Guiding and positioning device for shoreside piling
Through the shore piling guide and positioning device, the guide rail positioning technology of the guide frame and guide frame is used to solve the problem of verticality control in the construction of prefabricated pipe piles, realize efficient construction under high tide levels, and improve construction quality and efficiency.
Patent Information
- Application Number
- CN202422051548.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-22
- Publication Date
- 2025-09-19
- Estimated Expiration
- 2034-08-22
AI Technical Summary
During the construction of prefabricated pipe piles, especially under the influence of tides, it is difficult to ensure the verticality of the piles, resulting in poor construction quality and extended operation time.
A shore pile driving guide and positioning device is used, including a guide frame and a guide frame. The guide rails are used to position and secure the piles with clips to ensure the verticality of the piles, and construction can be carried out when the tide level is high.
It improves the verticality control and quality of pipe pile construction, extends the construction time, improves the construction efficiency, and avoids the influence of tides.
Smart Images

Figure CN223358262U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of prefabricated pipe pile positioning, in particular to a shore piling guide positioning device. Background Art
[0002] At present, common prefabricated pipe piles are mainly used for strengthening the foundation of buildings, and are more common in housing construction projects. Pipe pile construction generally adopts diesel hammer, hydraulic or static pressure pile driver. Prefabricated pipe piles are rarely used for embankment foot reinforcement in embankment projects. With the development of the construction industry, prefabricated pipe piles are not only used for bearing the load of building foundations, but also for foundation pit support, foundation treatment, embankment (river) care and other fields. The application will become more and more extensive. It is quite necessary to study the construction technology of prefabricated pipe piles for embankment projects.
[0003] During the construction of prefabricated pipe piles, the control of the verticality of the pipe piles directly affects the construction quality. However, due to the influence of tides, there are problems such as inability to position or inaccurate positioning when the tide level is high, which seriously delays the construction time. Utility Model Content
[0004] In order to overcome the problems existing in the prior art, the purpose of the present invention is to provide a shore piling guide and positioning device, which can strengthen the inspection and control of the verticality of the pile body and correct the deviation in time. At the same time, construction can be carried out through guide rail positioning when the tide level is high. It can not only control the construction quality of the pipe pile, but also be unaffected by the tide and extend the operation time.
[0005] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a shore piling guide and positioning device, comprising a guide frame and a guide frame; the guide frame comprises a guide rail, the guide frame is arranged in the guide rail, and reciprocates along the guide rail.
[0006] The utility model is further configured as follows: the guide frame includes four sliding blocks distributed in a rectangular shape, and adjacent sliding blocks are connected by steel pipes to form a rectangular frame.
[0007] The utility model is further configured as follows: a first auxiliary positioning frame is connected between adjacent steel pipes, and a second auxiliary positioning frame is connected between the adjacent first auxiliary positioning frames on the left and right sides.
[0008] The utility model is further configured as follows: the sizes of the first auxiliary positioning frame and the second auxiliary positioning frame match the pipe piles to be positioned.
[0009] The utility model is further configured as follows: a buckle is also provided on the slider.
[0010] The utility model is further configured as follows: the buckle is hinged to the slider.
[0011] The present invention is further configured as follows: the guide frame further comprises a vertical support frame and a transverse support frame, the vertical support frame is arranged at the bottom of the guide rail, and the transverse support frame is arranged at both ends of the guide rail.
[0012] The utility model is further configured as follows: the vertical support frame is inserted into the riverbed to fix the guide rail, and the horizontal support frame is inserted into the riverbank to fix the guide rail.
[0013] The utility model is further configured as follows: the side wall of the guide rail is provided with a snap groove.
[0014] In summary, the beneficial effects of the above technical solution of the present utility model are as follows:
[0015] The utility model has a simple overall structure and low cost, strengthens the inspection and control of the verticality of the pile body, and corrects the deviation in time. At the same time, it can also be positioned by the guide rail for construction when the tide level is high. It can not only control the construction quality of the pipe pile, but also is not affected by the tide, thereby extending the operation time and improving construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following briefly introduces the drawings required for describing the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0017] Figure 1 It is a schematic diagram of the overall structure of an embodiment of the utility model.
[0018] Figure 2 Schematic diagram of the guide frame structure.
[0019] Figure 3 Schematic diagram of the guide frame structure.
[0020] In the accompanying drawings, the components represented by the reference numerals are as follows:
[0021] 100. Guide frame, 101. Guide rail, 102. Vertical support frame, 103. Horizontal support frame, 200. Guide frame, 201. Slider, 202. First auxiliary positioning frame, 203. Second auxiliary positioning frame, 300. Pipe pile to be positioned. DETAILED DESCRIPTION
[0022] In order to enable those skilled in the art to better understand the technical solution of the present invention, the following is a clear and complete description of the technical solution of the present invention in conjunction with the drawings of the present invention. Based on the embodiments of the present invention, other similar embodiments obtained by ordinary technicians in this field without making creative work should fall within the scope of protection of the present invention. In addition, the directional words mentioned in the following embodiments, such as "up", "down", "left", "right", etc., are only referenced to the directions of the drawings. Therefore, the directional words used are used to illustrate rather than limit the invention of the present invention.
