Mark post for measuring house building construction
By installing a transparent sleeve inside the benchmark to hold liquid media and gravity balls, combined with adjustable feet and friction surface structure, the verticality and stability problems of traditional benchmarks in outdoor construction are solved, and high-precision measurements are achieved in changing environments.
Patent Information
- Application Number
- CN202423035547.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-10
- Publication Date
- 2025-10-24
- Estimated Expiration
- 2034-12-10
AI Technical Summary
Traditional benchmarks are difficult to maintain vertically during outdoor construction measurements. The external environment interferes with measurements, resulting in unstable measurements. The handheld method also causes worker fatigue, affecting the accuracy of measurement data.
The benchmark design adopts a transparent sleeve containing liquid medium, combined with a gravity ball and adjustable feet. It uses buoyancy and gravity to keep the benchmark upright, and improves stability through a friction surface structure to adapt to uneven ground.
Maintaining the verticality and stability of the benchmark in windy and uneven ground environments improves measurement accuracy, reduces worker fatigue, and enhances practicality.
Smart Images

Figure CN223470657U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to house building construction technical field especially, relate to a house building construction surveying and mapping with a standard pole. BACKGROUND
[0002] House building refers to the top cover, beam column, wall, foundation and can form internal space, satisfy people's production, residence, study, public activity needs engineering, house building construction often needs to use the surveying and mapping with the standard pole and carries out the line.
[0003] But the standard pole of traditional use does not have the function of supporting and adjusting, usually is the manual use handheld mode to make it reach the stable effect, and the standard pole and horizontal plane are difficult to guarantee vertical, and handheld time is too long after causing the staff hand sore problem, further influence the stability of standard pole in the measuring process, greatly influence the accuracy of measurement data.
[0004] The patent document with application No. 202220470423.X discloses a house building construction surveying and mapping with a standard pole, the standard pole is adjusted to the vertical state through the setting of the water storage cavity and the buoyancy plate, the standard pole solves the problem of difficult guaranteeing vertical, and the structure is simple and the operation is simple. However, our company found some deficiencies in the use process, mainly in, because house building construction is mostly in the environment variable outdoor, the standard pole has no protection device on the outside of the standard pole body, after the standard pole body is vertical, under the action of wind force, the standard pole will occur the phenomenon of drifting, causing the unstable display of the value on the standard pole, which brings inconvenience to the measurement. UTILITY MODEL CONTENTS
[0005] The technical problem to be solved by the utility model is to provide a house building construction surveying and mapping with a standard pole that can quickly realize verticality and is not disturbed by external environment.
[0006] The utility model adopts the technical scheme in the solution to the technical problem: the house building construction surveying and mapping with a standard pole, including base, the transparent sleeve for containing liquid medium being set on the base, the standard pole body being set in the transparent sleeve and the gravity ball being connected at the bottom of the standard pole body.
[0007] The bottom of the base is provided with adjustable supporting legs, and the bottom of the transparent sleeve is closed and provided with a liquid inlet and outlet.
[0008] Further, the transparent sleeve includes a bottom sleeve body, a middle sleeve body and a top sleeve body, and the upper and lower ends of the middle sleeve body are connected with the top sleeve body and the bottom sleeve body respectively.
[0009] Further, the bottom sleeve body includes a barrel portion and a neck portion, the barrel portion is drop-shaped, the bottom surface of the barrel portion is provided with the liquid inlet and outlet, and the liquid inlet and outlet is provided with a plug.
[0010] Further, the middle part of the base is provided with a bottom support, and the middle part of the bottom support is provided with a containing ring matched with the water-drop-shaped bottom.
[0011] Further, the upper end of the top sleeve body is provided with a top cover, and the inner surface of the top cover has a friction surface structure.
[0012] Further, the middle sleeve body is integrally formed; or the middle sleeve body is a multi-segment assembly structure.
[0013] Further, the bottom of the marker body is provided with a first connecting hole, the gravity ball comprises a spherical body and a connecting part connected with the spherical body at one end, and the other end of the connecting part is connected in the first connecting hole.
[0014] Further, the first connecting hole is provided with an internal thread, and the connecting part is provided with an external thread matched with the internal thread.
[0015] Further, the marker body comprises a plurality of marker segments, and the plurality of marker segments are assembled to form the marker body.
[0016] Further, the transparent sleeve is made of glass or resin material.
