House building foundation pit maintenance device

Through the design of the plug-in pins of the corrugated enclosure plate and the connecting beam, combined with the rib plate and bolt fixation, the problem of low construction efficiency of the foundation pit maintenance device is solved, and an efficient and stable foundation pit support effect is achieved.

CN223343288UActive Publication Date: 2025-09-16刘永发
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202422658896.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-10-31
Publication Date
2025-09-16
Estimated Expiration
2034-10-31

AI Technical Summary

Technical Problem

The existing foundation pit maintenance device has low construction efficiency, a small support range of the single structure, and cumbersome installation of the purlin, which affects construction efficiency and overall stability.

Method used

The design adopts corrugated enclosure plate and connecting beam combined with plug-in pins. The back of the enclosure plate is provided with ribs and pressure blocks, which are fixed with bolts. The connecting beam is provided with connecting screw holes to facilitate the installation of the purlin.

Benefits of technology

It improves the convenience and integrity of construction, enhances the neatness of the foundation pit construction surface, reduces the difficulty of construction, and improves construction efficiency and support and maintenance effects.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223343288U_ABST
    Figure CN223343288U_ABST
Patent Text Reader

Abstract

The utility model provides a house building foundation pit maintenance device, and belongs to the technical field of house buildings. The device is simple in structure, convenient to mount and assemble, high in construction surface neatness and good in construction effect. A plurality of enclosing baffles of the device are in lap joint with one another and are detachably and fixedly connected through connecting beams, the lap joint positions of the adjacent enclosing baffles are pressed by abutting blocks to enhance the structural strength, the abutting blocks are detachably and fixedly connected with the connecting beams, and connecting screw holes are formed in the connecting beams in advance and used for being connected with enclosing purlins. The fence plate of the device is high in integrality, convenient to construct and high in construction neatness; the device is assembled through detachable fixed connection, the construction difficulty is low, and the construction efficiency is high; rib plates are arranged on the fence plates, the structural strength is high, and the supporting and maintaining effects are good.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of house construction, in particular to a house construction foundation pit maintenance device. Background Art

[0002] When building a house, in order to ensure the quality and stability of the house, it is necessary to excavate the foundation pit during the foundation construction. Since house construction is usually carried out in urban areas, there are generally other buildings around the construction area. In order to ensure that the construction project will not affect the existing project, the foundation pit needs to be reinforced and maintained to ensure that the soil foundation at the edge of the foundation pit does not slip, avoid affecting the surrounding buildings, and ensure the smooth construction of the foundation. At present, the foundation pit maintenance fence usually uses trapezoidal bent plates as baffles. The support range of the single structure is small. In order to meet the support and maintenance needs, a large number of baffle units need to be connected. The construction volume is extremely large. At the same time, when constructing a deep foundation pit, the foundation pit wall needs to be supported by purlins. At present, when installing purlins, it is often used to weld support beams on the back of the baffles and then connect and fix the purlins to the support beams. The construction efficiency is low and the construction is inconvenient. Utility Model Content

[0003] In order to solve the problems existing in the above-mentioned background technology, the utility model provides a building construction foundation pit maintenance device, which has a simple structure, is easy to install and assemble, has a high degree of neatness in the construction surface, and has a good construction effect.

[0004] The technical solution adopted by the utility model to solve its technical problems is: a building foundation pit maintenance device, characterized in that: it includes a baffle plate, a connecting beam and a plurality of connecting pins, the baffle plate is corrugated, and a plurality of grooves on the back of the baffle plate are integrally fixed with rib plates, each rib plate is provided with a pin hole one along the longitudinal direction, the connecting beam is connected and arranged between two adjacent baffle plates, and a plurality of connecting fin plates are provided at the upper edge of the front end surface where the connecting beam is connected to the baffle plate, and a longitudinally through-going pin hole two is provided on each connecting fin plate, the connecting fin plate is inserted into the groove on the back of the baffle plate and is placed on the rib plate, the pin hole two is matched with the pin hole one, and the connecting pin is inserted through the pin hole two and the pin hole one, thereby completing the detachable fixed installation of the connecting beam on the baffle plate.

