the steel platform of the building machine are solved, and an efficient and safe protective mesh system is achieved.

CN223227026UActive Publication Date: 2025-08-15THE THIRD CONSTR CO LTD OF CHINA CONSTR THIRD ENG BUREAU
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202422386336.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-09-27
Publication Date
2025-08-15
Estimated Expiration
2034-09-27

AI Technical Summary

Technical Problem

The existing top protection device of the steel platform of the building machine is equipped with high construction risk factors, long construction time and increased costs when assembling in high altitude, and there are gaps between the protective net and the walkway plate, which affects the overall effect.

Method used

A protective device on the top of the building machine steel platform is designed. By positioning and pre-tightening of the protective net columns when assembling the Beret frame on the ground, the installation of the large-surface protective net is completed in the air. The combination of protective net columns, corner auxiliary columns and walkway plates is used to form a fully enclosed protection system.

Benefits of technology

The efficient construction of the protective net system is achieved, the construction safety is ensured, safety hazards in high-altitude operations are avoided, construction time is reduced and overall protection effect is improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223227026U_ABST
    Figure CN223227026U_ABST
Patent Text Reader

Abstract

The utility model relates to a building machine steel platform top protection device which comprises a plurality of steel platform bailey trusses, protection net stand columns, protection nets, corner auxiliary columns and walkway plates, the steel platform bailey trusses are connected into a whole and fixed to the tops of the building machine supporting stand columns to form a steel platform, and the protection net stand columns and the steel platform bailey trusses are fixed through connecting plates. A walkway plate is laid on the platform bailey truss, the walkway plate is fixed to a cross beam of the platform bailey truss, protection on the two sides of the walkway plate forms a frame through protection net stand columns, a protection net is arranged between the protection net stand columns, protection net bodies are connected at the corner positions through corner auxiliary columns, and full sealing of the protection net is achieved. The protective net system can be synchronously installed on the ground and the platform bailey truss, and the installation of the protective net corner auxiliary columns and the fixation of bolts are carried out in the air, so that the totally-closed system protection of the top platform of the building machine can be realized.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of building construction equipment, and more specifically, to a top protective device for a steel platform of a building construction machine. Background Art

[0002] The integrated construction platform used in high-rise buildings that is currently being gradually promoted is called a building crane. It solves the problem of roof collapse in construction. The top protection of the steel platform is generally assembled in bulk after the Bailey overhead is completed. It is necessary to pull the protective rope first, and the workers need to position the protective net columns at high altitude, install the protective net bolts, and lay the walkway boards. Many up and down construction actions need to be completed. Before the overall protection is formed, the risk factor is high, the construction time is long, and the cost increases. Due to the inevitable gap between the steel platform and the frame, the overall effect needs to be improved after the construction is completed. Summary of the Invention

[0003] The technical problem to be solved by the utility model is to provide a protective device for the top of the steel platform of a building construction machine, which can be used to position and pre-tighten bolts when assembling Bailey frames on the ground, and to install a large-area protective net after the aerial assembly is completed, thereby improving the overall construction efficiency of the protective net system and ensuring construction safety.

[0004] The technical solution adopted by the utility model to solve its technical problems is: constructing a protective device for the top of the steel platform of a building construction machine, including a steel platform Bailey frame, a protective net column, a protective net, a corner auxiliary column and a walkway plate, a plurality of steel platform Bailey frames are connected into a whole, fixed on the top of the building construction machine support column to form a steel platform, the protective net column and the steel platform Bailey frame are fixed by a connecting plate, a walkway plate is laid on the platform Bailey frame, the walkway plate is fixed on the crossbeam of the platform Bailey frame, the protection on both sides of the walkway plate is formed into a frame by the protective net columns, a protective net is arranged between the protective net columns, and the protective net body is connected at the corner position by the corner auxiliary column to realize the full enclosure of the protective net.

[0005] According to the above scheme, multiple steel platform Bailey frames are connected by bolts.

[0006] According to the above solution, the steel platform Bailey frame is connected to the building construction machine support column through bolts.

[0007] According to the above solution, the bottom of the protective net column is fixedly connected to the upper chord of the Bailey frame through bolts and a connecting plate.

[0008] According to the above solution, the protective net columns are provided with a plurality of mounting holes, and the protective net columns are fixedly connected to the protective net by bolts inserted into the mounting holes.

[0009] According to the above solution, the inner side of the protective net column is installed close to the inner side of the steel platform Bailey frame on the side facing the opening.

[0010] According to the above solution, the corner auxiliary column is connected to the upper chord of the Bailey frame through bolts and connecting plates.

