Stair tread capable of preventing soil deposition
By designing drainage tanks and sharp-angle scraper on the stair step board and combining the quick disassembly mechanism, the problem of soil deposition is solved, achieving convenient cleaning and beautiful anti-soil deposition effect.
Patent Information
- Application Number
- CN202422529146.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-19
- Publication Date
- 2025-08-26
- Estimated Expiration
- 2034-10-19
AI Technical Summary
Existing stair treads are prone to accumulate soil in outdoor environments or muddy places, which affects the beauty and poses safety hazards.
A stair step plate that is anti-silt deposit is designed, using base, bearing plate, baffle, mud scraper and drainage system. Combined with a quick disassembly mechanism, soil deposits are prevented through drainage tank and acute angle design, and convenient cleaning is achieved through removable baffle and mud scraper.
Effectively prevent soil deposition, reduce cleaning frequency and cost, improve convenience and safety of use, and enhance aesthetics.
Smart Images

Figure CN223269509U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of stair treads, in particular to a stair tread capable of preventing soil deposition. Background Art
[0002] Stair treads are necessary components connecting different floors and are widely used in various types of buildings. In outdoor environments or muddy places, mud easily accumulates on the surface of the treads, which not only affects the appearance but may also cause safety hazards such as slipping.
[0003] After searching, the Chinese patent publication number is: CN207620251U, which discloses a stair tread. The key points of its technical solution are that it includes an integrally arranged flat plate and an angle plate. The flat plate is divided into a first flat plate and a second flat plate, wherein the first flat plate is located between the second flat plate and the angle plate. The first flat plate is bonded to the flat surface of the stair tread, and the second flat plate is bent upward and bonded to the vertical surface of the stair tread and bonded to the stair tread of the previous step. The angle plate covers and bonds the second flat plate of the stair tread of the next step. There is an arc transition between the first and second flat plates, and there is a gap after bonding to the stair tread. A support block adapted to the gap is provided so that the arc surface between the first and second flat plates fits the support block. The stair tread of this utility model can smoothly transition with the stair tread and stably bond to the stair tread. However, in actual use, the design of the above device does not fully consider the function of preventing mud deposition, which leads to easy accumulation of mud when used in muddy environments, increasing the difficulty of cleaning and safety hazards. Therefore, a stair tread that prevents mud deposition is proposed to solve the above problem. Utility Model Content
[0004] In order to make up for the above shortcomings, the utility model provides a stair tread that prevents mud deposition, aiming to improve the problem in the existing technology that mud easily accumulates on the surface of the tread in outdoor environments or muddy places, which not only affects the appearance but also may cause safety hazards such as slipping.
[0005] In order to achieve the above-mentioned purpose, the present invention adopts the following technical solution: a stair tread that prevents mud deposition, including a base, a support plate fixedly connected to the top of the base, a plurality of first grooves on the top of the support plate, and a transverse drainage pipe connected to the right side of each of the first grooves, a longitudinal drainage groove on the right side of the top of the base, and a main drainage pipe connected to the front side of the longitudinal drainage groove, two baffles are provided inside the base, screw holes are provided inside the two baffles, and a mud scraper is provided on the adjacent side of the two baffles, and a quick-release mechanism is provided on the left and right sides of the base, and the quick-release mechanism is used to conveniently remove and install the baffle.
[0006] Through the above technical solution: the baffle is installed on the base, the grooves and drain pipes on the supporting plate can drain the mud and water encountered in the rain, and it has an anti-deposition structure design. By setting a baffle higher than the step body and a scraper with a sharp angle design, it effectively prevents the deposition of mud on the step board. At the same time, the baffle can prevent mud and water from splashing into the step board.
[0007] As a further description of the above technical solution:
[0008] The quick-release mechanism includes a second groove, which is opened on the left and right sides of the base. Two fixing parts are fixedly connected to the grooves on the left and right sides of the base. A spring is fixedly connected to the opposite side of the fixing parts. One end of each of the springs is fixedly connected to a bolt head. A bolt column is fixedly connected to the left side of each of the bolt heads. Bolt holes are opened inside the two baffles, and two third grooves are opened on the left and right sides of the support plate.
[0009] Through the above technical solution: pulling the bolt head causes the spring to undergo elastic deformation, and the bolt column can leave the third groove in the baffle, which can be more convenient for cleaning and replacement. This design allows users to easily disassemble and install the baffle according to actual needs, greatly improving the convenience of use.