[0005] The housing construction foundation pit maintenance device also includes a pressure block and multiple bolts. The pressure block is arranged in the same shape as the groove on the back of the enclosure plate. The pressure block is pressed and embedded in the groove where adjacent enclosure plates are spliced. The working end of the pressure block is against the bottom of the groove. The connecting end of the pressure block is fixedly connected to the connecting beam through multiple bolts. Fixed plates are protrudingly provided on the upper and lower end surfaces of the connecting beam. Through holes are provided on the fixing plates. Threaded holes are provided on the end surface of the connecting end of the pressure block to match the multiple through holes. Multiple bolts are screwed through the through holes and installed in the threaded holes to complete the detachable fixed connection between the pressure block and the connecting beam.

[0006] The grooves connecting the fin plate and the back of the enclosure plate are arranged in a similar manner. A plurality of connection screw holes are pre-processed on the end surface of the connection beam away from the enclosure plate, and the plurality of connection screw holes are used for detachable and fixed connection with the enclosure purlin.

[0007] The beneficial effects of the utility model are as follows: the enclosure plates of the device have high integrity, which improves the convenience of construction, and at the same time improves the neatness of the foundation pit construction surface, and the construction effect is good; the enclosure plates of the device are detachably fixedly connected by connecting beams combined with plug-in pins, which is convenient for loading and unloading, with low construction difficulty and high construction efficiency; rib plates are provided on the back of the enclosure plates of the device, which has high structural strength and good support and maintenance effects; connecting screw holes are provided on the connecting beams of the device, which is convenient for the installation of the purlins. BRIEF DESCRIPTION OF THE DRAWINGS

[0008] In the attached figure:

[0009] Figure 1 This is a schematic diagram of the overall installation layout of the utility model;

[0010] Figure 2 This is an exploded view of the overall structure of the utility model;

[0011] Figure 3 This is a schematic diagram of the overall structural connection relationship of the utility model;

[0012] Figure 4 yes Figure 2 A partial enlarged view of part A in the middle, schematic diagram of the overlapping relationship of the enclosure panels;

[0013] In the figure: 1. Enclosure plate; 2. Connecting beam; 3. Pressure block; 4. Connecting pin; 5. Bolt; 11. Rib plate; 12. Pin hole 1; 21. Connecting fin plate; 22. Pin hole 2; 23. Connecting screw hole; 24. Fixing plate. DETAILED DESCRIPTION

[0014] The present invention will now be described in further detail with reference to the accompanying drawings. The accompanying drawings are simplified schematic diagrams, which only illustrate the basic structure of the present invention in a schematic manner, and therefore only show the components related to the present invention.

[0015] The ribs 11 are fixedly mounted on the sides of the frame 1 for connection and fixing, and a pin hole 12 is provided on each rib 11 along the longitudinal direction. The connecting beam 2 is connected and arranged between two adjacent frame 1s. A plurality of connecting fins 21 are provided at the upper edge of the front end surface where the connecting beam 2 is connected to the frame 1 for connection, and each connecting fin 21 is respectively positioned at the groove position on the back side of each frame 1. A second pin hole 22 is provided on each connecting fin 21. The connecting fin 21 is inserted into the groove on the back side of the frame 1 and is placed on the rib 11. The second pin hole 22 is aligned with the first pin hole 12, and the plug pin 4 is inserted into the second pin hole 22 and the first pin hole 12, thereby completing the detachable fixed installation of the connecting beam 2 on the frame 1.

[0016] The positions of two adjacent enclosure panels 1 are as flat as the rest of the positions. The enclosure panels 1 change the structural form of the traditional single trapezoidal bent panels and adopt an integral corrugated structure with strong integrity, convenient loading and unloading, and high construction efficiency.

[0017] The housing construction foundation pit maintenance device also includes a pressure block 3 and a plurality of bolts 5. The pressure block 3 is configured to imitate the groove on the back of the enclosure plate 1. The pressure block 3 is pressed and embedded in the groove where the adjacent enclosure plates 1 are spliced. The working end of the pressure block 3 rests on the bottom of the groove. The connecting end of the pressure block 3 is fixedly connected to the connecting beam 2 by a plurality of bolts 5. A fixing plate 24 is protruded in a corresponding position on the upper and lower end surfaces of the connecting beam 2. A through hole is provided on the fixing plate 24. Threaded holes are provided on the end surface of the connecting end of the pressure block 3 to match the multiple through holes. A plurality of bolts 5 are screwed through the through holes and installed in the threaded holes to complete the detachable fixed connection between the pressure block 3 and the connecting beam 2. The pressure block 3 is pressed and embedded in the groove where the adjacent enclosure plates 1 are spliced, replacing the missing rib plate 11 to improve the structural strength of the groove formed by the splicing.