[0011] According to the above solution, the walkway plate is fixedly connected to the Bailey frame by hook bolts.

[0012] The implementation of the utility model of the steel platform top protection device for building construction machinery has the following beneficial effects:

[0013] 1. The utility model is provided with a protective net system and a construction platform on the top of the steel platform of the building construction machine. After being formed in one step, the walkway plate and the protective net system are stable and reliable. There is no gap between the walkway plate and the protective net, which avoids the safety hazard caused by falling objects from high altitude and solves the problem that the gap between the protective net system and the walkway plate cannot be closed.

[0014] 2. According to the characteristics of the ground assembly of the Bailey frame steel platform on the upper part of the light building construction machine, the utility model can jointly design the protection net system and the Bailey frame system during the design period. The integrated design can timely position the protection net columns and pre-tighten the bolts during the ground Bailey frame assembly period. After the Bailey frame platform is hoisted and assembled, the corner auxiliary columns are installed during high-altitude operations, which reduces high-altitude operations and speeds up the construction period.

[0015] 3. The utility model provides a working platform for various professional constructions, and the working platform is of appropriate size, safe, beautiful and humanized. The new protective net system design ensures all-round protection of the sides and bottom without dead angles. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] The present invention will be further described below with reference to the accompanying drawings and embodiments, in which:

[0017] Figure 1 This is a front view of the protective device on the top of the steel platform of the building construction machine of the utility model;

[0018] Figure 2 This is a schematic diagram of the connection between the protective net columns and the Bailey frame;

[0019] Figure 3 This is a side view of the protective device on the top of the steel platform of the building construction machine of the utility model;

[0020] Figure 4 This is a schematic diagram of the corner of the protective net on the top of the steel platform of the building construction machine;

[0021] Figure 5 This is the front view of the corner auxiliary column;

[0022] Figure 6 This is the side view of the corner auxiliary column. DETAILED DESCRIPTION

[0023] In order to have a clearer understanding of the technical features, purposes and effects of the present invention, the specific implementation methods of the present invention are now described in detail with reference to the accompanying drawings.

[0024] like Figures 1 to 6 As shown, the utility model of the steel platform top protection device of the building construction machine includes a steel platform Bailey frame 1, a protection net column 2, a protection net 3, a corner auxiliary column 4, M8*110 bolts 6, M8*80 bolts 7, M8*40 bolts 8 and a walkway plate 5.

[0025] The steel platform Bailey frame 1 is connected to other Bailey frames using specially designed male and female connectors and high-strength bolts. This is fixed to the top of the crane's support columns to form a steel platform. The steel platform serves as the crane's operating and control platform and as a work platform for other teams. The protective net columns 2 are secured to the steel platform Bailey frame 1 using connecting plates and bolts. A walkway slab 5 is laid on the steel platform Bailey frame 1 and secured to the crossbeams of the platform Bailey frame. The walkway slab is protected on both sides by protective net columns 3, forming a frame. The protective net 3 is bolted between the columns. The corners of the protective net system are fully enclosed by corner auxiliary columns 4.

[0026] The utility model is designed for the top protection of the steel platform of the building construction machine. By designing a full range of protective nets 3 and protective net columns 2 and corner auxiliary columns 4 on the top, the problem of tiny gaps between the side and bottom of the steel platform protection and poor sealing is solved.

[0027] In the above embodiment, the building machine is assembled by a steel platform Bailey frame 1, which is divided into various sections. In the preliminary design, the adaptability design is carried out according to the civil engineering structure. The Bailey frame 1 is composed of various types of Bailey plates to form an integral whole.

[0028] In the above embodiment, the steel platform Bailey frame 1 needs to be segmented in advance, assembled on the ground at the initial stage of installation, connected by Bailey pins, and fixed with tension screws to form a segment. The segments are spliced into a whole and connected with Bailey pins after aerial hoisting.

[0029] In the above embodiment, a protection system needs to be set up on the top of the steel platform Bailey frame 1 to ensure the safety of construction workers. During the ground assembly period of the steel platform Bailey frame 1 system, positioning is carried out according to the detailed design drawings of each system, the positioning of the protection net column 2 is drawn, and the connecting plate is installed. If there is any conflict between the connecting plate supporting bolts and the steel platform Bailey frame 1, timely adjustment is made, and slight movement is allowed according to the design drawings.

[0030] In the above embodiment, the protective net column 2 is preliminarily installed according to the positioning, and the bottom of the protective net column 2 is connected to the steel platform Bailey frame 1 through a connecting plate and matching bolts to ensure the installation progress of the straight section. The protective net 3 with a width of 2 meters ensures the overall effect. The corner part is equipped with a matching corner auxiliary column 4 to install the non-standard protective net 3. Pay attention to the opening direction of the corner auxiliary column 4 and the matching bolts.

