Light assembly type building practical training station capable of being repeatedly assembled, disassembled and used

By using installation mechanisms and isolation mechanisms in prefabricated building training stations, polystyrene boards can reduce the weight of the wall, quickly install card boards and slots, and assembly of isolation belts and wedge blocks, the assembly of time-consuming assembly in the prior art is solved and efficiency is improved.

CN223230038UActive Publication Date: 2025-08-15SHANDONG XINZHIZHU INFORMATION TECH CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202422504919.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-10-16
Publication Date
2025-08-15
Estimated Expiration
2034-10-16

AI Technical Summary

Technical Problem

The existing prefabricated building training stations require tools during assembly and disassembly, and it takes a long time, reducing the installation and use efficiency.

Method used

The installation mechanism and isolation mechanism are adopted to reduce the weight of the wall by using polystyrene boards, and the wall is quickly installed through the clamping boards and clamping slots. The assembly efficiency is improved by using components such as isolation belts and wedge blocks.

Benefits of technology

It realizes rapid assembly and disassembly of walls, reduces the use of bolts, and improves the installation and use efficiency of prefabricated building training stations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223230038U_ABST
    Figure CN223230038U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of assembly type components, and discloses a light assembly type building practical training station capable of being repeatedly assembled, disassembled and used, which comprises a first wall body and a second wall body, an installation mechanism is arranged between the first wall body and the second wall body, and an isolation mechanism is arranged on the front side of the first wall body and the front side of the second wall body; the mounting mechanism comprises a mounting assembly and a filling assembly; the filling assembly comprises two polystyrene boards. The weight of the first wall body and the second wall body is reduced through the mounting mechanism and the filling assembly by using a polystyrene board, so that the first wall body and the second wall body are convenient to carry, the mounting assembly is clamped in a clamping groove by using a clamping plate, the first wall body and the second wall body are mounted, the use of bolts is reduced, and the cost is reduced. The first wall body and the second wall body are convenient to assemble and disassemble, meanwhile, the connecting position of the practical training station is lowered through the L-shaped first wall body and the L-shaped second wall body, and the installation and use efficiency of the assembly type building practical training station is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of assembled components, in particular to an assembled construction training station that is lightweight and can be assembled and disassembled repeatedly. Background Art

[0002] The prefabricated building training station is a facility specifically used for prefabricated building education and training. It aims to help students understand and master the technology and process of prefabricated buildings by simulating a real production environment. The design of the training station is entirely based on the prefabricated building occupational skill standards, including the entire process of component production, installation, and inspection, to ensure that students can fully master the relevant knowledge and skills of prefabricated buildings.

[0003] According to a Chinese patent publication, a lightweight, reusable, assembled and disassembled prefabricated construction training station, with publication number CN220290319U, includes a first wall, a second wall, and a third wall. Each of the first and second walls is provided with at least two, and the bottom between the two second walls is detachably connected to a bottom beam, and the top between the two second walls is detachably connected to a top beam, and the first, second, and third walls are all hollow. This utility model meets the functional requirements and characteristic design of the construction training station by disassembling the entire station into prefabricated components. The prefabricated components adopt a hollow solid method to reduce weight, and the components are connected in different ways according to the characteristics of each component to ensure the strength of the connection parts, thereby achieving the fixed installation of the prefabricated construction training station.

[0004] In this device, a nut is provided on the side of wall three away from wall two. After the embedded bolt is inserted into the third circular hole, the nut and the embedded bolt are threadedly connected, completing the assembly of wall two and wall three. However, the existing device still has the following problems: when assembling and disassembling wall two and wall three, additional tools are required, and removing the bolts takes a considerable amount of time, which reduces the installation and use efficiency of the prefabricated construction training station. Therefore, a lightweight and reusable prefabricated construction training station is proposed. Utility Model Content

[0005] The purpose of the present invention is to provide a lightweight, reusable, assembled and disassembled prefabricated construction training station to solve the problems raised in the above-mentioned background technology.

[0006] To achieve the above objectives, the present invention provides the following technical solutions: a lightweight, reusable, assembled and disassembled construction training station, comprising a first wall and a second wall, a mounting mechanism disposed between the first wall and the second wall, and an isolation mechanism disposed on the front sides of the first wall and the second wall;

[0007] The installation mechanism includes an installation component and a filling component;

[0008] The filling assembly includes two polystyrene boards, the first wall and the second wall are both hollow, and the two polystyrene boards are respectively embedded in the first wall and the second wall;

[0009] The installation assembly includes a card plate, a pull rod, a spring and a pull rod. The spring is sleeved on the surface of the pull rod. A cavity is opened inside the second wall. The card plate, pull rod, spring and pull rod are all located inside the cavity. A card slot that is compatible with the card plate is opened through the side of the first wall.