[0010] As a further description of the above technical solution:
[0011] The away side of the baffle is fixedly connected with staggered beautiful lines, and the staggered beautiful lines are evenly arranged.
[0012] Through the above technical solution: the staggered beautiful patterns improve the overall aesthetics.
[0013] As a further description of the above technical solution:
[0014] The interiors of the two screw holes are both threadedly connected with screws, and one end of the screw is threadedly connected to the two sides of the scraper.
[0015] Through the above technical solution: the scraper blade is connected by screw threads so that the scraper blade is replaceable. The replaceable design of the scraper blade allows different materials to be selected according to needs to improve durability and scraping effect.
[0016] As a further description of the above technical solution:
[0017] A cross groove is provided on the top of the screw, and the size of the cross groove is consistent with the screw cap.
[0018] Through the above technical solution, the presence of the cross groove can make it more convenient to replace the scraper.
[0019] As a further description of the above technical solution:
[0020] Adjacent sides of the two baffles are fixedly connected with rubber strips, and the scraper blades are designed to form an acute angle with the base.
[0021] Through the above technical solution: the rubber strip and sharp angle design effectively prevent the deposition of mud on the tread plate, significantly reducing the cleaning frequency and cost.
[0022] As a further description of the above technical solution:
[0023] The support plate is made of wear-resistant material and has a wavy anti-slip texture design.
[0024] Through the above technical solution: the wear-resistant material makes the pedal last longer, and the added anti-slip texture greatly enhances the anti-slip performance under wet conditions, thereby improving the safety of users walking.
[0025] As a further description of the above technical solution:
[0026] A transverse drainage groove is provided on the front side of the top of the support plate, and the transverse drainage groove is arranged at the bottom of the scraper blade.
[0027] Through the above technical solution: the water guide groove design on the edge of the step body can effectively guide and drain the scraped mud and water, further keeping the step board clean and dry, and also helping to improve the overall aesthetics.
[0028] The utility model has the following beneficial effects:
[0029] 1. In this utility model, the baffle is installed on the base, and the grooves and drain pipes on the supporting plate can drain mud and water encountered in the rain. It has an anti-deposition structure design. By setting the baffle higher than the step body and the scraper with a sharp angle design, it effectively prevents the deposition of mud on the step plate, significantly reducing the cleaning frequency and cost.
[0030] 2. In the present invention, when the baffle needs to be disassembled, the bolt head is pulled to cause the spring to undergo elastic deformation, and the bolt column can leave the third groove in the baffle, which can be more convenient for cleaning and replacement. This design allows users to easily disassemble and install the baffle according to actual needs, greatly improving the convenience of use. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] Figure 1 A three-dimensional diagram of a stair tread for preventing soil deposition proposed by the present invention;
[0032] Figure 2 This is a top view of a stair tread that prevents soil deposition proposed by the present invention;
[0033] Figure 3This is a disassembled diagram of a stair tread that prevents soil deposition proposed by the present invention;
[0034] Figure 4 This is a right side view of a stair tread for preventing soil deposition proposed by the present invention;
[0035] Figure 5 The utility model is a three-dimensional schematic diagram of a bolt device for a stair tread that prevents soil deposition.
[0036] Legend:
[0037] 1. Base; 2. Support plate; 3. First groove; 4. Horizontal drain pipe; 5. Longitudinal drain groove; 6. Main drain pipe; 7. Baffle; 8. Screw hole; 9. Screw; 10. Scraper; 11. Quick release mechanism; 1101. Second groove; 1102. Fixing part; 1103. Spring; 1104. Bolt head; 1105. Bolt column; 1106. Bolt hole; 1107. Third groove; 12. Staggered beautiful pattern; 13. Cross groove; 14. Horizontal drain groove; 15. Rubber strip. DETAILED DESCRIPTION
[0038] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the embodiments described are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative efforts are within the scope of protection of the present invention.
