Timely-adjustable cutting device for construction of clean area of science and technology factory

By using a frame structure consisting of ceiling rails, floor rails, main purlins and secondary purlins in the clean room, combined with PVC film and sealing tape, the flexibility problem of clean room area division is solved, and timely adjustment and production synchronization of high-tech factories are achieved, with good airtight sealing performance and convenient installation characteristics.

CN223446429UActive Publication Date: 2025-10-17CHINA SHANXI SIJIAN GRP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202422853007.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-11-22
Publication Date
2025-10-17
Estimated Expiration
2034-11-22

AI Technical Summary

Technical Problem

Existing technologies are unable to achieve timely area division of clean rooms in high-tech factories, resulting in the inability to meet the growing production capacity demand.

Method used

A timely adjustable clean area construction partitioning device is used in a high-tech factory. The frame structure composed of overhead rails, floor rails, main purlins and secondary purlins is used, combined with PVC film and sealing tape to divide the area, thereby achieving flexible partitioning and airtight sealing of the clean room.

Benefits of technology

It realizes the flexible division of clean room areas and simultaneous production, meets the construction and production needs of different areas of high-tech factories, and has good airtight sealing performance and convenient installation characteristics.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223446429U_ABST
    Figure CN223446429U_ABST
Patent Text Reader

Abstract

The utility model discloses a technology factory clean area construction dividing device capable of being adjusted in time, which is arranged between walls on two sides of an air return passageway and comprises a sky rail and a ground rail which are respectively fixed on a suspended ceiling of the air return passageway and the ground, and two ends of the sky rail and two ends of the ground rail respectively extend to the walls. Vertical main keels are transversely arranged between the sky rail and the ground rail at intervals, the two ends of each main keel are fixedly connected with the sky rail and the ground rail respectively, the main keel on the outermost side is fixedly connected with the end of the sky rail and the end of the ground rail, transverse auxiliary keels are vertically arranged between the sky rail and the ground rail at intervals, and each auxiliary keel is connected with the corresponding main keel. A PVC film covering the air return passageway is arranged on the outer side of the main keel, the PVC film is fixed to the main keel through a fastener, and sealing adhesive tape is pasted to the main keel, the sky rail and the ground rail to block abutted seams. The clean area and the non-clean area of the dust-free room can be effectively divided through the stable structure and good airtight plugging, and the requirement that construction and production are conducted at the same time in different areas of the dust-free room is met.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The utility model relates to the technical field of new energy, electronics, pharmaceutical and other high-tech factory temporary segmentation, especially relates to a timely adjustable science and technology factory clean area construction partition device. BACKGROUND

[0002] With the development of new energy, electronics, pharmaceutical and other industries, the demand for high-tech factory is increasing. The development of the industry has always been changing rapidly, because of the continuous updating of technology, the earlier the production, the greater the benefit. Under this background, the construction speed of high-tech factory is constantly refreshed.

[0003] The dust-free room as the main functional area in the high-tech factory is generally large in area. If the production is waited until all the areas are completed, it cannot meet the increasing demand for production capacity. Therefore, a timely adjustable science and technology factory clean area construction partition device is urgently needed. UTILITY MODEL CONTENT

[0004] The utility model aims at providing a timely adjustable science and technology factory clean area construction partition device, which can well divide the dust-free room according to the demand and make the dust-free room produce while constructing.

[0005] The utility model adopts the following technical scheme: a timely adjustable science and technology factory clean area construction partition device is arranged between the walls on both sides of the return air aisle, comprising a sky rail and a ground rail fixed on the return air aisle ceiling and the ground respectively, the two ends of the sky rail and the ground rail are extended to the wall respectively, a vertical main keel is arranged transversely between the sky rail and the ground rail, the two ends of the main keel are fixedly connected with the sky rail and the ground rail respectively, the end part of the outermost main keel is fixedly connected with the sky rail and the ground rail, a horizontal secondary keel is arranged vertically between the sky rail and the ground rail, each secondary keel is connected with each main keel, a PVC film covering the return air aisle is arranged on the outer side of the main keel, the PVC film is fixed on the main keel through fasteners, and the main keel, the sky rail and the ground rail are sealed and spliced by sealing tape.

[0006] Further, the main keel and the secondary keel are U-shaped keels, the middle plate of the main keel is provided with a socket hole, and the secondary keel can be inserted into the socket hole and connected with the main keel.