[0031] In the above embodiment, the connection between the steel platform Bailey frame 1 and the walkway plate 5 is fixed with hook bolts, which are fixed on the ground in advance and cannot be simply pre-tightened. This is because it is easy to slip during high-altitude operations, causing safety hazards. After the steel platform Bailey frame 1 is assembled in sections, symmetrical lifting openings are reserved on the walkway plate 5 for easy lifting.

[0032] In the above embodiment, a system consisting of a large-surface protective net column 2, a protective net 3 and a corner auxiliary column 4 formed in one step is adopted, and a local corner position is reserved. After the steel platform Bailey frame 1 is hoisted and assembled, a protective rope is pulled on the top of the steel platform for installation.

[0033] In the above embodiment, the corner auxiliary column 4 is fixed at the corner with M8*80 bolts 7 and M8*40 bolts 8. Note that the opening position of the corner auxiliary column 4 is asymmetric, and the opening side close to the edge is installed on the inner side of the Bailey frame 1.

[0034] In the above embodiment, the protective net columns 2 and the corner auxiliary columns 4 installed on the inner side of the steel platform Bailey frame 1 and the walkway plate 5 form a three-sided closed protection system close to the steel platform Bailey frame 1 and the walkway plate 5. The maximum gap is only 2 mm, which meets the requirement that small stones cannot fall and improves overall safety.

[0035] The utility model also provides a construction method for a top protective device of a steel platform of a building construction machine, comprising the following steps:

[0036] S1, when the Bailey frame on the steel platform is chorded and Bailey plates are assembled on the ground in strict accordance with the detailed drawings, the protective net columns are positioned;

[0037] S2, install the walkway plate on the steel platform Bailey frame according to the designed position of the walkway plate, and then fix the walkway plate;

[0038] S3: Install the protective net columns according to the detailed drawings, pre-tighten the bolts connecting the protective net columns and the steel platform Bailey frame, and adjust the gap between the columns and the walkway board;

[0039] S4, install the bolt connection between the protective net and the protective net column, adjust the distance between the bottom of the protective net and the walkway plate to ensure there is no gap, tighten the bolts, and pre-install the corner auxiliary columns at the corners.

[0040] The embodiments of the present invention are described above in conjunction with the accompanying drawings, but the present invention is not limited to the above-mentioned specific implementation methods. The above-mentioned specific implementation methods are merely illustrative and not restrictive. Under the guidance of the present invention, ordinary technicians in this field can also make many forms without departing from the scope of protection of the purpose of the present invention and the claims, which are all within the protection of the present invention.

Claims

1. A protective device for the top of a steel platform of a building construction machine, characterized in that: It includes a steel platform Bailey frame, a protective net column, a protective net, a corner auxiliary column and a walkway board. Multiple steel platform Bailey frames are connected into a whole and fixed on the top of the building machine support column to form a steel platform. The protective net column and the steel platform Bailey frame are fixed by a connecting plate. The walkway board is laid on the platform Bailey frame, and the walkway board is fixed on the crossbeam of the platform Bailey frame. The protection on both sides of the walkway board is formed into a frame by the protective net columns. A protective net is set between the protective net columns. The protective net body is connected at the corner position by the corner auxiliary column to realize the full enclosure of the protective net.

2. The top protection device of the steel platform of the building construction machine according to claim 1 is characterized in that: Multiple steel platform Bailey frames are connected by bolts.

3. The top protection device of the steel platform of the building construction machine according to claim 1 is characterized in that: The steel platform Bailey frame is connected to the building construction machine support columns through bolts.

4. The top protection device of the steel platform of a building construction machine according to claim 1 is characterized in that: The bottom of the protective net column is fixedly connected to the upper chord of the Bailey frame through bolts and a connecting plate.

5. The top protection device of the steel platform of a building construction machine according to claim 1 is characterized in that: The protective net columns are provided with a plurality of mounting holes, and the protective net columns are fixedly connected to the protective net by bolts inserted into the mounting holes.

6. The top protection device of the steel platform of a building construction machine according to claim 5 is characterized in that: The inner side of the protective net column is installed toward the opening side close to the inner side of the steel platform Bailey frame.

7. The top protection device of the steel platform of a building construction machine according to claim 1 is characterized in that: The corner auxiliary column is connected to the upper chord of the Bailey frame through bolts and a connecting plate.

8. The top protection device of the steel platform of a building construction machine according to claim 1 is characterized in that: The walkway plate is fixedly connected to the Bailey frame through hook bolts.