Detachable steel pipe support operation platform for underground ramp repair operation

By designing a detachable steel pipe bracket operation platform, the stability and frequent movement of plug-in scaffolding in downhole ramp rework operations are solved, and higher safety and construction efficiency are achieved.

CN223293728UActive Publication Date: 2025-09-02JINCHUAN GROUP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202422639321.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-10-31
Publication Date
2025-09-02
Estimated Expiration
2034-10-31

AI Technical Summary

Technical Problem

When the existing plug-in type buckle scaffolding is used as a construction platform for downhole ramp rework, the safety factor is low, the structure is unstable, and it needs to be moved frequently, which affects the construction efficiency.

Method used

A detachable steel pipe bracket working platform is designed, including the first and second layers of steel mesh, equipped with cross bars, vertical bars, oblique struts and retractable legs, and uses φ89mm seamless steel pipes and φ10mm round steel mesh materials to form a stable support structure.

Benefits of technology

It improves the stability and safety of the construction platform, reduces the risks of high-altitude operations, allows construction vehicles to pass, avoid frequent movement, and improves construction efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223293728U_ABST
    Figure CN223293728U_ABST
Patent Text Reader

Abstract

The utility model provides a detachable steel pipe support operation platform for underground ramp repair operation, which comprises a first layer of reinforcing mesh and a second layer of reinforcing mesh which are arranged in parallel, four first row of cross rods are arranged on the periphery of the first layer of reinforcing mesh, and four second row of cross rods are arranged on the periphery of the second layer of reinforcing mesh. A plurality of first-row vertical rods are vertically arranged at the bottoms of the first-row transverse rods, four second-row transverse rods are arranged on the periphery of the second-layer reinforcing mesh in a surrounding mode, and the first-row vertical rods and the second-row transverse rods are fixedly connected. A square platform fence is arranged on the upper edge of the second row of transverse rods in a surrounding mode, a plurality of third row of transverse rods and a plurality of fourth row of transverse rods which are arranged in parallel are sequentially arranged at the bottom of the second row of transverse rods, the third row of transverse rods and the fourth row of transverse rods are connected through a plurality of third row of vertical rods which are vertically arranged, and telescopic supporting legs are arranged at the bottoms of the third row of vertical rods. The platform is good in stability and high in safety coefficient, the carry-scraper can pass through the lower portion of the platform, personnel on the platform and the carry-scraper can work at the same time, and the construction progress is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of underground equipment and relates to a detachable steel pipe support operating platform for underground ramp repair operations. Background Art

[0002] The metal mine tunnel repair project is one of the most important projects in the mining and production of metal and non-metallic ores. Its main contents include restoring the original tunnel design section; clearing the silt and water in the tunnel and adjusting the tunnel slope, cleaning the floating gangue and other debris; repairing the ditch and treating the tunnel bottom; and restoring the tunnel that has collapsed or collapsed. At present, the socket-type disc buckle scaffolding is used as the construction platform for the repair of the tunnel arch in Jinchuan Mine. It has a simple structure and is easy to assemble and disassemble, but its safety factor is low. It is only suitable for construction on relatively simple terrain and flat bottom plates. When used for repairing ramps, the scaffolding is tilted as a whole and the structure is unstable, making it difficult to withstand the counter-impact force during operation. At the same time, in order to cooperate with the waste rock shoveling and other operations of vehicles such as forklifts, the scaffolding needs to be moved frequently, reducing construction efficiency. Utility Model Content

[0003] The purpose of the utility model is to address the problems existing in the prior art and provide a detachable steel pipe support work platform for underground ramp repair operations, which solves the problems of low safety factor and unstable structure of the existing socket-type disc buckle scaffolding as a construction platform, and the need to frequently move the scaffolding to cooperate with operations such as waste rock shoveling by vehicles such as forklifts, resulting in reduced construction efficiency.

[0004] To this end, the present invention adopts the following technical solutions:

[0005] A detachable steel pipe support work platform for underground ramp repair work, comprising a first layer of steel mesh and a second layer of steel mesh arranged in parallel, the first layer of steel mesh being provided with four first-row cross bars around its periphery, a plurality of first-row vertical bars being provided at the bottom of the first row of cross bars, and the second layer of steel mesh being provided with four second-row cross bars around its periphery, the first row of vertical bars being fixedly connected to the second row of cross bars;

[0006] The upper edge of the second row of cross bars is surrounded by a square platform fence, and a plurality of third and fourth row cross bars are arranged in parallel at the bottom. The second and third row cross bars are connected by a plurality of vertically arranged second row vertical bars. A diagonal brace is provided between the second row of cross bars and the second row of vertical bars. The third and fourth row cross bars are connected by a plurality of vertically arranged third row vertical bars, and the bottom of the third row of vertical bars is provided with retractable legs.

[0007] Furthermore, the area of ​​the first layer of steel mesh is smaller than the area of ​​the second layer of steel mesh.

[0008] Furthermore, one end of the diagonal brace is connected to the second row of horizontal bars, and the other end is connected to the second row of vertical bars.

[0009] Furthermore, the first row of vertical poles, the third row of horizontal poles, the third row of vertical poles and the fourth row of horizontal poles are all made of two steel pipes connected by connecting flanges.

[0010] The beneficial effects of the present invention are:

[0011] The utility model has the characteristics of good stability and high safety factor, which reduces the safety risks of workers working at height. When performing underground construction, construction vehicles such as scrapers can operate under the working platform, avoiding the shortcomings of traditional socket-type disc buckle scaffolding that requires frequent moving and disassembly, thereby improving construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] Figure 1 It is a structural diagram of the present utility model.

