Easy-to-install duplex pipe grabber of spinning frame
By designing the centering boss and positioning boss structure of the double pipe grabber, the problems of non-vertical installation and complex installation of the pipe grabber are solved, efficient and accurate installation effects are achieved, and the operation process is simplified.
Patent Information
- Application Number
- CN202422755651.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-12
- Publication Date
- 2025-09-30
- Estimated Expiration
- 2034-11-12
AI Technical Summary
The existing tube grabber is prone to causing the axis to be non-vertical during installation, affecting the gathering action of the spinning frame. In addition, the installation of the double-spindle double-connected tube grabber is complicated and labor-intensive, which reduces the replacement efficiency.
A double pipe grabber is designed. The centering boss, positioning boss and auxiliary boss are used to increase the contact surface between the pipe grabber and the air frame. The pipe grabber can be quickly installed through bolts and connecting holes to ensure that the axis is vertical.
It improves the positioning accuracy and efficiency of pipe grabber installation, avoids wear, simplifies the installation process, ensures the vertical state of the pipe grabber and the gas frame, and improves work efficiency.
Smart Images

Figure CN223397853U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to textile machinery and equipment, in particular to a double-jointed tube grabber which is easy to install on a spinning frame. Background Art
[0002] The pipe grabbers currently available on the market are mainly divided into two types in terms of appearance and structure: single-spindle single-body type and double-spindle duplex type. One is single-spindle single-body type and the other is double-spindle duplex type. Among them, the single-spindle single-body type means that each spindle is an independent pipe grabber, which is fixed to the gas rack through the slot structure of the gas rack and the single fixing screw. It has the advantages of convenient installation and fast positioning. However, because the pipe grabber of this structure is a single-spindle single-body type, the length of the contact surface between it and the gas rack is relatively short, and there is only one fixed point below the pipe grabber connected to the gas rack. During installation, it is easy to cause the axis of the pipe grabber to be not perpendicular to the horizontal plane, thereby causing the pipe grabber to be out of alignment with the horizontal plane. This will have an adverse effect on the subsequent gathering action of the spinning frame; the double-spindle double-connected type designs the tube grabbers of the two spindles as a whole, sharing a common installation body. Although the contact surface length between the single-spindle single-body tube grabber and the air frame is increased, the tube grabber can be installed more accurately, but this type of tube grabber is fixed by six fixing screws and square nuts placed in the air frame. The workload of the staff when installing the tube grabber is large, and when replacing the tube grabber, the tube grabber needs to be installed again. At this time, the six fixing points of the tube grabber need to be aligned with the square nuts placed in the air frame. The operation is difficult and the replacement work efficiency is reduced. Utility Model Content
[0003] The purpose of the utility model is to provide a double tube grabber that is easy to install on a spinning frame, which can increase the size of the contact surface between the tube grabber and the air frame and improve the working efficiency when installing the tube grabber.
[0004] The technical solution of the utility model is as follows: a double tube grabber that is easy to install on a spinning frame, which is arranged on the air frame of the spinning frame, comprises a double tube grabber body, the double tube grabber body comprises a tube grabber mounting plate, a group of tube grabber bases are arranged side by side on one side of the tube grabber mounting plate, two mounting holes are penetrated through the tube grabber mounting plate, and the two mounting holes are respectively arranged below the two tube grabber bases; a centering boss is provided at the upper middle part of one side of the tube grabber mounting plate, positioning bosses are symmetrically provided on both sides of the centering boss, and the centering boss and the positioning boss are both arranged above the tube grabber base;
[0005] A positioning slot is provided above one side of the air rack, and a plurality of centering slots are evenly arranged on the positioning slot. The air rack is provided with a plurality of the double pipe grabbers, and the double pipe grabbers are arranged in parallel on the air rack, and each double pipe grabber is limited by the centering slot and the positioning slot.
[0006] Furthermore, a mounting slot is provided at the lower part of one side of the gas rack, a nut strip is movably provided inside the mounting slot, and a plurality of connection holes are evenly provided on the nut strip, and the plurality of connection holes are on the same horizontal line; when a plurality of double pipe grabbers are installed in parallel on the gas rack, each of the connection holes has a mounting hole that matches it.
[0007] Furthermore, an upper positioning boss is vertically extended from the top end of the positioning boss, and the upper positioning boss is arranged on the upper side surface of the pipe grabber mounting plate.
[0008] Furthermore, auxiliary bosses are provided on both sides of each positioning boss.