[0039] Reference Figure 1 、 Figure 2 and Figure 3 The utility model provides an embodiment of a stair tread for preventing mud deposition, comprising a base 1, the top of the base 1 is fixedly connected to a supporting plate 2, the top of the supporting plate 2 is provided with a plurality of first grooves 3, the right sides of the plurality of first grooves 3 are connected with a horizontal drainage pipe 4, the top right side of the base 1 is provided with a longitudinal drainage groove 5, the front side of the longitudinal drainage groove 5 is connected with a main drainage pipe 6, the interior of the base 1 is provided with two baffles 7, the adjacent sides of the two baffles 7 are fixedly connected with a rubber strip 15, the scraper 10 is designed at an acute angle to the base 1, the interior of the two baffles 7 are provided with screw holes 8, the interiors of the two screw holes 8 are threadedly connected with screws 9, one end of the screw 9 is threadedly connected to the two sides of the scraper 10, the top of the screw 9 is provided with a cross groove 13, the size of the cross groove 13 is consistent with the top cap of the screw 9, the adjacent sides of the two baffles 7 are provided with a scraper 10, and the left and right sides of the base 1 are provided with a quick release mechanism 11, which is used to conveniently remove and install the baffle 7.
[0040] Specifically, when the stair treads are outdoors and rainfall arrives, raindrops fall onto the surface of the support plate 2. At this point, the first grooves 3 on the support plate 2 function, draining muddy water into the transverse drain pipe 4, which in turn drains the muddy water into the longitudinal drain pipe 6. As people use the stair treads, the scraper 10 cleans mud from the soles of their shoes. The removed muddy water flows into the transverse drain groove 14 below the scraper 10. The muddy water in the transverse drain groove 14 and the longitudinal drain groove 5 converge and are then discharged through the main drain pipe. Because the stair treads are arranged on different steps, muddy water draining from the upper step flows into the longitudinal drain groove 5 of the lower step, ultimately draining through the lowest step. Furthermore, the baffle 7 prevents muddy water from splashing onto the stair treads, and the rubber strip 15 protects the baffle 7 from being eroded by muddy water. The interchangeable design of the scraper 10 allows for different materials to be selected to improve durability and mud-scraping effectiveness.
[0041] Reference Figure 3 、 Figure 4 and Figure 5 The quick-release mechanism 11 includes a second groove 1101, which is opened on the left and right sides of the base 1. Two fixing members 1102 are fixedly connected to the grooves on the left and right sides of the base 1. A spring 1103 is fixedly connected to the opposite side of the multiple fixing members 1102. One end of the multiple springs 1103 is fixedly connected to a bolt head 1104. The left side of the multiple bolt heads 1104 is fixedly connected to a bolt column 1105. Bolt holes 1106 are opened in the interior of the two baffles 7, and two third grooves 1107 are opened on the left and right sides of the carrier plate 2.
[0042] Specifically, when the baffle 7 needs to be disassembled, first pull the bolt head 1104 outward so that one end of the spring 1103 is fixed on the bolt head 1104 and the other end is fixed on the fixing piece 1102, and elastic deformation will occur. At this time, the bolt column 1105 leaves the third groove 1107 on the support plate 2, and then leaves the bolt hole 1106 on the baffle 7, so that the baffle 7 can be disassembled. At this time, loosen the bolt head 1104, so that the elastic deformation of the spring 1103 is restored, and the bolt column 1105 re-enters the third groove 1107, and the baffle 7 can be quickly disassembled, which makes it easier to clean and replace. This design allows users to easily disassemble and install the baffle 7 according to actual needs, greatly improving the convenience of use.
[0043] Reference Figure 1 and Figure 2 The away side of the baffle 7 is fixedly connected with a staggered beautiful pattern 12, and the staggered beautiful pattern 12 is evenly arranged. The supporting plate 2 is made of wear-resistant material, and the supporting plate 2 adopts a wavy anti-slip texture design. A horizontal drainage groove 14 is opened on the top front side of the supporting plate 2, and the horizontal drainage groove 14 is arranged at the bottom of the scraper 10.
[0044] Specifically, the staggered beautiful patterns 12 improve the overall aesthetics, the wear-resistant material makes the foot pedal longer in service life, the added anti-slip texture greatly enhances the anti-slip performance in wet conditions, and improves the safety of users walking. The water guide groove design on the edge of the step body can effectively guide and drain the scraped mud and water, further keeping the step board clean and dry, while also helping to improve the overall aesthetics.
