Foundation pit collapse prevention supporting device

By adopting the hexagonal boss and internal thread design on the outer side of the mounting tube in the support device, combined with the combined structure of the adjustment rod and the support rod, the problem of wall panel deformation caused by uneven force on the support device is solved, and the wall panel is reinforced and quickly installed.

CN223433832UActive Publication Date: 2025-10-14JILIN JIANZHU UNIVERSITY
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202422698696.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-11-06
Publication Date
2025-10-14
Estimated Expiration
2034-11-06

AI Technical Summary

Technical Problem

The existing support device is subjected to concentrated force at the center of the wall panel, causing the bottom and top ends of the wall panel to bend inward and deform, leading to damage.

Method used

The mounting tube adopts the design of external hexagonal boss and internal internal thread. Through the combination of the first and second adjustment rods, the fixing sleeve and the support rod, the wall panel is reinforced, and the width of the support device is adjusted by the thread to adapt to different environments.

Benefits of technology

It enhances the strength of the wall panels, improves the installation efficiency and assembly speed of the support device, and solves the problem of uneven reinforcement of the support device.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223433832U_ABST
    Figure CN223433832U_ABST
Patent Text Reader

Abstract

The utility model discloses a foundation pit anti-collapse supporting device which comprises a mounting pipe, a six-edge boss is arranged outside the mounting pipe, internal threads are arranged inside the mounting pipe, a first adjusting rod is installed inside one end of the mounting pipe through first external threads, and a first fixing sleeve is arranged outside one end of the first adjusting rod. A first fixing base is arranged at one end of the first fixing sleeve. The first adjusting rod is installed in one end of the installation pipe through the first external threads, the first fixing base is fixed to one end of the first adjusting rod through the first fixing sleeve, then the four sets of first supporting rods are obliquely arranged outside the first fixing base, and the first installation plate is arranged at one ends of the first supporting rods; and the first mounting plate is fixed to one side of the first wallboard, so that the second supporting rod fixes the first wallboard through the second mounting plate, the problem that when the supporting device reinforces the board wall, supporting force is concentrated at the center of the board wall is solved, and the strength of the board wall is enhanced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of support devices, in particular to a foundation pit anti-collapse support device. Background Art

[0002] During construction, the foundation pit is affected by factors such as rainy weather and ground overload, resulting in major safety hazards. Therefore, when excavating the foundation pit, support devices are needed to prevent the side wall soil from collapsing.

[0003] For example, the Chinese patent application number is CN219886853U, which is a collaborative support device for preventing foundation pit collapse, comprising two groups of panel walls; the two groups of panel walls are vertically arranged at opposite sides of the foundation pit in parallel and at intervals, and a positioning structure is installed on the inner side of each group of panel walls; a connecting structure is hinged between the two groups of positioning structures. Although the above structure can effectively prevent foundation pit collapse, the force-bearing device of the existing support device is located at the center of the wall panel, resulting in the bottom and top ends of the wall panel being bent inward when squeezed by soil and rocks, thereby causing damage to the wall panel. Therefore, the inventor proposes a foundation pit anti-collapse support device to solve the problem. Utility Model Content

[0004] The purpose of the utility model is to provide a foundation pit anti-collapse support device to solve the problem that the force-bearing device of the existing support device is located at the center of the wall panel, which causes the bottom and top ends of the wall panel to bend inward when the wall panel is squeezed by soil and rocks, thereby causing damage to the wall panel.

[0005] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a foundation pit anti-collapse support device, comprising a mounting tube, a hexagonal boss is provided on the outside of the mounting tube, an internal thread is provided on the inside of the mounting tube, and a first adjusting rod is installed on the inside of one end of the mounting tube through a first external thread, a first fixing sleeve is provided on the outside of one end of the first adjusting rod, a first fixed base is provided on one end of the first fixing sleeve, four groups of first support rods are obliquely provided on the outside of the first fixed base, and a first mounting plate is provided on one end of the first support rod to facilitate the second support rod to fix the first wall panel through the second mounting plate.