[0023] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those commonly understood by those skilled in the art in the art of the present invention. The terms used herein in the specification of the present invention are only for the purpose of describing specific embodiments and are not intended to limit the present invention.
[0024] The present invention will be further described below with reference to the accompanying drawings and preferred embodiments.
[0025] Example:
[0026] like Figure 1-Figure 3 As shown, a preferred embodiment of the present invention is a shore piling guide and positioning device, comprising a guide frame 100 and a guide frame 200; the guide frame 100 comprises a guide rail 101, and the guide frame 200 is arranged in the guide rail 101 and reciprocates along the guide rail 101.
[0027] Combine Figure 1 、 Figure 3 As shown, the guide frame 200 includes four sliders 201 arranged in a rectangular pattern. Adjacent sliders 201 are connected by steel pipes to form a rectangular frame. First auxiliary positioning frames 202 are connected between adjacent steel pipes, and second auxiliary positioning frames 203 are connected between adjacent first auxiliary positioning frames 202 on the left and right sides.
[0028] The sizes of the first auxiliary positioning frame 202 and the second auxiliary positioning frame 203 match the pipe pile 300 to be positioned.
[0029] The slider 201 is also provided with a buckle, which is hinged to the slider 201. The sidewalls of the guide rail 101 are provided with a buckle groove. When the guide frame 200 slides to a preset position, the buckle on the slider 201 is buckled into the buckle groove on the sidewall of the guide rail 101 to secure the guide frame 200, preventing it from moving during construction.
[0030] like Figure 2As shown, the guide frame 100 further includes a vertical support frame 102 and a transverse support frame 103 . The vertical support frame 102 is arranged at the bottom of the guide rail 101 , and the transverse support frame 103 is arranged at both ends of the guide rail 101 .
[0031] In actual use, first build the guide frame 100 at the river channel, insert the vertical support frame 102 into the riverbed fixed guide rail 101, and then insert the horizontal support frame 103 into the riverbank fixed guide rail 101. The guide frame 200 slides along the guide rail 101. When the guide frame 200 slides to the preset position, the buckle on the slider 201 is connected to the buckle groove on the side wall of the guide rail 101 to complete the fixation, so as to prevent the guide frame 200 from being displaced during the construction process. The crane hoists the pipe pile 300 to be positioned on the river bank and lowers the pipe pile 300 to be positioned along the center position of the guide frame 200. The guide frame 200 can effectively strengthen the inspection and control of the verticality of the pile body and correct the deviation in time. At the same time, when the tide level is high, it can also be positioned through the guide rail 101 for construction. It can not only control the construction quality of the pipe pile, but also be unaffected by the tide, extend the working time, and improve construction efficiency.
[0032] Finally, it should be noted that the above content is only used to illustrate the technical solution of the utility model, rather than to limit the scope of protection of the utility model. Simple modifications or equivalent replacements of the technical solution of the utility model by ordinary technicians in this field do not deviate from the essence and scope of the technical solution of the utility model.
Claims
1. A shore piling guide and positioning device, characterized in that: It includes a guide frame and a guide frame; the guide frame includes a guide rail, and the guide frame is arranged in the guide rail and reciprocates along the guide rail; The guide frame includes four sliders distributed in a rectangular shape, and adjacent sliders are connected by steel pipes to form a rectangular frame; A first auxiliary positioning frame is connected between adjacent steel pipes, and a second auxiliary positioning frame is connected between adjacent first auxiliary positioning frames on the left and right sides; the sizes of the first auxiliary positioning frame and the second auxiliary positioning frame match the pipe piles to be positioned.
2. A shore piling guide and positioning device according to claim 1, characterized in that: The slider is also provided with a buckle.
3. A shore piling guide and positioning device according to claim 2, characterized in that: The buckle is hinged to the slider.
4. A shore piling guide and positioning device according to claim 1, characterized in that: The guide frame further includes a vertical support frame and a transverse support frame. The vertical support frame is arranged at the bottom of the guide rail, and the transverse support frame is arranged at both ends of the guide rail.
5. A shore piling guide and positioning device according to claim 4, characterized in that: The vertical support frame is inserted into the riverbed to fix the guide rail, and the horizontal support frame is inserted into the riverbank to fix the guide rail.
6. The shore piling guide and positioning device according to claim 3, characterized in that: The side wall of the guide rail is provided with a snap groove.