[0009] The beneficial effects of the utility model are as follows: the tube grabber mounting plate is positioned by the centering boss, the positioning boss, the upper positioning boss and the auxiliary boss, thereby improving the positioning accuracy. At the same time, multiple positioning bosses and the auxiliary bosses can effectively reduce the pressure at a single contact point with the air frame, thereby reducing the wear of the tube grabber mounting plate and the positioning slot when installing the double tube grabber; the tube grabber mounting plate is connected to the nut strip through bolts, mounting holes and connecting holes, and then the tube grabber mounting plate is installed on one side of the air frame, without the need to punch holes on the air frame of the spinning frame, thereby avoiding affecting the structure of the air frame; by arranging two mounting holes on the tube grabber mounting plate, the double tube grabber has two fixing points, ensuring that when the double tube grabber is installed, the axis of the tube grabber base remains vertical to the horizontal plane, thereby avoiding affecting the gathering action of the spinning frame, and at the same time improving the work efficiency of the staff when installing the double tube grabber. BRIEF DESCRIPTION OF THE DRAWINGS
[0010] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the following briefly introduces the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative labor.
[0011] Figure 1 This is a schematic diagram of the installation state of the utility model;
[0012] Figure 2 It is a cutaway schematic diagram of the utility model in the installed state;
[0013] Figure 3 It is a structural diagram of the utility model;
[0014] Figure 4 This is a structural diagram of the nut strip of the utility model. DETAILED DESCRIPTION
[0015] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the embodiments described are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative efforts are within the scope of protection of the present invention.
[0016] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "one side", "one end", "vertical", "horizontal", "inside", "outside" and the like indicating orientations or positional relationships are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention; in addition, unless otherwise clearly specified and limited, the terms "installation", "setting", and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or an indirect connection through an intermediate medium, or it can be internal communication between two elements. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0017] At present, the contact surface between the single-spindle single-body tube grabber and the air frame is relatively short, and there is only one fixed point below it, which may easily cause the axis of the tube grabber to be not perpendicular to the horizontal plane during installation, affecting the subsequent gathering action of the spinning frame; and the double-spindle double-connected tube grabber needs to be fixed by six fixing screws and square nuts placed in the air frame, which increases the workload of the staff when installing the tube grabber, and when replacing the tube grabber, the tube grabber needs to be installed for the second time. At this time, the six fixing points of the tube grabber need to be aligned with the square nuts placed in the air frame, which is difficult to operate and reduces the efficiency of the replacement work; in view of this, the inventor of the present application provides a double-connected tube grabber that is easy to install on a spinning frame, which can increase the size of the contact surface between the tube grabber and the air frame while improving the work efficiency when installing the tube grabber.
[0018] like Figure 1-4As shown, a double tube grabber which is easy to install on a spinning frame is arranged on the air frame 1 of the spinning frame, and includes a double tube grabber main body 2. The double tube grabber main body 2 includes a tube grabber mounting plate 21, and a group of tube grabber bases 22 are arranged side by side on one side of the tube grabber mounting plate 21. Two mounting holes 23 are penetrated on the tube grabber mounting plate 21, and the two mounting holes 23 are respectively arranged below the two tube grabber bases 22; a centering boss 24 is provided in the upper middle part of one side of the tube grabber mounting plate 21, and positioning bosses 25 are symmetrically provided on both sides of the centering boss 24, and the centering boss 24 and the positioning boss 25 are both arranged above the tube grabber base 22.
[0019] Among them, a positioning slot 11 is provided on the upper side of the air rack 1, and a number of centering slots 12 are evenly opened on the positioning slot 11. A number of double pipe grabbers are provided on the air rack 1, and a number of double pipe grabbers are arranged in parallel on the air rack 1. Each double pipe grabber is limited by the centering slot 12 and the positioning slot 11.
[0020] The tube grabber mounting plate 21 of the double tube grabber is inserted into the positioning card slot 11, and the tube grabber mounting plate 21 is positioned by the positioning boss 25 and the positioning card slot 11. In this process, the centering boss 24 is gradually embedded in the centering card slot 12 to limit the tube grabber mounting plate 21, and the tube grabber mounting plate 21 is installed on the air frame 1 through the bolts and the mounting holes 23. At this time, a group of tube grabber bases 22 are arranged side by side on the air frame 1 of the spinning frame. By repeating the above steps, several double tube grabbers can be installed side by side on the air frame 1 of the spinning frame. The tube grabber mounting plate 21 of the double tube grabber is provided with two mounting holes 23, which has two fixing points to ensure that when the double tube grabber is installed, the axis of the tube grabber base 22 remains vertical to the horizontal plane, thereby avoiding affecting the gathering action of the spinning frame and improving the work efficiency of the staff when installing the double tube grabber.