[0006] As a technical solution of the present invention, a first wall panel is provided on one side of the first mounting plate, and a plurality of first positioning rods are provided on one side of the first wall panel so that the first positioning rods can position the first wall panel.

[0007] As a technical solution of the present invention, a first bottom plate is provided at the bottom end of the first wall panel, and a first reinforcing rib is provided at the center of the upper end surface of the first bottom plate so that the first reinforcing rib increases the connection strength between the first wall panel and the first bottom plate.

[0008] As a technical solution of the present invention, a second adjusting rod is installed inside the other end of the mounting tube through a second external thread, and a second fixing sleeve is provided outside one end of the second adjusting rod to facilitate the second external thread to install the second adjusting rod inside the mounting tube.

[0009] As a technical solution of the present invention, a second fixed base is provided at one end of the second fixed sleeve, and four groups of second support rods are obliquely provided on the outside of the second fixed base so that the second fixed sleeve can fix the second fixed base at one end of the second adjusting rod.

[0010] As a technical solution of the present invention, a second mounting plate is provided at one end of the second support rod, and a second wall panel is provided on one side of the second mounting plate to facilitate fixing the second wall panel on one side of the second mounting plate.

[0011] As a technical solution of the present invention, a plurality of second positioning rods are provided on one side of the second wall panel. The second positioning rods adopt a conical structure so that the second wall panel can be positioned by the second positioning rods.

[0012] As a technical solution of the present invention, a second bottom plate is provided at the bottom end of the second wall panel, and a second reinforcing rib is provided at the center of the upper end surface of the second bottom plate so that the second reinforcing rib increases the connection strength between the second bottom plate and the second wall panel.

[0013] Compared with the prior art, the beneficial effects of the present invention are: the foundation pit anti-collapse support device is not only reasonable in structure, easy to use and simple to maintain in the later stage, but also has the following advantages:

[0014] (1) The utility model installs the first adjusting rod inside one end of the mounting tube through the first external thread, and then fixes the first fixed base to one end of the first adjusting rod through the first fixing sleeve, and then obliquely arranges four groups of first supporting rods on the outside of the first fixing base, arranges a first mounting plate at one end of the first supporting rod, and fixes the first mounting plate to one side of the first wall panel, so that the second supporting rod fixes the first wall panel through the second mounting plate, which solves the problem that the supporting force is concentrated at the center of the board wall when the support device reinforces the board wall, thereby enhancing the strength of the board wall.

[0015] (2) The utility model provides a hexagonal boss on the outside of the mounting tube and an internal thread on the inside of the mounting tube, so that the first adjusting rod and the second adjusting rod are respectively installed inside the two ends of the mounting tube through the first external thread and the second external thread. When the mounting tube is controlled to rotate by the hexagonal boss, the first adjusting rod and the second adjusting rod move laterally along the inside of the internal thread through the first external thread and the second external thread, so that the width of the support device can be quickly adjusted. In addition, the support device has a simple structure and can be installed quickly, thereby improving assembly efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 This is a schematic diagram of the external structure of the utility model;

[0017] Figure 2 This is a left-side perspective structural diagram of the present invention;

[0018] Figure 3 This is a right-side perspective structural diagram of the present invention;

[0019] Figure 4 This is an explosion diagram of the utility model;

[0020] Figure 5 It is a schematic cross-sectional structure diagram of the explosion diagram of the utility model.

[0021] In the figure: 1. Mounting tube; 2. Hexagonal boss; 3. Internal thread; 4. First external thread; 5. First adjusting rod; 6. First fixing sleeve; 7. First fixed base; 8. First support rod; 9. First mounting plate; 10. First wall panel; 11. First positioning rod; 12. First bottom plate; 13. First reinforcing rib; 14. Second external thread; 15. Second adjusting rod; 16. Second fixing sleeve; 17. Second fixed base; 18. Second support rod; 19. Second mounting plate; 20. Second wall panel; 21. Second positioning rod; 22. Second bottom plate; 23. Second reinforcing rib. DETAILED DESCRIPTION

[0022] The following is a clear and complete description of the technical solutions in the embodiments of the present invention in conjunction with the accompanying drawings. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.