[0010] Preferably, the first wall and the second wall are both L-shaped, and the first wall and the second wall are symmetrically arranged.

[0011] Preferably, a sliding groove adapted to the first wall is provided on the left side of the second wall, and the right end face of the first wall slides through the sliding groove extending from the left side of the second wall to facilitate connection between the second wall and the first wall.

[0012] Preferably, the rear side surface of the card plate slides through the inner wall of the cavity and the front side of the first wall to extend into the inside of the card slot, the front side surface of the card plate and the rear end surface of the pull rod are fixedly connected, and the front end surface of the pull rod slides through the inner wall of the cavity to extend to the front side of the second wall, so that the position of the card plate can be easily adjusted by the pull rod.

[0013] Preferably, the rear end face of the spring is fixedly connected to the front side face of the clamping plate, and the front end face of the spring is fixedly connected to the inner side face of the cavity, thereby improving the stability of the spring connection.

[0014] Preferably, a display window and a door frame are glued to the left side of the first wall and the right side of the second wall respectively, so as to improve the simulation degree of the training station.

[0015] Preferably, the isolation mechanism includes a second isolation belt and two first isolation belts, the second isolation belt is located in front of the two first isolation belts, and mounting plates are provided on the outside of the two first isolation belts. The inner wall of the first wall, the inner wall of the second wall and the inner walls of the two first isolation belts are all threadedly connected to the inner walls of the mounting plates by bolts. A wedge block is fixedly connected to the front end face of the first isolation belt, and a wedge groove is provided on the top surface of the second isolation belt. The bottom end face of the wedge block slides through the top surface of the second isolation belt and extends to the inside of the wedge groove. The training workstation is surrounded by the first isolation belt, the second isolation belt, the first wall and the second wall.

[0016] Preferably, a connecting rod is provided on the front side of the second isolation zone, and a connecting groove adapted to the connecting rod is opened through the front end face of the wedge block, and the rear end face of the connecting rod slides through the front side face of the second isolation zone and the front end face of the wedge block and extends into the inside of the connecting groove. The connecting rod can prevent the wedge block from sliding out of the wedge groove.

[0017] Compared with the prior art, the beneficial effects of the present invention are as follows: the lightweight, reusable and assembled and disassembled prefabricated building training station, through the installation mechanism, the filling component uses polystyrene boards to reduce the weight of the first wall and the second wall, thereby facilitating the transportation of the first wall and the second wall, and the installation component uses a card plate to be clamped inside the card slot to achieve installation between the first wall and the second wall, reducing the use of bolts, facilitating the assembly and disassembly of the first wall and the second wall, and at the same time using the two L-shaped first walls and the second wall to lower the connection of the training station, thereby improving the installation and use efficiency of the prefabricated building training station; through the isolation mechanism, the first isolation belt, the second isolation belt, the first wall and the second wall surround the training station, and the first isolation belt is installed with the first wall and the second wall using the installation plate, and the first isolation belt and the second isolation belt are assembled together using wedge blocks, wedge grooves and connecting rods. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 This is a top-side sectional perspective view of the card board of the utility model;

[0019] Figure 2 This is the overall main perspective view of the utility model;

[0020] Figure 3 This is the overall rear perspective view of the utility model;

[0021] Figure 4 This is a main perspective view of the pallet of the utility model;

[0022] Figure 5 This is a partially cutaway perspective view of the connecting rod of the present invention from the top side;

[0023] Figure 6 For this utility model Figure 1 Enlarged stereogram of area A in the middle.

[0024] In the figure: first wall 1, second wall 2, mounting mechanism 3, clamping plate 301, pull rod 302, spring 303, connecting plate 304, polystyrene board 305, door frame 4, display window 5, isolation mechanism 6, first isolation strip 601, second isolation strip 602, mounting plate 603, wedge block 604, connecting rod 605. DETAILED DESCRIPTION

[0025] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the embodiments described are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative efforts are within the scope of protection of the present invention.

