Construction fence capable of being folded and stored
By designing a construction fence with supporting legs, a base, a folding storage and a quick splicing mechanism, the problem of existing construction fences occupying a large space is solved, quick storage and splicing are achieved, and the convenience of use is improved.
Patent Information
- Application Number
- CN202422555493.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-22
- Publication Date
- 2025-09-09
- Estimated Expiration
- 2034-10-22
AI Technical Summary
Existing construction fences take up a large space during storage and transportation and are inconvenient to use.
A construction enclosure is designed, which includes supporting legs, a base, an enclosure body, a folding and storage mechanism, and a quick splicing mechanism. The enclosure can be quickly folded and spliced by pulling the pull rod and the spring.
It enables the rapid storage and splicing of construction fences, reduces space occupation and improves ease of use.
Smart Images

Figure CN223317642U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of construction fences, in particular to a foldable and storable construction fence. Background Art
[0002] Construction fencing is a temporary wall that needs to be erected during construction or municipal construction. It isolates the construction site from the external environment, making the construction site a relatively closed space, avoiding noise, dust and mess during the construction process, and ensuring safe and civilized construction. However, the current construction fencing still has some defects, such as:
[0003] When existing construction fences are in use, they tend to occupy a large space when stored due to their large area. In addition, large construction fences also require a large space when transported, which increases the time required to transport the construction fences and makes them inconvenient to use. Utility Model Content
[0004] The purpose of the present invention is to provide a foldable and storable construction fence, so as to solve the problem that the construction fence proposed in the above background technology is not easy to fold and store.
[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a foldable and storable construction fence, comprising support legs, a base and a fence body, wherein the bottom ends of the two support legs are each provided with a base, the fence body is provided between the two support legs, and a folding and storing mechanism is provided between the two bases, the folding and storing mechanism comprises a docking block, a cavity and a limit plate, a docking block is provided on one side of one base, a cavity is opened inside the other base, and a limit plate is provided inside the cavity.
[0006] Preferably, a first pull rod extending to the outside of the base is provided on one side of the limiting plate, and a first spring is welded and connected between the limiting plate and the cavity.
[0007] Preferably, a locking rod extending into the interior of the docking block is provided at the bottom end of the limiting plate, and a locking groove is provided at one end of the docking block close to the locking rod.
[0008] Preferably, a quick splicing mechanism is provided between the two supporting legs, and the quick splicing mechanism includes a fixing frame, a fixing block, a connecting block, a T-shaped rod, a second pull rod, a second spring and a reserved groove. A fixing frame is provided on one side of one of the supporting legs, and fixing blocks are provided at both ends of the fixing frame.
[0009] Preferably, one side of the other supporting leg is provided with symmetrically distributed connecting blocks, and one side of the connecting blocks extends into the interior of the fixing block.
[0010] Preferably, symmetrically distributed T-shaped rods are provided inside the fixing frame, and one end of the T-shaped rod extends into the interior of the connecting block.
[0011] Preferably, one end of the T-shaped rod is welded to a second pull rod extending to the outside of the fixed frame, a second spring is welded between the T-shaped rod and the fixed frame, and a reserved groove is opened inside the connecting block near one end of the T-shaped rod.
[0012] Compared with the prior art, the beneficial effects of the present invention are as follows: the foldable and storable construction fence drives the locking rod to move by pulling the first pull rod, and then folds the fence body through the rotating shaft, so that the docking block at the bottom end of one base can be engaged with the other base, and the first pull rod is loosened so that the locking rod can be locked with the docking block, so that the construction fence can be quickly folded and stored to avoid occupying more space. By pinching the two second pull rods on one side of a supporting leg, the second pull rod can drive the T-shaped rod to move when moving, and then the connecting block on the other side of the supporting leg is docked with the fixed block, and then the second pull rod is loosened so that the T-shaped rod can be locked with the connecting block, so that the two construction fences can be quickly spliced, thereby making the construction fence more convenient to use.