[0017] The house building construction measurement marker comprises a sleeve, a marker body and a gravity ball, liquid medium is filled in the sleeve, the marker body is arranged in the sleeve and the bottom of the marker body is arranged in the liquid medium, therefore, under the action of the buoyancy and the gravity ball, the marker body can quickly be in a vertical state, and under the action of the sleeve, the marker body will not shake due to floating in some windy environments, and the practicality is higher. In addition, the base is provided with an adjustable support, and the adjustable support can be used when the slope is large or the bottom surface is too uneven, so that the marker body does not interfere with the inner wall of the sleeve and the verticality is not affected, and the measurement accuracy can be effectively ensured. BRIEF DESCRIPTION OF DRAWINGS
[0018] The utility model will be described further below by combining with the drawings and examples, and the drawings are as follows:
[0019] Figure 1 is the structure schematic diagram of the house building construction measurement marker of the utility model example;
[0020] Figure 2 is the structure schematic diagram of the house building construction measurement marker of the utility model example;
[0021] Figure 3 is the side view of the house building construction measurement marker of the utility model example;
[0022] Figure 4 is Figure 3Sectional view along A-A;
[0023] Figure 5 is a partial structure schematic view of the utility model embodiment house building construction surveying staff;
[0024] Figure 6 is a partial structure schematic view of the utility model embodiment house building construction surveying staff.
[0025] Mark explanation:
[0026] 1, base;11, adjustable foot;2, transparent sleeve;21, bottom sleeve body;22, middle sleeve body;23, top sleeve body;3, staff body;4, gravity ball;5, bottom support;51, containing ring. Specific implementation
[0027] In order to have more clear understanding to the technical features, object and effect of the utility model, now the specific implementation of the utility model is explained in detail with the drawings.
[0028] As Figures 1-6 Indicated, the house building construction surveying staff, including base 1, be set up on base 1 for filling liquid medium transparent sleeve 2, be set up in transparent sleeve 2 staff body 3 and the gravity ball 4 of connection in staff body 3 bottom;
[0029] The base 1 bottom sets up adjustable foot 11, the bottom of transparent sleeve 2 is closed and bottom sets up inlet and outlet.
[0030] The house building construction surveying staff, including sleeve, staff body 3 and gravity ball 4, wherein filling liquid medium in sleeve, staff body 3 is placed in sleeve and bottom enters liquid medium, therefore under the action of buoyancy and gravity ball 4, staff body 3 can be quickly in vertical state, again because of the action of sleeve, therefore when using in some windy environment, will not occur because of floating and shaking, practicality is stronger. In addition, base 1 sets up adjustable support, can be used when using in the slope is greater or too uneven bottom surface, causes staff body 3 to touch sleeve inner wall and causes the interference vertical situation, can effectively guarantee the accuracy of measurement.
[0031] For the carrying and transportation of the house building construction surveying staff, the transparent sleeve 2 includes bottom sleeve body 21, middle sleeve body 22 and top sleeve body 23, the upper and lower ends of the middle sleeve body 22 are connected to the top sleeve body 23 and the bottom sleeve body 21 respectively. In this embodiment, the sleeve is made of glass or resin material.
[0032] Among them, the middle sleeve body 22 is integrally formed;Or, the middle sleeve body 22 is a multi-segment assembly structure.
[0033] To prevent the pole body 3 located in the middle of the bottom sleeve body 21 from frequently colliding with the wall of the sleeve, the bottom sleeve body 21 comprises a sleeve body part and a neck part, the sleeve body part is water-drop-shaped, the bottom surface of the sleeve body part is provided with the liquid inlet and outlet, and the liquid inlet and outlet is provided with a plug. The water-drop-shaped structure can firstly place the pole body 3 to be clamped at a position to interfere with the wall of the sleeve, and secondly provide a larger space for the gravity ball 4 to move, so as to prevent the gravity ball 4 from colliding with the wall of the bottom sleeve body 21.
[0034] After the bottom sleeve body 21 is filled with liquid medium, the weight of the bottom sleeve body 21 is increased, in order to effectively prevent the bottom sleeve body 21 from being displaced relative to the base 1 and to ensure the stability of the measurement, the middle part of the base 1 is provided with a bottom support 5, and the middle part of the bottom support 5 is provided with a containing ring 51 matched with the water-drop-shaped bottom. The structure of the bottom support 5 can also avoid damaging the bottom sleeve body 21 and has a protective effect on the bottom sleeve body 21.