[0026] Example 1: Please refer to Figure 1 - Figure 6 The utility model provides a technical solution: a lightweight, reusable, assembled and disassembled prefabricated construction training station, comprising a first wall 1 and a second wall 2, a mounting mechanism 3 is provided between the first wall 1 and the second wall 2, and an isolation mechanism 6 is provided on the front sides of the first wall 1 and the second wall 2;

[0027] The mounting mechanism 3 includes a mounting assembly and a filling assembly;

[0028] The filling component includes two polystyrene boards 305. The first wall 1 and the second wall 2 are both hollow, and the two polystyrene boards 305 are embedded in the first wall 1 and the second wall 2 respectively.

[0029] The installation component includes a card plate 301, a pull rod 302, a spring 303 and a pull rod 302, the spring 303 is sleeved on the surface of the pull rod 302, a cavity is opened inside the second wall 2, the card plate 301, the pull rod 302, the spring 303 and the pull rod 302 are all located inside the cavity, a card slot adapted to the card plate 301 is opened on the side of the first wall 1, the first wall 1 and the second wall 2 are both L-shaped, the first wall 1 and the second wall 2 are symmetrically arranged, a slide groove adapted to the first wall 1 is opened on the left side of the second wall 2, the right end face of the first wall 1 slides through the left side of the second wall 2 and extends into the inside of the slide groove, the rear side of the card plate 301 slides through the inner wall of the cavity and the front of the first wall 1 to extend into the inside of the card slot, the front side of the card plate 301 and the rear side of the pull rod 302 The end faces are fixedly connected, the front end face of the pull rod 302 slides through the inner wall of the cavity and extends to the front side of the second wall 2, the rear end face of the spring 303 is fixedly connected to the front side of the clamping plate 301, and the front end face of the spring 303 is fixedly connected to the inner side of the cavity. Through the installation mechanism 3, the filling component uses the polystyrene board 305 to reduce the weight of the first wall 1 and the second wall 2, thereby facilitating the transportation of the first wall 1 and the second wall 2. The installation component uses the clamping plate 301 to be clamped inside the card slot to realize the installation between the first wall 1 and the second wall 2, reduce the use of bolts, and facilitate the assembly and disassembly of the first wall 1 and the second wall 2. At the same time, the two L-shaped first walls 1 and the second wall 2 are used to lower the connection between the training station, thereby improving the installation and use efficiency of the prefabricated building training station.

[0030] A display window 5 and a door frame 4 are glued to the left side of the first wall 1 and the right side of the second wall 2 respectively.

[0031] Example 2: Based on Example 1, the preferred embodiment of the present invention is a lightweight, reusable, and detachable prefabricated construction training station. Figure 1 and Figure 5As shown: the isolation mechanism 6 includes a second isolation belt 602 and two first isolation belts 601, the second isolation belt 602 is located in front of the two first isolation belts 601, and the outer sides of the two first isolation belts 601 are provided with mounting plates 603, the inner wall of the first wall 1, the inner wall of the second wall 2 and the inner walls of the two first isolation belts 601 are all threadedly connected to the inner walls of the mounting plates 603 by bolts, the front end surface of the first isolation belt 601 is fixedly connected with a wedge block 604, the top surface of the second isolation belt 602 is provided with a wedge groove, the bottom end surface of the wedge block 604 slides through the top surface of the second isolation belt 602 and extends to the inside of the wedge groove, the front end surface of the second isolation belt 602 A connecting rod 605 is provided on the side, and a connecting groove adapted to the connecting rod 605 is opened through the front end face of the wedge block 604, and the rear end face of the connecting rod 605 slides through the front side face of the second isolation belt 602 and the front end face of the wedge block 604 and extends to the inside of the connecting groove. Through the isolation mechanism 6, the first isolation belt 601, the second isolation belt 602, the first wall 1 and the second wall 2 surround the training workstation, and the first isolation belt 601 is installed with the first wall 1 and the second wall 2 using the mounting plate 603, and the first isolation belt 601 and the second isolation belt 602 are assembled together using the wedge block 604, the wedge groove and the connecting rod 605.