[0045] Working principle: When the tread is in an outdoor environment, rainfall will reach the surface of the carrier plate 2. At this time, the first groove 3 on the carrier plate 2 will drain the muddy water into the horizontal drain pipe 4, and the horizontal drain pipe 4 will drain the muddy water into the longitudinal drain pipe 6. At the same time, when the tread is in use, the scraper 10 can clean the mud on the sole of the shoe, and the cleaned muddy water will enter the horizontal drain groove 14 located below the scraper 10. The muddy water in the horizontal drain groove 14 and the longitudinal drain groove 5 will be collected and discharged through the main drain pipe. At the same time, the stair treads are arranged on different steps. The muddy water discharged from the upper step will be drained into the longitudinal drain groove 5 of the lower step, so that the muddy water can finally be discharged through the lowest level tread, and the baffle 7 can prevent the muddy water on both sides from splashing into the tread, and the rubber strip 15 prevents the baffle 7 from being eroded by muddy water.
[0046] And when the baffle 7 needs to be disassembled, the bolt head 1104 is first pulled outward, so that one end of the spring 1103 is fixed on the bolt head 1104 and the other end is fixed on the fixing piece 1102, and elastic deformation occurs. At this time, the bolt column 1105 leaves the third groove 1107 on the supporting plate 2, and then leaves the bolt hole 1106 on the baffle 7, so that the baffle 7 can be disassembled. At this time, the bolt head 1104 is loosened, so that the elastic deformation of the spring 1103 is restored, and the bolt column 1105 re-enters the third groove 1107, and the baffle 7 can be quickly disassembled.
[0047] Finally, it should be noted that the above is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or make equivalent replacements for some of the technical features therein. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.
Claims
1. A stair tread for preventing soil deposition, comprising a base (1), characterized in that: The top of the base (1) is fixedly connected to a support plate (2), the top of the support plate (2) is provided with a plurality of first grooves (3), the right sides of the plurality of first grooves (3) are all connected to a transverse drainage pipe (4), the top right side of the base (1) is provided with a longitudinal drainage groove (5), the front side of the longitudinal drainage groove (5) is connected to a main drainage pipe (6), two baffles (7) are provided inside the base (1), screw holes (8) are provided inside the two baffles (7), and scrapers (10) are provided on adjacent sides of the two baffles (7), and quick-release mechanisms (11) are provided on the left and right sides of the base (1), and the quick-release mechanisms (11) are used to conveniently remove and install the baffles (7).
2. The anti-soil deposition stair tread according to claim 1, characterized in that: The quick-release mechanism (11) comprises a second groove (1101), the second groove (1101) being provided on the left and right sides of the base (1), two fixing members (1102) being fixedly connected to the grooves on the left and right sides of the base (1), a plurality of fixing members (1102) being fixedly connected to the sides away from each other with springs (1103), one end of each of the plurality of springs (1103) being fixedly connected to a bolt head (1104), and a bolt column (1105) being fixedly connected to the left side of each of the plurality of bolt heads (1104), a bolt hole (1106) being provided inside each of the two baffles (7), and two third grooves (1107) being provided on the left and right sides of the support plate (2).
3. The stair tread for preventing soil deposition according to claim 1, characterized in that: The baffle (7) is fixedly connected to a side thereof that is away from the baffle with staggered aesthetic patterns (12), and the staggered aesthetic patterns (12) are evenly arranged.
4. The stair tread for preventing soil deposition according to claim 1, characterized in that: The interiors of the two screw holes (8) are both threadedly connected with screws (9), and one end of the screw (9) is threadedly connected to both sides of the scraper (10).
5. The stair tread for preventing soil deposition according to claim 4, characterized in that: A cross groove (13) is provided on the top of the screw (9), and the size of the cross groove (13) is consistent with the top cap of the screw (9).
6. The stair tread for preventing soil deposition according to claim 1, characterized in that: Adjacent sides of the two baffles (7) are fixedly connected with rubber strips (15), and the scraper (10) and the base (1) are designed to form an acute angle.
7. The stair tread for preventing soil deposition according to claim 1, characterized in that: The support plate (2) is made of a wear-resistant material, and the support plate (2) adopts a wavy anti-slip texture design.
8. The soil-deposition-preventing stair tread according to claim 1, characterized in that: A transverse drainage groove (14) is provided on the front side of the top of the support plate (2), and the transverse drainage groove (14) is arranged at the bottom of the scraper blade (10).
Citation Information
Patent Citations
Stair tread
CN207620251U