[0023] See also Figure 1-5The utility model provides an embodiment: a foundation pit anti-collapse support device, including a mounting tube 1, a hexagonal boss 2 is provided on the outside of the mounting tube 1, and an internal thread 3 is provided inside the mounting tube 1, and a first adjusting rod 5 is installed on the inside of one end of the mounting tube 1 through a first external thread 4, a first fixing sleeve 6 is provided on the outside of one end of the first adjusting rod 5, a first fixing base 7 is provided on one end of the first fixing sleeve 6, four groups of first support rods 8 are obliquely provided on the outside of the first fixed base 7, and a first mounting plate 9 is provided on one end of the first support rod 8;

[0024] When in use, the first adjusting rod 5 is installed inside one end of the mounting tube 1 through the first external thread 4, and the first fixing base 7 is fixed to one end of the first adjusting rod 5 through the first fixing sleeve 6. Then, four groups of first support rods 8 are obliquely arranged on the outside of the first fixing base 7, and a first mounting plate 9 is arranged at one end of the first support rods 8. The first mounting plate 9 is fixed to one side of the first wall panel 10, so that the second support rods 18 are fixed to the first wall panel 10 through the second mounting plate 19;

[0025] A first wall panel 10 is provided on one side of the first mounting plate 9, and a plurality of first positioning rods 11 are provided on one side of the first wall panel 10;

[0026] When in use, multiple sets of first positioning rods 11 are arranged on one side of the first wall panel 10 so that the first positioning rods 11 can position the first wall panel 10;

[0027] A first bottom plate 12 is provided at the bottom end of the first wall panel 10, and a first reinforcing rib 13 is provided at the center of the upper end surface of the first bottom plate 12;

[0028] When in use, a first reinforcing rib 13 is provided on the upper end surface at the center of the first bottom plate 12, and one side of the first reinforcing rib 13 is fixed to the first wall plate 10, so that the first reinforcing rib 13 increases the connection strength between the first wall plate 10 and the first bottom plate 12;

[0029] A second adjusting rod 15 is installed inside the other end of the mounting tube 1 through a second external thread 14, and a second fixing sleeve 16 is provided outside one end of the second adjusting rod 15;

[0030] When in use, the second external thread 14 is provided on the outside of the second adjusting rod 15 so that the second external thread 14 installs the second adjusting rod 15 inside the mounting tube 1;

[0031] A second fixed base 17 is provided at one end of the second fixed sleeve 16 , and four sets of second support rods 18 are obliquely provided on the outside of the second fixed base 17 ;

[0032] When in use, by setting the second fixing base 17 at one end of the second fixing sleeve 16, the second fixing sleeve 16 fixes the second fixing base 17 to one end of the second adjusting rod 15;

[0033] A second mounting plate 19 is provided at one end of the second support rod 18 , and a second wall panel 20 is provided on one side of the second mounting plate 19 ;

[0034] When in use, the second mounting plate 19 is fixed to one end of the second support rod 18 so that the second wall panel 20 is fixed to one side of the second mounting plate 19;

[0035] A plurality of second positioning rods 21 are provided on one side of the second wall panel 20, and the second positioning rods 21 have a conical structure;

[0036] When in use, the second positioning rod 21 is fixed to one side of the second wall panel 20 so that the second wall panel 20 is positioned by the second positioning rod 21;

[0037] A second bottom plate 22 is provided at the bottom end of the second wall panel 20, and a second reinforcing rib 23 is provided at the center of the upper end surface of the second bottom plate 22;

[0038] When in use, a second reinforcing rib 23 is provided at the center of the upper end surface of the second bottom plate 22 and one side of the second reinforcing rib 23 is fixed to the second positioning rod 21 so that the second reinforcing rib 23 increases the connection strength between the second bottom plate 22 and the second wall panel 20.