[0032] When in use, pull the connecting plate 304, the connecting plate 304 drives the pull rod 302 to move, the pull rod 302 drives the connected card plate 301 to slide into the cavity, the card plate 301 squeezes the connected spring 303, and slides the first wall 1 into the sliding groove of the second wall 2, loosens the connecting plate 304, and the spring 303 drives the connected card plate 301 to slide out of the cavity and slide into the groove, thereby installing the first wall 1 and the second wall 2; move the second isolation belt 602 downward, and the second isolation belt 602 drives the wedge block 604 to slide into the wedge groove, and then the connecting rod 605 is inserted into the connecting groove, so that the wedge block 604 is installed in the wedge groove, and the first isolation belt 601 and the second isolation belt 602 are assembled. Finally, the first isolation belt 601 is moved to the front of the first wall 1 and the second wall 2, and the mounting plate is installed on the first wall 1, the second wall 2 and the first isolation belt 601 by bolts, so that the first isolation belt 601 is installed on the first wall 1 and the second wall 2.

[0033] Although the embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A lightweight, reusable, assembled and disassembled prefabricated construction training station, comprising a first wall (1) and a second wall (2), characterized in that: A mounting mechanism (3) is provided between the first wall (1) and the second wall (2), and an isolation mechanism (6) is provided on the front sides of the first wall (1) and the second wall (2); The mounting mechanism (3) comprises a mounting component and a filling component; The filling component comprises two polystyrene boards (305), the interiors of the first wall (1) and the second wall (2) are both hollow, and the two polystyrene boards (305) are respectively embedded in the interiors of the first wall (1) and the second wall (2); The mounting assembly comprises a card plate (301), a pull rod (302), a spring (303) and the pull rod (302); the spring (303) is sleeved on the surface of the pull rod (302); a cavity is provided inside the second wall (2); the card plate (301), the pull rod (302), the spring (303) and the pull rod (302) are all located inside the cavity; a card slot adapted to the card plate (301) is provided through the side of the first wall (1).

2. A lightweight, reusable, assembled and disassembled construction training station according to claim 1, characterized in that: The first wall (1) and the second wall (2) are both L-shaped, and the first wall (1) and the second wall (2) are symmetrically arranged.

3. A lightweight, reusable, assembled and disassembled construction training station according to claim 1, characterized in that: The left side of the second wall (2) is provided with a sliding groove adapted to the first wall (1), and the right end face of the first wall (1) slides through the left side of the second wall (2) and extends into the interior of the sliding groove.

4. The lightweight, reusable, assembled and disassembled construction training station according to claim 1 is characterized by: The rear side surface of the card plate (301) slides through the inner wall of the cavity and the front surface of the first wall (1) to extend into the interior of the card slot; the front side surface of the card plate (301) is fixedly connected to the rear end surface of the pull rod (302); the front end surface of the pull rod (302) slides through the inner wall of the cavity to extend to the front side of the second wall (2).

5. The lightweight, reusable, assembled and disassembled construction training station according to claim 1 is characterized by: The rear end face of the spring (303) is fixedly connected to the front side face of the clamping plate (301), and the front end face of the spring (303) is fixedly connected to the inner side face of the cavity.

6. The lightweight, reusable, assembled and disassembled construction training station according to claim 1 is characterized by: A display window (5) and a door frame (4) are respectively glued to the left side of the first wall (1) and the right side of the second wall (2).

7. The lightweight, reusable, assembled and disassembled construction training station according to claim 1 is characterized by: The isolation mechanism (6) comprises a second isolation zone (602) and two first isolation zones (601), wherein the second isolation zone (602) is located in front of the two first isolation zones (601), and a mounting plate (603) is provided on the outside of the two first isolation zones (601), and the inner wall of the first wall (1), the inner wall of the second wall (2) and the inner walls of the two first isolation zones (601) are all threadedly connected to the inner wall of the mounting plate (603) via bolts, and a wedge block (604) is fixedly connected to the front end surface of the first isolation zone (601), and a wedge groove is provided on the top surface of the second isolation zone (602), and the bottom end surface of the wedge block (604) slides through the top surface of the second isolation zone (602) and extends into the inside of the wedge groove.

8. The lightweight, reusable, assembled and disassembled construction training station according to claim 7, characterized in that: A connecting rod (605) is provided on the front side of the second isolation belt (602), a connecting groove adapted for the connecting rod (605) is provided through the front end face of the wedge block (604), and a rear end face of the connecting rod (605) slides through the front side face of the second isolation belt (602) and the front end face of the wedge block (604) and extends into the interior of the connecting groove.

Citation Information

Patent Citations

  • Light assembly type building practical training station capable of being repeatedly assembled, disassembled and used

    CN220290319U