[0018] The connecting fins 21 are configured to mimic the grooves on the back of the enclosure plate 1. A plurality of connecting screw holes 23 are pre-machined on the end surface of the connecting beam 2 away from the enclosure plate 1. The plurality of connecting screw holes 23 are used for detachable and fixed connection with the enclosure purlin.

[0019] Working principle: When carrying out foundation pit construction, the baffle plate 1 is arranged at the edge of the foundation pit formed by excavation. The corresponding number of baffle plates 1 is applied according to the specific foundation pit size. The two adjacent baffle plates 1 are overlapped to form a complete groove. The pressure block 3 is movably inserted into the groove formed by the splicing. The pressure block 3 and the fixed plate 24 of the connecting beam 2 are detachably fixedly connected by bolts 5. The connecting beam 2 is detachably fixedly connected to the baffle plate 1 through the connecting fin plate 21 and the plug pin 4, and multiple components in the entire device are connected and fixed in the form of detachable fixed connection.

[0020] The connecting beam 2 is pre-machined with a plurality of connecting screw holes 23 , which are of standard size. During construction, the purlin can be directly installed using bolts of standard size according to the specific installation position, which makes installation convenient.

[0021] When the device is removed, the plug pin 4 is unloaded from the pin hole 12 and the pin hole 2 22, and then the connecting beam 2 is removed, and finally the enclosure plate 1 is removed. The enclosure plate 1, the connecting beam 2, the pressing block 3 and other components can be reused repeatedly.

[0022] The above description is merely a preferred embodiment of the present invention and is not intended to limit the present invention. Those skilled in the art will readily appreciate that the present invention is susceptible to various modifications and variations. Any modifications, equivalent substitutions, or improvements made within the spirit and principles of the present invention shall be included within the scope of protection of the present invention.

Claims

1. A building foundation pit maintenance device, characterized by: The invention comprises a baffle plate (1), a connecting beam (2) and a plurality of plug pins (4), wherein the baffle plate (1) is in a corrugated shape, and a plurality of grooves on the back of the baffle plate (1) are integrally fixedly provided with rib plates (11), and each rib plate (11) is provided with a pin hole (12) running through it in the longitudinal direction, and the connecting beam (2) is connected and arranged between two adjacent baffle plates (1), and the upper edge of the front end surface where the connecting beam (2) and the baffle plate (1) are connected is extended forward and provided A plurality of connecting fins (21) are provided, each of which is provided with a longitudinally penetrating pin hole two (22). The connecting fins (21) are inserted into the groove on the back of the enclosure plate (1) and are placed on the rib plate (11). The pin hole two (22) is matched with the pin hole one (12) and the plug pin (4) is inserted through the pin hole two (22) and the pin hole one (12), thus completing the detachable fixed installation of the connecting beam (2) on the enclosure plate (1).

2. A building construction foundation pit maintenance device according to claim 1, characterized in that: The housing construction foundation pit maintenance device also includes a pressure block (3) and a plurality of bolts (5). The pressure block (3) is arranged in the same shape as the groove on the back of the enclosure plate (1). The pressure block (3) is pressed and embedded in the groove of the adjacent enclosure plates (1). The working end of the pressure block (3) is against the bottom of the groove. The connecting end of the pressure block (3) is fixedly connected to the connecting beam (2) through a plurality of bolts (5). The upper and lower end surfaces of the connecting beam (2) are respectively provided with a fixed plate (24) protruding therefrom. A through hole is provided on the fixed plate (24). The end surface of the connecting end of the pressure block (3) is provided with a threaded hole that matches the plurality of through holes. The plurality of bolts (5) pass through the through holes and are screwed into the threaded holes to complete the detachable fixed connection between the pressure block (3) and the connecting beam (2).

3. A building construction foundation pit maintenance device according to claim 2, characterized in that: The groove connecting the fin plate (21) and the back of the baffle plate (1) is arranged in a similar manner.

4. A building construction foundation pit maintenance device according to claim 3, characterized in that: A plurality of connection screw holes (23) are pre-machined on the end surface of the connection beam (2) away from the enclosure plate (1), and the plurality of connection screw holes (23) are used for detachable fixed connection with the enclosure purlin.