[0021] In this embodiment, if Figure 2 、 Figure 4 As shown, a mounting slot 13 is provided at the lower portion of one side of the gas rack 1. A nut strip 3 is movably provided inside the mounting slot 13. A plurality of connection holes 31 are evenly provided on the nut strip 3. The plurality of connection holes 31 are located on the same horizontal line. When a plurality of double pipe grabbers are installed side by side on the gas rack 1, each connection hole 31 has a matching mounting hole 23.
[0022] Based on the above embodiment, the nut strip 3 is placed inside the mounting slot 13, and the tube grabber mounting plate 21 is connected to the nut strip 3 through bolts, mounting holes 23, and connecting holes 31, so that the tube grabber mounting plate 21 is installed on one side of the air frame 1. There is no need to drill holes on the air frame 1 of the spinning frame to avoid affecting the structure of the air frame 1. At the same time, when installing the tube grabber mounting plate 21, it is only necessary to align the two mounting holes 23 on one tube grabber mounting plate 21 with the two adjacent connecting holes 31 on the nut strip 3, respectively, and then the tube grabber mounting plate 21 can be connected to the nut strip 3 by bolts, thereby improving the installation efficiency of the double tube grabber by the staff.
[0023] In this embodiment, if Figure 3 As shown, an upper positioning boss 26 extends vertically from the top of the positioning boss 25 , and the upper positioning boss 26 is provided on the upper side of the pipe grabber mounting plate 21 .
[0024] Auxiliary bosses 27 are provided on both sides of each positioning boss 25 .
[0025] Based on the above embodiment, the side of the pipe grabber mounting plate 21 is positioned by the positioning boss 25 and the auxiliary boss 27. At the same time, multiple positioning bosses 25 and auxiliary bosses 27 can effectively reduce the pressure at a single contact point with the gas rack 1, thereby reducing the wear of the pipe grabber mounting plate 21 and the positioning slot 11 when installing the double pipe grabber; the upper surface of the pipe grabber mounting plate 21 is positioned by the upper positioning boss 26 to improve the positioning accuracy.
[0026] The working principle of the present invention is as follows: before installing the double tube grabber, the nut strip 3 is placed inside the mounting slot 13 at the lower part of the air frame 1, and the tube grabber mounting plate 21 is gradually inserted into the positioning slot 11. During this process, the side of the tube grabber mounting plate 21 is positioned by the positioning boss 25 and the auxiliary boss 27. At the same time, the centering boss 24 is gradually embedded in the centering slot 12, and the tube grabber mounting plate 21 is limited by the centering boss 24 and the centering slot 12. Continue to push the tube grabber mounting plate 21 until the upper positioning boss 26 abuts against the inner wall of the positioning slot 11, and connect the tube grabber mounting plate 21 to the nut strip 3 through the bolts, mounting holes 23, and connecting holes 31, and then the tube grabber mounting plate 21 is installed on one side of the air frame 1 to complete the installation of a double tube grabber. Repeat the above steps to install several double tube grabbers in parallel on the air frame 1 of the spinning frame.
[0027] Finally, it should be noted that the above is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or make equivalent replacements for some of the technical features therein. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.
Claims
1. A double tube grabber which is easy to install on a spinning frame, and is arranged on the air frame of the spinning frame, and is characterized in that: The double pipe grabber body includes a pipe grabber mounting plate, a group of pipe grabber bases are arranged side by side on one side of the pipe grabber mounting plate, two mounting holes are penetrated through the pipe grabber mounting plate, and the two mounting holes are respectively arranged below the two pipe grabber bases; a centering boss is provided in the upper middle part of one side of the pipe grabber mounting plate, and positioning bosses are symmetrically provided on both sides of the centering boss, and the centering boss and the positioning boss are both arranged above the pipe grabber base; A positioning slot is provided above one side of the air rack, and a plurality of centering slots are evenly arranged on the positioning slot. The air rack is provided with a plurality of the double pipe grabbers, and the double pipe grabbers are arranged in parallel on the air rack, and each double pipe grabber is limited by the centering slot and the positioning slot.
2. The double tube grabber that is easy to install on a spinning frame according to claim 1, characterized in that: A mounting slot is provided at the lower part of one side of the gas rack, a nut strip is movably provided inside the mounting slot, a plurality of connection holes are evenly provided on the nut strip, and the plurality of connection holes are on the same horizontal line; when a plurality of double pipe grabbers are installed side by side on the gas rack, each of the connection holes has a mounting hole that matches it.
3. The double tube grabber that is easy to install on a spinning frame according to claim 2, characterized in that: An upper positioning boss is vertically extended from the top end of the positioning boss, and the upper positioning boss is arranged on the upper side surface of the pipe grabber mounting plate.
4. The double tube grabber that is easy to install on a spinning frame according to claim 3, characterized in that: Auxiliary bosses are provided on both sides of each positioning boss.