[0013] 1. The foldable construction fence is configured to be folded and stored, by pulling the first pull rod so that the first pull rod can drive the limit plate to move when it moves, so that the limit plate can squeeze the first spring when it moves, and at the same time, the limit plate can drive the locking rod to move when it moves, and then the fence body is folded through the rotating shaft so that the docking block at the bottom end of one base can be engaged with the other base, the first pull rod is loosened, and then the locking rod can be locked with the locking groove through the resetting effect of the first spring, and at the same time, the locking rod can be locked with the docking block, so that the construction fence can be quickly folded and stored, avoiding taking up too much space, and making the construction fence more convenient to use;
[0014] 2. The foldable and storable construction fence is constructed by pinching the two second pull rods on one side of a supporting leg so that the second pull rod can drive the T-shaped rod to move when it moves, so that the T-shaped rod can squeeze the second spring when it moves, and then the connecting block on the other side of the supporting leg is docked with the fixed block, and then the second pull rod is loosened. Through the reset effect of the second spring, the T-shaped rod can be locked with the reserved groove, and at the same time the T-shaped rod can be locked with the connecting block, so that the two construction fences can be quickly spliced, making the construction fence more convenient to use. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 This is a front view cutaway diagram of the utility model;
[0016] Figure 2 This is an enlarged top view of the utility model;
[0017] Figure 3 This is an enlarged side cutaway view of the folding storage mechanism of the present invention;
[0018] Figure 4 This is an enlarged cutaway view of the main view of the quick splicing mechanism of the utility model;
[0019] Figure 5 It is a schematic diagram of the three-dimensional structure of the enclosure body of the utility model.
[0020] In the figure: 1. Support leg; 2. Base; 3. Enclosure body; 4. Folding storage mechanism; 401. Docking block; 402. Cavity; 403. Limiting plate; 404. First pull rod; 405. First spring; 406. Locking rod; 407. Locking groove; 5. Quick splicing mechanism; 501. Fixed frame; 502. Fixed block; 503. Connecting block; 504. T-rod; 505. Second pull rod; 506. Second spring; 507. Reserved groove. DETAILED DESCRIPTION
[0021] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the embodiments described are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative efforts are within the scope of protection of the present invention.
[0022] See also Figure 1 、 Figure 2 、 Figure 3 and Figure 5 It can be seen that the utility model provides a technical solution: a foldable and storable construction fence, including support legs 1, a base 2 and a fence body 3, the bottom ends of the two support legs 1 are each provided with a base 2, the fence body 3 is provided between the two support legs 1, and a folding and storage mechanism 4 is provided between the two bases 2, the folding and storage mechanism 4 includes a docking block 401, a cavity 402 and a limiting plate 403, a docking block 401 is provided on one side of one base 2, a cavity 402 is provided inside the other base 2, a limiting plate 403 is provided inside the cavity 402, a first pull rod 404 extending to the outside of the base 2 is provided on one side of the limiting plate 403, a first spring 405 is welded between the limiting plate 403 and the cavity 402, a locking rod 406 extending to the inside of the docking block 401 is provided at the bottom end of the limiting plate 403, and a locking groove 407 is provided at one end of the docking block 401 close to the locking rod 406.
[0023] See Figure 1 、 Figure 2、 Figure 3 and Figure 5 It can be seen that by pulling the first pull rod 404 to drive the locking rod 406 to move, and then folding the enclosure body 3 through the rotating shaft, the docking block 401 at the bottom end of one base 2 can be engaged with the other base 2, and the first pull rod 404 is loosened so that the locking rod 406 can be locked with the docking block 401, so that the construction enclosure can be quickly folded and stored to avoid occupying more space.
[0024] See Figure 1 、 Figure 4 and Figure 5 It can be seen that a quick splicing mechanism 5 is provided between the two supporting legs 1, and the quick splicing mechanism 5 includes a fixed frame 501, a fixed block 502, a connecting block 503, a T-shaped rod 504, a second pull rod 505, a second spring 506 and a reserved slot 507. A fixed frame 501 is provided on one side of one supporting leg 1, and fixed blocks 502 are provided at both ends of the fixed frame 501. A symmetrically distributed connecting block 503 is provided on one side of the other supporting leg 1, and one side of the connecting block 503 extends to the interior of the fixed block 502. A symmetrically distributed T-shaped rod 504 is provided inside the fixed frame 501, and one end of the T-shaped rod 504 extends to the interior of the connecting block 503. One end of the T-shaped rod 504 is welded to the second pull rod 505 extending to the outside of the fixed frame 501, and a second spring 506 is welded between the T-shaped rod 504 and the fixed frame 501. A reserved slot 507 is provided in the connecting block 503 at one end close to the T-shaped rod 504.