[0039] When the embodiment of the present application is used: first, the first adjusting rod 5 is installed inside one end of the mounting tube 1 through the first external thread 4, and the first fixed base 7 is fixed to one end of the first adjusting rod 5 through the first fixing sleeve 6. Then, the first support rod 8 is fixed to the outside of the first fixed base 7, and one end of the first support rod 8 is fixed to the first wall panel 10 through the first mounting plate 9. Then, the first positioning rod 11 is fixed to one side of the first wall panel 10, so that the first wall panel 10 is fixed inside the soil and stone through the first positioning rod 11, and the second adjusting rod 15 is installed on the mounting tube 1 through the second external thread 14. The inside of the other end, and fix the second fixed base 17 to one end of the second adjusting rod 15 through the second fixing sleeve 16, then fix the second support rod 18 to the outside of the second fixed base 17, and fix it to the second wall panel 20 through the second mounting plate 19 at one end of the second support rod 18, and then fix the second wall panel 20 to the inside of the soil and stone through the second positioning rod 21, and then rotate the mounting tube 1 through the hexagonal boss 2 to adjust the extension or contraction of the first adjusting rod 5 and the second adjusting rod 15, and then adjust the width of the support device, thereby completing the use of a foundation pit anti-collapse support device.

[0040] The implementation methods of the present invention are provided for the purpose of illustration and description. Although the embodiments of the present invention have been shown and described above, it can be understood that the above embodiments are exemplary and cannot be understood as limitations on the present invention. Ordinary technicians in this field can change, modify, replace and modify the above embodiments within the scope of the present invention.

Claims

1. A foundation pit anti-collapse support device, comprising a mounting pipe (1), characterized in that: The outside of the mounting tube (1) is provided with a hexagonal boss (2), and the inside of the mounting tube (1) is provided with an internal thread (3), and the inside of one end of the mounting tube (1) is provided with a first adjusting rod (5) through a first external thread (4), the outside of one end of the first adjusting rod (5) is provided with a first fixing sleeve (6), one end of the first fixing sleeve (6) is provided with a first fixing base (7), the outside of the first fixing base (7) is provided with four groups of first support rods (8) inclined, and one end of the first support rod (8) is provided with a first mounting plate (9).

2. The foundation pit anti-collapse support device according to claim 1, characterized in that: A first wall panel (10) is provided on one side of the first mounting plate (9), and a plurality of groups of first positioning rods (11) are provided on one side of the first wall panel (10).

3. The foundation pit anti-collapse support device according to claim 2, characterized in that: A first bottom plate (12) is provided at the bottom end of the first wall plate (10), and a first reinforcing rib (13) is provided at the center of the upper end surface of the first bottom plate (12).

4. The foundation pit anti-collapse support device according to claim 1, characterized in that: A second adjusting rod (15) is installed inside the other end of the installation tube (1) via a second external thread (14), and a second fixing sleeve (16) is provided outside one end of the second adjusting rod (15).

5. The foundation pit anti-collapse support device according to claim 4, characterized in that: A second fixed base (17) is provided at one end of the second fixed sleeve (16), and four groups of second support rods (18) are obliquely provided on the outside of the second fixed base (17).

6. The foundation pit anti-collapse support device according to claim 5, characterized in that: A second mounting plate (19) is provided at one end of the second support rod (18), and a second wall panel (20) is provided at one side of the second mounting plate (19).

7. The foundation pit anti-collapse support device according to claim 6, characterized in that: A plurality of groups of second positioning rods (21) are provided on one side of the second wall panel (20), and the second positioning rods (21) adopt a conical structure.

8. The foundation pit anti-collapse support device according to claim 6, characterized in that: A second bottom plate (22) is provided at the bottom end of the second wall plate (20), and a second reinforcing rib (23) is provided at the center of the upper end surface of the second bottom plate (22).