[0007] Further, the distance between the main keels is between 1.2m and 1.8m, and the distance between the secondary keels is between 0.8m and 1.5m.

[0008] Further, the width of the PVC film is consistent with the distance between the main keels, and the splicing joint of the PVC film is located at the position of the main keel.

[0009] Further, the sealing tape adopts a zebra tape.

[0010] The utility model has the following beneficial effects:

[0011] 1, it is applicable to new energy, electronic, pharmaceutical and other high-tech factory clean workshop, raw material source is extensive, principle and simple manufacturing method, convenient to use, its stable structure and good air seal, can effectively divide dust-free room clean area and non-clean area, satisfy dust-free room different area construction and production requirement of carrying out simultaneously.

[0012] 2, primary and secondary keel adopt modular section pipe joint connection, more easily install, can repeatedly dismount and use many times. Adopt the encapsulation of PVC film, material is cheap, satisfy the light transmission demand. Adopt zebra tape and seal, air seal is good, can satisfy clean workshop air seal requirement, beautiful and have warning effect. BRIEF DESCRIPTION OF DRAWINGS

[0013] Figure 1 It is the structural schematic diagram of the utility model;

[0014] Figure 2 It is the front view of the main keel of the utility model;

[0015] Figure 3 It is the side view of the main keel of the utility model;

[0016] Figure 4 It is the side view of the secondary keel of the utility model;

[0017] Figure 5 It is the schematic diagram of the installation of the main keel of the utility model;

[0018] Figure 6 It is the top view of the main keel arrangement of the utility model;

[0019] Figure 7 It is the schematic diagram of the installation of the secondary keel of the utility model;

[0020] Figure 8 It is the schematic diagram of the installation of the PVC film of the utility model;

[0021] Figure 9 It is the schematic diagram of the paste of the zebra tape of the utility model.

[0022] In the drawing: 1, the sky rail; 2, the ground rail; 3, the main keel; 4, the secondary keel; 5, the PVC film; 6, the zebra tape. DETAILED DESCRIPTION

[0023] In order to better understand the purpose, structure and function of the utility model, the following will be further described in detail to the clean area construction partition device of the science and technology factory of the utility model in combination with the drawings.

[0024] As Figure 1As shown, a clean area construction partition device of a technology factory which can be adjusted in time is arranged between the walls on both sides of the return air aisle, comprising a sky rail 1 and a ground rail 2 fixed on the ceiling and the ground of the return air aisle respectively, the two ends of the sky rail 1 and the ground rail 2 are extended to the walls respectively, vertical main keels 3 are arranged transversely between the sky rail 1 and the ground rail 2, the two ends of the main keels 3 are fixedly connected with the sky rail 1 and the ground rail 2 respectively, the outermost main keel 3 is fixedly connected with the end of the sky rail 1 and the ground rail 2, transverse secondary keels 4 are arranged vertically between the sky rail 1 and the ground rail 2, each secondary keel 4 is connected with each main keel 3, PVC membranes 5 covering the return air aisle are arranged on the outer side of the main keels 3, the PVC membranes 5 are fixed on the main keels 3 through fasteners, and sealing tapes are pasted on the main keels 3, the sky rail 1 and the ground rail 2 to block the joints.

[0025] As shown in the drawings, Figures 2-4 In the embodiment, the main keels 3 and the secondary keels 4 are all U-shaped keels, the middle plate of the main keel 3 is provided with a socket hole, and the secondary keel 4 can be inserted into the socket hole and connected with the main keel 3 in a socket manner.

[0026] As shown in the drawings, Figures 5-9 The installation process of the utility model is as follows:

[0027] 1. Main keel installation: according to the area where the partition device needs to be installed, the installation position and interval of the main keel 3 are calculated, and the interval is generally selected to be between 1.2m and 1.8m. According to the determined size, the site is measured and laid out.

[0028] The sky rail 1 and the ground rail 2 are fixed at the top and bottom of the return air aisle respectively, and the track material and size are the same as those of the main keel 3. After the installation of the sky rail 1 and the ground rail 2 is completed, the vertical main keel 3 is installed in sequence from left to right, the two ends of the main keel 3 are connected with the sky rail 1 and the ground rail 2 respectively, and the connection is fixed by screws.