[0035] In addition, after the pole body 3 is vertically erected, the top sleeve body is provided with a top cover, and the inner surface of the top cover is provided with a friction surface structure. The friction surface structure contacts the top of the pole body 3, and under the working action of the pressure of the top cover and the buoyancy, the stability of the pole body is effectively improved.
[0036] In order to facilitate the carrying of the pole body 3, the pole body 3 comprises a plurality of pole segments, and the plurality of pole segments are assembled to form the pole body 3. Of course, in other embodiments, an integrated pole body 3 can also be used. The bottom of the pole body 3 is provided with a first connecting hole, the gravity ball 4 comprises a ball body part and a connecting part connected to one end of the ball body part, and the other end of the connecting part is connected in the first connecting hole. In this embodiment, the first connecting hole is provided with an internal thread, and the connecting part is provided with an external thread for engaging with the internal thread. The detachable gravity ball 4 can be replaced according to different liquid media, so that the pole body 3 can be extended to a suitable height.
[0037] Finally, it should be noted that in this document, the terms such as first and second are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between the entities or operations. Moreover, the terms "include", "contain" or any other variants thereof are intended to cover non-exclusive inclusion, so that the process, method, article or equipment including a series of elements not only includes those elements, but also includes other elements not explicitly listed or inherent to such process, method, article or equipment. Without more limitations, the element defined by the statement "including a" does not exclude the presence of other identical elements in the process, method, article or equipment including the element.
[0038] Obviously, the above embodiments are merely exemplary and not intended to limit the embodiments. Based on the above description, one of ordinary skill in the art can make other different forms of changes or modifications. Here, all the embodiments are not required to be exhaustive. The obvious changes or modifications derived therefrom are still within the protection scope of the present application.
Claims
1. A pole for construction surveying, characterized in that, The utility model relates to a liquid medium display device, including base (1), set up on base (1) for containing liquid medium's transparent sleeve (2), set up in transparent sleeve (2) in the staff body (3) and connect in gravity ball (4) of staff body (3) bottom part, The bottom of the base (1) is provided with an adjustable supporting leg (11), and the bottom of the transparent sleeve (2) is closed and provided with an inlet and outlet.
2. The pole for housing construction surveying according to claim 1, characterized in that, The transparent sleeve (2) comprises a bottom sleeve body (21), a middle sleeve body (22) and a top sleeve body (23), and the upper and lower ends of the middle sleeve body (22) are connected with the top sleeve body (23) and the bottom sleeve body (21) respectively.
3. The pole for housing construction surveying according to claim 2, characterized in that, The bottom sleeve body (21) comprises a barrel part and a neck part, the barrel part is in the shape of a water droplet, the inlet and outlet are arranged on the bottom surface of the barrel part, and a plug is arranged in the inlet and outlet.
4. The pole for housing construction surveying according to claim 3, characterized in that, The middle part of the base (1) is provided with a bottom support (5), and the middle part of the bottom support (5) is provided with a containing ring (51) matched with the water droplet-shaped bottom.
5. The pole for housing construction surveying according to claim 3, characterized in that, The upper end of the top sleeve body is provided with a top cover, and the inner surface of the top cover has a friction surface structure.
6. The pole for housing construction surveying according to any one of claims 2 to 5, characterized in that The middle sleeve body (22) is integrally formed, or the middle sleeve body (22) is a multi-segment assembly structure.
7. The pole for housing construction surveying according to any one of claims 1 to 5, characterized in that The bottom of the staff body (3) is provided with a first connecting hole, the gravity ball (4) comprises a ball body and a connecting part connected with one end of the ball body, and the other end of the connecting part is connected in the first connecting hole.
8. The pole for housing construction surveying according to claim 7, characterized in that, The first connecting hole is provided with an internal thread, and the connecting part is provided with an external thread for engaging with the internal thread.
9. The pole for housing construction surveying according to any one of claims 1 to 5, characterized in that, The staff body (3) comprises a plurality of staff segments, and the plurality of staff segments are assembled to form the staff body (3).
10. The pole for housing construction surveying according to any one of claims 1 to 5, characterized in that The transparent sleeve (2) is made of glass or resin material.
Citation Information
Patent Citations
Mark post for building construction measurement
CN216846286U