[0025] See Figure 1 、 Figure 4 and Figure 5 It can be seen that by pinching the two second pull rods 505 on one side of a supporting leg 1, the second pull rod 505 can drive the T-shaped rod 504 to move when moving, and then the connecting block 503 on the other side of the supporting leg 1 is docked with the fixed block 502, and then the second pull rod 505 is loosened, so that the T-shaped rod 504 can be locked with the connecting block 503, so that the two construction fences can be quickly spliced, making the construction fence more convenient when used.
[0026] To sum up, the construction fence is a temporary wall that needs to be erected during construction or municipal construction operations. When the construction fence is not easy to fold and store, the first pull rod 404 can be pulled to drive the limit plate 403 to squeeze the first spring 405. At the same time, the limit plate 403 can drive the locking rod 406 to move when moving. Then the fence body 3 is folded through the rotating shaft so that the docking block 401 at the bottom end of one base 2 can be engaged with the other base 2, the first pull rod 404 is loosened, and then the locking rod 406 can be locked with the docking block 401 through the resetting effect of the first spring 405, so that the construction fence can be quickly folded and stored to avoid taking up more space, so that the construction fence can be more convenient to use. The content not described in detail in this description belongs to the existing technology known to professional and technical personnel in this field.
[0027] Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments, or make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.
Claims
1. A foldable construction enclosure comprising support legs (1), a base (2) and an enclosure body (3), characterized in that: The bottom ends of the two support legs (1) are both provided with a base (2), a barrier body (3) is provided between the two support legs (1), a folding storage mechanism (4) is provided between the two bases (2), and the folding storage mechanism (4) comprises a docking block (401), a cavity (402) and a limiting plate (403), a docking block (401) is provided on one side of one base (2), a cavity (402) is provided inside the other base (2), and a limiting plate (403) is provided inside the cavity (402).
2. The foldable construction enclosure according to claim 1, characterized in that: A first pull rod (404) extending to the outside of the base (2) is provided on one side of the limiting plate (403), and a first spring (405) is welded between the limiting plate (403) and the cavity (402).
3. The foldable construction enclosure according to claim 2, characterized in that: The bottom end of the limiting plate (403) is provided with a locking rod (406) extending into the interior of the docking block (401), and a locking groove (407) is provided in the interior of the docking block (401) at one end close to the locking rod (406).
4. The foldable construction enclosure according to claim 1, characterized in that: A quick splicing mechanism (5) is provided between the two supporting legs (1), and the quick splicing mechanism (5) comprises a fixing frame (501), a fixing block (502), a connecting block (503), a T-shaped rod (504), a second pull rod (505), a second spring (506) and a reserved groove (507). A fixing frame (501) is provided on one side of one supporting leg (1), and fixing blocks (502) are provided at both ends of the fixing frame (501).
5. The foldable construction enclosure according to claim 4, characterized in that: One side of the other supporting leg (1) is provided with symmetrically distributed connecting blocks (503), and one side of the connecting blocks (503) extends into the interior of the fixing block (502).
6. The foldable construction enclosure according to claim 4, characterized in that: Symmetrically distributed T-shaped rods (504) are provided inside the fixing frame (501), and one end of the T-shaped rod (504) extends into the interior of the connecting block (503).
7. The foldable construction enclosure according to claim 6, characterized in that: One end of the T-shaped rod (504) is welded to a second pull rod (505) extending to the outside of the fixed frame (501), a second spring (506) is welded between the T-shaped rod (504) and the fixed frame (501), and a reserved groove (507) is provided inside the connecting block (503) near one end of the T-shaped rod (504).