[0013] In the figure, 1-platform fence, 2-first row of horizontal bars, 3-first row of vertical bars, 4-second row of horizontal bars, 5-diagonal braces, 6-second row of vertical bars, 7-third row of horizontal bars, 8-third row of vertical bars, 9-connecting flange, 10-retractable legs, 11-first layer of steel mesh, 12-second layer of steel mesh, 13-fourth row of horizontal bars. DETAILED DESCRIPTION

[0014] The technical solution of the present invention is described below in conjunction with the accompanying drawings and implementation methods.

[0015] like Figure 1 As shown, a detachable steel pipe support work platform for underground ramp repair operations includes a first layer of steel mesh 11 and a second layer of steel mesh 12 arranged in parallel, and four first-row cross bars 2 are provided around the side of the first layer of steel mesh 11; specifically, the area of ​​the first layer of steel mesh 11 is smaller than that of the second layer of steel mesh 12.

[0016] A plurality of first row vertical bars 3 are vertically arranged at the bottom of the first row of horizontal bars 2, and four second row horizontal bars 4 are arranged around the sides of the second layer of steel mesh 12. The first row vertical bars 3 and the second row horizontal bars 4 are fixedly connected.

[0017] The upper edge of the second row of cross bars 4 is surrounded by a square platform fence 1, and the bottom is sequentially provided with a plurality of parallel third row cross bars 7 and a fourth row cross bars 13. The second row of cross bars 4 and the third row of cross bars 7 are connected by a plurality of vertically arranged second row vertical bars 6. A diagonal brace 5 is provided between the second row of cross bars 4 and the second row of vertical bars 6. One end of the diagonal brace 5 is connected to the second row of cross bars 4, and the other end is connected to the second row of vertical bars 6.

[0018] The third row of cross bars 7 and the fourth row of cross bars 13 are connected via a plurality of vertically arranged third row of vertical bars 8 , and retractable legs 10 are provided at the bottom of the third row of vertical bars 8 .

[0019] The first row of vertical poles 3 , the third row of horizontal poles 7 , the third row of vertical poles 8 and the fourth row of horizontal poles 13 are all made of two steel pipes connected by a connecting flange 9 .

[0020] Specifically, the materials used to make the above-mentioned first row of horizontal bars 2, first row of vertical bars 3, second row of horizontal bars 4, second row of vertical bars 6, third row of horizontal bars 7, third row of vertical bars 8, fourth row of horizontal bars 13 and diagonal braces 5 are all φ89mm seamless steel pipes; the materials used to make the first layer of steel mesh 11 and the second layer of steel mesh 12 are both φ10mm round steel with a grid density of 75mm*75mm; the material used to make the retractable legs 10 is φ108mm seamless steel pipes.

[0021] The utility model is used in the following process:

[0022] First, the retractable legs 10 are inserted into the third row of vertical poles 8 for assembly and use, and the height can be adjusted according to the repair section. The platform fence 1 is assembled with the first row of cross bars 2 and the second row of cross bars 4 using sleeves; when the arch foot of the ramp is under repair, the operator stands on the second layer of steel mesh 12 to work, and the rock drill legs can be stuck in the steel mesh. When the arch top of the ramp is under repair, the operator stands on the first layer of steel mesh 11 to work, and construction equipment such as scrapers can operate through the bottom of the work platform, avoiding the shortcomings of traditional socket-type disc buckle scaffolding that needs to be frequently moved and disassembled, hindering the scraper's waste rock transportation, material feeding and other construction tasks, and improving construction efficiency.

Claims

1. A detachable steel pipe support work platform for underground ramp repair work, characterized in that: The invention comprises a first layer of steel mesh (11) and a second layer of steel mesh (12) arranged in parallel, wherein the first layer of steel mesh (11) is provided with four first-row cross bars (2) on the periphery thereof, and the bottom of the first row of cross bars (2) is provided with a plurality of first-row vertical bars (3) arranged vertically, and the second layer of steel mesh (12) is provided with four second-row cross bars (4) on the periphery thereof, and the first row of vertical bars (3) and the second row of cross bars (4) are fixedly connected; The upper edge of the second row of cross bars (4) is surrounded by a square platform fence (1), and a plurality of third row cross bars (7) and a fourth row cross bars (13) are sequentially arranged in parallel at the bottom. The second row of cross bars (4) and the third row of cross bars (7) are connected by a plurality of second row of vertical bars (6) arranged vertically. A diagonal brace (5) is provided between the second row of cross bars (4) and the second row of vertical bars (6). The third row of cross bars (7) and the fourth row of cross bars (13) are connected by a plurality of third row of vertical bars (8) arranged vertically. The bottom of the third row of vertical bars (8) is provided with a retractable support leg (10).

2. A detachable steel pipe support work platform for underground ramp repair work according to claim 1, characterized in that: The area of ​​the first layer of steel mesh (11) is smaller than the area of ​​the second layer of steel mesh (12).

3. The detachable steel pipe support work platform for underground ramp repair work according to claim 1 is characterized in that: One end of the diagonal brace (5) is connected to the second row of cross bars (4), and the other end is connected to the second row of vertical bars (6).

4. The detachable steel pipe support work platform for underground ramp repair work according to claim 1 is characterized in that: The first row of vertical bars (3), the third row of horizontal bars (7), the third row of vertical bars (8) and the fourth row of horizontal bars (13) are all made of two steel pipes connected by a connecting flange (9).