[0029] 2. Secondary keel installation: the installation interval of the secondary keel 4 is determined according to the height where the partition device needs to be installed, and the installation interval of the secondary keel 4 needs to be determined in advance, so as to reserve the position of the socket hole when the main keel 3 is customized. The connection between the main keel 3 and the secondary keel 4 adopts a socket mode.

[0030] 3. PVC membrane installation: after the main and secondary keels are completely installed, the PVC membrane 5 is installed. The installation sequence is from top to bottom and from left to right. Ensure that the PVC membrane 5 is installed flat and straight. The PVC membrane 5 is fixed to the main keel 3 by screws, and the interval between the fixed points is not greater than 300mm, so as to ensure that the partition device is airtight. The main keel 3, the secondary keel 4 and the PVC membrane 5 are detachable, and can be flexibly disassembled on site according to the area where the partition device needs to be installed.

[0031] Because the clean room clean area has high requirement on the cleanliness, after the primary and secondary keels are installed in place and the PVC film 5 is fixed, air-tight sealing is performed on the positions of all joints, and 50mm wide zebra adhesive tape 6 is used to be pasted along the positions of the joints to ensure good air-tight sealing.

[0032] During actual design and construction, the spacing between the primary keel and the secondary keel can be flexibly adjusted according to the horizontal width and vertical height of the installation partition device area. The installation spacing of the primary keel 3 is generally selected to be between 1.2m and 1.8m, and the installation spacing of the secondary keel 4 is generally selected to be between 0.8m and 1.5m, and exceeding the spacing will affect the safety of the partition device. The width of the PVC film 5 is generally between 1.2m and 1.8m, and the spacing of the primary keel 3 is required to be exactly equal to the width of the PVC film 5, so that the joint of the PVC film 5 is located at the position of the primary keel 3, which can facilitate the fixation and the finished product is beautiful.

[0033] It can be understood that the utility model is described through some embodiments, and those skilled in the art know that various changes or equivalent replacements can be made to these features and embodiments without departing from the spirit and scope of the utility model. In addition, under the guidance of the utility model, these features and embodiments can be modified to adapt to specific conditions and materials without departing from the spirit and scope of the utility model. Therefore, the utility model is not limited by the specific embodiments disclosed herein, and all embodiments falling within the scope of the claims of the present application belong to the scope protected by the utility model.

Claims

1. A timely adjustable clean area construction partitioning device for a technology factory, characterized in that: The invention is provided between the walls on both sides of the return air duct, and includes a ceiling rail (1) and a ground rail (2) respectively fixed to the ceiling and the ground of the return air duct, wherein both ends of the ceiling rail (1) and the ground rail (2) extend to the wall, and a vertical main keel (3) is arranged horizontally between the ceiling rail (1) and the ground rail (2), and both ends of the main keel (3) are fixedly connected to the ceiling rail (1) and the ground rail (2), wherein the outermost main keel (3) is fixedly connected to the end of the ceiling rail (1) and the ground rail (2), and a horizontal secondary keel (4) is arranged vertically between the ceiling rail (1) and the ground rail (2), and each secondary keel (4) is connected to each main keel (3). A PVC film (5) covering the return air duct is arranged on the outer side of the main keel (3), and the PVC film (5) is fixed to the main keel (3) by fasteners. Sealing tape is pasted on the main keel (3), the ceiling rail (1) and the ground rail (2) to seal the joints.

2. The timely adjustable clean area construction partitioning device for a science and technology factory according to claim 1 is characterized in that: The main keel (3) and the secondary keel (4) are both U-shaped keels. The middle plate of the main keel (3) is provided with a socket hole, and the secondary keel (4) can be inserted into the socket hole and connected to the main keel (3) by a socket hole.

3. The timely adjustable clean area construction partitioning device for a science and technology factory according to claim 1 or 2, characterized in that: The spacing between the main keels (3) is between 1.2 meters and 1.8 meters, and the spacing between the secondary keels (4) is between 0.8 meters and 1.5 meters.

4. The timely adjustable clean area construction partitioning device for a science and technology factory according to claim 1 is characterized in that: The width of the PVC membrane (5) is consistent with the spacing between the main keels (3), and the joint of the PVC membrane (5) is located at the position of the main keels (3).

5. The timely adjustable clean area construction partitioning device for a science and technology factory according to claim 1 is characterized in that: The sealing tape is zebra tape (6).